PV Plant
Storage Plant PV
t Control Stor
Genset / Load Plant Control
Needed for Commissioining G
SMA - Request for Quotation - Sunny Central PV Inverter, Sunny Centra
COMMERCIAL INFORMATION
Contact Information
Customer Company Name
Customer Commercial Contact - Name
Customer Commercial Contact - Email
Customer Technical Contact - Name
Customer Technical Contact - Email
Main technical contact in Commissioning phase (Decider)
Main technical contact in Commissioning phase (Engineer / Foreman)
SMA Commercial Contact - Name
SMA Technical Contact - Name
General Information
Project Name
Project Location / Ship-to location
Project Adress and/or GPS coordinates
Proximity to the sea, other aggressive environment
System Owner
Interconnect Utility
Prevailing Wage (for USA only)
Is this project subject to the payment of prevailing wages?
Is this a Federal or State funded project?
[For California only] Has a PWC 100 form been completed and the Project
has been registered with the Department of Industrial Relations?
Expected Schedule
Date of request
Quote Due Date / Needed Date of Answer
Planned Supplier Selection Date
Planned Date of PO - NTP
Equipment Delivery on Site Date
Planned Schedule of Commissioning (Timeline)
Start of Commercial Operation
Other Information
Special Packing & Transportation Requirements
FAT Requirements & Scheduling
Service and /or Availibility Requirements
Spare Parts Requirement
Annual maintenance of SMA products by customers or by SMA
Miscellaneous
TECHNICAL INFORMATION
PV Plant Information
Active Power at POI
Required Power Factor at POI
Aux Power Factor Equipment
Voltage Level at POI
Tolerance of AC voltage at POI
Collector Voltage of Medium Voltage Transformer on MVPS
Medium Voltage Transformer Winding Configuration
Operating Temperature Range
Elevation
PV Information
Module Manufacturer
Module Model Number
Module Power Class
DC Array Size
Planned String Size
Tracker AC Power
Needed Scope of Supply of SMA
Inverter (if known)
Inverter Quantity
Inverter + MV Transformer + MV Switchgear
Power Management System / Plant Controller
Storage Plant Information
AC or DC coupled
Active Power at POI
Required Power Factor at POI
Voltage Level at POI
Tolerance of AC voltage at POI
For HV connection please provide uk and efficiency of HV Transformer
Operating Temperature Range
Design Operating Temperature
Elevation
Application Description
Modes of Operation
Mission Profile
Technical Specification
Grid Code
P(f) or droop curve in inverter?
Grid stability services needed*
Inertia amount*
Short Circuit Ratio at POI (from grid S_Plant/S_gen) *
Needed Short Circuit Level @ POI*
Handling in case of communication error
* only for special Applications with Grid Forming
Battery Information
DC Voltage Range
DC Voltage Range at Nominal Operation
Battery Rack Energy Content (kWh)
Battery Rack Power (kW)
Number of Racks connected per DC input / SLD available?
Battery Rack Prospective Peak Short Circuit Current (kA)
Fuse Pre-Arcing Integral I²t per DC input (A²s) / SLD available?
Battery Manufacturer and Model
Battery Management System and Model Number
Needed Scope of Supply of SMA
DC / DC Converter (only DC coupled)
DPS-500 Quantity per Inverter
Inverter (only AC coupled)
Inverter Quantity
Inverter + MV Transformer
Inverter + MV Transformer + MV Switchgear
Power Management System / Plant Controller
Plant Control Information
Power Management System / Plant Controller
Is the SMA PPM connected to other control devices?
Will a SCADA system be used
Communication network 1
Communication network 2
Interfaces with PPM (quantity and protocol)
Telecontrol Interface, DI/Os?
PQ meter
System / Apllication Information
Grid Studie availailable
Active Power Control
Frequency Response function 1
Frequency Response function 2
Frequency Response function 3
Active Power Control settings
Reactive Power Control
Reactive Power Control settings
Reactive Power Compensation
Prioritization of Active or Reactive Power
Voltage Stabilisation / FRT
Blackstart / Sync.
Inertia on plant level
Inertia amount
SCR (Short Circuit Ratio) at POI (from grid S_Plant/S_gen)
Needed SCL (Short Circuit Level) @ POI
Plant Operation Service / EnergyMarket Participation?
Fallbackhandling Mode (Controller / SCADA)
Fallbackhandling (Controller / SCADA)
Fallbackhandling PV inverter
Fallbackhandling Storage inverter
Q on demand
Genset System
Fuel type
number of gensets
power rating per genset
genset control (manual / automatic)
Asynchronous or droop mode
Load profile
Annual energy consumption
Minimum load
maximum load
nnon lood
average load power factor
Load profile
Seasonal variable
Needed Scope of SMA for Cx
Site Acceptance Test
Validationtest
Capacitytest
Communication test bevor Cx required (via VPN with SMA rest lab)
Functional description document
Grid simulation support
System size support
Needed Information
IP address list including device IDs
Single Line Diagram whole plant
Communication Single Line Diagram
How is the local access to the system planned by the service
Access to Station
Local features to be considered
Which remote dial-in does the customer want to make available to us for
later support? Information about the possibilities.
Technical Information
Which MVSG protection settings should be used?
Information about transformer protection, transfer station, converter types,
data sheet, network connection
Which tap changer position should be set on the MVT
Which MV cable types are used?
Grounding concept?
Insulation check of the DC main cable
System and Device Parameter set according to the grid requirements
Additional Cx Information
Service Relevant contract components beyond the standard
Has the customer installed everything according to SMA documentation
(installation guidelines)?
Inverter, Sunny Central Storage Battery Inverter, MVPS Medium Voltage Powe
> Values with cells highlighted in light blue are
mandatory, as they ensure that SMA can provide
a suitable technical offering
Customer
Example Customer
Customer
Example Project
Customer
Customer
Customer
Customer
- select -
- select -
Customer
Customer
- select -
- select -
- select -
Customer
- select -
- select -
Customer
Customer
- select -
- select -
- select -
- select -
- select -
Customer
- select -
- select -
- select -
- select -
- select -
- select -
- select -
Customer
- select -
- select -
- select -
- select -
- select -
- select -
- select -
- select -
- select -
- select -
- select -
- select -
- select -
- select -
Customer
- select -
- select -
Customer
- select -
- select -
Customer
- select -
- select -
- select -
- select -
- select -
- select -
- select -
Customer
Customer
SMA
ttery Inverter, MVPS Medium Voltage Power Station, Power Plant Manager
Comments
Comments
Comments
Explanation
Explanation
e.g. dirt road transportation
e.g. Preventive Maintainence, Extended Warranty, Availability Warranty
Explanation
e.g. 200MW - Total active power requirement at medium voltage level
Power Factor: e.g. 1 or 0.95
e.g. 1 MVAr
e.g. 20 kV
e.g. ±5 % at full power
if other:
select
e.g. -20°C to +40°C
e.g. <1000m
Explanation
Please provide module data sheet
e.g. 5 MW
e.g. 20 kW
Explanation
If already known, select the model
e.g 10
Medium Voltage Power Station (MVPS), with MV Switchgear
YES/NO - if yes, please provide detailed requirements
Explanation
select AC coupled for stand-alone or co-located storage projects, select DC coupled for PV + Storage
e.g. 20MW - Total active power requirement at medium voltage level
Power Factor: e.g. 1 or 0.95
e.g. 20 kV
e.g. ±5 % at full power
e.g. uk=12 %; eta=99.2 %
e.g. -20°C to +40°C
e.g. 30°C (at which the system has to provide its full power)
e.g. <1000m
e.g. Primary Control Reserve, Peak shaving; Load Shifting
e.g. Grid tied P&Q Commands, Grid forming, Black-Start capability, ..etc
Cycles per day, load profile etc., Needed for extendend warranty.
Please provide all relevant technical specification documents
e.g. IEEE 1547-2018 or VDE-AR-4110 or … (relevant for parameter settings and inverter options)
YES/NO - if yes, please provide information
YES/NO - if yes, please provide information and fill the following 3 columns
e.g. H*P = 150 MWs or H = 5s
e.g. 2 (low), 5 (medium), 8 (high)
e.g. 240 MVA (140 ms)
e.g. inverter should do only frequency response
Explanation
Maximum voltage range of battery
"Usable" voltage range of battery
e.g. 200 kWh
e.g. 100 kW
e.g. 8
e.g. 10 kA
e.g. 4 MA²s, please refer to SMA PQ Tool
needed, if SMA integrates BMS into inverter control
needed, if SMA integrates BMS into inverter control, or via ext. Controller
Explanation
For DC coupled with Sunny Central PV inverter
1-6 per inverter possible
If already known, select the model, if not known select YES
e.g 10
Medium Voltage Power Station (MVPS), without MV Switchgear
Medium Voltage Power Station (MVPS), with MV Switchgear
YES/NO - if yes, please provide detailed requirements
Explanation
YES/NO
YES/NO - if yes, please provide information
YES/NO - if yes, please provide information
Communication network 1 is plant network: Communication diagram + IP adress list required
Communication network 2 is inverter network: Communication diagram + IP adress list required
Please provide descrption and signallist(s); Communication SLD refered
If I/Os are needed please provide type and number
internal external HyC, Model
Explanation
YES/NO - if yes, please provide information
Please select all needed functions
if one is selected, please provide requirements-
if one is selected, please provide requirements-
if one is selected, please provide requirements-
Please describe requirments. (Ramp time fall and raise, dynamic requirements and filter times)
Please describe requirments. (Ramp time fall and raise, dynamic requirements and filter times)
if one is choosen, please provide requirements
Please provide FRT reuqirments
YES/NO - if yes, please provide parameter
e.g. H*P = 150 MWs or H = 5s
e.g. 2 (low), 5 (medium), 8 (high)
e.g. 240 MVA (140 ms)
YES/NO - if yes, please provide Application desciption
What should happend after Fallbackmode (time)
What should happend after Fallbackmode (time)
What should happend after Fallbackmode (time)
YES/NO; if yes number of inverter
Explanation
YES/NO - if yes, please provide detailed requirements
kVA
genset controller model / type
Explanation
kWh
kW
kW
kW
constant load, daytime / noon peak or eveniong/morning peak
YES/NO - if yes, please provide information
Explanation
standard SAT includes: open/closed loop P+Q control, basic function test, test for P+Q control mode
STANDARD/ADDITION tests: If additional , please specify
YES/NO - if yes, please provide detailed information
YES/NO - if yes, please provide detailed information
YES/NO - if yes, please provide detailed information
YES/NO
YES/NO
YES/NO
Explanation
e.g. code key, access via company X
Explanation
Standard or system specific? If system specific these must be checked for technical plausibility
Pleae provide measurement report
Explanation
SMA to check during Commissioning
Sunny Central (PV) and Sunny Central Storage (Ba
MVPS-S2-(US) - Medium Voltage Power
DPS-500 DC /DC Converter
SMA Power Plant Manager
entral Storage (Battery) Inverter
um Voltage Power Station
C /DC Converter
Plant Manager
TECHNICAL CLARIFICATION (Com
Project: Example Project
Service/Material Description: Example MVPS, SCS UP or SC UP…
Customer: Example Customer
Reference Document(s): …
Item Section/Topic Date Party
mm/dd/yyyy SMA
mm/dd/yyyy Client Company Name
0 Example Section 3, Item 1 mm/dd/yyyy SMA
T.01
T.02
T.03
T.04
T.04
T.05
T.06
T.07
T.08
T.09
T.10
T.10
L CLARIFICATION (Compliance Matrix/ Deviation List)
oject
S, SCS UP or SC UP…
omer
Description
SUPPLIER does not offer xxx
PURCHASER requests that xxx
Noted & Closed
Do not use this line - Insert line above
Do not use this line - Insert line above
Do not use this line - Insert line above
Do not use this line - Insert line above
Do not use this line - Insert line above
Do not use this line - Insert line above
Do not use this line - Insert line above
Do not use this line - Insert line above
Do not use this line - Insert line above
Do not use this line - Insert line above
Do not use this line - Insert line above
Status
CLOSED
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
PV Configurator - SC-(UP) and MVPS-S2
Option Code* for SMA Sunny Central and 20ft. Medium Voltage Power Station (IEC)
*Not applicable for 20ft. UL MVPS-S2-US + SC (-UP) US versions
Customer Company Name: Example Customer
Project Name: Example Project
Form Change Date: (dd/mm/yyyy)
Status: - select -
1. Select SC Model: - select -
2. Select MVPS Model - select -
Note: Graph shows max. power for SC/MVPS combination (Vdc limit, PF=1, nominal AC voltage), for detailed sizing according to SC/MVPS Power
project specifications, please refer to data sheets and SMA Application Enginnering. 12
Altitude option of SCS selected: Please select Option Code below 10
Temperatur option MVPS selected: Please select Option Code below
Power/ kVA
8
Ambient Temperature Grid-Feed [kVA] 6
30°C: n/a
35°C: n/a 4
40°C: n/a
2
45°C: n/a Grid-Feed
50°C: n/a 0
15 20 25 30 35 40 45 50 55
55°C: n/a
Temperature / °C
3. Enter Quantity SC/MVPS 0
4. DC Coupled Storage - select -
5. Select Quantity of DC-DC (DPS-
500) per Inverter - select -
6. Select Option Code:
Inverter SC-(UP) Option (drop down list)
1. DC Grounding - select -
2. DC Connection - select -
3. DC Input Configuration - select -
4. DC Fuse Rating - select -
200A 250A 315A 350A 400A
230
5. DC String Monitoring - select -
6. DC Insulation Monitoring - select -
7. Inverter Aux Power Supply - select -
8. Auxiliary Supply for MVPS or - select -
external Loads
9. Communication System A - select -
10. Communication System B - select -
11. Remote I/O - select -
12. Q@Night - select -
(optional: enter number of inverters and - select -
select option accordingly)
(optional: enter number of inverters and - select -
select option accordingly)
13. MV Transformer Type - select -
14. Lightning Surge Suppression - select -
15. Extended Aux Buffer - select -
16. AC-Preparation for PQ-Meter - select -
(optional: enter number of inverter and - select -
select option accordingly)
(optional: enter number of inverter and - select -
select option accordingly)
17. Mounting Plate at Door - select -
18. Enclosure - select -
19. Temperature - select -
20. Altitude - select -
MVPS-xxxx-S2-10(-11) Option (drop down list)
1. Nominal Medium Voltage - select -
2. Nominal Frequency - select -
3. Transformer Vector Group - select -
4. Transformer Tap Changer - select -
5. Transformer Shield Winding - select -
6. Transformer Load Profile - select -
7. Transformer Losses - select -
8. Transformer Inrush Current - select -
9. Oil Containment - select -
10. MV Switchgear - select -
11. Short Circuit Rating MVSG - select -
12. Accessories MVSG - select -
13. Protection MV Switchgear - select -
14. Safety Equipment - select -
15. Monitoring - select -
16. Accessories MVPS - select -
17. Cable Entry Kit - select -
18. LV Transformer - select -
19. Ambient Temperature - select -
20. Environment - select -
21. Earthquake and Storm Package - select -
22. Transportation Package - select -
23. Language (documentation) - select -
24. Customized Solution - select -
Version 3.41
C-(UP) and MVPS-S2
tage Power Station (IEC)
**Top down editing**
to be filled = 32
ok =
to be checked =
Check
SC/MVPS Power
12
10
Power/ kVA
2
Grid-Feed
0
15 20 25 30 35 40 45 50 55
Temperature / °C
Explanation Check
400A 450A 500A
Note: ***Selection of MOXA controller only, if additional signals from
customer need to be handled via remote I/O controller***
Explanation Check
Note:***Reduced Inrush Current option available for 20kV or 21kV/50Hz
(Other applications can be handled as customized solution)***
Select "Nominal Medium Voltage" first
Select "MV Switchgear" first
Select "Short Circuit Rating MVSG" first
Select "Safety Equipment" and "Accessories MVSG" first
For customized solutions, please provide full description in Technical
Clarification tab
- select -
Work in Progress
Completed
- select -
n/a
- select -
without MVPS
MVPS-2200-S2-11
MVPS-2475-S2-11
SC 2660 UP
MVPS-2660-S2-10
MVPS-2800-S2-10
MVPS-2930-S2-10
MVPS-3060-S2-10
MVPS-4000-S2-10
MVPS-4200-S2-10
MVPS-4400-S2-10
Yes (with charging AC)
No
Preparation of inverter DC input for adding DC-DC converters later
DC coupled operation included, battery to grid discharging only
DC coupled operation included, battery discharging and charging from grid possible
n/a
n/a
n/a
SC 4600 UP
- select -
0
###
###
###
###
###
###
unevenly distributed
et of 6
- select -
ts of 3
- select -
32 fused inputs
36 x 1-pol PV + 6 battery inputs
UPSys DC-Fuse
- select -
- select -
internal (tOVP)
Select "Inverter Aux power supply" first
2.5 kVA / 230 V
- select -
Ethernet RJ45
(optional) - Select "Communication System A" first
Managed Switch MMF Backbone
(optional)
Single busbar
- select -
No
Yes
Inverter with reactive power provision during feed-in operation and non-feed-in operation (night). Mandatory for -40C temperature option (No. 20)
- select -
2-Winding Transformer
4-Winding Transformer
Yes
###
(optional)
Yes
Yes
- select -
Yes, for all devices
@1200Vdc
###
- select -
-40 … 60°C (35°C)
- select -
0 to 1000m
1001 to 2000m
- select -
- select -
-25 … 60°C (35°C)
n/a
- select -
50 Hz
- select -
Dy11 (Standard)
- select -
Without
- select -
Without
- select -
12 hours
- select -
Standard
n/a
Standard
Strongly Reduced
Without
n/a
Without
n/a
Without
n/a
Without
Auxiliary Contacts (recommended)
Remote Control
- select -
- select -
n/a
Without
- select -
Without
n/a
Without
- select -
Without
-25°C to +45°C
-25°C to +55°C
-35°C to +55°C
Harsh
- select -
Without
- select -
Road transport
- select -
DE: German
EN: English
FR: French
ES: Spanish
STORAGE Configurator - SCS-(UP) and MVPS-S2
Option Code* for SMA Sunny Central Storage and 20ft. Medium Voltage Power Station (IEC)
*Not applicable for 20ft. UL MVPS-S2-US + SCS (-UP) US versions
Customer Company Name: Example Customer
Project Name: Example Project
Form Change Date: (dd/mm/yyyy)
Status: - select -
1. Select SCS Model: - select -
2. Select MVPS Model - select -
Note: Graph shows max. power for SCS/MVPS combination (SCS UP (-XT) @1200Vdc, PF=1, nominal AC voltage), for detailed sizing
according to project specifications, please refer to SMA PQ-Tool!
Altitude option of SCS selected: Please select Option Code below
Temperatur option MVPS selected: Please select Option Code below
Ambient Temperature Grid-Feed [kVA] Charging [kVA]
20°C: n/a n/a
25°C: n/a n/a
40°C: n/a n/a
45°C: n/a n/a
50°C: n/a n/a
55°C: n/a n/a
3. Select Option Code:
Inverter SCS-xxxx(-UP)(-XT) No. of devices Option (drop down list)
1. Grid Forming/Black Start - select -
(optional: enter 2 different number of devices - select -
and select option accordingly)
2. Inverter Aux Power Supply - select -
- select -
3. Auxiliary Supply for MVPS or - select -
external Loads
- select -
4. Communication System A all - select -
5. Communication System B - select -
(optional: enter 2 different number of devices - select -
and select option accordingly)
6. Remote I/O - select -
(optional: enter 2 different number of devices - select -
and select option accordingly)
7. DC Input Configuration all - select -
8. DC Insulation Monitoring all - select -
9. MV Transformer Type all - select -
10. Lightning Surge Suppression all - select -
11. Extended Aux Buffer all - select -
12. AC-Preparation for PQ-Meter - select -
(optional: enter 2 different number of devices - select -
and select option accordingly)
13. Mounting Plate at Door all - select -
14. Enclosure all - select -
15. Temperature all - select -
16. Altitude all - select -
MVPS-xxxx-S2-10(-11) Option (drop down list)
1. Nominal Medium Voltage - select -
2. Nominal Frequency - select -
3. Transformer Vector Group - select -
4. Transformer Tap Changer - select -
5. Transformer Shield Winding - select -
6. Transformer Load Profile - select -
7. Transformer Losses - select -
8. Transformer Inrush Current - select -
9. Oil Containment - select -
10. MV Switchgear - select -
11. Short Circuit Rating MVSG - select -
12. Accessories MVSG - select -
13. Protection MV Switchgear - select -
14. Safety Equipment - select -
15. Monitoring - select -
16. Accessories MVPS - select -
17. Cable Entry Kit - select -
18. LV Transformer - select -
19. Ambient Temperature - select -
20. Environment - select -
21. Earthquake and Storm Package - select -
22. Transportation Package - select -
23. Language (documentation) - select -
24. Customized Solution - select -
Version 3.41
ator - SCS-(UP) and MVPS-S2
um Voltage Power Station (IEC)
**Top down editing**
to be filled =
ok =
to be checked =
Check
SCS/MVPS Power
12
10
Power/ kVA
2
Charging Grid-Feed
0
15 20 25 30 35 40 45 50 55
Temperature / °C
Explanation Check
(optional)
Select "Grid Forming" first
(optional) - Select "Grid Forming" first
Select "Inverter Aux power supply" first
(optional) - Select "Inverter Aux power supply" first
Select "Communication System A" first
(optional) - Select "Communication System A" first
Note: ***Selection of MOXA controller only, if additional signals from
customer need to be handled via remote I/O controller***
(optional)
(optional)
Explanation Check
Note:***Reduced Inrush Current option available for 20kV or 21kV/50Hz
(Other applications can be handled as customized solution)***
Select "Nominal Medium Voltage" first
Select "MV Switchgear" first
Select "Short Circuit Rating MVSG" first
Select "Safety Equipment" and "Accessories MVSG" first
For customized solutions, please provide full description in Technical
Clarification tab
- select -
Work in Progress
Completed
- select -
n/a
- select -
without MVPS
MVPS-2200-S2-11
MVPS-2475-S2-11
MVPS-2900-S2-11
MVPS-2660-S2-10
MVPS-2800-S2-10
MVPS-2930-S2-10
MVPS-3060-S2-10
MVPS-4000-S2-10
MVPS-4200-S2-10
MVPS-4400-S2-10
###
50 55 ###
###
n1
n1
Last cell changed
$H$35
No - Grid Following only
Yes (with DC precharge) - Black Start
Select "Grid Forming" first
internal
internal (tOVP)
Select "Inverter Aux power supply" first
none
2.5 kVA / 230 V
- select -
Ethernet RJ45
(optional) - Select "Communication System A" first
none
Managed Switch MMF Backbone
(optional)
Without
16 DI
###
n/a
2-Winding Transformer
4-Winding Transformer
Yes
(optional)
N
o
Yes
- select -
Yes, for all devices
- select -
Standard, Lockable
Lockable with DC covers
Without Roof
- select -
-25 … 60°C (25°C)
-40 … 60°C (25°C)
- select -
- select -
-25 … 60°C (25°C)
n/a
- select -
50 Hz
- select -
Dy11 (Standard)
- select -
Without
- select -
Without
- select -
12 hours
- select -
Standard
n/a
Standard
Strongly Reduced
Without
n/a
Without
n/a
Without
n/a
Without
Auxiliary Contacts (recommended)
Remote Control
- select -
- select -
n/a
Without
- select -
Without
n/a
Without
- select -
Without
-25°C to +45°C
-25°C to +55°C
-35°C to +55°C
Harsh
- select -
Without
- select -
Road transport
- select -
DE: German
EN: English
FR: French
ES: Spanish
Configurator - PPM-10
Option Codes for SMA Power Plant Manager
Quantity of PPM: 30
Power Plant Manager Redundant System — PPM-RED-SYS
Options Customer Selection Additional Comments
Is controller redundancy needed? - select - if "Yes", also enter "Quantity of PPM" = 2 (per POC/POI)
SMA Power Plant Manager — PPM-10
Options Code Customer Selection Option Description
Power Supply 0 - select - #NAME?
Ethernet 1 0 - select - #NAME?
Ethernet 2 0 - select - #NAME?
Patch Panel 0 - select - #NAME?
Measurement & Control 0 - select - #NAME?
Telecontrol Interface 0 - select - #NAME?
I/O Extension 0 - select - #NAME?
Language 0 - select - #NAME?
Country 0 - select - #NAME?
Energy Management 0 - select - #NAME?
Sky Image Support 0 - select - #NAME?
Redundancy 0 - select - #NAME?
Version 3.4
Additional Comments
POC/POI)
Customer comments