Front Lastttttt
Front Lastttttt
I
I
Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/13
Time: 08.00 am
Works are intended to commence at Date: 2024/2/13
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/13
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 74+1
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR74+1/A0-P1/TB-1 ( Tbeam ) (74+111)
1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage
c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
PEI qk
ES; HE
6HE
d:td
6a=
eg
4:
sii,
< I O uX
.
F hEE 9-
a=F66
E
a
g
E=
Ed f
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I
I
Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/13
Time: 08.00 am
Works are intended to commence at Date: 2024/2/13
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/13
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 74+1
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR74+1/A0-P1/TB-2 ( Tbeam ) (74+112)
1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
I
I
Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/13
Time: 08.00 am
Works are intended to commence at Date: 2024/2/13
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/13
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 74+1
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR74+1/A0-P1/TB-3 ( Tbeam ) (74+113)
1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
E lbl
F
g
iut 6?
EI
$tr (F
e
a fi=
t^ 2O
4
E=
Eo
o
zo E
t I:
4e
:, f,
6
z
f,
frP
90
E
I
6;
OU
o vq
=d u
g
ii!
=d E fi+
EA
h
'.<*
34
6>
e2
dE
I L
rE
:E
sE -<d
fi=
trA
9D
z
,ag
*d
- l6.t
tsu
E5
EO tEv
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I
I
Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/13
Time: 08.00 am
Works are intended to commence at Date: 2024/2/13
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/13
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 74+1
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR74+1/A0-P1/TB-4 ( Tbeam ) (74+114)
1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
e fra
*o f,o P;
U
ka
o F
t EH "
z t!r,
3 fio
i
3 (!fi
z a6
^a
zd
odF
EE
U q O
6 Ea
4L
F 12 PO
PEI qk
ES; HE
6HE
d:td
6a=
eg
4:
sii,
< I O uX
.
F hEE 9-
a=F66
E
a
g
E=
Ed f
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I
I
Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/12
Time: 08.00 am
Works are intended to commence at Date: 2024/2/12
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/12
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 74+1
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR74+1/P1-P2/TB-1 ( Tbeam ) (74+121)
1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
e fra
*o f,o P;
U
ka
o F
t EH "
z t!r,
3 fio
i
3 (!fi
z a6
^a
zd
odF
EE
U q O
6 Ea
4L
F 12 PO
PEI qk
ES; HE
6HE
d:td
6a=
eg
4:
sii,
< I O uX
.
F hEE 9-
a=F66
E
a
g
E=
Ed f
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I
I
Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/12
Time: 08.00 am
Works are intended to commence at Date: 2024/2/12
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/12
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 74+1
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR74+1/P1-P2/TB-2 ( Tbeam ) (74+122)
1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
I
I
Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/12
Time: 08.00 am
Works are intended to commence at Date: 2024/2/12
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/12
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 74+1
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR74+1/P1-P2/TB-3 ( Tbeam ) (74+123)
1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
E lbl
F
g
iut 6?
EI
$tr (F
e
a fi=
t^ 2O
4
E=
Eo
o
zo E
t I:
4e
:, f,
6
z
f,
frP
90
E
I
6;
OU
o vq
=d u
g
ii!
=d E fi+
EA
h
'.<*
34
6>
e2
dE
I L
rE
:E
sE -<d
fi=
trA
9D
z
,ag
*d
- l6.t
tsu
E5
EO tEv
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I
I
Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/12
Time: 08.00 am
Works are intended to commence at Date: 2024/2/12
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/12
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 74+1
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR74+1/P1-P2/TB-4 ( Tbeam ) (74+124)
1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage
c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
e fra
*o f,o P;
U
ka
o F
t EH "
z t!r,
3 fio
i
3 (!fi
z a6
^a
zd
odF
EE
U q O
6 Ea
4L
F 12 PO
PEI qk
ES; HE
6HE
d:td
6a=
eg
4:
sii,
< I O uX
.
F hEE 9-
a=F66
E
a
g
E=
Ed f
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I
I
Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/12
Time: 08.00 am
Works are intended to commence at Date: 2024/2/12
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/12
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 74+1
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR74+1/P2-P3/TB-1 ( Tbeam ) (74+131)
1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage
c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
e fra
*o f,o P;
U
ka
o F
t EH "
z t!r,
3 fio
i
3 (!fi
z a6
^a
zd
odF
EE
U q O
6 Ea
4L
F 12 PO
PEI qk
ES; HE
6HE
d:td
6a=
eg
4:
sii,
< I O uX
.
F hEE 9-
a=F66
E
a
g
E=
Ed f
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I
I
Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/12
Time: 08.00 am
Works are intended to commence at Date: 2024/2/12
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/12
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 74+1
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR74+1/P2-P3/TB-2 ( Tbeam ) (74+132)
1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage
c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
I
I
Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/12
Time: 08.00 am
Works are intended to commence at Date: 2024/2/12
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/12
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 74+1
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR74+1/P2-P3/TB-3 ( Tbeam ) (74+133)
1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
E lbl
F
g
iut 6?
EI
$tr (F
e
a fi=
t^ 2O
4
E=
Eo
o
zo E
t I:
4e
:, f,
6
z
f,
frP
90
E
I
6;
OU
o vq
=d u
g
ii!
=d E fi+
EA
h
'.<*
34
6>
e2
dE
I L
rE
:E
sE -<d
fi=
trA
9D
z
,ag
*d
- l6.t
tsu
E5
EO tEv
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I
I
Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/12
Time: 08.00 am
Works are intended to commence at Date: 2024/2/12
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/12
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 74+1
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR74+1/P2-P3/TB-4 ( Tbeam ) (74+134)
1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
e fra
*o f,o P;
U
ka
o F
t EH "
z t!r,
3 fio
i
3 (!fi
z a6
^a
zd
odF
EE
U q O
6 Ea
4L
F 12 PO
PEI qk
ES; HE
6HE
d:td
6a=
eg
4:
sii,
< I O uX
.
F hEE 9-
a=F66
E
a
g
E=
Ed f
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I
I
Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/12
Time: 08.00 am
Works are intended to commence at Date: 2024/2/12
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/12
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 74+1
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR74+1/P3-P4/TB-1 ( Tbeam ) (74+141)
1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
e fra
*o f,o P;
U
ka
o F
t EH "
z t!r,
3 fio
i
3 (!fi
z a6
^a
zd
odF
EE
U q O
6 Ea
4L
F 12 PO
PEI qk
ES; HE
6HE
d:td
6a=
eg
4:
sii,
< I O uX
.
F hEE 9-
a=F66
E
a
g
E=
Ed f
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I
I
Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/12
Time: 08.00 am
Works are intended to commence at Date: 2024/2/12
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/12
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 74+1
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR74+1/P3-P4/TB-2 ( Tbeam ) (74+142)
1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
I
I
Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/12
Time: 08.00 am
Works are intended to commence at Date: 2024/2/12
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/12
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 74+1
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR74+1/P3-P4/TB-3 ( Tbeam ) (74+143)
1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
E lbl
F
g
iut 6?
EI
$tr (F
e
a fi=
t^ 2O
4
E=
Eo
o
zo E
t I:
4e
:, f,
6
z
f,
frP
90
E
I
6;
OU
o vq
=d u
g
ii!
=d E fi+
EA
h
'.<*
34
6>
e2
dE
I L
rE
:E
sE -<d
fi=
trA
9D
z
,ag
*d
- l6.t
tsu
E5
EO tEv
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I
I
Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/12
Time: 08.00 am
Works are intended to commence at Date: 2024/2/12
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/12
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 74+1
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR74+1/P3-P4/TB-4 ( Tbeam ) (74+144)
1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
e fra
*o f,o P;
U
ka
o F
t EH "
z t!r,
3 fio
i
3 (!fi
z a6
^a
zd
odF
EE
U q O
6 Ea
4L
F 12 PO
PEI qk
ES; HE
6HE
d:td
6a=
eg
4:
sii,
< I O uX
.
F hEE 9-
a=F66
E
a
g
E=
Ed f
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I
I
Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/6
Time: 08.00 am
Works are intended to commence at Date: 2024/2/6
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/6
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 74+1
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR74+1/P4-P5/TB-1 ( Tbeam ) (74+151)
1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
e fra
*o f,o P;
U
ka
o F
t EH "
z t!r,
3 fio
i
3 (!fi
z a6
^a
zd
odF
EE
U q O
6 Ea
4L
F 12 PO
PEI qk
ES; HE
6HE
d:td
6a=
eg
4:
sii,
< I O uX
.
F hEE 9-
a=F66
E
a
g
E=
Ed f
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I
I
Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/6
Time: 08.00 am
Works are intended to commence at Date: 2024/2/6
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/6
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 74+1
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR74+1/P4-P5/TB-2 ( Tbeam ) (74+152)
1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
I
I
Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/6
Time: 08.00 am
Works are intended to commence at Date: 2024/2/6
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/6
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 74+1
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR74+1/P4-P5/TB-3 ( Tbeam ) (74+153)
1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
E lbl
F
g
iut 6?
EI
$tr (F
e
a fi=
t^ 2O
4
E=
Eo
o
zo E
t I:
4e
:, f,
6
z
f,
frP
90
E
I
6;
OU
o vq
=d u
g
ii!
=d E fi+
EA
h
'.<*
34
6>
e2
dE
I L
rE
:E
sE -<d
fi=
trA
9D
z
,ag
*d
- l6.t
tsu
E5
EO tEv
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I
I
Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/6
Time: 08.00 am
Works are intended to commence at Date: 2024/2/6
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/6
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 74+1
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR74+1/P4-P5/TB-4 ( Tbeam ) (74+154)
1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
e fra
*o f,o P;
U
ka
o F
t EH "
z t!r,
3 fio
i
3 (!fi
z a6
^a
zd
odF
EE
U q O
6 Ea
4L
F 12 PO
PEI qk
ES; HE
6HE
d:td
6a=
eg
4:
sii,
< I O uX
.
F hEE 9-
a=F66
E
a
g
E=
Ed f
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I
I
Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/6
Time: 08.00 am
Works are intended to commence at Date: 2024/2/6
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/6
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 74+1
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR74+1/P5-P6/TB-1 ( Tbeam ) (74+161)
1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
e fra
*o f,o P;
U
ka
o F
t EH "
z t!r,
3 fio
i
3 (!fi
z a6
^a
zd
odF
EE
U q O
6 Ea
4L
F 12 PO
PEI qk
ES; HE
6HE
d:td
6a=
eg
4:
sii,
< I O uX
.
F hEE 9-
a=F66
E
a
g
E=
Ed f
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I
I
Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/6
Time: 08.00 am
Works are intended to commence at Date: 2024/2/6
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/6
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 74+1
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR74+1/P5-P6/TB-2 ( Tbeam ) (74+162)
1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
I
I
Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/6
Time: 08.00 am
Works are intended to commence at Date: 2024/2/6
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/6
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 74+1
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR74+1/P5-P6/TB-3 ( Tbeam ) (74+163)
1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
E lbl
F
g
iut 6?
EI
$tr (F
e
a fi=
t^ 2O
4
E=
Eo
o
zo E
t I:
4e
:, f,
6
z
f,
frP
90
E
I
6;
OU
o vq
=d u
g
ii!
=d E fi+
EA
h
'.<*
34
6>
e2
dE
I L
rE
:E
sE -<d
fi=
trA
9D
z
,ag
*d
- l6.t
tsu
E5
EO tEv
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I
I
Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/6
Time: 08.00 am
Works are intended to commence at Date: 2024/2/6
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/6
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 74+1
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR74+1/P5-P6/TB-4 ( Tbeam ) (74+164)
1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
e fra
*o f,o P;
U
ka
o F
t EH "
z t!r,
3 fio
i
3 (!fi
z a6
^a
zd
odF
EE
U q O
6 Ea
4L
F 12 PO
PEI qk
ES; HE
6HE
d:td
6a=
eg
4:
sii,
< I O uX
.
F hEE 9-
a=F66
E
a
g
E=
Ed f
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I
I
Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/6
Time: 08.00 am
Works are intended to commence at Date: 2024/2/6
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/6
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 74+1
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR74+1/P6-P7/TB-1 ( Tbeam ) (74+171)
1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
e fra
*o f,o P;
U
ka
o F
t EH "
z t!r,
3 fio
i
3 (!fi
z a6
^a
zd
odF
EE
U q O
6 Ea
4L
F 12 PO
PEI qk
ES; HE
6HE
d:td
6a=
eg
4:
sii,
< I O uX
.
F hEE 9-
a=F66
E
a
g
E=
Ed f
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I
I
Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/6
Time: 08.00 am
Works are intended to commence at Date: 2024/2/6
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/6
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 74+1
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR74+1/P6-P7/TB-2 ( Tbeam ) (74+172)
1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
I
I
Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/6
Time: 08.00 am
Works are intended to commence at Date: 2024/2/6
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/6
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 74+1
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR74+1/P6-P7/TB-3 ( Tbeam ) (74+173)
1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
E lbl
F
g
iut 6?
EI
$tr (F
e
a fi=
t^ 2O
4
E=
Eo
o
zo E
t I:
4e
:, f,
6
z
f,
frP
90
E
I
6;
OU
o vq
=d u
g
ii!
=d E fi+
EA
h
'.<*
34
6>
e2
dE
I L
rE
:E
sE -<d
fi=
trA
9D
z
,ag
*d
- l6.t
tsu
E5
EO tEv
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I
I
Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/6
Time: 08.00 am
Works are intended to commence at Date: 2024/2/6
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/6
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 74+1
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR74+1/P6-P7/TB-4 ( Tbeam ) (74+174)
1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
e fra
*o f,o P;
U
ka
o F
t EH "
z t!r,
3 fio
i
3 (!fi
z a6
^a
zd
odF
EE
U q O
6 Ea
4L
F 12 PO
PEI qk
ES; HE
6HE
d:td
6a=
eg
4:
sii,
< I O uX
.
F hEE 9-
a=F66
E
a
g
E=
Ed f
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I
I
Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/6
Time: 08.00 am
Works are intended to commence at Date: 2024/2/6
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/6
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 74+1
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR74+1/P7-A1/TB-1 ( Tbeam ) (74+181)
1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
e fra
*o f,o P;
U
ka
o F
t EH "
z t!r,
3 fio
i
3 (!fi
z a6
^a
zd
odF
EE
U q O
6 Ea
4L
F 12 PO
PEI qk
ES; HE
6HE
d:td
6a=
eg
4:
sii,
< I O uX
.
F hEE 9-
a=F66
E
a
g
E=
Ed f
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I
I
Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/6
Time: 08.00 am
Works are intended to commence at Date: 2024/2/6
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/6
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 74+1
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR74+1/P7-A1/TB-2 ( Tbeam ) (74+182)
1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
I
I
Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/6
Time: 08.00 am
Works are intended to commence at Date: 2024/2/6
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/6
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 74+1
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR74+1/P7-A1/TB-3 ( Tbeam ) (74+183)
1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage
c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
E lbl
F
g
iut 6?
EI
$tr (F
e
a fi=
t^ 2O
4
E=
Eo
o
zo E
t I:
4e
:, f,
6
z
f,
frP
90
E
I
6;
OU
o vq
=d u
g
ii!
=d E fi+
EA
h
'.<*
34
6>
e2
dE
I L
rE
:E
sE -<d
fi=
trA
9D
z
,ag
*d
- l6.t
tsu
E5
EO tEv
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I
I
Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/6
Time: 08.00 am
Works are intended to commence at Date: 2024/2/6
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/6
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 74+1
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR74+1/P7-A1/TB-4 ( Tbeam ) (74+184)
1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
e fra
*o f,o P;
U
ka
o F
t EH "
z t!r,
3 fio
i
3 (!fi
z a6
^a
zd
odF
EE
U q O
6 Ea
4L
F 12 PO
PEI qk
ES; HE
6HE
d:td
6a=
eg
4:
sii,
< I O uX
.
F hEE 9-
a=F66
E
a
g
E=
Ed f
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I
I
Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/14
Time: 08.00 am
Works are intended to commence at Date: 2024/2/14
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/14
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 74
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR74/A0-P1/TB-1 ( Tbeam ) (7411)
1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
e fra
*o f,o P;
U
ka
o F
t EH "
z t!r,
3 fio
i
3 (!fi
z a6
^a
zd
odF
EE
U q O
6 Ea
4L
F 12 PO
PEI qk
ES; HE
6HE
d:td
6a=
eg
4:
sii,
< I O uX
.
F hEE 9-
a=F66
E
a
g
E=
Ed f
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I
I
Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/14
Time: 08.00 am
Works are intended to commence at Date: 2024/2/14
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/14
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 74
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR74/A0-P1/TB-2 ( Tbeam ) (7412)
1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
I
I
Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/14
Time: 08.00 am
Works are intended to commence at Date: 2024/2/14
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/14
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 74
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR74/A0-P1/TB-3 ( Tbeam ) (7413)
1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
E lbl
F
g
iut 6?
EI
$tr (F
e
a fi=
t^ 2O
4
E=
Eo
o
zo E
t I:
4e
:, f,
6
z
f,
frP
90
E
I
6;
OU
o vq
=d u
g
ii!
=d E fi+
EA
h
'.<*
34
6>
e2
dE
I L
rE
:E
sE -<d
fi=
trA
9D
z
,ag
*d
- l6.t
tsu
E5
EO tEv
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I
I
Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/14
Time: 08.00 am
Works are intended to commence at Date: 2024/2/14
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/14
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 74
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR74/A0-P1/TB-4 ( Tbeam ) (7414)
1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage
c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
PEI qk
ES; HE
6HE
d:td
6a=
eg
4:
sii,
< I O uX
.
F hEE 9-
a=F66
E
a
g
E=
Ed f
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I
I
Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/14
Time: 08.00 am
Works are intended to commence at Date: 2024/2/14
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/14
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 74
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR74/P1-P2/TB-1 ( Tbeam ) (7421)
1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage
c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
e fra
*o f,o P;
U
ka
o F
t EH "
z t!r,
3 fio
i
3 (!fi
z a6
^a
zd
odF
EE
U q O
6 Ea
4L
F 12 PO
PEI qk
ES; HE
6HE
d:td
6a=
eg
4:
sii,
< I O uX
.
F hEE 9-
a=F66
E
a
g
E=
Ed f
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I
I
Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/14
Time: 08.00 am
Works are intended to commence at Date: 2024/2/14
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/14
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 74
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR74/P1-P2/TB-2 ( Tbeam ) (7422)
1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage
c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
I
I
Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/14
Time: 08.00 am
Works are intended to commence at Date: 2024/2/14
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/14
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 74
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR74/P1-P2/TB-3 ( Tbeam ) (7423)
1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
E lbl
F
g
iut 6?
EI
$tr (F
e
a fi=
t^ 2O
4
E=
Eo
o
zo E
t I:
4e
:, f,
6
z
f,
frP
90
E
I
6;
OU
o vq
=d u
g
ii!
=d E fi+
EA
h
'.<*
34
6>
e2
dE
I L
rE
:E
sE -<d
fi=
trA
9D
z
,ag
*d
- l6.t
tsu
E5
EO tEv
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I
I
Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/14
Time: 08.00 am
Works are intended to commence at Date: 2024/2/14
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/14
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 74
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR74/P1-P2/TB-4 ( Tbeam ) (7424)
1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
e fra
*o f,o P;
U
ka
o F
t EH "
z t!r,
3 fio
i
3 (!fi
z a6
^a
zd
odF
EE
U q O
6 Ea
4L
F 12 PO
PEI qk
ES; HE
6HE
d:td
6a=
eg
4:
sii,
< I O uX
.
F hEE 9-
a=F66
E
a
g
E=
Ed f
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I
I
Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/14
Time: 08.00 am
Works are intended to commence at Date: 2024/2/14
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/14
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 74
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR74/P2-A1/TB-1 ( Tbeam ) (7431)
1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
e fra
*o f,o P;
U
ka
o F
t EH "
z t!r,
3 fio
i
3 (!fi
z a6
^a
zd
odF
EE
U q O
6 Ea
4L
F 12 PO
PEI qk
ES; HE
6HE
d:td
6a=
eg
4:
sii,
< I O uX
.
F hEE 9-
a=F66
E
a
g
E=
Ed f
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I
I
Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/14
Time: 08.00 am
Works are intended to commence at Date: 2024/2/14
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/14
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 74
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR74/P2-A1/TB-2 ( Tbeam ) (7432)
1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage
c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
I
I
Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/14
Time: 08.00 am
Works are intended to commence at Date: 2024/2/14
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/14
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 74
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR74/P2-A1/TB-3 ( Tbeam ) (7433)
1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage
c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
E lbl
F
g
iut 6?
EI
$tr (F
e
a fi=
t^ 2O
4
E=
Eo
o
zo E
t I:
4e
:, f,
6
z
f,
frP
90
E
I
6;
OU
o vq
=d u
g
ii!
=d E fi+
EA
h
'.<*
34
6>
e2
dE
I L
rE
:E
sE -<d
fi=
trA
9D
z
,ag
*d
- l6.t
tsu
E5
EO tEv
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I
I
Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/14
Time: 08.00 am
Works are intended to commence at Date: 2024/2/14
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/14
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 74
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR74/P2-A1/TB-4 ( Tbeam ) (7434)
1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage
c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
e fra
*o f,o P;
U
ka
o F
t EH "
z t!r,
3 fio
i
3 (!fi
z a6
^a
zd
odF
EE
U q O
6 Ea
4L
F 12 PO
PEI qk
ES; HE
6HE
d:td
6a=
eg
4:
sii,
< I O uX
.
F hEE 9-
a=F66
E
a
g
E=
Ed f
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/24
Time: 08.00 am
Works are intended to commence at Date: 2024/2/24
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/24
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P29-P30/TB-1 ( Tbeam ) (73301)
1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage
c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
e fra
*o f,o P;
U
ka
o F
t EH "
z t!r,
3 fio
i
3 (!fi
z a6
^a
zd
odF
EE
U q O
6 Ea
4L
F 12 PO
PEI qk
ES; HE
6HE
d:td
6a=
eg
4:
sii,
< I O uX
.
F hEE 9-
a=F66
E
a
g
E=
Ed f
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I
I
Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/24
Time: 08.00 am
Works are intended to commence at Date: 2024/2/24
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/24
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P29-P30/TB-2 ( Tbeam ) (73302)
1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage
c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
I
I
Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/24
Time: 08.00 am
Works are intended to commence at Date: 2024/2/24
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/24
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P29-P30/TB-3 ( Tbeam ) (73303)
1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage
c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
E lbl
F
g
iut 6?
EI
$tr (F
e
a fi=
t^ 2O
4
E=
Eo
o
zo E
t I:
4e
:, f,
6
z
f,
frP
90
E
I
6;
OU
o vq
=d u
g
ii!
=d E fi+
EA
h
'.<*
34
6>
e2
dE
I L
rE
:E
sE -<d
fi=
trA
9D
z
,ag
*d
- l6.t
tsu
E5
EO tEv
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I
I
Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/24
Time: 08.00 am
Works are intended to commence at Date: 2024/2/24
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/24
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P29-P30/TB-4 ( Tbeam ) (73304)
1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage
c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
e fra
*o f,o P;
U
ka
o F
t EH "
z t!r,
3 fio
i
3 (!fi
z a6
^a
zd
odF
EE
U q O
6 Ea
4L
F 12 PO
PEI qk
ES; HE
6HE
d:td
6a=
eg
4:
sii,
< I O uX
.
F hEE 9-
a=F66
E
a
g
E=
Ed f
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/24
Time: 08.00 am
Works are intended to commence at Date: 2024/2/24
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/24
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P30-P31/TB-1 ( Tbeam ) (73311)
1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage
c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
e fra
*o f,o P;
U
ka
o F
t EH "
z t!r,
3 fio
i
3 (!fi
z a6
^a
zd
odF
EE
U q O
6 Ea
4L
F 12 PO
PEI qk
ES; HE
6HE
d:td
6a=
eg
4:
sii,
< I O uX
.
F hEE 9-
a=F66
E
a
g
E=
Ed f
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I
I
Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/24
Time: 08.00 am
Works are intended to commence at Date: 2024/2/24
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/24
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P30-P31/TB-2 ( Tbeam ) (73312)
1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage
c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
I
I
Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/24
Time: 08.00 am
Works are intended to commence at Date: 2024/2/24
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/24
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P30-P31/TB-3 ( Tbeam ) (73313)
1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage
c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
E lbl
F
g
iut 6?
EI
$tr (F
e
a fi=
t^ 2O
4
E=
Eo
o
zo E
t I:
4e
:, f,
6
z
f,
frP
90
E
I
6;
OU
o vq
=d u
g
ii!
=d E fi+
EA
h
'.<*
34
6>
e2
dE
I L
rE
:E
sE -<d
fi=
trA
9D
z
,ag
*d
- l6.t
tsu
E5
EO tEv
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I
I
Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/24
Time: 08.00 am
Works are intended to commence at Date: 2024/2/24
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/24
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P30-P31/TB-4 ( Tbeam ) (73314)
1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage
c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
e fra
*o f,o P;
U
ka
o F
t EH "
z t!r,
3 fio
i
3 (!fi
z a6
^a
zd
odF
EE
U q O
6 Ea
4L
F 12 PO
PEI qk
ES; HE
6HE
d:td
6a=
eg
4:
sii,
< I O uX
.
F hEE 9-
a=F66
E
a
g
E=
Ed f
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/24
Time: 08.00 am
Works are intended to commence at Date: 2024/2/24
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/24
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P31-P32/TB-1 ( Tbeam ) (73321)
1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage
c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
e fra
*o f,o P;
U
ka
o F
t EH "
z t!r,
3 fio
i
3 (!fi
z a6
^a
zd
odF
EE
U q O
6 Ea
4L
F 12 PO
PEI qk
ES; HE
6HE
d:td
6a=
eg
4:
sii,
< I O uX
.
F hEE 9-
a=F66
E
a
g
E=
Ed f
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I
I
Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/24
Time: 08.00 am
Works are intended to commence at Date: 2024/2/24
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/24
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P31-P32/TB-2 ( Tbeam ) (73322)
1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage
c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
I
I
Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/24
Time: 08.00 am
Works are intended to commence at Date: 2024/2/24
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/24
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P31-P32/TB-3 ( Tbeam ) (73323)
1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage
c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
E lbl
F
g
iut 6?
EI
$tr (F
e
a fi=
t^ 2O
4
E=
Eo
o
zo E
t I:
4e
:, f,
6
z
f,
frP
90
E
I
6;
OU
o vq
=d u
g
ii!
=d E fi+
EA
h
'.<*
34
6>
e2
dE
I L
rE
:E
sE -<d
fi=
trA
9D
z
,ag
*d
- l6.t
tsu
E5
EO tEv
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I
I
Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/24
Time: 08.00 am
Works are intended to commence at Date: 2024/2/24
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/24
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P31-P32/TB-4 ( Tbeam ) (73324)
1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage
c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
e fra
*o f,o P;
U
ka
o F
t EH "
z t!r,
3 fio
i
3 (!fi
z a6
^a
zd
odF
EE
U q O
6 Ea
4L
F 12 PO
PEI qk
ES; HE
6HE
d:td
6a=
eg
4:
sii,
< I O uX
.
F hEE 9-
a=F66
E
a
g
E=
Ed f
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/24
Time: 08.00 am
Works are intended to commence at Date: 2024/2/24
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/24
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P32-P33/TB-1 ( Tbeam ) (73331)
1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage
c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
e fra
*o f,o P;
U
ka
o F
t EH "
z t!r,
3 fio
i
3 (!fi
z a6
^a
zd
odF
EE
U q O
6 Ea
4L
F 12 PO
PEI qk
ES; HE
6HE
d:td
6a=
eg
4:
sii,
< I O uX
.
F hEE 9-
a=F66
E
a
g
E=
Ed f
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I
I
Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/24
Time: 08.00 am
Works are intended to commence at Date: 2024/2/24
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/24
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P32-P33/TB-2 ( Tbeam ) (73332)
1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage
c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
I
I
Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/24
Time: 08.00 am
Works are intended to commence at Date: 2024/2/24
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/24
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P32-P33/TB-3 ( Tbeam ) (73333)
1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage
c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
E lbl
F
g
iut 6?
EI
$tr (F
e
a fi=
t^ 2O
4
E=
Eo
o
zo E
t I:
4e
:, f,
6
z
f,
frP
90
E
I
6;
OU
o vq
=d u
g
ii!
=d E fi+
EA
h
'.<*
34
6>
e2
dE
I L
rE
:E
sE -<d
fi=
trA
9D
z
,ag
*d
- l6.t
tsu
E5
EO tEv
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I
I
Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/24
Time: 08.00 am
Works are intended to commence at Date: 2024/2/24
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/24
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P32-P33/TB-4 ( Tbeam ) (73334)
1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
e fra
*o f,o P;
U
ka
o F
t EH "
z t!r,
3 fio
i
3 (!fi
z a6
^a
zd
odF
EE
U q O
6 Ea
4L
F 12 PO
PEI qk
ES; HE
6HE
d:td
6a=
eg
4:
sii,
< I O uX
.
F hEE 9-
a=F66
E
a
g
E=
Ed f
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/24
Time: 08.00 am
Works are intended to commence at Date: 2024/2/24
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/24
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P33-P34/TB-1 ( Tbeam ) (73341)
1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
e fra
*o f,o P;
U
ka
o F
t EH "
z t!r,
3 fio
i
3 (!fi
z a6
^a
zd
odF
EE
U q O
6 Ea
4L
F 12 PO
PEI qk
ES; HE
6HE
d:td
6a=
eg
4:
sii,
< I O uX
.
F hEE 9-
a=F66
E
a
g
E=
Ed f
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I
I
Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/24
Time: 08.00 am
Works are intended to commence at Date: 2024/2/24
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/24
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P33-P34/TB-2 ( Tbeam ) (73342)
1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage
c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
I
I
Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/24
Time: 08.00 am
Works are intended to commence at Date: 2024/2/24
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/24
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P33-P34/TB-3 ( Tbeam ) (73343)
1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
E lbl
F
g
iut 6?
EI
$tr (F
e
a fi=
t^ 2O
4
E=
Eo
o
zo E
t I:
4e
:, f,
6
z
f,
frP
90
E
I
6;
OU
o vq
=d u
g
ii!
=d E fi+
EA
h
'.<*
34
6>
e2
dE
I L
rE
:E
sE -<d
fi=
trA
9D
z
,ag
*d
- l6.t
tsu
E5
EO tEv
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I
I
Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/24
Time: 08.00 am
Works are intended to commence at Date: 2024/2/24
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/24
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P33-P34/TB-4 ( Tbeam ) (73344)
1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
e fra
*o f,o P;
U
ka
o F
t EH "
z t!r,
3 fio
i
3 (!fi
z a6
^a
zd
odF
EE
U q O
6 Ea
4L
F 12 PO
PEI qk
ES; HE
6HE
d:td
6a=
eg
4:
sii,
< I O uX
.
F hEE 9-
a=F66
E
a
g
E=
Ed f
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/24
Time: 08.00 am
Works are intended to commence at Date: 2024/2/24
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/24
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P34-P35/TB-1 ( Tbeam ) (73351)
1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
e fra
*o f,o P;
U
ka
o F
t EH "
z t!r,
3 fio
i
3 (!fi
z a6
^a
zd
odF
EE
U q O
6 Ea
4L
F 12 PO
PEI qk
ES; HE
6HE
d:td
6a=
eg
4:
sii,
< I O uX
.
F hEE 9-
a=F66
E
a
g
E=
Ed f
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I
I
Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/24
Time: 08.00 am
Works are intended to commence at Date: 2024/2/24
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/24
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P34-P35/TB-2 ( Tbeam ) (73352)
1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage
c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
I
I
Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/24
Time: 08.00 am
Works are intended to commence at Date: 2024/2/24
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/24
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P34-P35/TB-3 ( Tbeam ) (73353)
1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage
c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
E lbl
F
g
iut 6?
EI
$tr (F
e
a fi=
t^ 2O
4
E=
Eo
o
zo E
t I:
4e
:, f,
6
z
f,
frP
90
E
I
6;
OU
o vq
=d u
g
ii!
=d E fi+
EA
h
'.<*
34
6>
e2
dE
I L
rE
:E
sE -<d
fi=
trA
9D
z
,ag
*d
- l6.t
tsu
E5
EO tEv
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I
I
Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/24
Time: 08.00 am
Works are intended to commence at Date: 2024/2/24
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/24
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P34-P35/TB-4 ( Tbeam ) (73354)
1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage
c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
e fra
*o f,o P;
U
ka
o F
t EH "
z t!r,
3 fio
i
3 (!fi
z a6
^a
zd
odF
EE
U q O
6 Ea
4L
F 12 PO
PEI qk
ES; HE
6HE
d:td
6a=
eg
4:
sii,
< I O uX
.
F hEE 9-
a=F66
E
a
g
E=
Ed f
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/24
Time: 08.00 am
Works are intended to commence at Date: 2024/2/24
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/24
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P35-P36/TB-1 ( Tbeam ) (73361)
1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage
c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
e fra
*o f,o P;
U
ka
o F
t EH "
z t!r,
3 fio
i
3 (!fi
z a6
^a
zd
odF
EE
U q O
6 Ea
4L
F 12 PO
PEI qk
ES; HE
6HE
d:td
6a=
eg
4:
sii,
< I O uX
.
F hEE 9-
a=F66
E
a
g
E=
Ed f
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I
I
Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/24
Time: 08.00 am
Works are intended to commence at Date: 2024/2/24
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/24
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P35-P36/TB-2 ( Tbeam ) (73362)
1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage
c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
I
I
Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/24
Time: 08.00 am
Works are intended to commence at Date: 2024/2/24
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/24
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P35-P36/TB-3 ( Tbeam ) (73363)
1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage
c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
E lbl
F
g
iut 6?
EI
$tr (F
e
a fi=
t^ 2O
4
E=
Eo
o
zo E
t I:
4e
:, f,
6
z
f,
frP
90
E
I
6;
OU
o vq
=d u
g
ii!
=d E fi+
EA
h
'.<*
34
6>
e2
dE
I L
rE
:E
sE -<d
fi=
trA
9D
z
,ag
*d
- l6.t
tsu
E5
EO tEv
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I
I
Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/24
Time: 08.00 am
Works are intended to commence at Date: 2024/2/24
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/24
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P35-P36/TB-4 ( Tbeam ) (73364)
1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage
c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
e fra
*o f,o P;
U
ka
o F
t EH "
z t!r,
3 fio
i
3 (!fi
z a6
^a
zd
odF
EE
U q O
6 Ea
4L
F 12 PO
PEI qk
ES; HE
6HE
d:td
6a=
eg
4:
sii,
< I O uX
.
F hEE 9-
a=F66
E
a
g
E=
Ed f
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/24
Time: 08.00 am
Works are intended to commence at Date: 2024/2/24
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/24
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P36-P37/TB-1 ( Tbeam ) (73371)
1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage
c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
e fra
*o f,o P;
U
ka
o F
t EH "
z t!r,
3 fio
i
3 (!fi
z a6
^a
zd
odF
EE
U q O
6 Ea
4L
F 12 PO
PEI qk
ES; HE
6HE
d:td
6a=
eg
4:
sii,
< I O uX
.
F hEE 9-
a=F66
E
a
g
E=
Ed f
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I
I
Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/24
Time: 08.00 am
Works are intended to commence at Date: 2024/2/24
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/24
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P36-P37/TB-2 ( Tbeam ) (73372)
1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage
c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
I
I
Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/24
Time: 08.00 am
Works are intended to commence at Date: 2024/2/24
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/24
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P36-P37/TB-3 ( Tbeam ) (73373)
1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage
c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
E lbl
F
g
iut 6?
EI
$tr (F
e
a fi=
t^ 2O
4
E=
Eo
o
zo E
t I:
4e
:, f,
6
z
f,
frP
90
E
I
6;
OU
o vq
=d u
g
ii!
=d E fi+
EA
h
'.<*
34
6>
e2
dE
I L
rE
:E
sE -<d
fi=
trA
9D
z
,ag
*d
- l6.t
tsu
E5
EO tEv
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I
I
Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/24
Time: 08.00 am
Works are intended to commence at Date: 2024/2/24
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/24
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P36-P37/TB-4 ( Tbeam ) (73374)
1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage
c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
e fra
*o f,o P;
U
ka
o F
t EH "
z t!r,
3 fio
i
3 (!fi
z a6
^a
zd
odF
EE
U q O
6 Ea
4L
F 12 PO
PEI qk
ES; HE
6HE
d:td
6a=
eg
4:
sii,
< I O uX
.
F hEE 9-
a=F66
E
a
g
E=
Ed f
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I
I
Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/20
Time: 08.00 am
Works are intended to commence at Date: 2024/2/20
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/20
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P37-P38/TB-1 ( Tbeam ) (73381)
1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage
c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
e fra
*o f,o P;
U
ka
o F
t EH "
z t!r,
3 fio
i
3 (!fi
z a6
^a
zd
odF
EE
U q O
6 Ea
4L
F 12 PO
PEI qk
ES; HE
6HE
d:td
6a=
eg
4:
sii,
< I O uX
.
F hEE 9-
a=F66
E
a
g
E=
Ed f
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I
I
Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/20
Time: 08.00 am
Works are intended to commence at Date: 2024/2/20
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/20
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P37-P38/TB-2 ( Tbeam ) (73382)
1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage
c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
I
I
Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/20
Time: 08.00 am
Works are intended to commence at Date: 2024/2/20
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/20
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P37-P38/TB-3 ( Tbeam ) (73383)
1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage
c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
E lbl
F
g
iut 6?
EI
$tr (F
e
a fi=
t^ 2O
4
E=
Eo
o
zo E
t I:
4e
:, f,
6
z
f,
frP
90
E
I
6;
OU
o vq
=d u
g
ii!
=d E fi+
EA
h
'.<*
34
6>
e2
dE
I L
rE
:E
sE -<d
fi=
trA
9D
z
,ag
*d
- l6.t
tsu
E5
EO tEv
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I
I
Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/20
Time: 08.00 am
Works are intended to commence at Date: 2024/2/20
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/20
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P37-P38/TB-4 ( Tbeam ) (73384)
1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage
c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
e fra
*o f,o P;
U
ka
o F
t EH "
z t!r,
3 fio
i
3 (!fi
z a6
^a
zd
odF
EE
U q O
6 Ea
4L
F 12 PO
PEI qk
ES; HE
6HE
d:td
6a=
eg
4:
sii,
< I O uX
.
F hEE 9-
a=F66
E
a
g
E=
Ed f
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I
I
Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/20
Time: 08.00 am
Works are intended to commence at Date: 2024/2/20
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/20
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P38-P39/TB-1 ( Tbeam ) (73391)
1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage
c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
e fra
*o f,o P;
U
ka
o F
t EH "
z t!r,
3 fio
i
3 (!fi
z a6
^a
zd
odF
EE
U q O
6 Ea
4L
F 12 PO
PEI qk
ES; HE
6HE
d:td
6a=
eg
4:
sii,
< I O uX
.
F hEE 9-
a=F66
E
a
g
E=
Ed f
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I
I
Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/20
Time: 08.00 am
Works are intended to commence at Date: 2024/2/20
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/20
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P38-P39/TB-2 ( Tbeam ) (73392)
1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage
c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
I
I
Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/20
Time: 08.00 am
Works are intended to commence at Date: 2024/2/20
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/20
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P38-P39/TB-3 ( Tbeam ) (73393)
1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage
c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
E lbl
F
g
iut 6?
EI
$tr (F
e
a fi=
t^ 2O
4
E=
Eo
o
zo E
t I:
4e
:, f,
6
z
f,
frP
90
E
I
6;
OU
o vq
=d u
g
ii!
=d E fi+
EA
h
'.<*
34
6>
e2
dE
I L
rE
:E
sE -<d
fi=
trA
9D
z
,ag
*d
- l6.t
tsu
E5
EO tEv
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I
I
Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/20
Time: 08.00 am
Works are intended to commence at Date: 2024/2/20
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/20
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P38-P39/TB-4 ( Tbeam ) (73394)
1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage
c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
e fra
*o f,o P;
U
ka
o F
t EH "
z t!r,
3 fio
i
3 (!fi
z a6
^a
zd
odF
EE
U q O
6 Ea
4L
F 12 PO
PEI qk
ES; HE
6HE
d:td
6a=
eg
4:
sii,
< I O uX
.
F hEE 9-
a=F66
E
a
g
E=
Ed f
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I
I
Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/18
Time: 08.00 am
Works are intended to commence at Date: 2024/2/18
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/18
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P39-P40/TB-1 ( Tbeam ) (73401)
1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage
c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
e fra
*o f,o P;
U
ka
o F
t EH "
z t!r,
3 fio
i
3 (!fi
z a6
^a
zd
odF
EE
U q O
6 Ea
4L
F 12 PO
PEI qk
ES; HE
6HE
d:td
6a=
eg
4:
sii,
< I O uX
.
F hEE 9-
a=F66
E
a
g
E=
Ed f
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I
I
Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/18
Time: 08.00 am
Works are intended to commence at Date: 2024/2/18
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/18
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P39-P40/TB-2 ( Tbeam ) (73402)
1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage
c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
I
I
Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/18
Time: 08.00 am
Works are intended to commence at Date: 2024/2/18
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/18
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P39-P40/TB-3 ( Tbeam ) (73403)
1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage
c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
E lbl
F
g
iut 6?
EI
$tr (F
e
a fi=
t^ 2O
4
E=
Eo
o
zo E
t I:
4e
:, f,
6
z
f,
frP
90
E
I
6;
OU
o vq
=d u
g
ii!
=d E fi+
EA
h
'.<*
34
6>
e2
dE
I L
rE
:E
sE -<d
fi=
trA
9D
z
,ag
*d
- l6.t
tsu
E5
EO tEv
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I
I
Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/18
Time: 08.00 am
Works are intended to commence at Date: 2024/2/18
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/18
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P39-P40/TB-4 ( Tbeam ) (73404)
1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage
c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
e fra
*o f,o P;
U
ka
o F
t EH "
z t!r,
3 fio
i
3 (!fi
z a6
^a
zd
odF
EE
U q O
6 Ea
4L
F 12 PO
PEI qk
ES; HE
6HE
d:td
6a=
eg
4:
sii,
< I O uX
.
F hEE 9-
a=F66
E
a
g
E=
Ed f
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I
I
Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/18
Time: 08.00 am
Works are intended to commence at Date: 2024/2/18
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/18
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P40-P41/TB-1 ( Tbeam ) (73411)
1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage
c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
e fra
*o f,o P;
U
ka
o F
t EH "
z t!r,
3 fio
i
3 (!fi
z a6
^a
zd
odF
EE
U q O
6 Ea
4L
F 12 PO
PEI qk
ES; HE
6HE
d:td
6a=
eg
4:
sii,
< I O uX
.
F hEE 9-
a=F66
E
a
g
E=
Ed f
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I
I
Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/18
Time: 08.00 am
Works are intended to commence at Date: 2024/2/18
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/18
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P40-P41/TB-2 ( Tbeam ) (73412)
1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage
c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
I
I
Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/18
Time: 08.00 am
Works are intended to commence at Date: 2024/2/18
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/18
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P40-P41/TB-3 ( Tbeam ) (73413)
1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage
c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
E lbl
F
g
iut 6?
EI
$tr (F
e
a fi=
t^ 2O
4
E=
Eo
o
zo E
t I:
4e
:, f,
6
z
f,
frP
90
E
I
6;
OU
o vq
=d u
g
ii!
=d E fi+
EA
h
'.<*
34
6>
e2
dE
I L
rE
:E
sE -<d
fi=
trA
9D
z
,ag
*d
- l6.t
tsu
E5
EO tEv
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I
I
Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/18
Time: 08.00 am
Works are intended to commence at Date: 2024/2/18
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/18
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P40-P41/TB-4 ( Tbeam ) (73414)
1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage
c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
e fra
*o f,o P;
U
ka
o F
t EH "
z t!r,
3 fio
i
3 (!fi
z a6
^a
zd
odF
EE
U q O
6 Ea
4L
F 12 PO
PEI qk
ES; HE
6HE
d:td
6a=
eg
4:
sii,
< I O uX
.
F hEE 9-
a=F66
E
a
g
E=
Ed f
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I
I
Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/18
Time: 08.00 am
Works are intended to commence at Date: 2024/2/18
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/18
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P41-P42/TB-1 ( Tbeam ) (73421)
1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage
c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
e fra
*o f,o P;
U
ka
o F
t EH "
z t!r,
3 fio
i
3 (!fi
z a6
^a
zd
odF
EE
U q O
6 Ea
4L
F 12 PO
PEI qk
ES; HE
6HE
d:td
6a=
eg
4:
sii,
< I O uX
.
F hEE 9-
a=F66
E
a
g
E=
Ed f
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I
I
Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/18
Time: 08.00 am
Works are intended to commence at Date: 2024/2/18
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/18
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P41-P42/TB-2 ( Tbeam ) (73422)
1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage
c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
I
I
Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/18
Time: 08.00 am
Works are intended to commence at Date: 2024/2/18
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/18
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P41-P42/TB-3 ( Tbeam ) (73423)
1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage
c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
E lbl
F
g
iut 6?
EI
$tr (F
e
a fi=
t^ 2O
4
E=
Eo
o
zo E
t I:
4e
:, f,
6
z
f,
frP
90
E
I
6;
OU
o vq
=d u
g
ii!
=d E fi+
EA
h
'.<*
34
6>
e2
dE
I L
rE
:E
sE -<d
fi=
trA
9D
z
,ag
*d
- l6.t
tsu
E5
EO tEv
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I
I
Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/18
Time: 08.00 am
Works are intended to commence at Date: 2024/2/18
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/18
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P41-P42/TB-4 ( Tbeam ) (73424)
1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage
c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
e fra
*o f,o P;
U
ka
o F
t EH "
z t!r,
3 fio
i
3 (!fi
z a6
^a
zd
odF
EE
U q O
6 Ea
4L
F 12 PO
PEI qk
ES; HE
6HE
d:td
6a=
eg
4:
sii,
< I O uX
.
F hEE 9-
a=F66
E
a
g
E=
Ed f
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I
I
Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/18
Time: 08.00 am
Works are intended to commence at Date: 2024/2/18
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/18
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P42-A1/TB-1 ( Tbeam ) (73431)
1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage
c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
e fra
*o f,o P;
U
ka
o F
t EH "
z t!r,
3 fio
i
3 (!fi
z a6
^a
zd
odF
EE
U q O
6 Ea
4L
F 12 PO
PEI qk
ES; HE
6HE
d:td
6a=
eg
4:
sii,
< I O uX
.
F hEE 9-
a=F66
E
a
g
E=
Ed f
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I
I
Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/18
Time: 08.00 am
Works are intended to commence at Date: 2024/2/18
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/18
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P42-A1/TB-2 ( Tbeam ) (73432)
1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage
c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
I
I
Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/18
Time: 08.00 am
Works are intended to commence at Date: 2024/2/18
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/18
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P42-A1/TB-3 ( Tbeam ) (73423)
1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage
c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
E lbl
F
g
iut 6?
EI
$tr (F
e
a fi=
t^ 2O
4
E=
Eo
o
zo E
t I:
4e
:, f,
6
z
f,
frP
90
E
I
6;
OU
o vq
=d u
g
ii!
=d E fi+
EA
h
'.<*
34
6>
e2
dE
I L
rE
:E
sE -<d
fi=
trA
9D
z
,ag
*d
- l6.t
tsu
E5
EO tEv
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I
I
Discipline: Section:
I
BRIDGE CONSTRUCTION S4
The following works are/will be ready for inspection/testing at Date: 2024/2/18
Time: 08.00 am
Works are intended to commence at Date: 2024/2/18
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
NIE DAPENG ENGINEER cccc 2024/2/18
Signature
��J'
DESCRIPTION OF WORKS
Location:
BRIDGE 73
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE02/00027-00028
inspection activity:
BR73/P42-A1/TB-4 ( Tbeam ) (73434)
1) Inspection for installation of rebar and formwork of precast T- beam 8) Protective layer
2) Inspection for concreting of precast T - beam 9) 28days cube test for protective layer
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28 days cube test for sealing Anchorage
c::::J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
e fra
*o f,o P;
U
ka
o F
t EH "
z t!r,
3 fio
i
3 (!fi
z a6
^a
zd
odF
EE
U q O
6 Ea
4L
F 12 PO
PEI qk
ES; HE
6HE
d:td
6a=
eg
4:
sii,
< I O uX
.
F hEE 9-
a=F66
E
a
g
E=
Ed f