Initial Environmental Examination (IEE) Checklist Report for Corn and Rice Mill Projects
CORN AND RICE MILL PROJECTS
I.2 PROJECT COMPONENTS
Capacity
Facilities
No. of (ton/hour) Specification/Description
please enumerate; use separate sheet, if
Units or Area
necessary)
(sq./M)
1. Main Components 1 1000 kg/hr Corn Mill served with Cyclone Separators
Corn Mill 1 4000 kg/hr Corn Mill served with Cyclone Separators
Corn Mill 1 1000 kg/hr Hammer Mill
Hammer Mill
a. Drying (method)
Mechanical 1 1.6 Mechanical dryer
Solar n/a
b. Cleaning/Hulling n/a
c. Shaking/Separating n/a
d. Polishing 2 15 HORSE Polisher
POWER
e. Grinding 2 10 HORSE Grinder
POWER
f. All in one machine for n/a
cleaning/polishing/grinding
g. Weighing and Packaging 1 45 TONS TRUCK SCALE
h. Others, specify n/a
2. Storage Facility
a. Fuel Storage N/A
b. Product Storage inside the building
Project Name: ____________________________________________________
Page 1 of 4
Initial Environmental Examination (IEE) Checklist Report for Corn and Rice Mill Projects
c. Palay/corn Storage inisde the building
d. Others, specify n/a
3. Air pollution control Facility
a. Cyclone Dust Collector 2
b. Rice Hulls Storage Bins n/a
4. Power source/supply
a. Electric source Local Utility Service Provider
b. Genset n/a
5. Water source / supply Local Water District Provider
6. Waste water management Facility/ 1 Three Chambered Oil and Water Separator
septic tank
7. Solid waste management Facility 1 5 sq.m Material Recovery Fcaility
1 2 sq.m Compost Pit
8. Drainage System Septic Tank
9. Support Facilities
a. Workers quarters n/a
b. Admin building Located outside the developed area as shown in the site development plan
c. Motor pool facility n/a
d. Others, specify
Project Name: ____________________________________________________
Page 2 of 4
Initial Environmental Examination (IEE) Checklist Report for Corn and Rice Mill Projects
I.3 UTILITIES/REQUIREMENTS (Operation Phase):
Power/Energy and Water Requirements
Utilities Estimated Demand/ Source Breakdown Projected breakdown
Consumption (Total) from Source specified
Grid KWh
Power/Electricity
KWh
Generator Set KWh
Others, please specify: KWh
Local Water Utility Provider m3/day
Water Local Water Distric (Manolo Fortich Water
District)
m3/day
Well in: (specify location): m3/day
Spring in: (specify location): m3/day
River, Lake or other surface m3/day
water : (specify name &
location)
Others, please specify: m3/day
Power/Energy and Water Efficiency Measures (if any)
Utilities Proposed Estimated Savings Estimated Total Savings
Efficiency/Conservation for each Measure
Measures
Power/ Electricity KWh KWh
KWh
Project Name: ____________________________________________________
Page 3 of 4
Initial Environmental Examination (IEE) Checklist Report for Corn and Rice Mill Projects
Water Rainwater collection system m3/day m3/day
with total capacity of
Others, please specify: m3/day
Regular check up of water pipe lines to timely
detect leaks. Constantly remind workers to
conserve water, reuse if possible.
Regulate frequency of car washing and use of
rags and buckets of water instead of hose in
car washing.
I.4 MANPOWER & TIMETABLE OF CONSTRUCTION
Proposed Start of Construction
Proposed Start of Commissioning
Proposed Start of Commercial Operation
Phase Expertise/Skills Requirement per Expertise/Skill Total Requirement
per project phase
a. Construction eodetic Engineer, Civil engineer, Mechanical 1 each 1 each
Engineer, Electrical Engineer, Electronics
Engineer, Master Plumber,
Foreman 1 each 1 each
Electrician
Laborers 3 3
Plumber 1 1
Mason 2 2
Paintor 2 2
b. Operation Manager 1 1
Admin Staff 1 1
Laborer 4 4
Driver 1 1
I.5 INDICATIVE PROJECT COST (Initial Investment):
10000000
PhP __________ US $ ___________ _ (specify if with foreign investment)
Project Name: ____________________________________________________
Page 4 of 4