Sheet No.
: 2 of 6
TECHNICAL BID EVALUATION FOR
PROJECT NO.: P11P3351
TREL Doc. No. :
CHILLER UNIT [R-1704]
9-13-317
Date:30-05-2019 Rev. No.: 0A
REVISION LOG
REV NO REV DATE REVISED PAGE/S REVISION DESCRIPTION
0A 30-05-2019 - ISSUED FOR INFORMATION
0 1/0/1900 4 to 6 0
Sheet No. : 3 of 6
TECHNICAL BID EVALUATION FOR
PROJECT NO.: P11P3351
TREL Doc. No. :
CHILLER UNIT [R-1704]
9-13-317
Date:30-05-2019 Rev. No.: 0A
TABLE OF CONTENTS
NO DESCRIPTION PAGE
1 TECHNICAL BID EVALUATION FOR CHILLER UNIT [R-1704] 4-6
Sheet No. : 4 of 6
PROJECT NO.: P11P3351
TECHNICAL BID EVALUATION FOR
TREL Doc. No. :
9-13-317
CHILLER UNIT [R-1704]
Date:30-05-2019 Rev. No.: 0A
Design requirement/ CARRIER
S/N Evaluation Criteria
Specification
Offered Specification Accpt. ? Remarks
1 Vendor ENTECH Yes
2 Quotation Reference ST62050315-R3 Yes
3 Chiller unit Make / Country of Origin USA / China / Japan/ Thailand Thailand Yes
4 Model Vendor To propose 30GTF030 Yes
5 Item No. R-1704 R-1704 Yes
6 Required Quantities 1 set (3 parallel x 1 in series) 1 set (3 parallel x 1 in series) Yes
7 Rerquired Compressor Unit 3 x 50% 3 x 50% Yes
8 Type Air Cooled Air Cooled Water Chiller Yes
9 Location Outdoor Outdoor Yes
Chiller unit is considered safe
Safe Area for External Bund zone
10 Hazardous Area as per TTT Classcification wall Safe Area for External Bund wall Yes TREL understands this is because
Zone 1 for Internal bund wall chiller unit skid content only
water however electrical team
11 Process Data
106.98kw/Unit
Design total system heat duty capacity(155) +
12 kW 186 (AT 100% OF Yes
margin 20%(31) KW
2Unit=213.96kw)
Tons of 30.41RT/Unit
13 Total Cooling Capaicty 52.9 Yes
Refrigeration(RT) (2 Unit=60.82 RT)
14 Design Heat duty per Unit, KW/ Unit kW/Unit 93 106.98 kw Yes
Chiller unit to maintain tank T-1704 product Required,follow TREL Process Confirm, follow TREL Process Data
15 Yes
temperature 10 Deg.C Data sheet and Calculation sheet and Calculation
16 Efficiency (Without Pump) : EER BTU / WH EER (VTA) 5.22 Yes
17 Design pressure bar g 9.2 9.2 Yes
18 Design temperature °C 93 93 Yes
19 Ambient temperature °C 35 35 Yes
20 Refrigerant Non CFC R407C (Non CFC) Yes
Confirm, follow TREL Process
21 PO Mass flow rate @ Tank Kg/Hr Inlet=84,050 / Outlet=84,050 Inlet=84,050 / Outlet=84,050 Yes
Data sheet and Calculation
22 Water Mass flow rate @ Heat Exchanger Kg/Hr Inlet=55,000 / Outlet=55,000 Inlet=55,000 / Outlet=55,000 Yes
Confirm, follow TREL Process
23 PO Specific gravity at 10 DegC @ Tank °C Inlet=0.84 / Outlet=0.84 Inlet=0.84 / Outlet=0.84 Yes
Data sheet and Calculation
Confirm, follow TREL Process
24 PO Viscosity at 10 DegC @ Tank cP Inlet=0.41 / Outlet=0.41 Inlet=0.41 / Outlet=0.41 Yes
Data sheet and Calculation
Confirm, follow TREL Process
25 PO Specific Heat @ Tank kCal/Kg-C Inlet=0.456 / Outlet=0.456 Inlet=0.456 / Outlet=0.456 Yes
Data sheet and Calculation
Confirm, follow TREL Process
26 PO Thermal Conductivity @ Tank W/m-C Inlet=0.156 / Outlet=0.156 Inlet=0.156 / Outlet=0.156 Yes
Data sheet and Calculation
Confirm, follow TREL Process
27 PO Temperature @ Tank °C Inlet=13.5 / Outlet=9.4 Inlet=13.5 / Outlet=9.4 Yes
Data sheet and Calculation
But Vendor confirm at Inlet Note
28 Water Temperature @ Heat Exchanger °C Inlet=7.2 / Outlet=10.08 Inlet=7.2 / Outlet=10.08 Yes
: For outlet depend on Load.
Confirm, follow TREL Process
29 Pressure Drop Total / Allowed (PO) bar g 0.77 0.77 Yes
Data sheet and Calculation
Confirm, follow TREL Process
30 Pressure Drop Total / Allowed (Chiller water) bar g 0.15 0.15 Yes
Data sheet and Calculation
31 Connection
PROPYLENE OXIDE NOZZLE SIZE / FLANGE
32 6'' / 150# RF/FF, ASME/ANSI 6" 150# RF,ANSI Flange Yes
RATING INLET:
PROPYLENE OXIDE NOZZLE SIZE / FLANGE
33 6'' / 150# RF/FF, ASME/ANSI 6" 150# RF,ANSI Flange Yes
RATING OUTLET:
34 Shell and Tube Heat Exchanger
35 Type Shell and Tube Confirmed Yes
36 Make / Scope TREL BY TREL Yes
37 Required Quantities Set 1 Set 1 Set Yes
38 Origin Thailan Thailand Yes
39 Hazardous Area Zone1 Zone1 Yes
40 Compressor
MYCOM / Carrier / Burkhardt
41 Compressor Make Carlyle (Carrier make) Yes
compression
TTT to confirm.
42 Compressor Origin VTA China Yes However,TREL proposed the
origin as same as Bidding stage
43 Model VTA 06E6299611 Yes
Sheet No. : 4 of 6
PROJECT NO.: P11P3351
TECHNICAL BID EVALUATION FOR
TREL Doc. No. :
9-13-317
CHILLER UNIT [R-1704]
Date:30-05-2019 Rev. No.: 0A
Design requirement/ CARRIER
S/N Evaluation Criteria
Specification
Offered Specification Accpt. ? Remarks
RECIPROCATING SEMI-
44 Compressor Type VTA Yes
HERMATIC
45 Hazardous Area Safe Area Safe Area Yes
46 Evaporator
Vendor please provide more
47 Required Quantities Set 3 3 Yes
specification
48 Evaporator heat exchanged kW/hr VTA 128kw/hr Yes
49 Fouling factor (hr-sq-ft-F)/BTU VTA 0.00075 Yes
50 Evaporator pressure drop Bar VTA 0.5 Bar ( 7.3 PSI) Yes
51 Hazardous Area Safe Area Safe Area Yes
52 Condenser
53 Required Quantities Set VTA 2 Sets/Unit Yes Total of Condensor = 6 Sets
Max. duty 75.46Kw/set (
54 Condenser Capacity kW VTA 150.92 kW/Unit Yes Chiller1 unit= 2set of Condenser)
75.46 x 2 = 150.92 Kw/Unit
55 No. of Fans per condenser unit Nos. VTA 2 Nos/ Unit Yes
Condenser Fan Air Flow at Ambient
56 CFM VTA Approx 23,200 CFM Yes
Temperature
57 Condenser: Outdoor Air Temp °C VTA 35 Deg C Yes
58 Hazardous Area Safe Area Safe Area Yes
59 Water Pump
60 Water Supply Pump Required Quantities Sets 2(R1+S1) 2(R1+S1) Yes
61 Pump casing with Insulation Required Confirmed Yes
62 Model VTA N50/250B Yes Please provide specification
63 Make VTA Calpeda Yes
64 Origin China / India not accept Italy Yes
65 Type Centrifugal Centrifugal Yes
66 Capacity m3/Hr 55 24-69 Yes
67 Head mH20 Approx. 40 m 43-69 Yes
68 Motor Type VTA Induction Yes
69 Motor KW KW VTA 15 kw/unit Yes
70 Water Circulation Pump Required Quantities Sets VTA 3( R2 +S1) Yes
71 Pump casing with Insulation Required Confirmed Yes
72 Model VTA N40/125 AA Yes Please provide specification
73 Make VTA Calpeda Yes
74 Origin China / India not accept Italy Yes
75 Type Centrifugal Centrifugal Yes
76 Capacity m3/Hr VTA 15-42 Yes
77 Head mH20 VTA 11-22 Yes
78 Motor Type VTA Induction Yes
79 Motor KW KW VTA 2.2 kw/unit Yes
80 Water Pump Hazardous Area Safe Area Safe Area Yes
81 Mixing Tank Design / Condition Included Yes
82 Mixing Tank with Insulation Required Confirmed Yes
83 Required Quantities VTA 1 Yes
84 Tank Material VTA Stainless Steel Yes
But Vendor, please make sure
85 Capacity m3 4 m3 (VTA) 4(2X2) Yes
tank capacity enough.
86 Hazardous Area Safe Area Confirmed Yes
Total Unit Power(Electrical Load by Total loade shall be 139.8+19.4
87 kW VTA 159.2 Yes
included S/N 89,90 and 91) = 159.2 kW
Chiller/unit current 118 amp,
88 Compressor KW kW VTA 133.8 Yes Then 118 amp= 69.9kw (69.9 x
2 = 139.80 kW)
At 100% = 1.5 x 4 fan = 6 kW
89 Condenser Fan Motor KW kW VTA 6 Yes because 1 fan =1.5 kW (1 Unit =
2 Fans ).
Sheet No. : 4 of 6
PROJECT NO.: P11P3351
TECHNICAL BID EVALUATION FOR
TREL Doc. No. :
9-13-317
CHILLER UNIT [R-1704]
Date:30-05-2019 Rev. No.: 0A
Design requirement/ CARRIER
S/N Evaluation Criteria
Specification
Offered Specification Accpt. ? Remarks
At runnig 100% = 15 +( 2.2x2)
90 Motor of Water Pump KW kW VTA 19.4 Yes
=19.4 kW,
91 Spring Isolator (Anti vibration damper) VTA Confirmed Yes
92 Chiller Plant Management System(CPMS) Not Applicable N/A Yes
93 Painting Referece to SPEC NO. 9-16-206 Confirmed Yes
94 Noise level dBA < 85 Confirmed Yes
95 Tests
96 HYDRO TEST Required Confirmed Yes
97 PNEUMATIC TEST Required if any Confirmed Yes
PERFORMANCE TEST OF COMPLETE SYSTEM AT
98 Required Confirmed Yes
SITE
99 DISMANTLE & INSPECTION AFTER TEST Not applicable at site Confirmed Yes
100 VISUAL INSPECTION Required Confirmed Yes
101 DIMENSIONAL INSPECTION Required Confirmed Yes
102 NDT Required Confirmed Yes
103 VIBRATION MESUREMENT For Rotating equipment only Confirmed Yes
104 NOISE LEVEL TEST AT SITE Required Confirmed Yes
105 Documents/ Drawings
106 Technical Specification for All Equipments Required Confirmed Yes
107 General Arrangement Dwg. Required Confirmed Yes
108 Dimension Outline Dwg Required Confirmed Yes
109 Overall Layout Drawings Required Confirmed Yes
Sectional Drawings Including Parts Lists for
110 Required Confirmed Yes
Main and Auxiliary Equipments
111 Foundation Arrangement Drawings Required Confirmed Yes
112 Installation Dwg. Required Confirmed Yes
113 Process Flow Diagrams Required Confirmed Yes
114 Utility Flow Diagrams Required Confirmed Yes
Vendor provide Chiller Water
115 Piping & Instrument Diagrams Required Confirmed Yes
Schemetic Diraram
116 Schematic Wiring Diagrams Required Confirmed Yes
117 Logic Diagrams Required Confirmed Yes
To consider as Alam , Temp ,
118 Interface Diagrams Required Confirmed Yes Pressure ,Flow. If any change
to be discussed.
119 Details / Terminal Boxes Required Confirmed Yes
120 Calculations sheet Required if any Confirmed Yes
121 Loading/weight Data Required Confirmed Yes
122 Equipment Characteristic Performance Curve Required Confirmed Yes
Spare Part List for Construction &
123 Required Confirmed Yes
Commissioning
Spare Part List for Two(2) Years
124 Required Confirmed Yes
Operation(Optional)
Installation / Operation and Maintenance
125 Required Confirmed Yes
Manual
126 Factory Test / Inspection Report Required Confirmed Yes
Such as Pipe, Valve, Etc shall be
127 Mill Test Certificate Vendor To propose Confirmed Yes
provided as well.
128 Noise Certificate/Report Required Confirmed Yes
129 Equipment List Required Confirmed Yes
130 Lubricating List Vendor To propose Confirmed Yes
No. of criteria that do not meet design
0
requirement/specification.