0% found this document useful (0 votes)
18 views2 pages

Near Plan QC On 02-03-2024

____________________________Signature:________________________Date:______________ Remarks: □ Approved □ Approved with comments: □ Rejected, Resubmit:

Uploaded by

vinhtv
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
18 views2 pages

Near Plan QC On 02-03-2024

____________________________Signature:________________________Date:______________ Remarks: □ Approved □ Approved with comments: □ Rejected, Resubmit:

Uploaded by

vinhtv
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

NAM MO 2 HYDROPOWER PROJECT

NEAR PLAN QC INSPECTION ON 02-03-2024

Phase type(**)
No. Descriptions Request No Location Expecting time Action by(*) Remark
I W H
Witnessing comprssive strength of CVC Trial Mix in Laboratory @3days
mix code:
C30-19-(14-18)-107 02/03/2024
1 NM2-SCI-GP-0-CON-IR-0238 Laboratory RL F
C30-37.5-(12-16)-108 7:30
C35-19-(14-18)-109
C35-37.5-(12-16)-110
Witnessing compresssive strength of cement for LVV P52.5 Type I 02/03/2024
2 NM2-SCI-GP-0-CON-IR-0239 Laboratory RL F
cement . Delivery on site:23/2/24. Lot No : BPI 524010 @7days 8:00

Witnessing compresssive strength of concrete for Headrace Tunnel 02/03/2024


3 NM2-SCI-HT-4-CON-IR-0216 Laboratory RL F
Block: BT-12,5-14,5 Section 1 @7days 8:00

Witnessing compresssive strength of Grout for Rock Bolts installation on 02/03/2024


4 NM2-SCI-SP-5-CON-IR-0087 Laboratory RL F
right abutment of Scour Hole Type 2 @7days 8:00

Rebar checking and concrete pouring for Block: TP-19-20,5 Headrace tunnel 02/03/2024
5 NM2-SCI-HT-4-CON-IR-0215 AP F
Section 1 Section 1 15:00

Inspection before pouring concrete of Main Dam Right bank grout cap 22/01/2024
6 NM2-SCI-DA-3-CON-IR-0017 Main Dam AP F Postponed
concrete- Block BR-06 8:30

02/03/2024
7 Inspection before upstream and downstream cofferdam embankment NM2-SCI-RD-2-FIL-IR-0138 Cofferdams AP F
8:00

Legend:
(*) RL-Laboratory Responsible, SM-Site Manager ,SQM- Site Quality Manager, QCE-Field QC Engineer,
RT-Surveyor, AP-Production Supervisor, GEO-Geologist Engineer
(**) I-Information, W- witness, H-Hold point(need to approval before start)

Page 1 of 1
MR-NM2- 01-01
REQUEST FOR INSPECTION
Req. No: NM2-SCI-RD-2-FIL-IR-0138
m

To: NM2 Employer’s Engineer (LJ Hydro Consultancy) Date: 01/03/2024


□ Civil □Geologist □ HM □ E&M □ HSE □ QC □ Survey

□ River Diversion □ Power Intake □ Access Road


□ Diversion Tunnel □ Intake Slope □ Temporary Access Road
□ Upstream Cofferdam □ Intake Foundation □ Operation Road
□ Downstream Cofferdam □ Headrace Channel □ Operator Camps
□ Main Dam □ Power Tunnel □ Camp at Powerhouse
□ Dam Body □ Headrace Tunnel □ Camp at Headwork
□ Left Dam Abutment □ Vertical Shaft
□ Temporary Facilities
□ Right Dam Abutment □ Penstock
□ Crushing Plant at.........
□ Auxiliary Dam □ Powerhouse platform
□ Batching Plant at.........
□ Left Dam Abutment □ Powerhouse Platform
□ Other...........................
□ Right Dam Abutment □ Powerhouse Building
□ Laboratory
□ Spillway □ Powerhouse Slope
□ Quarry works
□ Spillway □ Tailrace Channel
□ Chute □ Switchyard □ H&M at the ………………....
□ Plunge Pool / Stilling Basin □ Auxiliary Tunnel □ E&M at the ………………....
□ Spillway Slope □ Adit 1 □ Adit 2 □ Other: ……………………….
□ Adit □ Other…..

The NM2_EPC Contractor is hereby informing/requesting inspection □ I □ W □ H as follows:


Purpose of
Location (Elevation, Station) Item for Inspection Inspection1
Proposed Date and Time Remarks

02/03/2024
Inspection before upstream and downstream 8:00
F
cofferdam embankment

Location: Headworks Site

1) Inspection purpose:
A-Punch List D-Re-evaluation of NCR G-Material’s manufacturing at site
B-QC completion inspection E-Notification of NCR deficiency of correction H-Field testing and inspection
C-Definition of construction detail F-General inspection during work I-Others…..

Requested by SCI AP/QCE/QCM: Received by EE:


Name: Nguyen Van, Kien Name:

Employer / Engineer QC Remarks

By Employer/ Engineers QC:

Name:________________________________Signature:________________________Date:______________