0% found this document useful (0 votes)
483 views5 pages

Clough Creek Refurbishment Plan

This document contains: 1) A list of 28 specific pieces of equipment that will be allocated to the Clough Creek Platform Refurbishment project, including their quantities and locations. 2) Details of the company's equipment maintenance policy which requires regular maintenance and repair of equipment to reduce downtime. 3) An organogram showing the maintenance management structure headed by a Maintenance Manager with engineers and craft labour reporting to them.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
483 views5 pages

Clough Creek Refurbishment Plan

This document contains: 1) A list of 28 specific pieces of equipment that will be allocated to the Clough Creek Platform Refurbishment project, including their quantities and locations. 2) Details of the company's equipment maintenance policy which requires regular maintenance and repair of equipment to reduce downtime. 3) An organogram showing the maintenance management structure headed by a Maintenance Manager with engineers and craft labour reporting to them.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 5

ena k E n e r g y S e r v ic e s L td .

ENAK SERVICES LIMITED


No.5 KELECHI STREET OFF PRIME, RIVERS STATE
TEL: 07034292538.
E-MAIL: [email protected]

PROJECT EXECUTION PLAN

CLOUGH CREEK PLATFORM REFURBISHMENT

TENDER NO. 7200015310

TOCHUKW
0 25.10.17 PRESENTED FOR BID THEO. O C.NNADI
U. O.

ORIG. CHK APPR. Rep.


Rev Date Description
CONTRACTOR COMPANY

enak
ENAK Document Number Rev

ENAK/NAOC/CCPR/TECH BID/LE
0

E nergy S er v ices Ltd.

Project Contract Originator Type Seq. No. Sheets Rev.

Project Management
Document No.

0
CLOUGH CREEK PLATFORM
REFURBISHMENT

LIST OF SPECIFIC EQUIPMENT TO THE PROJECT


AND OPERATING PROCEDURES
enak E n e r g y S e r v ic e s L td .

Document ENAK/NAOC/CCPR/TECH
Number BID/LE
Document Type : TECHNICAL TENDER Date : 25 /10/ 2017

LIST OF EQUIPMENT ALLOCATTED TO THIS PROJECT


ITEM DESCRIPTION QTY LOCATION
1. AIR COMPRESSOR 1 Yard
2. BLASTING GEAR 1 Yard
3. MATERIAL BARGE 1 Jetty
4. TUG BOAT 1 Jetty
5. CHAIN BLOCK (2 to 5tons) 2 Yard
6. CRANE 25 TON 2 Yard
7. DARKROOM COMPLETE 1 Yard
8. DIESEL TANK 1 Yard
9. GAS DETECTOR 2 Yard
10. GRINDING MACHINE 8 Some in yard
11. ISOTOPE CAMERA (STORE) 1 Yard/ Lay barge
12. OFFICE CONTAINER 4 Yard
13. OXY / ACT SET 4 Some in yard
14. PAINT MACHINE 1 Yard
15. PICK-UP VAN 4 Yard
16. POWER GENERATOR 25KVA 2 Yard
17. SMALL TOOLS (MECHANICAL) (set) 4 Some in yard
18. CREW BOAT 2 Yard
19. STORE CONTAINER 2 Yard
20. TORQUE WRENCH 2 Yard
21. TRAILER & TRUCK 4 Some in yard
22. TRIPOD STAND/H-FRAME 4 Yard
23. WALKY TALKY 3 Some in yard
24. WATER TANKER 1 Yard
25. WELDING SET 4 Yard/ Lay barge
26. ULTRA SONIC TEST MACHINE 4 Yard
27. RACHET SPANNER 8 Yard
28. HARNESS BELT 8 Yard

NOTE: - Additional Equipment shall be provided with short of notice.


CLOUGH CREEK PLATFORM
REFURBISHMENT

LIST OF SPECIFIC EQUIPMENT TO THE PROJECT


AND OPERATING PROCEDURES
enak
E n e r g y S e r v ic e s L td .

Document ENAK/NAOC/CCPR/TECH
Number BID/LE
Document Type : TECHNICAL TENDER Date : 25 /10/ 2017

EQUIPMENT MAINTENANCE POLICY


All equipment MUST be regularly maintained. All unserviceable equipment shall be
locked out and tagged as thus.

The objective of such routine Preventive maintenance is to reduce equipment


Downtime and Lost time incidents resulting from lack of maintenance.

Routine maintenance and minor repairs shall be undertaken at the work site, while
serious maintenance of completely broken down equipment shall be done at the base.

Turn around maintenance shall be planned and executed once a year. The aim being to
put all equipment in serviceable order for hitches free operation/use.

It is mandatory that equipment operators report immediately any break down or faults
observed in their equipment. Late reportage of faults shall be met with appropriate
reprisals.

Toolbox meetings on proposed equipment maintenance MUST precede the


maintenance work planned for each day.

All maintenance Crew must be trained and only experienced personnel shall be job
placed and authorized to carry out maintenance.

All maintenance work shall be carried out in accordance with the Company’s safety
maintenance procedures. The maintenance crew must be briefed before each
maintenance episode.

The implementation of the maintenance policy shall be the responsibility of the


Maintenance Engineer, who should report to the Base/Facilities Manager/Project
Manager.
CLOUGH CREEK PLATFORM
REFURBISHMENT

LIST OF SPECIFIC EQUIPMENT TO THE PROJECT


AND OPERATING PROCEDURES
enak
E n e r g y S e r v ic e s L td .

Document ENAK/NAOC/CCPR/TECH
Number BID/LE
Document Type : TECHNICAL TENDER Date : 25 /10/ 2017

JAN, 2017

C. NNADI
MANAGING DIRECTOR

PROJECT EQUIPMENT MAINTENANCE


ORGANOGRAM

MAINTENANCE MANAGER

MECHANICAL ENGINEER ELECTRICAL,


&
INSTRUMENT ENGINEER

FOREMAN MATERIAL
SUPERVISOR

CRAFT LABOUR STORE KEEPER


*FITTERS
*WELDERS
*SKILLED ASSTS.
*CRANE OPTS.
*OTHERS
CLOUGH CREEK PLATFORM
REFURBISHMENT

LIST OF SPECIFIC EQUIPMENT TO THE PROJECT


AND OPERATING PROCEDURES
enak
E n e r g y S e r v ic e s L td .

Document ENAK/NAOC/CCPR/TECH
Number BID/LE
Document Type : TECHNICAL TENDER Date : 25 /10/ 2017

You might also like