This document contains two requests for inspection of precast T-beam works for Bridge 74+1 of the East Coast Rail Link project in Malaysia. The inspections will take place on February 13, 2024 at 8:00 am and include checking the installation of rebar, formwork, concreting, prestressing and grouting of the precast beams. Test results will also be reviewed to ensure the concrete and grout meet strength requirements. Supervising consultants and quality control representatives must sign off on the works before they proceed to the next stage of construction.

Uploaded by

ammar.sahak10
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
74 views300 pages

Front Lastttttt

This document contains two requests for inspection of precast T-beam works for Bridge 74+1 of the East Coast Rail Link project in Malaysia. The inspections will take place on February 13, 2024 at 8:00 am and include checking the installation of rebar, formwork, concreting, prestressing and grouting of the precast beams. Test results will also be reviewed to ensure the concrete and grout meet strength requirements. Supervising consultants and quality control representatives must sign off on the works before they proceed to the next stage of construction.

Uploaded by

ammar.sahak10
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 300

CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD

EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2024/2/13

I
I

Ref No: ECRL-S4-BR074+1-P1-PB-RFl-0001 REVOO

Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/13
Time: 08.00 am
Works are intended to commence at Date: 2024/2/13
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/13
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 74+1
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR74+1/A0-P1/TB-1 ( Tbeam ) (74+111)

1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC}
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation
:
Comments:

RFI Rev: 03 Date: 24 Mar 2020


e
e fra
* f,
o o P;
U
ka
o tF EH "
z t!r,
3 fio
i
3 (!fi
z a6
^a
zd
odF
EE
U q O
6 Ea
4L
F 12 PO

PEI qk
ES; HE
6HE
d:td
6a=
eg
4:
sii,
< I O uX
.
F hEE 9-
a=F66
E
a
g
E=
Ed f
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2024/2/13

I
I

Ref No: ECRL-S4-BR074+1-P1-PB-RFl-0002 REVOO

Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/13
Time: 08.00 am
Works are intended to commence at Date: 2024/2/13
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/13
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 74+1
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR74+1/A0-P1/TB-2 ( Tbeam ) (74+112)

1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC}
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation
:
Comments:

RFI Rev: 03 Date: 24 Mar 2020


6 a
u
zo e
6= >:
g^ :
&B z6
:.f
6;
ou
:o O- !
E lbl
F
g
iut 6?
EI
$tr (F
e t^
a fi= 2O
4
E=
Eo
o
zo E
t I:
4e
:, f,
6
z
f,
frP
90
E
I
6;
OU
o vq
=d u
g
ii!
=d E fi+
EA
h
'.<*
34
6>
e2
dE
I L
rE
:E
sE -<d
fi=
trA
9D
z
,ag
*d
- l6.t
tsu
E5
EO tEv
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2024/2/13

I
I

Ref No: ECRL-S4-BR074+1-P1-PB-RFl-0003 REVOO

Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/13
Time: 08.00 am
Works are intended to commence at Date: 2024/2/13
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/13
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 74+1
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR74+1/A0-P1/TB-3 ( Tbeam ) (74+113)

1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC}
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation
:
Comments:

RFI Rev: 03 Date: 24 Mar 2020


6 a
u
zo e
6= >:
g^ :
6
&B
6; :
:.f
ou o
z
O- !

E lbl
F
g
iut 6?
EI
$tr (F
e
a fi=
t^ 2O
4
E=
Eo
o
zo E
t I:
4e
:, f,
6
z
f,
frP
90
E
I
6;
OU
o vq
=d u
g
ii!
=d E fi+
EA
h
'.<*
34
6>
e2
dE
I L
rE
:E
sE -<d
fi=
trA
9D
z
,ag
*d
- l6.t
tsu
E5
EO tEv
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2024/2/13

I
I

Ref No: ECRL-S4-BR074+1-P1-PB-RFl-0004 REVOO

Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/13
Time: 08.00 am
Works are intended to commence at Date: 2024/2/13
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/13
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 74+1
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR74+1/A0-P1/TB-4 ( Tbeam ) (74+114)

1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC}
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation
:
Comments:

RFI Rev: 03 Date: 24 Mar 2020


e

e fra
*o f,o P;
U
ka
o F
t EH "
z t!r,
3 fio
i
3 (!fi
z a6
^a
zd
odF
EE
U q O
6 Ea
4L
F 12 PO

PEI qk
ES; HE
6HE
d:td
6a=
eg
4:
sii,
< I O uX
.
F hEE 9-
a=F66
E
a
g
E=
Ed f
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2024/2/12

I
I

Ref No: ECRL-S4-BR074+1-P2-PB-RFl-0001 REVOO

Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/12
Time: 08.00 am
Works are intended to commence at Date: 2024/2/12
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/12
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 74+1
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR74+1/P1-P2/TB-1 ( Tbeam ) (74+121)

1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC}
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation
:
Comments:

RFI Rev: 03 Date: 24 Mar 2020


e

e fra
*o f,o P;
U
ka
o F
t EH "
z t!r,
3 fio
i
3 (!fi
z a6
^a
zd
odF
EE
U q O
6 Ea
4L
F 12 PO

PEI qk
ES; HE
6HE
d:td
6a=
eg
4:
sii,
< I O uX
.
F hEE 9-
a=F66
E
a
g
E=
Ed f
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2024/2/12

I
I

Ref No: ECRL-S4-BR074+1-P2-PB-RFl-0002 REVOO

Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/12
Time: 08.00 am
Works are intended to commence at Date: 2024/2/12
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/12
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 74+1
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR74+1/P1-P2/TB-2 ( Tbeam ) (74+122)

1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC}
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation
:
Comments:

RFI Rev: 03 Date: 24 Mar 2020


6 a
u
zo e
6= >:
g^ :
&B z6
:.f
6;
ou
:o O- !
E lbl
F
g
iut 6?
EI
$tr (F
e t^
a fi= 2O
4
E=
Eo
o
zo E
t I:
4e
:, f,
6
z
f,
frP
90
E
I
6;
OU
o vq
=d u
g
ii!
=d E fi+
EA
h
'.<*
34
6>
e2
dE
I L
rE
:E
sE -<d
fi=
trA
9D
z
,ag
*d
- l6.t
tsu
E5
EO tEv
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2024/2/12

I
I

Ref No: ECRL-S4-BR074+1-P2-PB-RFl-0003 REVOO

Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/12
Time: 08.00 am
Works are intended to commence at Date: 2024/2/12
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/12
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 74+1
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR74+1/P1-P2/TB-3 ( Tbeam ) (74+123)

1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC}
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation
:
Comments:

RFI Rev: 03 Date: 24 Mar 2020


6 a
u
zo e
6= >:
g^ :
6
&B
6; :
:.f
ou o
z
O- !

E lbl
F
g
iut 6?
EI
$tr (F
e
a fi=
t^ 2O
4
E=
Eo
o
zo E
t I:
4e
:, f,
6
z
f,
frP
90
E
I
6;
OU
o vq
=d u
g
ii!
=d E fi+
EA
h
'.<*
34
6>
e2
dE
I L
rE
:E
sE -<d
fi=
trA
9D
z
,ag
*d
- l6.t
tsu
E5
EO tEv
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2024/2/12

I
I

Ref No: ECRL-S4-BR074+1-P2-PB-RFl-0004 REVOO

Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/12
Time: 08.00 am
Works are intended to commence at Date: 2024/2/12
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/12
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 74+1
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR74+1/P1-P2/TB-4 ( Tbeam ) (74+124)

1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC}
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation
:
Comments:

RFI Rev: 03 Date: 24 Mar 2020


e

e fra
*o f,o P;
U
ka
o F
t EH "
z t!r,
3 fio
i
3 (!fi
z a6
^a
zd
odF
EE
U q O
6 Ea
4L
F 12 PO

PEI qk
ES; HE
6HE
d:td
6a=
eg
4:
sii,
< I O uX
.
F hEE 9-
a=F66
E
a
g
E=
Ed f
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2024/2/12

I
I

Ref No: ECRL-S4-BR074+1-P3-PB-RFl-0001 REVOO

Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/12
Time: 08.00 am
Works are intended to commence at Date: 2024/2/12
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/12
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 74+1
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR74+1/P2-P3/TB-1 ( Tbeam ) (74+131)

1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC}
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation
:
Comments:

RFI Rev: 03 Date: 24 Mar 2020


e

e fra
*o f,o P;
U
ka
o F
t EH "
z t!r,
3 fio
i
3 (!fi
z a6
^a
zd
odF
EE
U q O
6 Ea
4L
F 12 PO

PEI qk
ES; HE
6HE
d:td
6a=
eg
4:
sii,
< I O uX
.
F hEE 9-
a=F66
E
a
g
E=
Ed f
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2024/2/12

I
I

Ref No: ECRL-S4-BR074+1-P3-PB-RFl-0002 REVOO

Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/12
Time: 08.00 am
Works are intended to commence at Date: 2024/2/12
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/12
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 74+1
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR74+1/P2-P3/TB-2 ( Tbeam ) (74+132)

1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC}
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation
:
Comments:

RFI Rev: 03 Date: 24 Mar 2020


6 a
u
zo e
6= >:
g^ :
&B z6
:.f
6;
ou
:o O- !
E lbl
F
g
iut 6?
EI
$tr (F
e t^
a fi= 2O
4
E=
Eo
o
zo E
t I:
4e
:, f,
6
z
f,
frP
90
E
I
6;
OU
o vq
=d u
g
ii!
=d E fi+
EA
h
'.<*
34
6>
e2
dE
I L
rE
:E
sE -<d
fi=
trA
9D
z
,ag
*d
- l6.t
tsu
E5
EO tEv
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2024/2/12

I
I

Ref No: ECRL-S4-BR074+1-P3-PB-RFl-0003 REVOO

Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/12
Time: 08.00 am
Works are intended to commence at Date: 2024/2/12
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/12
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 74+1
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR74+1/P2-P3/TB-3 ( Tbeam ) (74+133)

1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC}
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation
:
Comments:

RFI Rev: 03 Date: 24 Mar 2020


6 a
u
zo e
6= >:
g^ :
6
&B
6; :
:.f
ou o
z
O- !

E lbl
F
g
iut 6?
EI
$tr (F
e
a fi=
t^ 2O
4
E=
Eo
o
zo E
t I:
4e
:, f,
6
z
f,
frP
90
E
I
6;
OU
o vq
=d u
g
ii!
=d E fi+
EA
h
'.<*
34
6>
e2
dE
I L
rE
:E
sE -<d
fi=
trA
9D
z
,ag
*d
- l6.t
tsu
E5
EO tEv
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2024/2/12

I
I

Ref No: ECRL-S4-BR074+1-P3-PB-RFl-0004 REVOO

Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/12
Time: 08.00 am
Works are intended to commence at Date: 2024/2/12
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/12
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 74+1
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR74+1/P2-P3/TB-4 ( Tbeam ) (74+134)

1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC}
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation
:
Comments:

RFI Rev: 03 Date: 24 Mar 2020


e

e fra
*o f,o P;
U
ka
o F
t EH "
z t!r,
3 fio
i
3 (!fi
z a6
^a
zd
odF
EE
U q O
6 Ea
4L
F 12 PO

PEI qk
ES; HE
6HE
d:td
6a=
eg
4:
sii,
< I O uX
.
F hEE 9-
a=F66
E
a
g
E=
Ed f
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2024/2/12

I
I

Ref No: ECRL-S4-BR074+1-P4-PB-RFl-0001 REVOO

Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/12
Time: 08.00 am
Works are intended to commence at Date: 2024/2/12
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/12
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 74+1
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR74+1/P3-P4/TB-1 ( Tbeam ) (74+141)

1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC}
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation
:
Comments:

RFI Rev: 03 Date: 24 Mar 2020


e

e fra
*o f,o P;
U
ka
o F
t EH "
z t!r,
3 fio
i
3 (!fi
z a6
^a
zd
odF
EE
U q O
6 Ea
4L
F 12 PO

PEI qk
ES; HE
6HE
d:td
6a=
eg
4:
sii,
< I O uX
.
F hEE 9-
a=F66
E
a
g
E=
Ed f
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2024/2/12

I
I

Ref No: ECRL-S4-BR074+1-P4-PB-RFl-0002 REVOO

Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/12
Time: 08.00 am
Works are intended to commence at Date: 2024/2/12
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/12
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 74+1
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR74+1/P3-P4/TB-2 ( Tbeam ) (74+142)

1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC}
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation
:
Comments:

RFI Rev: 03 Date: 24 Mar 2020


6 a
u
zo e
6= >:
g^ :
&B z6
:.f
6;
ou
:o O- !
E lbl
F
g
iut 6?
EI
$tr (F
e t^
a fi= 2O
4
E=
Eo
o
zo E
t I:
4e
:, f,
6
z
f,
frP
90
E
I
6;
OU
o vq
=d u
g
ii!
=d E fi+
EA
h
'.<*
34
6>
e2
dE
I L
rE
:E
sE -<d
fi=
trA
9D
z
,ag
*d
- l6.t
tsu
E5
EO tEv
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2024/2/12

I
I

Ref No: ECRL-S4-BR074+1-P4-PB-RFl-0003 REVOO

Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/12
Time: 08.00 am
Works are intended to commence at Date: 2024/2/12
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/12
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 74+1
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR74+1/P3-P4/TB-3 ( Tbeam ) (74+143)

1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC}
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation
:
Comments:

RFI Rev: 03 Date: 24 Mar 2020


6 a
u
zo e
6= >:
g^ :
6
&B
6; :
:.f
ou o
z
O- !

E lbl
F
g
iut 6?
EI
$tr (F
e
a fi=
t^ 2O
4
E=
Eo
o
zo E
t I:
4e
:, f,
6
z
f,
frP
90
E
I
6;
OU
o vq
=d u
g
ii!
=d E fi+
EA
h
'.<*
34
6>
e2
dE
I L
rE
:E
sE -<d
fi=
trA
9D
z
,ag
*d
- l6.t
tsu
E5
EO tEv
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2024/2/12

I
I

Ref No: ECRL-S4-BR074+1-P4-PB-RFl-0004 REVOO

Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/12
Time: 08.00 am
Works are intended to commence at Date: 2024/2/12
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/12
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 74+1
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR74+1/P3-P4/TB-4 ( Tbeam ) (74+144)

1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC}
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation
:
Comments:

RFI Rev: 03 Date: 24 Mar 2020


e

e fra
*o f,o P;
U
ka
o F
t EH "
z t!r,
3 fio
i
3 (!fi
z a6
^a
zd
odF
EE
U q O
6 Ea
4L
F 12 PO

PEI qk
ES; HE
6HE
d:td
6a=
eg
4:
sii,
< I O uX
.
F hEE 9-
a=F66
E
a
g
E=
Ed f
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2024/2/6

I
I

Ref No: ECRL-S4-BR074+1-P5-PB-RFl-0001 REVOO

Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/6
Time: 08.00 am
Works are intended to commence at Date: 2024/2/6
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/6
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 74+1
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR74+1/P4-P5/TB-1 ( Tbeam ) (74+151)

1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC}
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation
:
Comments:

RFI Rev: 03 Date: 24 Mar 2020


e

e fra
*o f,o P;
U
ka
o F
t EH "
z t!r,
3 fio
i
3 (!fi
z a6
^a
zd
odF
EE
U q O
6 Ea
4L
F 12 PO

PEI qk
ES; HE
6HE
d:td
6a=
eg
4:
sii,
< I O uX
.
F hEE 9-
a=F66
E
a
g
E=
Ed f
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2024/2/6

I
I

Ref No: ECRL-S4-BR074+1-P5-PB-RFl-0002 REVOO

Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/6
Time: 08.00 am
Works are intended to commence at Date: 2024/2/6
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/6
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 74+1
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR74+1/P4-P5/TB-2 ( Tbeam ) (74+152)

1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC}
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation
:
Comments:

RFI Rev: 03 Date: 24 Mar 2020


6 a
u
zo e
6= >:
g^ :
&B z6
:.f
6;
ou
:o O- !
E lbl
F
g
iut 6?
EI
$tr (F
e t^
a fi= 2O
4
E=
Eo
o
zo E
t I:
4e
:, f,
6
z
f,
frP
90
E
I
6;
OU
o vq
=d u
g
ii!
=d E fi+
EA
h
'.<*
34
6>
e2
dE
I L
rE
:E
sE -<d
fi=
trA
9D
z
,ag
*d
- l6.t
tsu
E5
EO tEv
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2024/2/6

I
I

Ref No: ECRL-S4-BR074+1-P5-PB-RFl-0003 REVOO

Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/6
Time: 08.00 am
Works are intended to commence at Date: 2024/2/6
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/6
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 74+1
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR74+1/P4-P5/TB-3 ( Tbeam ) (74+153)

1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC}
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation
:
Comments:

RFI Rev: 03 Date: 24 Mar 2020


6 a
u
zo e
6= >:
g^ :
6
&B
6; :
:.f
ou o
z
O- !

E lbl
F
g
iut 6?
EI
$tr (F
e
a fi=
t^ 2O
4
E=
Eo
o
zo E
t I:
4e
:, f,
6
z
f,
frP
90
E
I
6;
OU
o vq
=d u
g
ii!
=d E fi+
EA
h
'.<*
34
6>
e2
dE
I L
rE
:E
sE -<d
fi=
trA
9D
z
,ag
*d
- l6.t
tsu
E5
EO tEv
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2024/2/6

I
I

Ref No: ECRL-S4-BR074+1-P5-PB-RFl-0004 REVOO

Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/6
Time: 08.00 am
Works are intended to commence at Date: 2024/2/6
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/6
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 74+1
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR74+1/P4-P5/TB-4 ( Tbeam ) (74+154)

1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC}
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation
:
Comments:

RFI Rev: 03 Date: 24 Mar 2020


e

e fra
*o f,o P;
U
ka
o F
t EH "
z t!r,
3 fio
i
3 (!fi
z a6
^a
zd
odF
EE
U q O
6 Ea
4L
F 12 PO

PEI qk
ES; HE
6HE
d:td
6a=
eg
4:
sii,
< I O uX
.
F hEE 9-
a=F66
E
a
g
E=
Ed f
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2024/2/6

I
I

Ref No: ECRL-S4-BR074+1-P6-PB-RFl-0001 REVOO

Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/6
Time: 08.00 am
Works are intended to commence at Date: 2024/2/6
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/6
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 74+1
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR74+1/P5-P6/TB-1 ( Tbeam ) (74+161)

1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC}
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation
:
Comments:

RFI Rev: 03 Date: 24 Mar 2020


e

e fra
*o f,o P;
U
ka
o F
t EH "
z t!r,
3 fio
i
3 (!fi
z a6
^a
zd
odF
EE
U q O
6 Ea
4L
F 12 PO

PEI qk
ES; HE
6HE
d:td
6a=
eg
4:
sii,
< I O uX
.
F hEE 9-
a=F66
E
a
g
E=
Ed f
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2024/2/6

I
I

Ref No: ECRL-S4-BR074+1-P6-PB-RFl-0002 REVOO

Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/6
Time: 08.00 am
Works are intended to commence at Date: 2024/2/6
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/6
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 74+1
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR74+1/P5-P6/TB-2 ( Tbeam ) (74+162)

1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC}
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation
:
Comments:

RFI Rev: 03 Date: 24 Mar 2020


6 a
u
zo e
6= >:
g^ :
&B z6
:.f
6;
ou
:o O- !
E lbl
F
g
iut 6?
EI
$tr (F
e t^
a fi= 2O
4
E=
Eo
o
zo E
t I:
4e
:, f,
6
z
f,
frP
90
E
I
6;
OU
o vq
=d u
g
ii!
=d E fi+
EA
h
'.<*
34
6>
e2
dE
I L
rE
:E
sE -<d
fi=
trA
9D
z
,ag
*d
- l6.t
tsu
E5
EO tEv
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2024/2/6

I
I

Ref No: ECRL-S4-BR074+1-P6-PB-RFl-0003 REVOO

Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/6
Time: 08.00 am
Works are intended to commence at Date: 2024/2/6
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/6
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 74+1
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR74+1/P5-P6/TB-3 ( Tbeam ) (74+163)

1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC}
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation
:
Comments:

RFI Rev: 03 Date: 24 Mar 2020


6 a
u
zo e
6= >:
g^ :
6
&B
6; :
:.f
ou o
z
O- !

E lbl
F
g
iut 6?
EI
$tr (F
e
a fi=
t^ 2O
4
E=
Eo
o
zo E
t I:
4e
:, f,
6
z
f,
frP
90
E
I
6;
OU
o vq
=d u
g
ii!
=d E fi+
EA
h
'.<*
34
6>
e2
dE
I L
rE
:E
sE -<d
fi=
trA
9D
z
,ag
*d
- l6.t
tsu
E5
EO tEv
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2024/2/6

I
I

Ref No: ECRL-S4-BR074+1-P6-PB-RFl-0004 REVOO

Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/6
Time: 08.00 am
Works are intended to commence at Date: 2024/2/6
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/6
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 74+1
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR74+1/P5-P6/TB-4 ( Tbeam ) (74+164)

1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC}
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation
:
Comments:

RFI Rev: 03 Date: 24 Mar 2020


e

e fra
*o f,o P;
U
ka
o F
t EH "
z t!r,
3 fio
i
3 (!fi
z a6
^a
zd
odF
EE
U q O
6 Ea
4L
F 12 PO

PEI qk
ES; HE
6HE
d:td
6a=
eg
4:
sii,
< I O uX
.
F hEE 9-
a=F66
E
a
g
E=
Ed f
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2024/2/6

I
I

Ref No: ECRL-S4-BR074+1-P7-PB-RFl-0001 REVOO

Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/6
Time: 08.00 am
Works are intended to commence at Date: 2024/2/6
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/6
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 74+1
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR74+1/P6-P7/TB-1 ( Tbeam ) (74+171)

1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC}
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation
:
Comments:

RFI Rev: 03 Date: 24 Mar 2020


e

e fra
*o f,o P;
U
ka
o F
t EH "
z t!r,
3 fio
i
3 (!fi
z a6
^a
zd
odF
EE
U q O
6 Ea
4L
F 12 PO

PEI qk
ES; HE
6HE
d:td
6a=
eg
4:
sii,
< I O uX
.
F hEE 9-
a=F66
E
a
g
E=
Ed f
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2024/2/6

I
I

Ref No: ECRL-S4-BR074+1-P7-PB-RFl-0002 REVOO

Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/6
Time: 08.00 am
Works are intended to commence at Date: 2024/2/6
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/6
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 74+1
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR74+1/P6-P7/TB-2 ( Tbeam ) (74+172)

1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC}
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation
:
Comments:

RFI Rev: 03 Date: 24 Mar 2020


6 a
u
zo e
6= >:
g^ :
&B z6
:.f
6;
ou
:o O- !
E lbl
F
g
iut 6?
EI
$tr (F
e t^
a fi= 2O
4
E=
Eo
o
zo E
t I:
4e
:, f,
6
z
f,
frP
90
E
I
6;
OU
o vq
=d u
g
ii!
=d E fi+
EA
h
'.<*
34
6>
e2
dE
I L
rE
:E
sE -<d
fi=
trA
9D
z
,ag
*d
- l6.t
tsu
E5
EO tEv
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2024/2/6

I
I

Ref No: ECRL-S4-BR074+1-P7-PB-RFl-0003 REVOO

Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/6
Time: 08.00 am
Works are intended to commence at Date: 2024/2/6
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/6
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 74+1
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR74+1/P6-P7/TB-3 ( Tbeam ) (74+173)

1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC}
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation
:
Comments:

RFI Rev: 03 Date: 24 Mar 2020


6 a
u
zo e
6= >:
g^ :
6
&B
6; :
:.f
ou o
z
O- !

E lbl
F
g
iut 6?
EI
$tr (F
e
a fi=
t^ 2O
4
E=
Eo
o
zo E
t I:
4e
:, f,
6
z
f,
frP
90
E
I
6;
OU
o vq
=d u
g
ii!
=d E fi+
EA
h
'.<*
34
6>
e2
dE
I L
rE
:E
sE -<d
fi=
trA
9D
z
,ag
*d
- l6.t
tsu
E5
EO tEv
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2024/2/6

I
I

Ref No: ECRL-S4-BR074+1-P7-PB-RFl-0004 REVOO

Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/6
Time: 08.00 am
Works are intended to commence at Date: 2024/2/6
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/6
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 74+1
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR74+1/P6-P7/TB-4 ( Tbeam ) (74+174)

1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC}
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation
:
Comments:

RFI Rev: 03 Date: 24 Mar 2020


e

e fra
*o f,o P;
U
ka
o F
t EH "
z t!r,
3 fio
i
3 (!fi
z a6
^a
zd
odF
EE
U q O
6 Ea
4L
F 12 PO

PEI qk
ES; HE
6HE
d:td
6a=
eg
4:
sii,
< I O uX
.
F hEE 9-
a=F66
E
a
g
E=
Ed f
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2024/2/6

I
I

Ref No: ECRL-S4-BR074+1-P8-PB-RFl-0001 REVOO

Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/6
Time: 08.00 am
Works are intended to commence at Date: 2024/2/6
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/6
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 74+1
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR74+1/P7-A1/TB-1 ( Tbeam ) (74+181)

1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC}
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation
:
Comments:

RFI Rev: 03 Date: 24 Mar 2020


e

e fra
*o f,o P;
U
ka
o F
t EH "
z t!r,
3 fio
i
3 (!fi
z a6
^a
zd
odF
EE
U q O
6 Ea
4L
F 12 PO

PEI qk
ES; HE
6HE
d:td
6a=
eg
4:
sii,
< I O uX
.
F hEE 9-
a=F66
E
a
g
E=
Ed f
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2024/2/6

I
I

Ref No: ECRL-S4-BR074+1-P8-PB-RFl-0002 REVOO

Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/6
Time: 08.00 am
Works are intended to commence at Date: 2024/2/6
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/6
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 74+1
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR74+1/P7-A1/TB-2 ( Tbeam ) (74+182)

1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC}
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation
:
Comments:

RFI Rev: 03 Date: 24 Mar 2020


6 a
u
zo e
6= >:
g^ :
&B z6
:.f
6;
ou
:o O- !
E lbl
F
g
iut 6?
EI
$tr (F
e t^
a fi= 2O
4
E=
Eo
o
zo E
t I:
4e
:, f,
6
z
f,
frP
90
E
I
6;
OU
o vq
=d u
g
ii!
=d E fi+
EA
h
'.<*
34
6>
e2
dE
I L
rE
:E
sE -<d
fi=
trA
9D
z
,ag
*d
- l6.t
tsu
E5
EO tEv
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2024/2/6

I
I

Ref No: ECRL-S4-BR074+1-P8-PB-RFl-0003 REVOO

Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/6
Time: 08.00 am
Works are intended to commence at Date: 2024/2/6
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/6
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 74+1
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR74+1/P7-A1/TB-3 ( Tbeam ) (74+183)

1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC}
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation
:
Comments:

RFI Rev: 03 Date: 24 Mar 2020


6 a
u
zo e
6= >:
g^ :
6
&B
6; :
:.f
ou o
z
O- !

E lbl
F
g
iut 6?
EI
$tr (F
e
a fi=
t^ 2O
4
E=
Eo
o
zo E
t I:
4e
:, f,
6
z
f,
frP
90
E
I
6;
OU
o vq
=d u
g
ii!
=d E fi+
EA
h
'.<*
34
6>
e2
dE
I L
rE
:E
sE -<d
fi=
trA
9D
z
,ag
*d
- l6.t
tsu
E5
EO tEv
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2024/2/6

I
I

Ref No: ECRL-S4-BR074+1-P8-PB-RFl-0004 REVOO

Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/6
Time: 08.00 am
Works are intended to commence at Date: 2024/2/6
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/6
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 74+1
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR74+1/P7-A1/TB-4 ( Tbeam ) (74+184)

1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC}
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation
:
Comments:

RFI Rev: 03 Date: 24 Mar 2020


e

e fra
*o f,o P;
U
ka
o F
t EH "
z t!r,
3 fio
i
3 (!fi
z a6
^a
zd
odF
EE
U q O
6 Ea
4L
F 12 PO

PEI qk
ES; HE
6HE
d:td
6a=
eg
4:
sii,
< I O uX
.
F hEE 9-
a=F66
E
a
g
E=
Ed f
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2024/2/14

I
I

Ref No: ECRL-S4-BR074-P1-PB-RFl-0001 REVOO

Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/14
Time: 08.00 am
Works are intended to commence at Date: 2024/2/14
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/14
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 74
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR74/A0-P1/TB-1 ( Tbeam ) (7411)

1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC}
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation
:
Comments:

RFI Rev: 03 Date: 24 Mar 2020


e

e fra
*o f,o P;
U
ka
o F
t EH "
z t!r,
3 fio
i
3 (!fi
z a6
^a
zd
odF
EE
U q O
6 Ea
4L
F 12 PO

PEI qk
ES; HE
6HE
d:td
6a=
eg
4:
sii,
< I O uX
.
F hEE 9-
a=F66
E
a
g
E=
Ed f
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2024/2/14

I
I

Ref No: ECRL-S4-BR074-P1-PB-RFl-0002 REVOO

Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/14
Time: 08.00 am
Works are intended to commence at Date: 2024/2/14
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/14
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 74
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR74/A0-P1/TB-2 ( Tbeam ) (7412)

1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC}
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation
:
Comments:

RFI Rev: 03 Date: 24 Mar 2020


6 a
u
zo e
6= >:
g^ :
&B z6
:.f
6;
ou
:o O- !
E lbl
F
g
iut 6?
EI
$tr (F
e t^
a fi= 2O
4
E=
Eo
o
zo E
t I:
4e
:, f,
6
z
f,
frP
90
E
I
6;
OU
o vq
=d u
g
ii!
=d E fi+
EA
h
'.<*
34
6>
e2
dE
I L
rE
:E
sE -<d
fi=
trA
9D
z
,ag
*d
- l6.t
tsu
E5
EO tEv
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2024/2/14

I
I

Ref No: ECRL-S4-BR074-P1-PB-RFl-0003 REVOO

Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/14
Time: 08.00 am
Works are intended to commence at Date: 2024/2/14
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/14
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 74
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR74/A0-P1/TB-3 ( Tbeam ) (7413)

1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC}
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation
:
Comments:

RFI Rev: 03 Date: 24 Mar 2020


6 a
u
zo e
6= >:
g^ :
6
&B
6; :
:.f
ou o
z
O- !

E lbl
F
g
iut 6?
EI
$tr (F
e
a fi=
t^ 2O
4
E=
Eo
o
zo E
t I:
4e
:, f,
6
z
f,
frP
90
E
I
6;
OU
o vq
=d u
g
ii!
=d E fi+
EA
h
'.<*
34
6>
e2
dE
I L
rE
:E
sE -<d
fi=
trA
9D
z
,ag
*d
- l6.t
tsu
E5
EO tEv
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2024/2/14

I
I

Ref No: ECRL-S4-BR074-P1-PB-RFl-0004 REVOO

Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/14
Time: 08.00 am
Works are intended to commence at Date: 2024/2/14
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/14
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 74
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR74/A0-P1/TB-4 ( Tbeam ) (7414)

1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC}
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation
:
Comments:

RFI Rev: 03 Date: 24 Mar 2020


e
e fra
* f,
o o P;
U
ka
o tF EH "
z t!r,
3 fio
i
3 (!fi
z a6
^a
zd
odF
EE
U q O
6 Ea
4L
F 12 PO

PEI qk
ES; HE
6HE
d:td
6a=
eg
4:
sii,
< I O uX
.
F hEE 9-
a=F66
E
a
g
E=
Ed f
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2024/2/14

I
I

Ref No: ECRL-S4-BR074-P2-PB-RFl-0001 REVOO

Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/14
Time: 08.00 am
Works are intended to commence at Date: 2024/2/14
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/14
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 74
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR74/P1-P2/TB-1 ( Tbeam ) (7421)

1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC}
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation
:
Comments:

RFI Rev: 03 Date: 24 Mar 2020


e

e fra
*o f,o P;
U
ka
o F
t EH "
z t!r,
3 fio
i
3 (!fi
z a6
^a
zd
odF
EE
U q O
6 Ea
4L
F 12 PO

PEI qk
ES; HE
6HE
d:td
6a=
eg
4:
sii,
< I O uX
.
F hEE 9-
a=F66
E
a
g
E=
Ed f
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2024/2/14

I
I

Ref No: ECRL-S4-BR074-P2-PB-RFl-0002 REVOO

Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/14
Time: 08.00 am
Works are intended to commence at Date: 2024/2/14
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/14
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 74
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR74/P1-P2/TB-2 ( Tbeam ) (7422)

1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC}
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation
:
Comments:

RFI Rev: 03 Date: 24 Mar 2020


6 a
u
zo e
6= >:
g^ :
&B z6
:.f
6;
ou
:o O- !
E lbl
F
g
iut 6?
EI
$tr (F
e t^
a fi= 2O
4
E=
Eo
o
zo E
t I:
4e
:, f,
6
z
f,
frP
90
E
I
6;
OU
o vq
=d u
g
ii!
=d E fi+
EA
h
'.<*
34
6>
e2
dE
I L
rE
:E
sE -<d
fi=
trA
9D
z
,ag
*d
- l6.t
tsu
E5
EO tEv
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2024/2/14

I
I

Ref No: ECRL-S4-BR074-P2-PB-RFl-0003 REVOO

Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/14
Time: 08.00 am
Works are intended to commence at Date: 2024/2/14
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/14
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 74
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR74/P1-P2/TB-3 ( Tbeam ) (7423)

1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC}
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation
:
Comments:

RFI Rev: 03 Date: 24 Mar 2020


6 a
u
zo e
6= >:
g^ :
6
&B
6; :
:.f
ou o
z
O- !

E lbl
F
g
iut 6?
EI
$tr (F
e
a fi=
t^ 2O
4
E=
Eo
o
zo E
t I:
4e
:, f,
6
z
f,
frP
90
E
I
6;
OU
o vq
=d u
g
ii!
=d E fi+
EA
h
'.<*
34
6>
e2
dE
I L
rE
:E
sE -<d
fi=
trA
9D
z
,ag
*d
- l6.t
tsu
E5
EO tEv
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2024/2/14

I
I

Ref No: ECRL-S4-BR074-P2-PB-RFl-0004 REVOO

Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/14
Time: 08.00 am
Works are intended to commence at Date: 2024/2/14
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/14
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 74
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR74/P1-P2/TB-4 ( Tbeam ) (7424)

1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC}
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation
:
Comments:

RFI Rev: 03 Date: 24 Mar 2020


e

e fra
*o f,o P;
U
ka
o F
t EH "
z t!r,
3 fio
i
3 (!fi
z a6
^a
zd
odF
EE
U q O
6 Ea
4L
F 12 PO

PEI qk
ES; HE
6HE
d:td
6a=
eg
4:
sii,
< I O uX
.
F hEE 9-
a=F66
E
a
g
E=
Ed f
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2024/2/14

I
I

Ref No: ECRL-S4-BR074-P3-PB-RFl-0001 REVOO

Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/14
Time: 08.00 am
Works are intended to commence at Date: 2024/2/14
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/14
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 74
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR74/P2-A1/TB-1 ( Tbeam ) (7431)

1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC}
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation
:
Comments:

RFI Rev: 03 Date: 24 Mar 2020


e

e fra
*o f,o P;
U
ka
o F
t EH "
z t!r,
3 fio
i
3 (!fi
z a6
^a
zd
odF
EE
U q O
6 Ea
4L
F 12 PO

PEI qk
ES; HE
6HE
d:td
6a=
eg
4:
sii,
< I O uX
.
F hEE 9-
a=F66
E
a
g
E=
Ed f
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2024/2/14

I
I

Ref No: ECRL-S4-BR074-P3-PB-RFl-0002 REVOO

Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/14
Time: 08.00 am
Works are intended to commence at Date: 2024/2/14
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/14
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 74
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR74/P2-A1/TB-2 ( Tbeam ) (7432)

1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC}
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation
:
Comments:

RFI Rev: 03 Date: 24 Mar 2020


6 a
u
zo e
6= >:
g^ :
&B z6
:.f
6;
ou
:o O- !
E lbl
F
g
iut 6?
EI
$tr (F
e t^
a fi= 2O
4
E=
Eo
o
zo E
t I:
4e
:, f,
6
z
f,
frP
90
E
I
6;
OU
o vq
=d u
g
ii!
=d E fi+
EA
h
'.<*
34
6>
e2
dE
I L
rE
:E
sE -<d
fi=
trA
9D
z
,ag
*d
- l6.t
tsu
E5
EO tEv
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2024/2/14

I
I

Ref No: ECRL-S4-BR074-P3-PB-RFl-0003 REVOO

Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/14
Time: 08.00 am
Works are intended to commence at Date: 2024/2/14
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/14
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 74
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR74/P2-A1/TB-3 ( Tbeam ) (7433)

1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC}
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation
:
Comments:

RFI Rev: 03 Date: 24 Mar 2020


6 a
u
zo e
6= >:
g^ :
6
&B
6; :
:.f
ou o
z
O- !

E lbl
F
g
iut 6?
EI
$tr (F
e
a fi=
t^ 2O
4
E=
Eo
o
zo E
t I:
4e
:, f,
6
z
f,
frP
90
E
I
6;
OU
o vq
=d u
g
ii!
=d E fi+
EA
h
'.<*
34
6>
e2
dE
I L
rE
:E
sE -<d
fi=
trA
9D
z
,ag
*d
- l6.t
tsu
E5
EO tEv
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2024/2/14

I
I

Ref No: ECRL-S4-BR074-P3-PB-RFl-0004 REVOO

Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/14
Time: 08.00 am
Works are intended to commence at Date: 2024/2/14
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/14
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 74
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR74/P2-A1/TB-4 ( Tbeam ) (7434)

1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC}
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation
:
Comments:

RFI Rev: 03 Date: 24 Mar 2020


e

e fra
*o f,o P;
U
ka
o F
t EH "
z t!r,
3 fio
i
3 (!fi
z a6
^a
zd
odF
EE
U q O
6 Ea
4L
F 12 PO

PEI qk
ES; HE
6HE
d:td
6a=
eg
4:
sii,
< I O uX
.
F hEE 9-
a=F66
E
a
g
E=
Ed f
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) IDate: 2024/2/24

Ref No: ECRL-S4-BR073-P30-PB-RFl-0001 I REVOO

Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/24
Time: 08.00 am
Works are intended to commence at Date: 2024/2/24
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/24
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P29-P30/TB-1 ( Tbeam ) (73301)

1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC}
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation
:
Comments:

RFI Rev: 03 Date: 24 Mar 2020


e

e fra
*o f,o P;
U
ka
o F
t EH "
z t!r,
3 fio
i
3 (!fi
z a6
^a
zd
odF
EE
U q O
6 Ea
4L
F 12 PO

PEI qk
ES; HE
6HE
d:td
6a=
eg
4:
sii,
< I O uX
.
F hEE 9-
a=F66
E
a
g
E=
Ed f
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2024/2/24

I
I

Ref No: ECRL-S4-BR073-P30-PB-RFl-0002 REVOO

Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/24
Time: 08.00 am
Works are intended to commence at Date: 2024/2/24
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/24
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P29-P30/TB-2 ( Tbeam ) (73302)

1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC}
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation
:
Comments:

RFI Rev: 03 Date: 24 Mar 2020


6 a
u
zo e
6= >:
g^ :
&B z6
:.f
6;
ou
:o O- !
E lbl
F
g
iut 6?
EI
$tr (F
e t^
a fi= 2O
4
E=
Eo
o
zo E
t I:
4e
:, f,
6
z
f,
frP
90
E
I
6;
OU
o vq
=d u
g
ii!
=d E fi+
EA
h
'.<*
34
6>
e2
dE
I L
rE
:E
sE -<d
fi=
trA
9D
z
,ag
*d
- l6.t
tsu
E5
EO tEv
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2024/2/24

I
I

Ref No: ECRL-S4-BR073-P30-PB-RFl-0003 REVOO

Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/24
Time: 08.00 am
Works are intended to commence at Date: 2024/2/24
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/24
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P29-P30/TB-3 ( Tbeam ) (73303)

1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC}
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation
:
Comments:

RFI Rev: 03 Date: 24 Mar 2020


6 a
u
zo e
6= >:
g^ :
6
&B
6; :
:.f
ou o
z
O- !

E lbl
F
g
iut 6?
EI
$tr (F
e
a fi=
t^ 2O
4
E=
Eo
o
zo E
t I:
4e
:, f,
6
z
f,
frP
90
E
I
6;
OU
o vq
=d u
g
ii!
=d E fi+
EA
h
'.<*
34
6>
e2
dE
I L
rE
:E
sE -<d
fi=
trA
9D
z
,ag
*d
- l6.t
tsu
E5
EO tEv
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2024/2/24

I
I

Ref No: ECRL-S4-BR073-P30-PB-RFl-0004 REVOO

Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/24
Time: 08.00 am
Works are intended to commence at Date: 2024/2/24
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/24
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P29-P30/TB-4 ( Tbeam ) (73304)

1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC}
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation
:
Comments:

RFI Rev: 03 Date: 24 Mar 2020


e

e fra
*o f,o P;
U
ka
o F
t EH "
z t!r,
3 fio
i
3 (!fi
z a6
^a
zd
odF
EE
U q O
6 Ea
4L
F 12 PO

PEI qk
ES; HE
6HE
d:td
6a=
eg
4:
sii,
< I O uX
.
F hEE 9-
a=F66
E
a
g
E=
Ed f
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) IDate: 2024/2/24

Ref No: ECRL-S4-BR073-P31-PB-RFl-0001 I REVOO

Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/24
Time: 08.00 am
Works are intended to commence at Date: 2024/2/24
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/24
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P30-P31/TB-1 ( Tbeam ) (73311)

1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC}
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation
:
Comments:

RFI Rev: 03 Date: 24 Mar 2020


e

e fra
*o f,o P;
U
ka
o F
t EH "
z t!r,
3 fio
i
3 (!fi
z a6
^a
zd
odF
EE
U q O
6 Ea
4L
F 12 PO

PEI qk
ES; HE
6HE
d:td
6a=
eg
4:
sii,
< I O uX
.
F hEE 9-
a=F66
E
a
g
E=
Ed f
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2024/2/24

I
I

Ref No: ECRL-S4-BR073-P31-PB-RFl-0002 REVOO

Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/24
Time: 08.00 am
Works are intended to commence at Date: 2024/2/24
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/24
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P30-P31/TB-2 ( Tbeam ) (73312)

1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC}
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation
:
Comments:

RFI Rev: 03 Date: 24 Mar 2020


6 a
u
zo e
6= >:
g^ :
&B z6
:.f
6;
ou
:o O- !
E lbl
F
g
iut 6?
EI
$tr (F
e t^
a fi= 2O
4
E=
Eo
o
zo E
t I:
4e
:, f,
6
z
f,
frP
90
E
I
6;
OU
o vq
=d u
g
ii!
=d E fi+
EA
h
'.<*
34
6>
e2
dE
I L
rE
:E
sE -<d
fi=
trA
9D
z
,ag
*d
- l6.t
tsu
E5
EO tEv
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2024/2/24

I
I

Ref No: ECRL-S4-BR073-P31-PB-RFl-0003 REVOO

Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/24
Time: 08.00 am
Works are intended to commence at Date: 2024/2/24
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/24
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P30-P31/TB-3 ( Tbeam ) (73313)

1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC}
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation
:
Comments:

RFI Rev: 03 Date: 24 Mar 2020


6 a
u
zo e
6= >:
g^ :
6
&B
6; :
:.f
ou o
z
O- !

E lbl
F
g
iut 6?
EI
$tr (F
e
a fi=
t^ 2O
4
E=
Eo
o
zo E
t I:
4e
:, f,
6
z
f,
frP
90
E
I
6;
OU
o vq
=d u
g
ii!
=d E fi+
EA
h
'.<*
34
6>
e2
dE
I L
rE
:E
sE -<d
fi=
trA
9D
z
,ag
*d
- l6.t
tsu
E5
EO tEv
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2024/2/24

I
I

Ref No: ECRL-S4-BR073-P31-PB-RFl-0004 REVOO

Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/24
Time: 08.00 am
Works are intended to commence at Date: 2024/2/24
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/24
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P30-P31/TB-4 ( Tbeam ) (73314)

1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC}
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation
:
Comments:

RFI Rev: 03 Date: 24 Mar 2020


e

e fra
*o f,o P;
U
ka
o F
t EH "
z t!r,
3 fio
i
3 (!fi
z a6
^a
zd
odF
EE
U q O
6 Ea
4L
F 12 PO

PEI qk
ES; HE
6HE
d:td
6a=
eg
4:
sii,
< I O uX
.
F hEE 9-
a=F66
E
a
g
E=
Ed f
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) IDate: 2024/2/24

Ref No: ECRL-S4-BR073-P32-PB-RFl-0001 I REVOO

Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/24
Time: 08.00 am
Works are intended to commence at Date: 2024/2/24
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/24
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P31-P32/TB-1 ( Tbeam ) (73321)

1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC}
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation
:
Comments:

RFI Rev: 03 Date: 24 Mar 2020


e

e fra
*o f,o P;
U
ka
o F
t EH "
z t!r,
3 fio
i
3 (!fi
z a6
^a
zd
odF
EE
U q O
6 Ea
4L
F 12 PO

PEI qk
ES; HE
6HE
d:td
6a=
eg
4:
sii,
< I O uX
.
F hEE 9-
a=F66
E
a
g
E=
Ed f
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2024/2/24

I
I

Ref No: ECRL-S4-BR073-P32-PB-RFl-0002 REVOO

Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/24
Time: 08.00 am
Works are intended to commence at Date: 2024/2/24
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/24
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P31-P32/TB-2 ( Tbeam ) (73322)

1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC}
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation
:
Comments:

RFI Rev: 03 Date: 24 Mar 2020


6 a
u
zo e
6= >:
g^ :
&B z6
:.f
6;
ou
:o O- !
E lbl
F
g
iut 6?
EI
$tr (F
e t^
a fi= 2O
4
E=
Eo
o
zo E
t I:
4e
:, f,
6
z
f,
frP
90
E
I
6;
OU
o vq
=d u
g
ii!
=d E fi+
EA
h
'.<*
34
6>
e2
dE
I L
rE
:E
sE -<d
fi=
trA
9D
z
,ag
*d
- l6.t
tsu
E5
EO tEv
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2024/2/24

I
I

Ref No: ECRL-S4-BR073-P32-PB-RFl-0003 REVOO

Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/24
Time: 08.00 am
Works are intended to commence at Date: 2024/2/24
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/24
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P31-P32/TB-3 ( Tbeam ) (73323)

1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC}
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation
:
Comments:

RFI Rev: 03 Date: 24 Mar 2020


6 a
u
zo e
6= >:
g^ :
6
&B
6; :
:.f
ou o
z
O- !

E lbl
F
g
iut 6?
EI
$tr (F
e
a fi=
t^ 2O
4
E=
Eo
o
zo E
t I:
4e
:, f,
6
z
f,
frP
90
E
I
6;
OU
o vq
=d u
g
ii!
=d E fi+
EA
h
'.<*
34
6>
e2
dE
I L
rE
:E
sE -<d
fi=
trA
9D
z
,ag
*d
- l6.t
tsu
E5
EO tEv
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2024/2/24

I
I

Ref No: ECRL-S4-BR073-P32-PB-RFl-0004 REVOO

Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/24
Time: 08.00 am
Works are intended to commence at Date: 2024/2/24
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/24
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P31-P32/TB-4 ( Tbeam ) (73324)

1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC}
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation
:
Comments:

RFI Rev: 03 Date: 24 Mar 2020


e

e fra
*o f,o P;
U
ka
o F
t EH "
z t!r,
3 fio
i
3 (!fi
z a6
^a
zd
odF
EE
U q O
6 Ea
4L
F 12 PO

PEI qk
ES; HE
6HE
d:td
6a=
eg
4:
sii,
< I O uX
.
F hEE 9-
a=F66
E
a
g
E=
Ed f
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) IDate: 2024/2/24

Ref No: ECRL-S4-BR073-P33-PB-RFl-0001 I REVOO

Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/24
Time: 08.00 am
Works are intended to commence at Date: 2024/2/24
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/24
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P32-P33/TB-1 ( Tbeam ) (73331)

1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC}
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation
:
Comments:

RFI Rev: 03 Date: 24 Mar 2020


e

e fra
*o f,o P;
U
ka
o F
t EH "
z t!r,
3 fio
i
3 (!fi
z a6
^a
zd
odF
EE
U q O
6 Ea
4L
F 12 PO

PEI qk
ES; HE
6HE
d:td
6a=
eg
4:
sii,
< I O uX
.
F hEE 9-
a=F66
E
a
g
E=
Ed f
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2024/2/24

I
I

Ref No: ECRL-S4-BR073-P33-PB-RFl-0002 REVOO

Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/24
Time: 08.00 am
Works are intended to commence at Date: 2024/2/24
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/24
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P32-P33/TB-2 ( Tbeam ) (73332)

1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC}
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation
:
Comments:

RFI Rev: 03 Date: 24 Mar 2020


6 a
u
zo e
6= >:
g^ :
&B z6
:.f
6;
ou
:o O- !
E lbl
F
g
iut 6?
EI
$tr (F
e t^
a fi= 2O
4
E=
Eo
o
zo E
t I:
4e
:, f,
6
z
f,
frP
90
E
I
6;
OU
o vq
=d u
g
ii!
=d E fi+
EA
h
'.<*
34
6>
e2
dE
I L
rE
:E
sE -<d
fi=
trA
9D
z
,ag
*d
- l6.t
tsu
E5
EO tEv
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2024/2/24

I
I

Ref No: ECRL-S4-BR073-P33-PB-RFl-0003 REVOO

Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/24
Time: 08.00 am
Works are intended to commence at Date: 2024/2/24
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/24
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P32-P33/TB-3 ( Tbeam ) (73333)

1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC}
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation
:
Comments:

RFI Rev: 03 Date: 24 Mar 2020


6 a
u
zo e
6= >:
g^ :
6
&B
6; :
:.f
ou o
z
O- !

E lbl
F
g
iut 6?
EI
$tr (F
e
a fi=
t^ 2O
4
E=
Eo
o
zo E
t I:
4e
:, f,
6
z
f,
frP
90
E
I
6;
OU
o vq
=d u
g
ii!
=d E fi+
EA
h
'.<*
34
6>
e2
dE
I L
rE
:E
sE -<d
fi=
trA
9D
z
,ag
*d
- l6.t
tsu
E5
EO tEv
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2024/2/24

I
I

Ref No: ECRL-S4-BR073-P33-PB-RFl-0004 REVOO

Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/24
Time: 08.00 am
Works are intended to commence at Date: 2024/2/24
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/24
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P32-P33/TB-4 ( Tbeam ) (73334)

1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC}
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation
:
Comments:

RFI Rev: 03 Date: 24 Mar 2020


e

e fra
*o f,o P;
U
ka
o F
t EH "
z t!r,
3 fio
i
3 (!fi
z a6
^a
zd
odF
EE
U q O
6 Ea
4L
F 12 PO

PEI qk
ES; HE
6HE
d:td
6a=
eg
4:
sii,
< I O uX
.
F hEE 9-
a=F66
E
a
g
E=
Ed f
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) IDate: 2024/2/24

Ref No: ECRL-S4-BR073-P34-PB-RFl-0001 I REVOO

Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/24
Time: 08.00 am
Works are intended to commence at Date: 2024/2/24
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/24
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P33-P34/TB-1 ( Tbeam ) (73341)

1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC}
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation
:
Comments:

RFI Rev: 03 Date: 24 Mar 2020


e

e fra
*o f,o P;
U
ka
o F
t EH "
z t!r,
3 fio
i
3 (!fi
z a6
^a
zd
odF
EE
U q O
6 Ea
4L
F 12 PO

PEI qk
ES; HE
6HE
d:td
6a=
eg
4:
sii,
< I O uX
.
F hEE 9-
a=F66
E
a
g
E=
Ed f
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2024/2/24

I
I

Ref No: ECRL-S4-BR073-P34-PB-RFl-0002 REVOO

Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/24
Time: 08.00 am
Works are intended to commence at Date: 2024/2/24
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/24
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P33-P34/TB-2 ( Tbeam ) (73342)

1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC}
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation
:
Comments:

RFI Rev: 03 Date: 24 Mar 2020


6 a
u
zo e
6= >:
g^ :
&B 6z
:.f
6;
ou
:o O- !
E lbl
F
g
iut 6?
EI
$tr (F
e fi=
a t^ 2O
4
E=
Eo
o
zo E
t I:
4e
:, f,
6
z
f,
frP
90
E
I
6;
OU
o vq
=d u
g
ii!
=d E fi+
EA
h
'.<*
34
6>
e2
dE
I L
rE
:E
sE -<d
fi=
trA
9D
z
,ag
*d
- l6.t
tsu
E5
EO tEv
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2024/2/24

I
I

Ref No: ECRL-S4-BR073-P34-PB-RFl-0003 REVOO

Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/24
Time: 08.00 am
Works are intended to commence at Date: 2024/2/24
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/24
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P33-P34/TB-3 ( Tbeam ) (73343)

1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC}
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation
:
Comments:

RFI Rev: 03 Date: 24 Mar 2020


6 a
u
zo e
6= >:
g^ :
6
&B
6; :
:.f
ou o
z
O- !

E lbl
F
g
iut 6?
EI
$tr (F
e
a fi=
t^ 2O
4
E=
Eo
o
zo E
t I:
4e
:, f,
6
z
f,
frP
90
E
I
6;
OU
o vq
=d u
g
ii!
=d E fi+
EA
h
'.<*
34
6>
e2
dE
I L
rE
:E
sE -<d
fi=
trA
9D
z
,ag
*d
- l6.t
tsu
E5
EO tEv
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2024/2/24

I
I

Ref No: ECRL-S4-BR073-P34-PB-RFl-0004 REVOO

Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/24
Time: 08.00 am
Works are intended to commence at Date: 2024/2/24
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/24
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P33-P34/TB-4 ( Tbeam ) (73344)

1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC}
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation
:
Comments:

RFI Rev: 03 Date: 24 Mar 2020


e

e fra
*o f,o P;
U
ka
o F
t EH "
z t!r,
3 fio
i
3 (!fi
z a6
^a
zd
odF
EE
U q O
6 Ea
4L
F 12 PO

PEI qk
ES; HE
6HE
d:td
6a=
eg
4:
sii,
< I O uX
.
F hEE 9-
a=F66
E
a
g
E=
Ed f
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) IDate: 2024/2/24

Ref No: ECRL-S4-BR073-P35-PB-RFl-0001 I REVOO

Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/24
Time: 08.00 am
Works are intended to commence at Date: 2024/2/24
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/24
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P34-P35/TB-1 ( Tbeam ) (73351)

1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC}
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation
:
Comments:

RFI Rev: 03 Date: 24 Mar 2020


e

e fra
*o f,o P;
U
ka
o F
t EH "
z t!r,
3 fio
i
3 (!fi
z a6
^a
zd
odF
EE
U q O
6 Ea
4L
F 12 PO

PEI qk
ES; HE
6HE
d:td
6a=
eg
4:
sii,
< I O uX
.
F hEE 9-
a=F66
E
a
g
E=
Ed f
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2024/2/24

I
I

Ref No: ECRL-S4-BR073-P35-PB-RFl-0002 REVOO

Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/24
Time: 08.00 am
Works are intended to commence at Date: 2024/2/24
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/24
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P34-P35/TB-2 ( Tbeam ) (73352)

1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC}
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation
:
Comments:

RFI Rev: 03 Date: 24 Mar 2020


6 a
u
zo e
6= >:
g^ :
&B z6
:.f
6;
ou
:o O- !
E lbl
F
g
iut 6?
EI
$tr (F
e t^
a fi= 2O
4
E=
Eo
o
zo E
t I:
4e
:, f,
6
z
f,
frP
90
E
I
6;
OU
o vq
=d u
g
ii!
=d E fi+
EA
h
'.<*
34
6>
e2
dE
I L
rE
:E
sE -<d
fi=
trA
9D
z
,ag
*d
- l6.t
tsu
E5
EO tEv
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2024/2/24

I
I

Ref No: ECRL-S4-BR073-P35-PB-RFl-0003 REVOO

Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/24
Time: 08.00 am
Works are intended to commence at Date: 2024/2/24
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/24
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P34-P35/TB-3 ( Tbeam ) (73353)

1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC}
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation
:
Comments:

RFI Rev: 03 Date: 24 Mar 2020


6 a
u
zo e
6= >:
g^ :
6
&B
6; :
:.f
ou o
z
O- !

E lbl
F
g
iut 6?
EI
$tr (F
e
a fi=
t^ 2O
4
E=
Eo
o
zo E
t I:
4e
:, f,
6
z
f,
frP
90
E
I
6;
OU
o vq
=d u
g
ii!
=d E fi+
EA
h
'.<*
34
6>
e2
dE
I L
rE
:E
sE -<d
fi=
trA
9D
z
,ag
*d
- l6.t
tsu
E5
EO tEv
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2024/2/24

I
I

Ref No: ECRL-S4-BR073-P35-PB-RFl-0004 REVOO

Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/24
Time: 08.00 am
Works are intended to commence at Date: 2024/2/24
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/24
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P34-P35/TB-4 ( Tbeam ) (73354)

1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC}
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation
:
Comments:

RFI Rev: 03 Date: 24 Mar 2020


e

e fra
*o f,o P;
U
ka
o F
t EH "
z t!r,
3 fio
i
3 (!fi
z a6
^a
zd
odF
EE
U q O
6 Ea
4L
F 12 PO

PEI qk
ES; HE
6HE
d:td
6a=
eg
4:
sii,
< I O uX
.
F hEE 9-
a=F66
E
a
g
E=
Ed f
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) IDate: 2024/2/24

Ref No: ECRL-S4-BR073-P36-PB-RFl-0001 I REVOO

Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/24
Time: 08.00 am
Works are intended to commence at Date: 2024/2/24
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/24
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P35-P36/TB-1 ( Tbeam ) (73361)

1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC}
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation
:
Comments:

RFI Rev: 03 Date: 24 Mar 2020


e

e fra
*o f,o P;
U
ka
o F
t EH "
z t!r,
3 fio
i
3 (!fi
z a6
^a
zd
odF
EE
U q O
6 Ea
4L
F 12 PO

PEI qk
ES; HE
6HE
d:td
6a=
eg
4:
sii,
< I O uX
.
F hEE 9-
a=F66
E
a
g
E=
Ed f
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2024/2/24

I
I

Ref No: ECRL-S4-BR073-P36-PB-RFl-0002 REVOO

Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/24
Time: 08.00 am
Works are intended to commence at Date: 2024/2/24
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/24
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P35-P36/TB-2 ( Tbeam ) (73362)

1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC}
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation
:
Comments:

RFI Rev: 03 Date: 24 Mar 2020


6 a
u
zo e
6= >:
g^ :
&B z6
:.f
6;
ou
:o O- !
E lbl
F
g
iut 6?
EI
$tr (F
e t^
a fi= 2O
4
E=
Eo
o
zo E
t I:
4e
:, f,
6
z
f,
frP
90
E
I
6;
OU
o vq
=d u
g
ii!
=d E fi+
EA
h
'.<*
34
6>
e2
dE
I L
rE
:E
sE -<d
fi=
trA
9D
z
,ag
*d
- l6.t
tsu
E5
EO tEv
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2024/2/24

I
I

Ref No: ECRL-S4-BR073-P36-PB-RFl-0003 REVOO

Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/24
Time: 08.00 am
Works are intended to commence at Date: 2024/2/24
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/24
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P35-P36/TB-3 ( Tbeam ) (73363)

1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC}
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation
:
Comments:

RFI Rev: 03 Date: 24 Mar 2020


6 a
u
zo e
6= >:
g^ :
6
&B
6; :
:.f
ou o
z
O- !

E lbl
F
g
iut 6?
EI
$tr (F
e
a fi=
t^ 2O
4
E=
Eo
o
zo E
t I:
4e
:, f,
6
z
f,
frP
90
E
I
6;
OU
o vq
=d u
g
ii!
=d E fi+
EA
h
'.<*
34
6>
e2
dE
I L
rE
:E
sE -<d
fi=
trA
9D
z
,ag
*d
- l6.t
tsu
E5
EO tEv
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2024/2/24

I
I

Ref No: ECRL-S4-BR073-P36-PB-RFl-0004 REVOO

Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/24
Time: 08.00 am
Works are intended to commence at Date: 2024/2/24
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/24
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P35-P36/TB-4 ( Tbeam ) (73364)

1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC}
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation
:
Comments:

RFI Rev: 03 Date: 24 Mar 2020


e

e fra
*o f,o P;
U
ka
o F
t EH "
z t!r,
3 fio
i
3 (!fi
z a6
^a
zd
odF
EE
U q O
6 Ea
4L
F 12 PO

PEI qk
ES; HE
6HE
d:td
6a=
eg
4:
sii,
< I O uX
.
F hEE 9-
a=F66
E
a
g
E=
Ed f
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) IDate: 2024/2/24

Ref No: ECRL-S4-BR073-P37-PB-RFl-0001 I REVOO

Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/24
Time: 08.00 am
Works are intended to commence at Date: 2024/2/24
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/24
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P36-P37/TB-1 ( Tbeam ) (73371)

1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC}
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation
:
Comments:

RFI Rev: 03 Date: 24 Mar 2020


e

e fra
*o f,o P;
U
ka
o F
t EH "
z t!r,
3 fio
i
3 (!fi
z a6
^a
zd
odF
EE
U q O
6 Ea
4L
F 12 PO

PEI qk
ES; HE
6HE
d:td
6a=
eg
4:
sii,
< I O uX
.
F hEE 9-
a=F66
E
a
g
E=
Ed f
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2024/2/24

I
I

Ref No: ECRL-S4-BR073-P37-PB-RFl-0002 REVOO

Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/24
Time: 08.00 am
Works are intended to commence at Date: 2024/2/24
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/24
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P36-P37/TB-2 ( Tbeam ) (73372)

1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC}
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation
:
Comments:

RFI Rev: 03 Date: 24 Mar 2020


6 a
u
zo e
6= >:
g^ :
&B z6
:.f
6;
ou
:o O- !
E lbl
F
g
iut 6?
EI
$tr (F
e t^
a fi= 2O
4
E=
Eo
o
zo E
t I:
4e
:, f,
6
z
f,
frP
90
E
I
6;
OU
o vq
=d u
g
ii!
=d E fi+
EA
h
'.<*
34
6>
e2
dE
I L
rE
:E
sE -<d
fi=
trA
9D
z
,ag
*d
- l6.t
tsu
E5
EO tEv
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2024/2/24

I
I

Ref No: ECRL-S4-BR073-P37-PB-RFl-0003 REVOO

Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/24
Time: 08.00 am
Works are intended to commence at Date: 2024/2/24
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/24
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P36-P37/TB-3 ( Tbeam ) (73373)

1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC}
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation
:
Comments:

RFI Rev: 03 Date: 24 Mar 2020


6 a
u
zo e
6= >:
g^ :
6
&B
6; :
:.f
ou o
z
O- !

E lbl
F
g
iut 6?
EI
$tr (F
e
a fi=
t^ 2O
4
E=
Eo
o
zo E
t I:
4e
:, f,
6
z
f,
frP
90
E
I
6;
OU
o vq
=d u
g
ii!
=d E fi+
EA
h
'.<*
34
6>
e2
dE
I L
rE
:E
sE -<d
fi=
trA
9D
z
,ag
*d
- l6.t
tsu
E5
EO tEv
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2024/2/24

I
I

Ref No: ECRL-S4-BR073-P37-PB-RFl-0004 REVOO

Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/24
Time: 08.00 am
Works are intended to commence at Date: 2024/2/24
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/24
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P36-P37/TB-4 ( Tbeam ) (73374)

1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC}
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation
:
Comments:

RFI Rev: 03 Date: 24 Mar 2020


e

e fra
*o f,o P;
U
ka
o F
t EH "
z t!r,
3 fio
i
3 (!fi
z a6
^a
zd
odF
EE
U q O
6 Ea
4L
F 12 PO

PEI qk
ES; HE
6HE
d:td
6a=
eg
4:
sii,
< I O uX
.
F hEE 9-
a=F66
E
a
g
E=
Ed f
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2024/2/20

I
I

Ref No: ECRL-S4-BR073-P38-PB-RFl-0001 REVOO

Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/20
Time: 08.00 am
Works are intended to commence at Date: 2024/2/20
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/20
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P37-P38/TB-1 ( Tbeam ) (73381)

1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC}
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation
:
Comments:

RFI Rev: 03 Date: 24 Mar 2020


e

e fra
*o f,o P;
U
ka
o F
t EH "
z t!r,
3 fio
i
3 (!fi
z a6
^a
zd
odF
EE
U q O
6 Ea
4L
F 12 PO

PEI qk
ES; HE
6HE
d:td
6a=
eg
4:
sii,
< I O uX
.
F hEE 9-
a=F66
E
a
g
E=
Ed f
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2024/2/20

I
I

Ref No: ECRL-S4-BR073-P38-PB-RFl-0002 REVOO

Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/20
Time: 08.00 am
Works are intended to commence at Date: 2024/2/20
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/20
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P37-P38/TB-2 ( Tbeam ) (73382)

1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC}
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation
:
Comments:

RFI Rev: 03 Date: 24 Mar 2020


6 a
u
zo e
6= >:
g^ :
&B z6
:.f
6;
ou
:o O- !
E lbl
F
g
iut 6?
EI
$tr (F
e t^
a fi= 2O
4
E=
Eo
o
zo E
t I:
4e
:, f,
6
z
f,
frP
90
E
I
6;
OU
o vq
=d u
g
ii!
=d E fi+
EA
h
'.<*
34
6>
e2
dE
I L
rE
:E
sE -<d
fi=
trA
9D
z
,ag
*d
- l6.t
tsu
E5
EO tEv
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2024/2/20

I
I

Ref No: ECRL-S4-BR073-P38-PB-RFl-0003 REVOO

Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/20
Time: 08.00 am
Works are intended to commence at Date: 2024/2/20
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/20
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P37-P38/TB-3 ( Tbeam ) (73383)

1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC}
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation
:
Comments:

RFI Rev: 03 Date: 24 Mar 2020


6 a
u
zo e
6= >:
g^ :
6
&B
6; :
:.f
ou o
z
O- !

E lbl
F
g
iut 6?
EI
$tr (F
e
a fi=
t^ 2O
4
E=
Eo
o
zo E
t I:
4e
:, f,
6
z
f,
frP
90
E
I
6;
OU
o vq
=d u
g
ii!
=d E fi+
EA
h
'.<*
34
6>
e2
dE
I L
rE
:E
sE -<d
fi=
trA
9D
z
,ag
*d
- l6.t
tsu
E5
EO tEv
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2024/2/20

I
I

Ref No: ECRL-S4-BR073-P38-PB-RFl-0004 REVOO

Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/20
Time: 08.00 am
Works are intended to commence at Date: 2024/2/20
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/20
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P37-P38/TB-4 ( Tbeam ) (73384)

1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC}
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation
:
Comments:

RFI Rev: 03 Date: 24 Mar 2020


e

e fra
*o f,o P;
U
ka
o F
t EH "
z t!r,
3 fio
i
3 (!fi
z a6
^a
zd
odF
EE
U q O
6 Ea
4L
F 12 PO

PEI qk
ES; HE
6HE
d:td
6a=
eg
4:
sii,
< I O uX
.
F hEE 9-
a=F66
E
a
g
E=
Ed f
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2024/2/20

I
I

Ref No: ECRL-S4-BR073-P39-PB-RFl-0001 REVOO

Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/20
Time: 08.00 am
Works are intended to commence at Date: 2024/2/20
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/20
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P38-P39/TB-1 ( Tbeam ) (73391)

1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC}
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation
:
Comments:

RFI Rev: 03 Date: 24 Mar 2020


e

e fra
*o f,o P;
U
ka
o F
t EH "
z t!r,
3 fio
i
3 (!fi
z a6
^a
zd
odF
EE
U q O
6 Ea
4L
F 12 PO

PEI qk
ES; HE
6HE
d:td
6a=
eg
4:
sii,
< I O uX
.
F hEE 9-
a=F66
E
a
g
E=
Ed f
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2024/2/20

I
I

Ref No: ECRL-S4-BR073-P39-PB-RFl-0002 REVOO

Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/20
Time: 08.00 am
Works are intended to commence at Date: 2024/2/20
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/20
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P38-P39/TB-2 ( Tbeam ) (73392)

1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC}
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation
:
Comments:

RFI Rev: 03 Date: 24 Mar 2020


6 a
u
zo e
6= >:
g^ :
&B z6
:.f
6;
ou
:o O- !
E lbl
F
g
iut 6?
EI
$tr (F
e t^
a fi= 2O
4
E=
Eo
o
zo E
t I:
4e
:, f,
6
z
f,
frP
90
E
I
6;
OU
o vq
=d u
g
ii!
=d E fi+
EA
h
'.<*
34
6>
e2
dE
I L
rE
:E
sE -<d
fi=
trA
9D
z
,ag
*d
- l6.t
tsu
E5
EO tEv
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2024/2/20

I
I

Ref No: ECRL-S4-BR073-P39-PB-RFl-0003 REVOO

Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/20
Time: 08.00 am
Works are intended to commence at Date: 2024/2/20
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/20
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P38-P39/TB-3 ( Tbeam ) (73393)

1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC}
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation
:
Comments:

RFI Rev: 03 Date: 24 Mar 2020


6 a
u
zo e
6= >:
g^ :
6
&B
6; :
:.f
ou o
z
O- !

E lbl
F
g
iut 6?
EI
$tr (F
e
a fi=
t^ 2O
4
E=
Eo
o
zo E
t I:
4e
:, f,
6
z
f,
frP
90
E
I
6;
OU
o vq
=d u
g
ii!
=d E fi+
EA
h
'.<*
34
6>
e2
dE
I L
rE
:E
sE -<d
fi=
trA
9D
z
,ag
*d
- l6.t
tsu
E5
EO tEv
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2024/2/20

I
I

Ref No: ECRL-S4-BR073-P39-PB-RFl-0004 REVOO

Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/20
Time: 08.00 am
Works are intended to commence at Date: 2024/2/20
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/20
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P38-P39/TB-4 ( Tbeam ) (73394)

1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC}
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation
:
Comments:

RFI Rev: 03 Date: 24 Mar 2020


e

e fra
*o f,o P;
U
ka
o F
t EH "
z t!r,
3 fio
i
3 (!fi
z a6
^a
zd
odF
EE
U q O
6 Ea
4L
F 12 PO

PEI qk
ES; HE
6HE
d:td
6a=
eg
4:
sii,
< I O uX
.
F hEE 9-
a=F66
E
a
g
E=
Ed f
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2024/2/18

I
I

Ref No: ECRL-S4-BR073-P40-PB-RFl-0001 REVOO

Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/18
Time: 08.00 am
Works are intended to commence at Date: 2024/2/18
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/18
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P39-P40/TB-1 ( Tbeam ) (73401)

1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC}
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation
:
Comments:

RFI Rev: 03 Date: 24 Mar 2020


e

e fra
*o f,o P;
U
ka
o F
t EH "
z t!r,
3 fio
i
3 (!fi
z a6
^a
zd
odF
EE
U q O
6 Ea
4L
F 12 PO

PEI qk
ES; HE
6HE
d:td
6a=
eg
4:
sii,
< I O uX
.
F hEE 9-
a=F66
E
a
g
E=
Ed f
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2024/2/18

I
I

Ref No: ECRL-S4-BR073-P40-PB-RFl-0002 REVOO

Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/18
Time: 08.00 am
Works are intended to commence at Date: 2024/2/18
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/18
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P39-P40/TB-2 ( Tbeam ) (73402)

1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC}
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation
:
Comments:

RFI Rev: 03 Date: 24 Mar 2020


6 a
u
zo e
6= >:
g^ :
&B z6
:.f
6;
ou
:o O- !
E lbl
F
g
iut 6?
EI
$tr (F
e t^
a fi= 2O
4
E=
Eo
o
zo E
t I:
4e
:, f,
6
z
f,
frP
90
E
I
6;
OU
o vq
=d u
g
ii!
=d E fi+
EA
h
'.<*
34
6>
e2
dE
I L
rE
:E
sE -<d
fi=
trA
9D
z
,ag
*d
- l6.t
tsu
E5
EO tEv
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2024/2/18

I
I

Ref No: ECRL-S4-BR073-P40-PB-RFl-0003 REVOO

Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/18
Time: 08.00 am
Works are intended to commence at Date: 2024/2/18
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/18
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P39-P40/TB-3 ( Tbeam ) (73403)

1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC}
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation
:
Comments:

RFI Rev: 03 Date: 24 Mar 2020


6 a
u
zo e
6= >:
g^ :
6
&B
6; :
:.f
ou o
z
O- !

E lbl
F
g
iut 6?
EI
$tr (F
e
a fi=
t^ 2O
4
E=
Eo
o
zo E
t I:
4e
:, f,
6
z
f,
frP
90
E
I
6;
OU
o vq
=d u
g
ii!
=d E fi+
EA
h
'.<*
34
6>
e2
dE
I L
rE
:E
sE -<d
fi=
trA
9D
z
,ag
*d
- l6.t
tsu
E5
EO tEv
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2024/2/18

I
I

Ref No: ECRL-S4-BR073-P40-PB-RFl-0004 REVOO

Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/18
Time: 08.00 am
Works are intended to commence at Date: 2024/2/18
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/18
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P39-P40/TB-4 ( Tbeam ) (73404)

1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC}
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation
:
Comments:

RFI Rev: 03 Date: 24 Mar 2020


e

e fra
*o f,o P;
U
ka
o F
t EH "
z t!r,
3 fio
i
3 (!fi
z a6
^a
zd
odF
EE
U q O
6 Ea
4L
F 12 PO

PEI qk
ES; HE
6HE
d:td
6a=
eg
4:
sii,
< I O uX
.
F hEE 9-
a=F66
E
a
g
E=
Ed f
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2024/2/18

I
I

Ref No: ECRL-S4-BR073-P41-PB-RFl-0001 REVOO

Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/18
Time: 08.00 am
Works are intended to commence at Date: 2024/2/18
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/18
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P40-P41/TB-1 ( Tbeam ) (73411)

1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC}
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation
:
Comments:

RFI Rev: 03 Date: 24 Mar 2020


e

e fra
*o f,o P;
U
ka
o F
t EH "
z t!r,
3 fio
i
3 (!fi
z a6
^a
zd
odF
EE
U q O
6 Ea
4L
F 12 PO

PEI qk
ES; HE
6HE
d:td
6a=
eg
4:
sii,
< I O uX
.
F hEE 9-
a=F66
E
a
g
E=
Ed f
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2024/2/18

I
I

Ref No: ECRL-S4-BR073-P41-PB-RFl-0002 REVOO

Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/18
Time: 08.00 am
Works are intended to commence at Date: 2024/2/18
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/18
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P40-P41/TB-2 ( Tbeam ) (73412)

1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC}
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation
:
Comments:

RFI Rev: 03 Date: 24 Mar 2020


6 a
u
zo e
6= >:
g^ :
&B z6
:.f
6;
ou
:o O- !
E lbl
F
g
iut 6?
EI
$tr (F
e t^
a fi= 2O
4
E=
Eo
o
zo E
t I:
4e
:, f,
6
z
f,
frP
90
E
I
6;
OU
o vq
=d u
g
ii!
=d E fi+
EA
h
'.<*
34
6>
e2
dE
I L
rE
:E
sE -<d
fi=
trA
9D
z
,ag
*d
- l6.t
tsu
E5
EO tEv
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2024/2/18

I
I

Ref No: ECRL-S4-BR073-P41-PB-RFl-0003 REVOO

Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/18
Time: 08.00 am
Works are intended to commence at Date: 2024/2/18
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/18
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P40-P41/TB-3 ( Tbeam ) (73413)

1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC}
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation
:
Comments:

RFI Rev: 03 Date: 24 Mar 2020


6 a
u
zo e
6= >:
g^ :
6
&B
6; :
:.f
ou o
z
O- !

E lbl
F
g
iut 6?
EI
$tr (F
e
a fi=
t^ 2O
4
E=
Eo
o
zo E
t I:
4e
:, f,
6
z
f,
frP
90
E
I
6;
OU
o vq
=d u
g
ii!
=d E fi+
EA
h
'.<*
34
6>
e2
dE
I L
rE
:E
sE -<d
fi=
trA
9D
z
,ag
*d
- l6.t
tsu
E5
EO tEv
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2024/2/18

I
I

Ref No: ECRL-S4-BR073-P41-PB-RFl-0004 REVOO

Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/18
Time: 08.00 am
Works are intended to commence at Date: 2024/2/18
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/18
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P40-P41/TB-4 ( Tbeam ) (73414)

1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC}
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation
:
Comments:

RFI Rev: 03 Date: 24 Mar 2020


e

e fra
*o f,o P;
U
ka
o F
t EH "
z t!r,
3 fio
i
3 (!fi
z a6
^a
zd
odF
EE
U q O
6 Ea
4L
F 12 PO

PEI qk
ES; HE
6HE
d:td
6a=
eg
4:
sii,
< I O uX
.
F hEE 9-
a=F66
E
a
g
E=
Ed f
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2024/2/18

I
I

Ref No: ECRL-S4-BR073-P42-PB-RFl-0001 REVOO

Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/18
Time: 08.00 am
Works are intended to commence at Date: 2024/2/18
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/18
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P41-P42/TB-1 ( Tbeam ) (73421)

1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC}
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation
:
Comments:

RFI Rev: 03 Date: 24 Mar 2020


e

e fra
*o f,o P;
U
ka
o F
t EH "
z t!r,
3 fio
i
3 (!fi
z a6
^a
zd
odF
EE
U q O
6 Ea
4L
F 12 PO

PEI qk
ES; HE
6HE
d:td
6a=
eg
4:
sii,
< I O uX
.
F hEE 9-
a=F66
E
a
g
E=
Ed f
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2024/2/18

I
I

Ref No: ECRL-S4-BR073-P42-PB-RFl-0002 REVOO

Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/18
Time: 08.00 am
Works are intended to commence at Date: 2024/2/18
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/18
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P41-P42/TB-2 ( Tbeam ) (73422)

1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC}
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation
:
Comments:

RFI Rev: 03 Date: 24 Mar 2020


6 a
u
zo e
6= >:
g^ :
&B z6
:.f
6;
ou
:o O- !
E lbl
F
g
iut 6?
EI
$tr (F
e t^
a fi= 2O
4
E=
Eo
o
zo E
t I:
4e
:, f,
6
z
f,
frP
90
E
I
6;
OU
o vq
=d u
g
ii!
=d E fi+
EA
h
'.<*
34
6>
e2
dE
I L
rE
:E
sE -<d
fi=
trA
9D
z
,ag
*d
- l6.t
tsu
E5
EO tEv
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2024/2/18

I
I

Ref No: ECRL-S4-BR073-P42-PB-RFl-0003 REVOO

Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/18
Time: 08.00 am
Works are intended to commence at Date: 2024/2/18
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/18
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P41-P42/TB-3 ( Tbeam ) (73423)

1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC}
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation
:
Comments:

RFI Rev: 03 Date: 24 Mar 2020


6 a
u
zo e
6= >:
g^ :
6
&B
6; :
:.f
ou o
z
O- !

E lbl
F
g
iut 6?
EI
$tr (F
e
a fi=
t^ 2O
4
E=
Eo
o
zo E
t I:
4e
:, f,
6
z
f,
frP
90
E
I
6;
OU
o vq
=d u
g
ii!
=d E fi+
EA
h
'.<*
34
6>
e2
dE
I L
rE
:E
sE -<d
fi=
trA
9D
z
,ag
*d
- l6.t
tsu
E5
EO tEv
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2024/2/18

I
I

Ref No: ECRL-S4-BR073-P42-PB-RFl-0004 REVOO

Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/18
Time: 08.00 am
Works are intended to commence at Date: 2024/2/18
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/18
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P41-P42/TB-4 ( Tbeam ) (73424)

1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC}
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation
:
Comments:

RFI Rev: 03 Date: 24 Mar 2020


e

e fra
*o f,o P;
U
ka
o F
t EH "
z t!r,
3 fio
i
3 (!fi
z a6
^a
zd
odF
EE
U q O
6 Ea
4L
F 12 PO

PEI qk
ES; HE
6HE
d:td
6a=
eg
4:
sii,
< I O uX
.
F hEE 9-
a=F66
E
a
g
E=
Ed f
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2024/2/18

I
I

Ref No: ECRL-S4-BR073-P43-PB-RFl-0001 REVOO

Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/18
Time: 08.00 am
Works are intended to commence at Date: 2024/2/18
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/18
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P42-A1/TB-1 ( Tbeam ) (73431)

1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC}
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation
:
Comments:

RFI Rev: 03 Date: 24 Mar 2020


e

e fra
*o f,o P;
U
ka
o F
t EH "
z t!r,
3 fio
i
3 (!fi
z a6
^a
zd
odF
EE
U q O
6 Ea
4L
F 12 PO

PEI qk
ES; HE
6HE
d:td
6a=
eg
4:
sii,
< I O uX
.
F hEE 9-
a=F66
E
a
g
E=
Ed f
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2024/2/18

I
I

Ref No: ECRL-S4-BR073-P43-PB-RFl-0002 REVOO

Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/18
Time: 08.00 am
Works are intended to commence at Date: 2024/2/18
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/18
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P42-A1/TB-2 ( Tbeam ) (73432)

1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC}
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation
:
Comments:

RFI Rev: 03 Date: 24 Mar 2020


6 a
u
zo e
6= >:
g^ :
&B z6
:.f
6;
ou
:o O- !
E lbl
F
g
iut 6?
EI
$tr (F
e t^
a fi= 2O
4
E=
Eo
o
zo E
t I:
4e
:, f,
6
z
f,
frP
90
E
I
6;
OU
o vq
=d u
g
ii!
=d E fi+
EA
h
'.<*
34
6>
e2
dE
I L
rE
:E
sE -<d
fi=
trA
9D
z
,ag
*d
- l6.t
tsu
E5
EO tEv
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2024/2/18

I
I

Ref No: ECRL-S4-BR073-P43-PB-RFl-0003 REVOO

Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/18
Time: 08.00 am
Works are intended to commence at Date: 2024/2/18
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/18
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P42-A1/TB-3 ( Tbeam ) (73423)

1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC}
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation
:
Comments:

RFI Rev: 03 Date: 24 Mar 2020


6 a
u
zo e
6= >:
g^ :
6
&B
6; :
:.f
ou o
z
O- !

E lbl
F
g
iut 6?
EI
$tr (F
e
a fi=
t^ 2O
4
E=
Eo
o
zo E
t I:
4e
:, f,
6
z
f,
frP
90
E
I
6;
OU
o vq
=d u
g
ii!
=d E fi+
EA
h
'.<*
34
6>
e2
dE
I L
rE
:E
sE -<d
fi=
trA
9D
z
,ag
*d
- l6.t
tsu
E5
EO tEv
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2024/2/18

I
I

Ref No: ECRL-S4-BR073-P43-PB-RFl-0004 REVOO

Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/18
Time: 08.00 am
Works are intended to commence at Date: 2024/2/18
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/18
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P42-A1/TB-4 ( Tbeam ) (73434)

1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC}
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation
:
Comments:

RFI Rev: 03 Date: 24 Mar 2020


e

e fra
*o f,o P;
U
ka
o F
t EH "
z t!r,
3 fio
i
3 (!fi
z a6
^a
zd
odF
EE
U q O
6 Ea
4L
F 12 PO

PEI qk
ES; HE
6HE
d:td
6a=
eg
4:
sii,
< I O uX
.
F hEE 9-
a=F66
E
a
g
E=
Ed f

You might also like