0% found this document useful (0 votes)
1K views354 pages

Material Submittal For Fire Rated System

The document is a comments form reviewing a material submittal for fire rated glass doors and partitions. It includes 8 comments from the consultant with requests for additional documentation, shop drawings, samples, and compliance with specifications. The contractor must address each comment and note their action or response.

Uploaded by

Chris Enyinnaya
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
1K views354 pages

Material Submittal For Fire Rated System

The document is a comments form reviewing a material submittal for fire rated glass doors and partitions. It includes 8 comments from the consultant with requests for additional documentation, shop drawings, samples, and compliance with specifications. The contractor must address each comment and note their action or response.

Uploaded by

Chris Enyinnaya
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 354

COMMENTS FORM

PROJECT: CONSTRUCTION OF THE ARAB INTERNATIONAL ACADEMY SCHOOLS- TARSHEED

Client ASHGHAL (Public Works Authority - PWA) Date Review


31 January 2024
Consultant: AEB (Arab Engineering Bureau) Completed
Contractor Boom General Contractors
Contract No. C2023/4
Project ID No.: BP 2022 C 004 G

Document / FIRE RATED GLASS DOOR & PARTITION


Submitted by
Package Name WITH IRON MONGERY
Supplier Nabina Aluminium & Glass Factory Boom General Contractors
Manufacturer Nabina Aluminium & Glass Factory Submitted to
Reference/ Rev. BP2022C004G-AIAS-MAR-ARC-0094-0 AEB (Arab Engineering Bureau)

SR. DOCUMENT
CONSULTANT COMMENTS Status ACTION BY CONTRACTOR
NO REFERENCE
Please note that the system
Architectural: supplier does not have the
approved type in their
1. Door handle and door closer shall be the same C catalogue. The profile and
as previously approved hardware for steel door. the accessories are tested
as a system and may not be
compatible with other
brands. Please refer to the
attached letter from the
manufacturer in section 5
Shop drawing is submitted
2. Please submit detailed shop drawing for review B
and approval.

Glass sample is submitted


3. Please submit glass physical sample for B
approval.

QAQC:

4. Compliance statement shall have material B Noted and complied.


submittal reference Number and to be signed Reference number is added,
and and compliance statement is
stamped also by Main Contractor (BGC) in all stamped and signed.
pages

5. Submission of Warranty to comply with B Warranty will be submitted


Contract/Project Specification requirement (i.e. separately.
with stipulated format & to be submitted to
Authority along with final dossier). To be
submitted & reviewed separately during handing
over stage
6. Material delivery, transportation and storage B Material delivery,
method shall be as per manufacturer’s transportation and storage
recommendation. method shall be as per
manufacturer’s
recommendation.

Legend: A – Approved; B – Approved as Noted: C – Revised and Resubmit; D – Rejected; E – For Information

AIAS-F-QAQC-0001 V0.0 (15/2/2023) Page 1 of 2


7. Valid test certificate, country of origin certificate B Valid test certificate, country
from chamber of commerce, Bill of of origin certificate from
lading/packing list to be provided during material chamber of commerce, Bill of
delivery at site of the approved materials lading/packing list to be
provided during material
delivery at site of the approved
materials
8. Contractor to submit MST/ITP upon obtaining B MST/ITP will be submitted
approval of the MAR. separately for approval

Document(s) Status
☐ A - Approved ☐ B - Approved as Noted: ☐ C - Revise and Resubmit: ☐ D - Rejected

Reviewed by : Reviewed by : Checked by : Approved by : Approved by :

Sr. Engineer QAQC Manager Const. Manager Project Manager PWA – Ashghal

Date: Date: Date: Date: Date:

Legend: A – Approved; B – Approved as Noted: C – Revised and Resubmit; D – Rejected; E – For Information

AIAS-F-QAQC-0001 V0.0 (15/2/2023) Page 2 of 2


Project Logo
Project Name : Construction of Arab International Academy Schools - Tarsheed
Project No. : Form Ref. No. : P07-F21 / Rev. 0 / Feb. 2012

Client Project Manager: Consultant: Contractor

arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau ara

Block / Building Name : Material Submittal Ref. No. :


Location of Use : Name of Material : Fire Rated Partitions and Door
Date Submitted : Submitted by : Enyinnaya.

Material For Fire Rated Partitions and Doors

Project Name: Construction of Arab International Academy Schools - Tarsheed

Consultant: Arab Engineering Bureau

Main Contractor: Boom General Contractors

FR Contractor: Nabina Aluminum & Glass Factory


Project Logo
Project Name : Construction of Arab International Academy Schools - Tarsheed
Project No. : Form Ref. No. : P07-F21 / Rev. 0 / Feb. 2012

Client Project Manager: Consultant: Contractor

arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau ara

Block / Building Name : Material Submittal Ref. No. :


Location of Use : Name of Material : Fire Rated Partitions and Door
Date Submitted : Submitted by : Enyinnaya.

TABLE OF CONTENT

S/No Description

1 Scope and/or area of application.

2 IFC Drawings Reference identifying the intended Scope.

3 Project Specifications.

4 Compliance Statement.

5 Manufacturer Letter for Door Handle

6 Material List and Description.

Product description (Product catalogue / Manufacturer specifications /


7
Material technical data sheets).

8 Installation recommendations and/or application guidelines.

9 QCDD Certificates

Valid test reports and/or certificates (others applicator certificates if


10
required).

11 Safety material data sheet (SMDS) / handling & storage requirements.

12 Quality assurance & quality control literature (Manufacturer/Supplier)

13 Material Sources (Country of Origin Certificate)

14 Project references list.

15 M.A.R approvals from previous projects.

16 Samples board for hardware & accessories


Project Logo
Project Name : Construction of Arab International Academy Schools - Tarsheed
Project No. : Form Ref. No. : P07-F21 / Rev. 0 / Feb. 2012

Client Project Manager: Consultant: Contractor

arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau ara

Block / Building Name : Material Submittal Ref. No. :


Location of Use : Name of Material : Fire Rated Partitions and Door
Date Submitted : Submitted by : Enyinnaya.

SCOPE OF WORK
The scope of work covers Supply, Fabrication and Installation of fire rated systems,
which include-
- Fixed Partition
- Swing doors
- Door accessories.
For the construction of Arab International Academy School - Tarsheed
Project Logo
Project Name : Construction of Arab International Academy Schools - Tarsheed
Project No. : Form Ref. No. : P07-F21 / Rev. 0 / Feb. 2012

Client Project Manager: Consultant: Contractor

arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau ara

Block / Building Name : Material Submittal Ref. No. :


Location of Use : Name of Material : Fire Rated Partitions and Door
Date Submitted : Submitted by : Enyinnaya.

IFC DRAWINGS REFERENCE IDENTIFYING THE INTENDED SCOPE


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
• ALL DIMENSIONS AND LEVELS ARE IN METERS UNLESS
OTHERWISE SPECIFICALLY INDICATED.
• LEVEL ±0.000 IS EQUIVALENT TO +19.50 DATUM LEVEL.
83.98 • THIS DRAWING SHALL BE READ WITH ALL RELATED
SERVICES DRAWINGS.
4.75 6.70 6.10 6.00 6.00 5.00 3.10 4.02 2.67 5.22 6.08 3.55 2.50 4.80 2.53 6.50 8.45 • FOR SETTING OUT OF STRUCTURAL WALLS AND
COLUMNS REFER TO STRUCTURAL DRAWINGS.
• ALL FREE STANDING CONCRETE COLUMNS TO BE FAIR-
FACED AND SMOOTHLY FINISHED UNLESS OTHERWISE
SPECIFICALLY INDICATED.
• INTERNAL DIMENSIONS ARE TAKEN FROM FACE OF
BLOCKWORK, FACE OF CONCRETE WORK OR FACE OF
CEMENT BOARD WORKS UNLESS OTHERWISE STATED.
• EXTERNAL DIMENSIONS ARE TAKEN FROM FACE OF
FINISHED WALL UNLESS OTHERWISE STATED.
• DOORS AND WINDOWS DIMENSIONS SHOWN ARE
MATCH LINE MATCH LINE A CLEAR OPENING.
• THIS DRAWING SHALL BE READ WITH ANNOTATION
F PLANS FOR REFERENCING OF OPENINGS AND
B ENLARGEMENTS.
CA-A-302 • FOR WINDOW, CURTAIN WALL & DOOR DETAILS REFER
ADA MALE TO ASSOCIATED SCHEDULES AND DRAWINGS.
EW-17 EW-17 EW-17
EW-17
CA-W29
TOILET
FEMALE TOILET 5 C • FOR FIT OUTS, FIXTURES, FITTED FURNITURE AND
CA-C06
CA-W06 CA-W05 CA-W04
6 EQUIPMENT REFER TO INTERIOR DRAWINGS.
D12-C D27 D11 • FOR WET AREA DETAILS, REFER TO TYPICAL WET AREA

0.77 1.13
CA-50 CA-49 CA-56
ENLARGEMENTS IN THE INTERIOR DRAWINGS.
BACK
A3/A509 SHAFT STAIRS D • FOR SIGNS AMD WAY FINDING REFERS TO SIGNAGE

0.99
STAGE-CHANGING 0.50
(M) 9 QUALITY 01
D23
55 F.F.L BOOKSHOP
ASSURANCE H1 D25 D25 EW-18
PACKAGE.
CA-33 STORE B2 MEETING ROOM CA-W03
• ALL EXTERNAL FINISHED FLOOR LEVELS ARE NOMINAL
OFFICE CA-25 CA-24

D12
10
ELEVATOR 8
4
E AND ARE TO BE READ IN CONJUNCTION WITH

1.65
D02
CA-18 01
UP CA-45
LANDSCAPE DRAWINGS.
B D07 D39
• FOR SETTING OUT OF EXTERNAL WORKS, CANOPIES
IW-06 CA-17
A3/A552 D26 CA-55

1.15
CA-35
CA-A-301 D02-B 0.50 AND PLANTERS REFER TO LANDSCAPE DRAWINGS.
• FOR MESH ELEVATIONS, REFER TO RELEVANT

2.20 0.90
CA-08
F.F.L
LOBBY
19
ASSISTANT
EW-18
SCHEDULE.
-4.90
-5.20 AV
53 FOYER
DIRECTOR'S
OFFICE
CA-W02
G
F.F.L
F.F.L 21 EXP. JOINT CA-C02
D39
CA-15
3
D07

0.48
A A3/A552
CA-16
0.50 1.20 D39
F.F.L
CA-14
H

1.00 2.12
CA-A-301 D02-B TOILET D25
CA-32
CA-09 LOBBY 2

2.75
LCS 19
54

24.65
EW-19
I
UNIFORM STORE CA-W08

11 DIRECTOR'S

2.80
CA-M01 OFFICE

DN D12
CA-19
H1
CA-C01
REF. TO MESH
1
J
C SCHEDULES

0.75 1.05
D23 BACK
CA-34
STAGE-CHANGING
CA-A-302 0.50 K

0.80
(F)
57 A3/A509 F.F.L EW-16
CA-W01

CA-C05
PANTRY
D28
CA-22
0.50 D39
L
12 CA-13
F.F.L HEAD
D29-B D29-C ADMISSION
JANITOR
DN
CA-01
A4/A567
CA-02
A4/A567 OFFICE M

6.85
18 EW-16
STAFF-FEMALE D25 13 D25 STAFF-MALE ELEC. & MDF
CA-W07
SHAFT CA-26 CA-27
GENERAL KEY PLAN
24 TOILET TOILET SERVER ROOM ROOM
15 14 31 16
D29
CA-03 N PARKING

SENIOR
SCHOOL
SPORT PARKING
LONG JUMP
BUILDING
SENIOR

O OUTDOOR
SPACE

D
MATCH LINE MATCH LINE MAIN
SPECIAL

NO
DRAIN DETAIL

STADIUM CANTEEN PLAZA CENTRAL ADMINISTRATION


SERVICES
CA-A-302

RT
P
FOOTBALL & SPORTS
FIELD

H
JUNIOR SCHOOL

G E
BRAKE TANK 75m3
LOCATION

KG &
JUNIOR PARKING
PRE-KG
CA-A-302 CA-A-302 OUTDOOR
SPACE
SCHOOL

PARKING

1 CA-A-FP-GF-ANN
SCALE 1 : 200

NOV
00 ISSUED FOR CONSTRUCTION
2022
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 ‫ﺍﻟﺗﺎﺭﻳﺦ ﺗﻌﺩﻳﻝ‬ ‫ﺍﻟﻭﺻﻑ‬ ‫ﺑﻭﺍﺳﻁﺔ‬
REV. DATE DESCRIPTION BY
83.98
Stamp :
4.75 6.70 6.10 6.00 6.00 5.00 3.10 4.02 2.67 5.22 6.08 3.55 2.50 4.80 2.53 6.50 8.45

F
A
CA-A-302

ACCOUNTING
2 2 ADA FEMALE B
8.15 TOILET OUTDOOR
OFFICE CA-A-403 CA-A-401 27
T.O.P MALE TOILET COURT
7.65 EW-17 EW-17 33 EW-17 EW-17 28 02
T.O.P
CA-W13 CA-W12 CA-W11 CA-W10
C

0.77 1.13
E3/ A503 SHAFT
D

0.99
PROCUREMENT 9
ACADEMIC
FINANCE
OFFICE
C1/ A563 CA-C07
EW-17 COORDINATOR 1 OFFECER 2 32
MAIN FACILITIES
H1 STAIRS
OFFICE ROOM D25 D25
CA-W14
35
B2
01 CA-29 CA-28 5.00
CA-A-351
34 CA-A-351 A3/ A551 ELEVATOR 30
F.F.L E

1.65
D02 CORRIDOR LOUNGE
01 UP CA-46
48 26
B D26 D26 D26 D26 D26 OPEN
CA-40 CA-39 CA-36

1.15
CA-38 CA-37
CA-A-301 D10-A
UP D26 TO ABOVE
CA-10 CA-44
H1
CORRIDOR F

2.20 0.90
49
D26 D39
6.13 NETWORK CA-41 CA-47

EXTERNAL F.F.L EW-17


CA-W15
ADMIN OFFICE
36 CA-C02 G
1

0.48
A 2
H1 CA-A-352 BOARD CA-A-202

1.00 2.12
CA-A-301 3
CA-C01
CONFERENCE
ROOM
H
GOVERNMENT D26
CA-A-352 EW-17 CA-42
2 25
RELATIONS

24.65
CA-W16

OFFICER
37 CA-A-402 EW-19
CA-W20 I
CA-M01

2.80
HR OFFICE A3/D26A551 REF. TO MESH
H1
C
EW-17
CA-W17
38 CA-43
SCHEDULES J

0.75 1.05
CA-A-302 8.15 D17
UP

0.80
CA-20
T.O.P
HR STORAGE
39
EW-16
CA-W09 K
Project : : ‫ﺍﻟﻣﺷﺭﻭﻉ‬
PANTRY D28 D26 D26 A4/A567
CA-23 CORRIDOR C3/ A563
L
CA-56 CA-21
40 51
1 D29 A4/A567 D29-B D29-C ARAB INTERNATIONAL ACADEMY SCHOOL
2
CA-05 CA-06 CA-04
FILES ARCHIVE 1 CENTRAL ADMINISTRATION &

6.85
CA-A-352 47 EW-16
Title :
AUDITORIUM BUILDING
STAFF-FEMALED25 D25 STAFF-MALE
CA-W19
CA-I-410
CA-A-352 TOILET CA-30 CA-31 TOILET MAIN AV ROOM IT ROOM
ELEC. & MDF M : ‫ﺍﺳﻡ ﺍﻟﻠﻭﺣﺔ‬
41 43 ROOM

A1/ A501
D29
CA-07
29 45
44 GROUND AND FIRST FLOOR
N PLANS (FURN & ANNO)
: ‫ﺗﺻﻣﻳﻡ‬
JANITORIAL Designed : Faris & Faris Architects
ROOM
42 3
D O : ‫ﺭﺳﻡ ﺍﻟﻣﺷﺭﻭﻉ‬
CA-A-351 P. M. : Faris & Faris Architects
CA-A-302
E : ‫ﺭﺳﻡ‬
P Drawn : Faris & Faris Architects
G CA-A-302
: ‫ﺗﺩﻗﻳﻖ‬
CA-A-302 Checked : Faris & Faris Architects

Date : March 2022 : ‫ﺍﻟﺗﺎﺭﻳﺦ‬

2 CA-A-FP-01-ANN Scale : : ‫ﻣﻘﻳﺎﺱ ﺍﻟﺭﺳﻡ‬

SCALE 1 : 200 Dwg. No. : : ‫ﺭﻗﻡ ﺍﻟﻠﻭﺣﺔ‬


CA-A-151
• ALL DIMENSIONS AND LEVELS ARE IN METERS UNLESS
OTHERWISE SPECIFICALLY INDICATED.
• LEVEL ±0.000 IS EQUIVALENT TO +19.50 DATUM LEVEL.
• THIS DRAWING SHALL BE READ WITH ALL RELATED
SERVICES DRAWINGS.
• FOR SETTING OUT OF STRUCTURAL WALLS AND
COLUMNS REFER TO STRUCTURAL DRAWINGS.
• ALL FREE STANDING CONCRETE COLUMNS TO BE FAIR-
FACED AND SMOOTHLY FINISHED UNLESS OTHERWISE
SPECIFICALLY INDICATED.
• INTERNAL DIMENSIONS ARE TAKEN FROM FACE OF
BLOCKWORK, FACE OF CONCRETE WORK OR FACE OF
CEMENT BOARD WORKS UNLESS OTHERWISE STATED.
• EXTERNAL DIMENSIONS ARE TAKEN FROM FACE OF
FINISHED WALL UNLESS OTHERWISE STATED.
• DOORS AND WINDOWS DIMENSIONS SHOWN ARE CLEAR
OPENING.
• THIS DRAWING SHALL BE READ WITH ANNOTATION
PLANS FOR REFERENCING OF OPENINGS AND
19 ENLARGEMENTS.
• FOR WINDOW, CURTAIN WALL & DOOR DETAILS REFER
TO ASSOCIATED SCHEDULES AND DRAWINGS.
1 2 3 4 5 6 7 C 10 11 12 13 14 15 16 17 18 20 21 22 • FOR FIT OUTS, FIXTURES, FITTED FURNITURE AND
EQUIPMENT REFER TO INTERIOR DRAWINGS.
SS-A-302 • FOR WET AREA DETAILS, REFER TO TYPICAL WET AREA
117.55 •
ENLARGEMENTS IN THE INTERIOR DRAWINGS.
FOR SIGNS AMD WAY FINDING REFERS TO SIGNAGE
PACKAGE.
• ALL EXTERNAL FINISHED FLOOR LEVELS ARE NOMINAL
3.25 1.43 3.80 14.13 3.25 1.43 10.20 14.15 4.87 4.75 6.12 12.38 6.72 3.80 1.42 3.25 17.93 1.43 3.25 AND ARE TO BE READ IN CONJUNCTION WITH
LANDSCAPE DRAWINGS.
E • FOR SETTING OUT OF EXTERNAL WORKS, CANOPIES AND
1 SS-A-201 PLANTERS REFER TO LANDSCAPE DRAWINGS.
MATCH LINE MATCH LINE
SS-A-303 GRC FIN (TYPE C)-(REFER TO • FOR MESH ELEVATIONS, REFER TO RELEVANT
SS-I-401 GRC FIN (TYPE A)-(REFER TO 2 SCHEDULE A-613)
SCHEDULE A-613) SCHEDULE.
E1/ A-105
EW-02 EW-02 EW-01 EW-01 EW-01 EW-01 EW-01 EW-01 EW-01 EW-01 EW-01 EW-01 EW-01 EW-01 EW-01 EW-01 EW-01 EW-01 EW-02 EW-02
1 2 3 4 5 6 7 8 9 10 11 12
13 14 15 16
A1/A513 17 18 19 20

A
C1/ A-501 C1/ A-501

STUDENTS STUDENTS 1
TOILET TOILET ELECTRICAL STUDENTS STUDENTS
SS GF 81 SS GF 82 ROOM TOILET TOILET SS-I-451
E1/ A-562 REGULAR REGULAR REGULAR MATERIAL SS GF 90 REGULAR REGULAR REGULAR SS GF 94 SS GF 95
CLASSROOM L1 CLASSROOM L1 CLASSROOM L1 STORAGE DRAMA STORAGE DRAMA ROOM CLASSROOM L2 CLASSROOM L2 CLASSROOM L2

9.80
SS GF 83 SS GF 84 SS GF 85 SS GF 86 SS GF 87 SS GF 88 SS GF 91 SS GF 92 SS GF 93
D23 D23 D23 D23
SS-139 SS-171 SS-140 SS-141

ADA TOILET E1/ A-562 1 C1/A565 E5/ A-565 ADA TOILET


SS GF 80 D23
D23 SS-142
SS GF 96
SS-143 D35
D02 SS-I-402 SS-44
D16-C D02 CENTRAL GAS SENIORS
SS-195 SS-88 SS-194
CYLIDERS SCHOOL
C1/A565 D02 IW-04
C1/A565
JANITORIAL IT ROOM IW-01 JANITORIAL SS GF 251
SS-C01 D01 D01 D01 SS-45 SS-IW-43
IW-04 IW-01 D01 IW-01 D01 D01
STORE IW-01 IW-01 SS-IW-4 SS-IW-5 STORE
IW-01
SS-05 SS-33
SS-IW-7
SS-04 SS-IW-6 D21 SS-IW-42 SS GF 89 D02 SS-03 SS-IW-41 SS-30 SS-35
D02 SS-C02
SS GF 79 SS-IW-8 SS-93 SS-43
SS GF SS-325
97

SIM
D21
SS-103 B
STAIRS 1 SIM
STAIRS
B2 GP-B SHAFT SS ST 04
1 SS ST 05 SHAFT CORRIDOR STAFF FEMALE 1
C16
SS-GP5
C16 SS SH 99 SS-A-354

5.05
SS SH 77 SS-C18 SS GF 66 TOILET SS-C22
GP-B GP-D GP-D
SS-A-401 SS-GP2 SS-GP24 SS-GP23 SS GF 65 SS-A-401
D -0.30 COMMON AREA OUTDOOR COURT OUTDOOR COURT -0.30
D16-D C17 B2
F.F.L UP SS-275
SS GF 78 SS-C17 SS GF 09
FACULTY FACULTY D23 SS GF 08
COMMON AREA D16-D
SS-274
UP F.F.L
SS-A-302 C1/A565 C17 SS-138 C17 C17 SS GF 101 C1/A565
0.20 OPEN TO ABOVE SS-C20 LOUNGE & LOUNGE & SS-C21 OPEN TO ABOVE SS-C23

F.F.L WORKROOM WORKROOM SHAFT 0.20 C


1
GP-B SS GF 68 SS GF 67 SS SH 63 F.F.L

2.75
SS-GP3
C16 C16 CORRIDOR
SS-C19 D23 GP-B SS-C24 SS-C03
SS-165
SS-A-352 SS-GP4 SS GF 100
SS-C15

D02-B
SS-64
D GENERAL KEY PLAN
C1/A565 C1/A565 PARKING
IW-01 IW-01 IW-01 IW-02
IW-02 D01 IW-01 D01 D01 SS-IW-10 D01 IW-01 EW-03 EW-03 EW-03 EW-03 IW-01 D01 D01 D01 D01 SS-IW-47
SS-IW-48 SS-06 SS-IW-11 SS-32 SS-34 SS-07 SS-IW-9
256 255 260 259
STAFF MALE SS-IW-3 SS-02
SS-IW-2
SS-31 SS-36
SS-IW-01
SS-01 SENIOR
ELECTRICAL TOILET

5.27
SCHOOL
SPORT PARKING
ROOM SS GF 64
BUILDING
OUTDOOR COURT
LONG JUMP

SENIOR
SS GF 69 OPEN TO ABOVE OUTDOOR
SS GF 06 SPACE

0.17 REGULAR REGULAR REGULAR REGULAR


REGULAR REGULAR REGULAR REGULAR MAIN
SPECIAL

NO
SS-C16
DRAIN DETAIL

LOCKERS CLASSROOM H CLASSROOM H CLASSROOM L2 CLASSROOM L2 STADIUM CANTEEN PLAZA CENTRAL ADMINISTRATION
CLASSROOM L1 CLASSROOM L1 CLASSROOM H CLASSROOM H F.F.L SS GF 61 SS GF 60 SS GF 59 SS GF 58
SERVICES

RT
SS GF 62
SS GF 74 SS GF 73 SS GF 72 SS GF 71
E FOOTBALL & SPORTS
FIELD

H
SHAFT 1.55 BRAKE TANK 75m3
LOCATION
JUNIOR SCHOOL

SS SH 70 F.F.L 1.10 KG &

1
PARKING
SHAFT JUNIOR PRE-KG

4.97
OUTDOOR SCHOOL
F.F.L AMPHITHEATRE SPACE
SS SH 235

E3/ A-565
E1/ A-501 SS-A-408 1 0.65 SS GF 240
F.F.L PARKING

SS-A-353

A3/ A-565
A1/A513 A1/A513 A3/A509
A3/A509 C5/A565 C5/A565 C5/A565

EW-01 EW-01 EW-01 EW-01 EW-01 EW-01 EW-01 EW-01


1 F
61 60 59
EW-01 EW-01 EW-01 EW-01 EW-01 EW-01 EW-01 EW-01
38 39 40 41 42 43 44 45 E1/A557 0.20 EXP. JOINT
58 57 56 55 54
SS-A-201
2 F.F.L GRC FIN (TYPE A)-(REFER TO
SCHEDULE A-613)
SS-A-202
1
1
SS-A-203 SS-I-406

9.63
MATCH LINE SS-C04 MATCH LINE

67.65
COMMON AREA
SS GF 57
MATCH LINE SSM02 SS-A-203 MATCH LINE
2 0.20 3
F.F.L REF. TO 2
SS-A-352 SS-A-352 NOV
MESH 00 ISSUED FOR CONSTRUCTION
SS-C14 SCHEDULE GRC FIN (TYPE A)-(REFER TO 2022
SCHEDULE A-613)
G
GP-A ‫ﺍﻟﺗﺎﺭﻳﺦ ﺗﻌﺩﻳﻝ‬ ‫ﺍﻟﻭﺻﻑ‬ ‫ﺑﻭﺍﺳﻁﺔ‬

2.32
ADA TOILET
0.20
F.F.L C1/ A-516
SS GF 48 UP EW-01
84
EW-01
83
EW-01
82
EW-01
81
EW-02
80
EW-02
79
EW-02
78
REV. DATE DESCRIPTION BY
H2
H
IT CAB 2 Stamp :
D23 CORRIDOR B2 1
SS-146
SS GF 49 SS GF 54
C1/A565 LIBRARY STORE SS-A-353 SHAFT
D02 SS-C05 SS-A-403 1 SS SH 24
D23 D23 D02 SS GF 52 D02 SS-55
STAIRS
3 SS-145 SS-144 SS-46 SS-54
FACULTY & STAFF E1/ A-501
CORRIDOR SS ST 03 SS-I-409 LOUNGE
C1/A565
SS-A-351 STUDENTS STUDENTS STORAGE
D16-C
SS GF 56 SS GF 27 CONFERENCE
TOILET TOILET

9.80
SS GF 51 SS-253
WORKSHOP\WORKROOM ROOM
SECONDARY
SS GF 47 SS GF 50
SCHOOL STUDENT FILES SS GF 28 SS GF 29
GP-A ELEVATOR
SS-GP01 1 SS-C06 SECRETARIAL STORAGE
CENTRAL GAS
JANITORIAL SS EL EL01 ELECTRICAL SUITE SS GF 26 STORAGE
GP-F CYLIDERS
STORE D02
SS-58
ELEC RM SS-A-404 ROOM SS GF 25 SS-GP34 SS GF 30
SS GF 250
SS GF 243 SS GF 253 0.20 SS GF 23
D23-B D23-B
SS-174 SS-173 F.F.L E5/ A-565
STAFF MALE GP-C CORRIDOR
SS-GP18 D02 GP-E SS-C07
SS-C13 TOILET STAFF FEMALE SS GF 22 SS-38 SS-GP33 D02
TOILET C1/A565 SS-196
D02
SS GF 45 D02 C1/A565 SS-326
SS GF 46 SS-41
3 D02-B
SS-63
D09
SS-176
SIM
I
STAFF MALE
STAIRS INFIRMARY SS-A-353 GP-D
TOILET SHAFT STAIRS
1 B2 SS ST 02 SHAFT SS-C09
LOBBY
SS-GP22
SS GF 37 SS SH 31 SS ST 01
1
C18

5.05
SS SH 44 SS GF 20 SS-C26 D09
SS-A-402 LIBRARY(SHELVING,
SS-175
SS-A-402
MALE GUEST
-0.30
READING & ICT OUTDOOR COURT C19 B2
SIM UP D16-D CENTERS) SS-C37 TOILET 2 C19 SS GF 39 SS-C25 FM OFFICE D16-D UP F.F.L
SS-276 SS-C27 C1/A565 CENTRAL SS-277
C1/A565 SS GF 42 SS GF 41 SS GF 33
D23 INSTRUCTION
SS-A-354 OPEN TO ABOVE
J
SS-131
MATERIAL STORE
A JANITORIAL D02
SS GF 34
RECOVERY SS-39 CORRIDOR
STORE

2.75
SS-A-301 EW-01
ISOLATION RECEPTION, D23
SS-134
D02-B SS GF 2 3
SS-C12 0.20 SS GF 36 SS-62 SS-C08
108 SS GF 19 D02
LOBBY & WAITING E1/ A-562 CENTRAL D02 D23
F.F.L D03 SS-59 SS GF 21 STATIONARY SS-40 SS-132 E5/ A-565 SS-A-354
K
SS-72
STORE STAFF FEMALE
IT ROOM
E1/ A-562 SS GF 38 TOILET
C1/A565 D03
D23
SS-133 SS GF 35
SS GF 32
D03
SS-322 COUNSELORS
TREATMENT SS-73
D02
SS-37 SS GF 3
EW-02 SS GF 18
106 FEMALE GUEST 0.20
SSM01 TOILET GP-E1 GP-E F.F.L
SS-GP19 C1/A565 SS-GP32
REF. TO SS GF 40
GP-D
MESH D03 GP-D D03

10.25
D03 D03
EW-01 TREATMENT CORRIDOR
SS-74 SS-185
SS-GP21 SS-GP20 SS-182 SS-321
COUNSELORS
SECONDARY COLLEGE LEARNING D03
SCHEDULE SS-C11 SS-C10
213
SS GF 17 SS GF 239 PRINCIPALS PLACEMENT SUPPORT SS-323
SS GF 4
MIDDILE OFFICE COUNSELOR COORDINATOR
PRINCIPAL
COUNSELORS E1/ A-501
SS GF 9 SS GF 8 SS GF 7 SS GF 6
D02 OFFICE MIDDILE VICE SECONDARY VICE
SS-61
D23 SS GF 12 PRINCIPAL PRINCIPAL
D03
SS-135 OFFICE OFFICE
D23 D23 D02 SS GF 11 SS GF 10
E1/ A-501 SS-320
COUNSELORS
SS-136 SS-137 SS-42 SS GF 5
E1/ A-512 EW-02
214
C1/ A-501 A1/A513
HW-GD04 L
ADA TOILET
EW-03 EW-03 EW-03 MALE TOILET JANITORIAL EW-01 EW-01 EW-01 EW-01 EW-01 EW-01 EW-01 EW-01
173 172 171 SS GF 16 STORE 161 158 154 144 137 136 146 139

EW-03 EW-03 EW-03 EW-03


SS GF 14
FEMALE TOILET SS GF 13 Project : : ‫ﺍﻟﻣﺷﺭﻭﻉ‬
177 176 175 174
B
1 2 SS GF 15
1 GRC FIN (TYPE A)-(REFER TO
SS-A-301
SS-A-351 SS-A-351 SS-A202
SCHEDULE A-613) ARAB INTERNATIONAL ACADEMY SCHOOL
Title :
SENIOR SCHOOL GROUND : ‫ﺍﺳﻡ ﺍﻟﻠﻭﺣﺔ‬
FLOOR PLAN (FURN & ANNO)
: ‫ﺗﺻﻣﻳﻡ‬
Designed : Faris & Faris Architects

: ‫ﺭﺳﻡ ﺍﻟﻣﺷﺭﻭﻉ‬
P. M. : Faris & Faris Architects
: ‫ﺭﺳﻡ‬
Drawn : Faris & Faris Architects

: ‫ﺗﺩﻗﻳﻖ‬
Checked : Faris & Faris Architects

Date : March 2022 : ‫ﺍﻟﺗﺎﺭﻳﺦ‬


SS-A-FP-GF-ANN : ‫ﻣﻘﻳﺎﺱ ﺍﻟﺭﺳﻡ‬
Scale :
1 SCALE 1 : 200 Dwg. No. : : ‫ﺭﻗﻡ ﺍﻟﻠﻭﺣﺔ‬
SS-A-151
• ALL DIMENSIONS AND LEVELS ARE IN METERS UNLESS
OTHERWISE SPECIFICALLY INDICATED.
• LEVEL ±0.000 IS EQUIVALENT TO +19.50 DATUM LEVEL.
• THIS DRAWING SHALL BE READ WITH ALL RELATED
SERVICES DRAWINGS.
• FOR SETTING OUT OF STRUCTURAL WALLS AND
COLUMNS REFER TO STRUCTURAL DRAWINGS.
• ALL FREE STANDING CONCRETE COLUMNS TO BE FAIR-
FACED AND SMOOTHLY FINISHED UNLESS OTHERWISE
SPECIFICALLY INDICATED.
• INTERNAL DIMENSIONS ARE TAKEN FROM FACE OF
BLOCKWORK, FACE OF CONCRETE WORK OR FACE OF

IW-45 •


CEMENT BOARD WORKS UNLESS OTHERWISE STATED.
EXTERNAL DIMENSIONS ARE TAKEN FROM FACE OF
FINISHED WALL UNLESS OTHERWISE STATED.
DOORS AND WINDOWS DIMENSIONS SHOWN ARE CLEAR
OPENING.
• THIS DRAWING SHALL BE READ WITH ANNOTATION
E PLANS FOR REFERENCING OF OPENINGS AND
ENLARGEMENTS.
1 2 3 4 5 6 7 10 11 12 SS-A-303 13 14 15 16 17 18 19 20 21 22 • FOR WINDOW, CURTAIN WALL & DOOR DETAILS REFER
TO ASSOCIATED SCHEDULES AND DRAWINGS.
• FOR FIT OUTS, FIXTURES, FITTED FURNITURE AND
C EQUIPMENT REFER TO INTERIOR DRAWINGS.
117.55 • FOR WET AREA DETAILS, REFER TO TYPICAL WET AREA
SS-A-302 ENLARGEMENTS IN THE INTERIOR DRAWINGS.
3.25 1.43 3.80 14.13 3.25 1.43 10.20 14.15 4.87 4.75 6.12 12.38 6.72 3.80 1.42 3.25 17.93 1.43 3.25 • FOR SIGNS AMD WAY FINDING REFERS TO SIGNAGE
PACKAGE.
• ALL EXTERNAL FINISHED FLOOR LEVELS ARE NOMINAL
AND ARE TO BE READ IN CONJUNCTION WITH
SS-A-201 LANDSCAPE DRAWINGS.
• FOR SETTING OUT OF EXTERNAL WORKS, CANOPIES AND
1 2 PLANTERS REFER TO LANDSCAPE DRAWINGS.
C1/ A-515 SS-I-410 C1/ A-515
• FOR MESH ELEVATIONS, REFER TO RELEVANT
A1/513 C3/ A-515 SCHEDULE.
EW-02 EW-02 EW-01 EW-01 EW-01 EW-01 EW-01 EW-01 EW-01 EW-01 EW-01 EW-01 EW-01 EW-01 EW-02 EW-02
21 22 23 24 25 27 28 34 35 36 37
29 30 31 32 33

A
C1/ -501 C1/ -501
STUDENTS
STUDENTS TOILET IT ROOM
TOILET POTTERY KILN MUSIC SS FF 177 STUDENTS STUDENTS
SS FF 170
SS FF 169 ROOM POTTERY ROOM INSTRUMENT TOILET TOILET
SS FF 172 STORAGE STORE SS FF 182 SS FF 183
SS FF 173 SS FF 175 E5/ A-565 STORAGE REGULAR

9.80
POTTERY\ART ART ROOM
MUSIC ROOM SS FF 180 CLASSROOM
D23 D23 ROOM SS FF 174 D02 D23 D23
SS-154 SS-155 INCL. VOCALS SS-52 SS FF 181 SS-156 SS-157
SS FF 171
ADA TOILET SS FF 176
C1/A565 C1/A565 ADA TOILET
SS FF 168 D23 GENERAL D23 SS FF 184
SS-153 SS-158
D34 D22 D22
JANITORIAL SCIENCE LAB
D35 D34
SS-130 SS-115 SS-295 STORE SS-60 SENIORS
SS-51
SS FF 179
SHAFT SS FF 178 D01 SCHOOL
IW-04 SS-19
IW-01 SHAFT SS-C02
SS SH 167 IW-01 SS-IW-17 D02 SS-IW-18
D33
SS-113
D33
SS-114
SS-IW-39 D33
SS-123
D21
SS-95
SS-53 IW-01
SS-IW-45
D33
SS-116
SS SH 185
SS-C01
D33
SS-125
D33
SS-124 B
SHAFT IW-01 CORRIDOR 1
2.45 SS SH 77
SS-IW-40
GP-B SS FF 157 OUTDOOR COURT STAIRS
2 SS-GP10
STAFF MALE
SS ST 04 2
F.F.L C16 TOILET SS GF 08 C16 SS-A-354

5.05
SS-C18 GP-D GP-D GP-B SS-C22
4.70
SS-A-401 B2 STAIRS
SS-GP26 SS-GP25 SS FF 154 SS-GP13 SS-A-401
F.F.L B2
D SS ST 05 D16-D
OUTDOOR COURT 2.45
UP C1/A565
SS-199
COMMON AREA C17 SS GF 09 C17
SS-C20
E1/ A-562 SS-166
D23 C17 OPEN TO BELOW C17
COMMON AREA
C1/A565SS-198
D16-D UP F.F.L
SS-A-302 SS FF 187
SS-C17
OPEN TO BELOW SS-C21 SS-C23 SS FF 186
FACULTY FACULTY A5/ A-516
A5/ A-516 LOUNGE &
WORKROOM
LOUNGE &
WORKROOM SHAFT C
1 GP-B CORRIDOR

2.75
GP-B SS SH 63
SS-C15
4.70 C16 SS-GP11 SS FF 156 SS FF 155 D23
SS-GP12 C16
SS-C24 SS FF 146 SS-C03
SS-A-352 F.F.L IW-01
SS-C19
SS-167 C5/ A-515
SS-IW-36

D02-B
SS-66
D GENERAL KEY PLAN
C1/A565 C1/A565
IW-01 IW-01 IW-01 IW-02 PARKING
IW-02 IW-01 SS-IW-35
EW-01 EW-01 EW-01 EW-01 IW-01
D01 D01 D01 D01 STAFF FEMALE D01 SS-IW-34 D01 D01 SS-IW-33 D01 SS-IW-51
SS-IW-52
SS-20
SS-IW-37
SS-26 SS-27 SS-21 ELECTRICAL 74 75 257 258
SS-IW-38
SS-18 SS-28 SS-29 SS-17
ROOM TOILET

5.27
SENIOR
SCHOOL
SPORT
SS FF 158 SS FF 153 LONG JUMP
BUILDING
PARKING

SENIOR
OUTDOOR
SPACE
OUTDOOR COURT
REGULAR SS GF 06 REGULAR
LOCKERS REGULAR
CLASSROOM REGULAR MAIN
SPECIAL

REGULAR REGULAR REGULAR

NO
CLASSROOM
DRAIN DETAIL

STADIUM CANTEEN
SS FF 151 CLASSROOM SERVICES
PLAZA CENTRAL ADMINISTRATION

CLASSROOM CLASSROOM SS FF 161 CLASSROOM CLASSROOM SS FF 148


REGULAR
E

RT
SS FF 147
SS FF 163 SS FF 162 SS FF 160 SS FF 150 CLASSROOM
FOOTBALL & SPORTS
FIELD

H
SS FF 149 BRAKE TANK 75m3
LOCATION
JUNIOR SCHOOL

KG &

4.97
JUNIOR PARKING
PRE-KG
SHAFT OUTDOOR
SPACE
SCHOOL

E1/ A-501 SS SH 70 1 E1/ A-501


A1/513 SS-A-353 PARKING

5.90 F
EW-01 EW-01 EW-01 EW-01 EW-01 EW-01 EW-01 EW-01 EXTERNAL F.F.L SHAFT EW-01
EW-01 EW-01 EW-01 EW-01 EW-01 EW-01 EW-01
46 47 48 49 50 51 52 53 68 67 66 65 64 63 62
2 SS SH 235 69

3
SS-A-202 1
SS-A-352
SS-A-203
4.70 1

9.63
F.F.L

67.65
SS-A-201
SS-A-203
C5/ A-515
2 SSM02 2
SS-C04 REF. TO
SS-A-352
SS-C36 MESH NOV
00 ISSUED FOR CONSTRUCTION
SCHEDULE 2022
C1/ A-515 A1/513 C3/ A-515 G
‫ﺍﻟﺗﺎﺭﻳﺦ ﺗﻌﺩﻳﻝ‬ ‫ﺍﻟﻭﺻﻑ‬ ‫ﺑﻭﺍﺳﻁﺔ‬

2.32
C1/ A-516
EW-02 EW-02 EW-04 EW-04 EW-04 EW-04
EW-04 EW-04 UP
H2 EW-01 EW-01 EW-01 EW-01 EW-01 EW-01 EW-02 EW-02
DESCRIPTION BY
DATE
126 127 115 119 120 121 89 262 261
REV.
123 95 98 97 91 90
122 STAIRS
SS ST 03 H
C1/ -501 2
STUDENTS STUDENTS B2 2 Stamp :
TOILET TOILET SS-A-353 SHAFT C1/ -501
SS FF 123 SS FF 124 SS-A-403 SS SH 24
3 4.70 STUDENTS STUDENTS
SS-C05 TOILET TOILET
REGULAR REGULAR F.F.L 2.45 REGULAR REGULAR REGULAR
SS-A-351 REGULAR SS FF 138 SS FF 139
CLASSROOM CLASSROOM F.F.L CLASSROOM CLASSROOM CLASSROOM
CLASSROOM C1/A565

9.80
SS FF 125 SS FF 126 SS FF 135 SS FF 136 SS FF 137
D23 D23 SS FF 127 2 D23 D23
STAFF MALE
SS-151 SS-172 ELEVATOR SS-149 SS-148
TOILET
ADA TOILET SS EL EL01 SS-A-404 ELECTRICAL ADA TOILET
SS FF 131
SS FF 122 D23
SS-152

SHAFT IW-01
IW-46 4.95
EXTERNAL F.F.L
ROOM
SS GF 23

C1/A565 SHAFT
D23
SS-147
SS FF 140

IW-01
SS-IW-32 D01 D01 IW-01 D01 SS-IW-28 EW-01 EW-01 EW-01 IW-01 D01 D01 D01 SS SH 141 SS-C07
SS-C13 SS. FF 121 SS-22 SS-23 SS-IW-31 SS-16 215 101 102 SS-IW-16 SS-294 SS-14 SS-13

3
D02-B
SS-65 I
IW-01 IW-01
STAIRS GP-B SS-IW-15 SHAFT STAIRS
C16 GP-B SS-IW-14
2 B2 SS ST 02 SS-C32 SS-GP6 SS-A-353 D23
SS-GP8
C18
SS SH 159 SS ST 01 2
FACULTY FACULTY A5/ A-516

5.05
SS-168 SS-C29

SS-A-402 4.70 5.10 A5/ A-516 LOUNGE & LOUNGE & SHAFT 4.70 SS-A-402
D32
F.F.L F.F.L SS-C32-D1 WORKROOM WORKROOM SS FF 132 F.F.L
SS FF 128 SS FF 129 B2
UP D16-D COMMON AREA C17 OPEN TO ABOVE OPEN TO BELOW COMMON AREA D16-D UP
SS-352
SS FF 188
SS-C35 E1/ A-562 D23 2 C19 SS FF 142 C1/A565SS-201
C1/A565 OUTDOOR COURT C17
SS-150 C19 OUTDOOR COURT SS-C30
SS-C28
SS FL 43
J
SS-C34
SS GF 39
A GP-D
SS-A-354
SS-GP28 GP-D STAFF FEMALE

2.75
CORRIDOR SS-GP27 C18 CORRIDOR 3
SS-A-301 SS-C12 C16
SHAFT TOILET
GP-B
SS-C31
SS FF 118 GP-B SS FF 104
C5/ A-515 IW-02 SS-C33 SS FF 237 SS FF 130 SS-GP9 IW-02 SS-C08
SS-IW-53 IW-01
SS-IW-29
SS-GP7
IW-01
SS-IW-46
IW-01
SS-IW-12
IW-01
SS-IW-13
SS-A-354SS-IW-50
D33
SS-126
K
IW-01 D02 C1/A565
D01 D01 D01 D01
SS-IW-44 E1/ A-562 SS-48 D33
SS-112
D21
SS-102
IW-02 IW-02
D21
SS-94 D01 D01 D01
SS-IW-54 SS-IW-49
SS-08 SS-24 SS-25 IW-01 SS-09 SS-10 SS-11 SS-12
SS-IW-30

JANITORIAL
D34 C1/A565D35
STORE SS-49 SS-50

SS FF 113 DT LAB DT LAB


SS FF 111

10.25
REGULAR REGULAR REGULAR REGULAR E5/ A-565 SS FF 109 MATERIALS REGULAR REGULAR REGULAR
CLASSROOM CLASSROOM CLASSROOM CLASSROOM D02 STORAGE STORAGE CLASSROOM CLASSROOM CLASSROOM
SS FF 117 SS FF 116 SS FF 115 SS FF 114
SS-47
SS FF 110 SS FF 108 SS FF 107 SS FF 106 SS FF 105
E1/ A-501
E1/ A-501
IT ROOM
SS FF 112

C3/ A-515 A1/513


C3/ A-515

EW-01 EW-01 EW-01 EW-01 EW-01 EW-01 EW-01 EW-01 EW-01 EW-01 EW-01 EW-01 EW-01
L
EW-01 EW-01 EW-01 EW-01 EW-01 EW-01 EW-01
185 184 181 180 164 163 162 159 156 155 150 149 142 147 140
183 182 179 178 117

Project : : ‫ﺍﻟﻣﺷﺭﻭﻉ‬
B
1 2 1
SS-A-301
SS-A-351 SS-A-351 SS-A202 ARAB INTERNATIONAL ACADEMY SCHOOL
Title :
SENIOR SCHOOL FIRST FLOOR : ‫ﺍﺳﻡ ﺍﻟﻠﻭﺣﺔ‬
PLAN (FURN & ANNO)
: ‫ﺗﺻﻣﻳﻡ‬
Designed : Faris & Faris Architects

: ‫ﺭﺳﻡ ﺍﻟﻣﺷﺭﻭﻉ‬
P. M. : Faris & Faris Architects
: ‫ﺭﺳﻡ‬
Drawn : Faris & Faris Architects

: ‫ﺗﺩﻗﻳﻖ‬
Checked : Faris & Faris Architects

Date : March 2022 : ‫ﺍﻟﺗﺎﺭﻳﺦ‬

SS-A-FP-01-ANN Scale : : ‫ﻣﻘﻳﺎﺱ ﺍﻟﺭﺳﻡ‬

1 1 : 200 Dwg. No. : : ‫ﺭﻗﻡ ﺍﻟﻠﻭﺣﺔ‬


SS-A-152
• ALL DIMENSIONS AND LEVELS ARE IN METERS UNLESS
OTHERWISE SPECIFICALLY INDICATED.
• LEVEL ±0.000 IS EQUIVALENT TO +19.50 DATUM LEVEL.
• THIS DRAWING SHALL BE READ WITH ALL RELATED
SERVICES DRAWINGS.
• FOR SETTING OUT OF STRUCTURAL WALLS AND
COLUMNS REFER TO STRUCTURAL DRAWINGS.
• ALL FREE STANDING CONCRETE COLUMNS TO BE FAIR-
FACED AND SMOOTHLY FINISHED UNLESS OTHERWISE
SPECIFICALLY INDICATED.
• INTERNAL DIMENSIONS ARE TAKEN FROM FACE OF
BLOCKWORK, FACE OF CONCRETE WORK OR FACE OF
CEMENT BOARD WORKS UNLESS OTHERWISE STATED.
• EXTERNAL DIMENSIONS ARE TAKEN FROM FACE OF
FINISHED WALL UNLESS OTHERWISE STATED.
• DOORS AND WINDOWS DIMENSIONS SHOWN ARE CLEAR
OPENING.
• THIS DRAWING SHALL BE READ WITH ANNOTATION
PLANS FOR REFERENCING OF OPENINGS AND
ENLARGEMENTS.
• FOR WINDOW, CURTAIN WALL & DOOR DETAILS REFER
E
1 2 3 4 5 6 7 10 11 12 13 14 15 16 17 18 19 20 21 22 •
TO ASSOCIATED SCHEDULES AND DRAWINGS.
FOR FIT OUTS, FIXTURES, FITTED FURNITURE AND
SS-A-303 EQUIPMENT REFER TO INTERIOR DRAWINGS.
• FOR WET AREA DETAILS, REFER TO TYPICAL WET AREA
ENLARGEMENTS IN THE INTERIOR DRAWINGS.
117.55 • FOR SIGNS AMD WAY FINDING REFERS TO SIGNAGE
PACKAGE.
• ALL EXTERNAL FINISHED FLOOR LEVELS ARE NOMINAL
3.25 1.43 3.80 14.13 3.25 1.43 10.20 14.15 4.87 4.75 6.12 12.38 6.72 3.80 1.42 3.25 17.93 1.43 3.25 AND ARE TO BE READ IN CONJUNCTION WITH
LANDSCAPE DRAWINGS.
SS-A-201 • FOR SETTING OUT OF EXTERNAL WORKS, CANOPIES AND
PLANTERS REFER TO LANDSCAPE DRAWINGS.
2 • FOR MESH ELEVATIONS, REFER TO RELEVANT
SCHEDULE.

10.45 A
EXTERNAL F.F.L

9.80
10.45
EXTERNAL F.F.L
SENIORS
11.05 E5/ L-543 E5/ L-543
SCHOOL
SS-C01 EXTERNAL F.F.L SS-C02

B
STAIRS
STAIRS
SS ST 04 1
B2 SS ST 05

5.05
OUTDOOR COURT OUTDOOR COURT B2 SS-A-354
C1/A-510 C1/A-510
SS GF 09 SS GF 08
D B2
UP D10 OPEN TO BELOW OPEN TO BELOW D10 UP
SS-A-302 SS-351 SS-362

C
1

2.75
10.45
SS-A-352 EXTERNAL F.F.L

D GENERAL KEY PLAN


PARKING

5.27
SENIOR
SCHOOL
SPORT PARKING
LONG JUMP
BUILDING
SENIOR
OUTDOOR
SPACE
E5/ L-543 OPEN TO BELOW E5/ L-543
SPECIAL
MAIN

NO
DRAIN DETAIL

STADIUM CANTEEN PLAZA CENTRAL ADMINISTRATION


SERVICES

RT
FOOTBALL & SPORTS
FIELD

H
JUNIOR SCHOOL
9.45 BRAKE TANK 75m3
LOCATION

EXTERNAL F.F.L

4.97
KG &
JUNIOR PARKING
PRE-KG
OUTDOOR SCHOOL

1 SPACE

SS-A-353 PARKING

5.90 F
EXTERNAL F.F.L
2 1 3

SS-A-203 SS-A-352
SS-A-202

9.63
67.65
SS-A-201
SS-A-203
2 SSM02 2
GRC FIN (TYPE B)-(REFER TO
REF. TO
SS-A-352 SCHEDULE A-613)
EW -05A
229
MESH SCHEDULE IW-27 00
NOV
2022
ISSUED FOR CONSTRUCTION
G
C3/ A-515

2.32
EW-02
130
EW-02
131
EW-01
132 EW-01 EW-01 EW-01
B2
UP
C1/ A-516
A1/ A-501
EW-01
96
EW-01
99
EW-01
94
EW-01
93
EW-01
92
EW-02
264 EW-02
263
‫ﺍﻟﺗﺎﺭﻳﺦ ﺗﻌﺩﻳﻝ‬ ‫ﺍﻟﻭﺻﻑ‬ ‫ﺑﻭﺍﺳﻁﺔ‬
133 134
A1/A513 135
H2 A1/A513 REV. DATE DESCRIPTION BY
H
C1/ A-501 C1/ A-501
2 3 Stamp :
SHAFT
STUDENTS SS-A-403 STUDENTS
STUDENTS
TOILET
SS-A-353 SS SH 24 STUDENTS
3 TOILET STAIRS TOILET
SS SF 213 9.20 SS-C05 PHYSICS LAB SS SF 230
TOILET
SS SF 212 SS ST 03
SS-A-351 F.F.L PHYSICS PREP
SS SF 229
SS SF 231
E1/ A-562 MULTI-PURPOSE STORE
ART MATERIALS ROOM C1/A565 E1/ A-562

9.80
ART ROOM COMMON AREA SS SF 228
STORAGE SS SF 227
D23 D23 SS SF 214 SS SF 216 D23 D23
SS-160 SS-161 SS SF 215 SS-162 SS-163
ELEVATOR 3
ADA TOILET CORRIDOR SS EL EL01 ADA TOILET
C1/A565 ELECTRICAL
SS SF 211 D23
SS-159
SS SF 217 SS-A-404 ROOM D34
D23
SS-164
SS SF 232
D34
SS-109
4.95 SS SF 224
SS-108

EXTERNAL F.F.L STAFF MALE


SHAFT TOILET SHAFT
SS-C13 EW-01 EW-01 EW-01
SS. FF 121 D33 103 104 105 SS SF 222 IW-01 D33 D33 IW-01
SS SH 141 SS-C07
C1/A565 SS-119 SS-IW-26 SS-120 SS-121 SS-IW-27

D33
SS-122
D02-B
SS-67
D33
SS-260
SIM I
SHAFT IW-01
3
STAIRS STAIRS
3 SS SH 44
SS-IW-25
GP-B B2 3
SHAFT
SS ST 02 B2 C16 FACULTY FACULTY SS-A-353 SS-170
D23 SS-GP14
C18 SS ST 01

5.05
SS-C32
A5/ A-516 GP-B LOUNGE & LOUNGE & SHAFT A5/ A-516 SS-C29 SS SH 159
SS-A-402 SS-GP16
WORKROOM WORKROOM
SS-A-402
SS FF 132

UP D16-D
SS-353
C1/A565 COMMON AREA
SS SF 207
C17
SS-C35
OPEN TO BELOW
C17
SS-C34
SS SF 219 SS SF 220
D23
SS-169
2
SS-A-354
C19
SS-C28
OPEN TO BELOW C19
SS-C30 IW-20 COMMON AREA
SS SF 234
IW-19 C1/A565
D16-D
SS-203
UP

A STAFF FEMALE
J
GP-D GP-D

2.75
GP-B TOILET C18
9.20 3
SS-A-301 CORRIDOR C16 SS-GP17 SHAFT
SS-GP30 SS-GP29
SS SF 221 GP-B
SS-C31
SS-C12 IW-01
SS SF 206
SS-C33
SS-GP15 CORRIDOR F.F.L SS-C08
SS-IW-24
IW-01
SS FF 237 IW-01
SS-IW-20 SS SF 192 IW-01 SS-A-354
K
SS-IW-23 SS-IW-19

D21 D21 D33 D33


SS-105 SS-104 SS-129 SS-128

D21 D21 D02 D21 D21 D33 D33


SS-101 SS-100 SS-56
IW-04 SS-97 SS-96 IW-04 SS-118 SS-117
SS-IW-22 SS-IW-21

JANITORIAL
STORE D35 D35
C1/A565
C1/A565
D35 C1/A565
D35 SS-98 SS-99
D34 D34
SS-111 SS-110 SS SF 202 SS-107 C1/A565
SS-106
MUSIC CHEMISTRY LAB BIOLOGY LAB
DT PREP INSTRUMENT SS SF 196 CHEMISTRY PREP BIOLOGY PREP SS SF 193

10.25
FILM MAKING LAB STORAGE STORAGE SECONDARY E5/ A-565 MUSIC ROOM STORE MUSIC ROOM STORE STORE
SCHOOL DT LAB D02
SS SF 205 SS SF 252 SS SF 204 SS-57 SS SF 199 SS SF 198 SS SF 197 SS SF 195 SS SF 194
SS SF 203

IT ROOM
E1/ A-501 SS SF 201 E1/ A-501

A1/A513 A1/A513
C3/ A-515 A1/ A-501 C3/ A-515
SHAFT
L
EW-01 EW-01 EW-01 EW-01 EW-01 EW-01 EW-01 EW-01 EW-01 EW-01 EW-01 EW-01 EW-01 EW-01 EW-01 EW-01 EW-01 EW-01
193 192 191 190 189 188 187 186
SS SF 200 168 167 160 157 153 152 151 148 118 141

Project : : ‫ﺍﻟﻣﺷﺭﻭﻉ‬
1 2 1
SS-A-351 SS-A-351 SS-A202 ARAB INTERNATIONAL ACADEMY SCHOOL
Title :
SENIOR SCHOOL SECOND : ‫ﺍﺳﻡ ﺍﻟﻠﻭﺣﺔ‬
FLOOR PLAN (FURN & ANNO)
: ‫ﺗﺻﻣﻳﻡ‬
Designed : Faris & Faris Architects

: ‫ﺭﺳﻡ ﺍﻟﻣﺷﺭﻭﻉ‬
P. M. : Faris & Faris Architects
: ‫ﺭﺳﻡ‬
Drawn : Faris & Faris Architects

: ‫ﺗﺩﻗﻳﻖ‬
Checked : Faris & Faris Architects

SS-A-FP-02-ANN Date : March 2022 : ‫ﺍﻟﺗﺎﺭﻳﺦ‬

1 Scale : : ‫ﻣﻘﻳﺎﺱ ﺍﻟﺭﺳﻡ‬

SCALE 1 : 200 Dwg. No. : : ‫ﺭﻗﻡ ﺍﻟﻠﻭﺣﺔ‬


SS-A-153
A B C D E F G H I C J K L M N O P A B C D E F G H I J K L M N O P
SB-A-303 • ALL DIMENSIONS AND LEVELS ARE IN METERS UNLESS
47.82
OTHERWISE SPECIFICALLY INDICATED.
• LEVEL ±0.000 IS EQUIVALENT TO +19.50 DATUM LEVEL.
7.93 1.83 1.37 1.95 2.25 0.70 3.00 4.90 7.90 A5/ A-501 4.90 1.65 1.60 2.20 0.78 4.87 2 47.82
UNDERGROUND • THIS DRAWING SHALL BE READ WITH ALL RELATED
SERVICES DRAWINGS.
D SB-A-402 7.93 1.83 1.37 1.95 2.25 0.70 3.00 4.90 7.90 4.90 1.65 1.60 2.20 0.78 4.87 • FOR SETTING OUT OF STRUCTURAL WALLS AND
COLUMNS REFER TO STRUCTURAL DRAWINGS.
SB-A-304 OPEN TO OBOVE C1/ A-507 • ALL FREE STANDING CONCRETE COLUMNS TO BE FAIR-
HW-GD-03 OUTDOOR POOL H2 H2
FACED AND SMOOTHLY FINISHED UNLESS OTHERWISE
SPECIFICALLY INDICATED.
1 COURT
• INTERNAL DIMENSIONS ARE TAKEN FROM FACE OF
SB B1 77
BLOCKWORK, FACE OF CONCRETE WORK OR FACE OF
SB-I-408 UP EXTERNAL CEMENT BOARD WORKS UNLESS OTHERWISE STATED.
SB-C02 SB-C03 SB-C04 SB-C05 B2 STAIRS 1 • EXTERNAL DIMENSIONS ARE TAKEN FROM FACE OF
B2 SB ST 200 UNDERGROUND FINISHED WALL UNLESS OTHERWISE STATED.
SB-A-402
1 • DOORS AND WINDOWS DIMENSIONS SHOWN ARE CLEAR
OPENING.
• THIS DRAWING SHALL BE READ WITH ANNOTATION
2 SHAFT
H2 UP PLANS FOR REFERENCING OF OPENINGS AND
-7.000 SB SH 110
ENLARGEMENTS.
2 SB-A-351 F.F.L
5.43

• FOR WINDOW, CURTAIN WALL & DOOR DETAILS REFER


D B2 TO ASSOCIATED SCHEDULES AND DRAWINGS.
E5 SHAFT C UNDERGROUND EXTERNAL • FOR FIT OUTS, FIXTURES, FITTED FURNITURE AND
SB-A-304
3 A-554 SB SH 101
SB-A-303
STAIRS
SB ST 200
EQUIPMENT REFER TO INTERIOR DRAWINGS.
• FOR WET AREA DETAILS, REFER TO TYPICAL WET AREA
A5
1 ENLARGEMENTS IN THE INTERIOR DRAWINGS.
1.90 1.400.90

D10 • FOR SIGNS AMD WAY FINDING REFERS TO SIGNAGE


4 A-553
SERVICE TRENCH
SB-59
PACKAGE.
C1/A-566 D02 • ALL EXTERNAL FINISHED FLOOR LEVELS ARE NOMINAL
C5 SB-14 STORAGE SB B2 73 SHAFT
5 SB B1 05 2 SB SH 109 AND ARE TO BE READ IN CONJUNCTION WITH

5.43
A1 A-553 CORRIDOR
LANDSCAPE DRAWINGS.
C3/ A-502 SHAFT ABOVE • FOR SETTING OUT OF EXTERNAL WORKS, CANOPIES AND
SB B1 71
A3 PLANTERS REFER TO LANDSCAPE DRAWINGS.
6 A-553
3 C1/A-566
D14
SB-15 • FOR MESH ELEVATIONS, REFER TO RELEVANT
A-553 SCHEDULE.
A SWIMMING POOL
SB-GP-13 2 • COURT MARKINGS REFER TO FURNITURE AND

1.90 1.400.90
SB B1 20 OFFICE\ POOL ANNOTATIONS PLAN

SB-GP-12
SB-A-351
SB-A-301 CONTROL 4
5.25

SB B1 22

SB-GP-11 5
SWIMMING
7 CORRIDOR STORAGE
6
POOLS PLANT
1.55

SB B1 72 SB B1 06 SWIMMING POOL SB B2 02
C1/A-566 C3/ A-502
UNDERGROUND
8 1 A
SB-A-301
2.50

SB-A-352

5.25
C1/A-566

25.33
D16
E1 SB-19

C5/ A-566
9 B A-554
0.851.00

D14
E5 D02
39.75

SB-16

10
SB-51

SB-A-302 UNDERGROUND
A553 SWIMMING POOL
HALL UP
STAIRS
SB ST 203
7

1.55
JANITORIAL JANITORIAL
11 STORE 1 SB B1 74
STORE B2 1
8
2.85

E3/ A-563 SB-GP-17 SB B1 79 SB B1 78


SB-A-401 -7.000 H2 SB-A-404

2.50
F.F.L POOL BALANCE
A1/ A-502
13 1.90
-6.650
SB-GP-16
E3/ A-563
TANK
SB B2 01
1.70

A1
GP-M F.F.L GP-M 9 B

0.851.00
14 A-563
CORRIDOR
SB B1 72 POOL SPECTATOR SEATING AREA
BOYS CHANGING
ROOM 10 SB-A-302
E1/ A-502
UNDERGROUND
1.70

D23-G
SB-36
-5.600 D23-G
SB-35
SB B1 08
F.F.L
15 UNDERGROUND GIRLS CHANGING D23
C3
D23
SB-32
1
11

2.85
SB-28
ROOM SB-GP-15 UNDERGROUND
SB B1 15
E1/ A-562
E1/ A-562 A-563 SB-I-452
OFFICE
D23
SB-GP-09
SB B1 16 OFFICE SB-GP-10
D23 13
GP-E
FEMALE MALE TEACHERS GENERAL KEY PLAN

1.70
SB-29 SB-33
6.20

SB B1 19
GIRLS TOILET
SB B1 14 D23
CORRIDOR
D23
SB-30
TEACHERS
CHANING\TOILET
SB B1 17
CHANGING\TOILET
SB B1 18 GP-E D23
SB-31

D23
BOYS TOILET
SB B1 09 14
PARKING

SB-27 SB B1 27 SB-GP-08 SB-GP-07 SB-34 SENIOR


SCHOOL

CORRIDOR
C1/ A-563 LONG JUMP
SPORT
BUILDING
PARKING

SENIOR
OUTDOOR
SB B1 26
16
SPACE

SPECIAL
MAIN
D02

NO
2.25

DRAIN DETAIL

STADIUM CANTEEN PLAZA CENTRAL ADMINISTRATION


SB-52 SERVICES
1 SHAFT H1 LOBBY\RECEPTION E1/ A-562
H1 UP

RT
FOOTBALL & SPORTS
SB SH 111 SB B1 21 D09 FIELD

17

H
SB-A-406 -7.000
SB-07
JUNIOR SCHOOL
STAIRS ELEVATOR
BRAKE TANK 75m3
1.90

LOCATION

STAIRS
SB ST 202 SB EL 1 C1/A-566 F.F.L KG &
SB ST 201 JUNIOR
OUTDOOR
PRE-KG
PARKING

18
SCHOOL
D02-B D02-D
E SB-03 SB-06
SPACE

IT ROOM
E1/ A-502 FIRST AID SHAFT
SB-A-305 E1/ A-562 B2
2.38

ELEC. ROOM H2
SB B1 10 SB SH 102 1
PARKING
SB B1 13 SB B1 12

19 SB-A-405
1 3
SHAFT UNDERGROUND
SB-A-408 SB-A-351 SB SH 105
BASEMENT 02 FLOOR FURNITURE
BASEMENT 01 FLOOR FURNITURE
2 LAYOUT
1 LAYOUT 1 : 200
1 : 200
C
A B C D E F G H I C J K L M N O P A B C D E F G H I SB-A-303 J K L M N O P
SB-A-303 47.82
47.82 NOV
00 ISSUED FOR CONSTRUCTION
7.93 1.83 1.37 1.95 2.25 0.70 3.00 4.90 7.90 4.90 1.65 1.60 2.20 0.78 4.87 7.93 1.83 1.37 1.95 2.25 0.70 3.00 4.90 7.90 4.90
A5/ A-501 1.65 1.60 2.20 0.78 4.87 3 2022

1
SB-A-402
‫ﺍﻟﺗﺎﺭﻳﺦ ﺗﻌﺩﻳﻝ‬ ‫ﺍﻟﻭﺻﻑ‬ ‫ﺑﻭﺍﺳﻁﺔ‬
D SB-A-402 D OUTDOOR POOL REV. DATE DESCRIPTION BY
H2 EXTERNAL
EXTERNAL COURT
SB-A-304 OPEN TO BELOW 1 STAIRS SB-A-304 SB B1 77
STAIRS

SHAFT
A1/ A-501
SB ST 200
B2 SB ST 200 Stamp :
SB-M01 SB-I-401
SB SH 108 REF. TO MESH SCHEDULES UP B2 UP
E5/ A-501
H2
OPEN TO BELOW H2

1 D04-B
SB-61
1
A1/ A-501 HW-GD-01
3.57

14.00 SHAFT
2 A1 SB SH 101
2 SHAFT
2

5.43
E5/ A-501 10.97 SB SH 107
SB-A-351 A-554
1 1 2
3 SB-A-351 NCS S 0570-G30Y 33.00 B2 3 SB-A-351 SB-A-351
OR APPROVED EQUAL
1.85

57 9.00 E5/ A-565


1.90 1.400.90

1.90 1.400.90
6.
57

D02 D11
4 R
4
6.

SB-02 SB-57
66
R

UP
1.
R

5 R
1.
66 5.18
CORRIDOR
5 E1/ A-502
SB GF 58 E1/ A-502
6 5.18
6
A R A
6.
00 00
SB-A-301 6. SB-A-301
.00 WATER HEATER
5.25

5.25
R R9 R 9.0
0 E5/ A-501 AND SEVICE
NCS S1080-Y90R ROOM
OR APPROVED EQUAL GYMNASIUM HALL SB MZ 39
R 1.66
13.40

SB GF 59
.00
R

20.00

R3
7 7
1.
66

13.40

18.00
23.77

26.00

26.00
23.77

18.00
1.55

1.55

1
8 SB-A-352 8 1
C3
2.50

0.85 1.00 2.50

SB-A-352
A-554
9
B 9 NCS S 0570-Y
B
0.851.00

OR APPROVED EQUAL
10 STAGE 10

D02
SB-50
SB-A-302 SB-A-302
39.75

SB GF 69
11 UP
39.75

B2
Moveable STAIRS
2
Stairs
11 E3/ A-563 SB ST 203
2.85

2.85

R
1.64.43 C5 6 H2
NCS S 2060-R70B 1.6 IW-03 IW -03 IW -03
E3/ A-563
6 R SB-IW-02 SB-IW-03 SB-IW-01 SB-A-404
OR APPROVED EQUAL 9.00
A-554
13 13
R
1.70

1.70

10.97 57
6.
6.

C3/ A-567
57

2.97 R
14 D04
14 Project : : ‫ﺍﻟﻣﺷﺭﻭﻉ‬
GP-P C3/ A-502
5.26

SB-53

GP-P
1.70

1.70

D02
14.00 4.00 14.00 2.11 SB-05
D23-F BOYS CHANGING
D23-F
-5.550 SB-39
AREA
15 15
SB-38
ATHLETICS &
F.F.L GIRLS CHANGING
FITNESS ROOM
GYM ROOM ATHLETICS &
FITNESS ROOM
SB MZ 29 ARAB INTERNATIONAL ACADEMY SCHOOL
AREA SB MZ 36
SB MZ 35
5.47

SB MZ 37
SB MZ 34
Title :
NCS S 0502-B
A3/ A568 GP-P C1/A-566 SPORTS BUILDING FLOOR : ‫ﺍﺳﻡ ﺍﻟﻠﻭﺣﺔ‬
7.75

OR APPROVED EQUAL C1/A-566

D23-F
PLANS (FURN & ANNO)

SB-23
STORAGE SQUASH COURT
6.20

6.20

MALE TEACHERS SB GF 75 SB B1 57 BOYS TOILETS


D04-B CHANGING\TOILET E5/ A-565 REV. 01 C1/ A-563 GP-P
SB-GP-03
SB-68
GIRLS TOILETS GP-P E1/ A-562 D23-F SB MZ 30
SB GF 53 JANITORIAL CORRIDOR E1/ A-562 SB-GP-05 SB-24
STORE
1.60

SB MZ 33
E5/ A-565 SB GF 81
SB GF 54 1.60 3.20 1.60 : ‫ﺗﺻﻣﻳﻡ‬
C1/A-566 GP-L C1/A-566 D23-F
SB-26 Designed : Faris & Faris Architects
SB-GP-01

16 D16
SB-20
D09
SB-40
16 C1/ A-568
GP-P : ‫ﺭﺳﻡ ﺍﻟﻣﺷﺭﻭﻉ‬
H1 D16-C STAIRS H1 D02
2.25

2.25

1 SB-72
UP D11 SB-GP-04
UP P. M. : Faris & Faris Architects
STORAGE
UP UP
SB-49
STAIRS GYM OFFICE STORAGE SB-66 SB ST 202
SB GF 56
SHAFT LC CLOSET
D02 SB GF 50 LOBBY H2
SB ST 202 H1
SB-A-406 SB GF 54 SB GF 62 -3.400 : ‫ﺭﺳﻡ‬
17 SB SH 100
17
SB-04
D23 SHAFT SB MZ 32
C1/A-566 H1 H2
ELEVATOR LOBBY
SB-22
STAIRS
GP-K
SB SH 104 ELEVATOR F.F.L STAIRS Drawn : Faris & Faris Architects
1.90

1.90
SB-GP-02

E1/ A-562 SB-GP-06


GP-E

CORRIDOR D02 D16


SB EL 1 SB GF 55 SB-37
SB-17 SB ST 201 SB EL 1 SB ST 201
B2 SHAFT SHAFT : ‫ﺗﺩﻗﻳﻖ‬
SHAFT SB GF 45
E 18 C5/ A-501 SB SH 105
D23
SB-21
ELEC. ROOM
SB GF 49 SHAFT 18 E
COURT WAITING
SB SH 105
SHAFT
SB SH 106
SB SH 102 Checked : Faris & Faris Architects
SB-A-305 H1 SB-A-305 -5.550 E1/ A-502 B2
2.38

2.38

SB SH 102
? H2 SB B1 62
1 F.F.L H1 H2
1
D11
SB-58
Date : March 2022 : ‫ﺍﻟﺗﺎﺭﻳﺦ‬
19 SB-A-405 19 SB-A-405
1 3 SHAFT 1 1 3 : ‫ﻣﻘﻳﺎﺱ ﺍﻟﺭﺳﻡ‬
SB-C01 FEMALE SB SH 103
Scale :
SB-A-408 SB-A-351 TEACHERS MEZZANINE FLOOR FURNITURE SB-A-408 SB-A-406 SB-A-351
CHANING\TOILET : ‫ﺭﻗﻡ ﺍﻟﻠﻭﺣﺔ‬
GROUND FLOOR FURNITURE LAYOUT SB-M01 LAYOUT Dwg. No. :
3 SB GF 51
REF. TO MESH SCHEDULES 4 SB-A-151
1 : 200 1 : 200
Project Logo
Project Name : Construction of Arab International Academy Schools - Tarsheed
Project No. : Form Ref. No. : P07-F21 / Rev. 0 / Feb. 2012

Client Project Manager: Consultant: Contractor

arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau ara

Block / Building Name : Material Submittal Ref. No. :


Location of Use : Name of Material : Fire Rated Partitions and Door
Date Submitted : Submitted by : Enyinnaya.

PROJECT SPECIFICATIONS.
1.1.4 Submittals
2.2.2 Transparent Glass

2.2.3 High Performance Glass


2.2.4 Mirror Glass

2.2.5 Fire Resistant Glass

2.2.6 Patterned and Rough Cast (obscured) Glass

2.2.7 Bullet Resisting Glass

2.2.8 Anti-bandit Glass


2.2.9 Toughened Glass

2.3 GLAZING MATERIALS

2.3.1 Glazing Compounds

2.3.2 Distance Setting and Location Blocks

2.3.3 Glazing Gasket


Project Logo
Project Name : Construction of Arab International Academy Schools - Tarsheed
Project No. : Form Ref. No. : P07-F21 / Rev. 0 / Feb. 2012

Client Project Manager: Consultant: Contractor

arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau ara

Block / Building Name : Material Submittal Ref. No. :


Location of Use : Name of Material : Fire Rated Partitions and Door
Date Submitted : Submitted by : Enyinnaya.

COMPLIANCE STATEMENT
BP2022C004G-A1AS-MAR-ARC-0094 Rev 1
Project Logo
Project Name : Construction of Arab International Academy Schools - Tarsheed
Project No. : Form Ref. No. : P07-F21 / Rev. 0 / Feb. 2012

Client Project Manager: Consultant: Contractor

arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau ara

Block / Building Name : Material Submittal Ref. No. :


Location of Use : Name of Material : Fire Rated Partitions and Door
Date Submitted : Submitted by : Enyinnaya.

LETTER FROM MANUFACTURER ON DOOR HANDLE


Reynaers Middle East WLL
Forster Profile Systems
A4 - U11-14, Dubai Digital Park
Dubai Silicon Oasis
Att. Mr. Sanjo John P O Box 341484, Dubai, UAE.
Senior Sales Engineer
M/s NABINA ALUMINIUM & GLASS FACTORY Contact person
P.O.Box : 130 Clayton Braggs
Doha, Qatar
Tel : +974 778 8625 [email protected]
Email : [email protected] T +971 566895010

08.02.2024

Subject: Clarification letter

Project: Arab International Academy Project In Lusail, Qatar

Dear Mr. Sanjo,

This letter is with reference to the consultant comment about lever handles for the fire rated glazed hinged doors
on the project.

The forster presto door system uses narrow stile cold rolled profiles. It is always recommended to use cranked lever
handles for narrow stile profiles, to avoid knuckle trapping. The forster lever handles are a part of the tested and
certified system. See below the lever handle options;

forstersystems.com
T +9714 501 59 33
Furthermore, the lever handle indicated by the consultant, is mainly used for flush metal or wooden doors. These
lever handles have round covers, which is too large to install on narrow stile profile systems.

We trust the above is self-explanatory however should you have any problems or queries, please do not hesitate
to contact us.

Kind Regards

Clayton Braggs
Technical and Estimation Manager - Middle East & South Asia
Sales Manager – Qatar
Forster Profile Systems - Middle East

Seite 2/2
Project Logo
Project Name : Construction of Arab International Academy Schools - Tarsheed
Project No. : Form Ref. No. : P07-F21 / Rev. 0 / Feb. 2012

Client Project Manager: Consultant: Contractor

arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau ara

Block / Building Name : Material Submittal Ref. No. :


Location of Use : Name of Material : Fire Rated Partitions and Door
Date Submitted : Submitted by : Enyinnaya.

MATERIAL LIST AND DESCRIPTION


List of Materials
S/n Description Manufacturer Country of Origin Remarks
1 14mm Glass Vetrotech India
2 43.52mm Glass Vetrotech India
3 905065 ATHMER STADI L-24/20 TS L 1050mm, 150mm cut Forster Switzerland
4 907350 DOOR HANDLE INOX nut spindle 9mm Forster Switzerland
5 Carry Bar Large Forster Switzerland
6 Anti Panic Push Bar Forster Switzerland
7 Door weatherstripping Forster Switzerland
8 Locking pin Forster Switzerland
9 Automatic drop seal Forster Switzerland
10 Weld-on hinge Forster Switzerland
11 Door Handle Forster Switzerland
12 Door keep Forster Switzerland
13 Single mortise lock Forster Switzerland
14 Intumescent strips Forster Switzerland
15 Fire resistant glazing tape Forster Switzerland
16 Glazing beads Forster Switzerland
17 Profiles Steel Forster Switzerland
18 Door Closer Dormakaba Switzerland/ China
19 Silicon sealant Nullifire & Tremstop UK/ Canada
20 Rockwool Qatar Rockwool Qatar
21 Fasteners Fischer German
22 Coating Jotun Oman
23 Door Cylinder Consort UK
Project Logo
Project Name : Construction of Arab International Academy Schools - Tarsheed
Project No. : Form Ref. No. : P07-F21 / Rev. 0 / Feb. 2012

Client Project Manager: Consultant: Contractor

arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau ara

Block / Building Name : Material Submittal Ref. No. :


Location of Use : Name of Material : Fire Rated Partitions and Door
Date Submitted : Submitted by : Enyinnaya.

PRODUCT DESCRIPTION (PRODUCT CATALOGUE / MANUFACTURER SPECIFICATIONS / MATERIAL


TECHNICAL DATA SHEETS).
FORSTER MATERIALS
Technical submittal for fully glazed fire rated
steel fixed screens and rebated hinged doors

Project Name:

ARAB INTERNATIONAL ACADEMY PROJECT

Fire classification & Rating:

EW60 – Integrity and radiation control for 60 minutes

System proposed:
Forster Profile systems - Brochure
Revolutionary
Architectural Solutions
Profile Systems in Steel
and Stainless Steel
Sustainability and environment protection in style What we do
Besides full support from our Dubai based technical advisers, we provide architects, planners, and metal
Forster Profile Systems brings the solution to sustainability, environment, and climate protection construction companies with detailed documentation and practical digital aids to help them complete their
by combining elegance, strength, durability, and timelessness with our steel and stainless steel systems. design and implement our systems.

Project consulting
• Projects, designing and detailing support and recommendation
Who we are • Drafting specifications assistance
• Project-specific solutions
Forster Profile Systems develops and produces high-quality steel and stainless steel profile systems for both
internal and external applications: Tender specifications
• Provides specification manuscript in CSI / NBS format
• Thermally insulated doors and windows
• Facades and skylights CAD profile catalogue
• Non-thermally insulated doors and windows • Organized CAD drawings
• Fire and smoke protection systems for doors and windows
• Security doors and windows (burglar resistance, bullet resistance and blast resistance) Design and processing information
• Complete support from the design stage with budgetary review to project execution
Forster Profile Systems was founded in 1874 by Mr. Franz Josef Forster when he opened a coppersmith’s shop
in Arbon, Switzerland, producing hot water bottles. Decades later, the factory diversified its production into
welded steel tubing and, eventually, profile steel tubing in the 1930s.
Our mission – what we strive for
The company continued to innovate throughout the 20th century launching insulated window systems, steel
profiles, smoke control doors, and fire-resistant security rated systems. The Forster Profile Systems Group is a leader in the development, manufacture and sale of sustainable, smart
steel systems and associated consulting services. Our proximity to the market enables us to respond quickly
In recent years, Forster was acquired by the Reynaers group and the group has a turnover exceeding € 700M, and dynamically to evolving market and customer needs. We continue to focus on technical innovation, lean
selling into over 100 countries. processes and a strong organisation with the aim of becoming number one in our niche by 2026.

Our innovative systems impress with their architectural expression, second-to-none security standards, un-
surpassed sustainability and Swiss performance. We ensure this together with our highly qualified, flexible
employees, to whom we offer long-term, interesting jobs with prospects.

As an important part of a family-run group, we see it as our obligation to promote a solid, sustainable
business trajectory. Our aim is to generate stable, long-term growth with above-average profitability.

Our ambition —
­ in a world that is constantly changing, where
more individuality is required, resource-conserving behaviour is
vital and employees are the key to success — is to create a positive
impact on living spaces and buildings for the people who live and
work in them, and to make them safe, attractive and enjoyable.

Our values
Forster strives for a corporate culture based on respect for employees, customers, suppliers, and society,
leading to long-term cooperation with our partners to reach our shared goals towards success.
Project: Dubai Trade Center District, UAE We further stand for excellence while safeguarding the interests of our customers, thereby living up to their
forster system: thermfix vario expectations. Finally, we promote innovative behavior and create customer value through solutions with the
highest quality standards that meet their current and future needs.

4 5
Where and how we’re different
Foster offers profile systems for a variety of different requirements and needs. Our systems are continuously
updated and expanded by innovations to meet the latest demands of the global market.

Optimal construction design


Profile steel tubes are an optimal construction element for doors, windows, and curtain walls. Steel and
stainless steel are the perfect primary material for large-surface areas with highly narrow face widths.

• Elegant, transparent, lightweight and slim constructions


• Impressive element dimensions and forms
• Easy to combine with concrete, glass, membranes and wood
• Durable, economical and offers many fitting options
• Ecological, sustainable, ideal for renovations

Sustainability
Steel is 100 % recyclable and continually reusable, timeless and durable.

Forster is ISO 14001:2004 and ISO 9001:2015 certified and provides EPDs in compliance with DIN ISO 14025
and EN 15804 for windows, doors, and curtain walls made of steel and stainless steel that can be used as a
basis for building identification.

Project: Pepsi Co. Dubai, UAE


forster system: presto stainless steel

Innovative system and structure


Slender steel and stainless steel profiles concealed hinges and integrated door closers, establishing a clear,
modern, and elegant appearance on our fenestration systems.
For glazed, fire-resistant, smoke control, and heat-insulating elements, the identical face widths of the various
systems guarantee a uniform appearance.

Energy efficiency
Forster products, like the forster unico system, don’t need additional synthetic insulating materials. It is entirely
made of steel that meets the highest demands for technical and structural functions for thermal insulation,
fire protection, and burglary / bullet resistance.
With the mission of establishing a responsible and sustainable building, Forster combines the latest
technology, energy efficiency, and ecological material used for both new building construction and the
renovation of historic buildings.

Produced in Switzerland, sold worldwide: In Arbon, the Forster


Group encompasses around 14,000 sqm of production area for manu-
facturing steel profiles. Our own subsidiaries as well as contractors
expand across Europe, Asia, Middle East and North America.

6 7
Design
The entire forster product range has a consistent architectural design which enables variant systems, such as
swing doors, sliding doors, partitions and curtain walls to give a wide range of application options.

Safety
Forster profile systems have been tested and approved globally. The wide range of versions allows planners
a high degree of freedom in aesthetic design and functionality.
We work closely with glazing and fitting manufacturers to ensure that all components are optimally
compatible, including the innovations, new tests, and product line supplements.

Security
Forster’s steel and stainless steel profile systems have a wide range of increased security applications
particularly on burglary, bullet and blast-resistant applications.
The same visual appearance for different security areas offers a uniform aesthetic design and inconspicuous
integration in the overall architecture.

Benefits of steel
In a standard EN or UL fire test scenario (standard time-temperature curve), the temperature of the furnace
can reach approx. 1000  ˚C, which is well below the melting point of carbon steel (approx. 1400 ˚C), and
therefore carbon steel profiles requires no additional enhancements or reinforcements to maintain integrity
within a building fire scenario. The high-melting point of steel means it is possible to achieve E and EW fire
ratings, using simple, uninsulated, hollow profiles, which are slim, attractive and take up less floor space than
fire-rated profiles constructed from other materials. Steel also has high mechanical strength (or modulus of
elasticity) and is ideal for large single span facades or oversize doors and windows.

Additionally, steel fire-rated glazing systems can be ballistic, manual attack and blast-rated. Therefore, steel
systems can be multi-functional, weather-resistant and thermally enhanced, as well as fire and security-
rated. Steel is denser and harder than many other materials, such as aluminium, which means it is much more
resistant to impact damage and this makes it less likely to warp, deform or bend under weight, force or heat.
Thanks to the outstanding static values of steel, less material is required to achieve structural requirements and
because steel is 100 % recyclable, a profile out of steel can be recycled into the same material, of the same
quality, time and time again.

Project: Wafi Mall Dubai, UAE


forster system: presto & thermfix vario

8 9
forster presto Technical data
Material variants Steel, bright (mild steel)

Glazed doors (swing and Glazed partitions / screens


Stainless steel grades 304 and 316 (brush finish grain 220−240)
Zinc magnesium (ZM) coated steel

automatic sliding) and opening windows


Dimensions Available profile depths: 50 and 60 mm
Fire resistance options Fixed partitions from E30 to E120 and EW30 to EW120 / E180 in accordance with EN 1364-1
Single and double doors from E30 to E180 in accordance with EN 1634-1
Double egress doors / push-pull from EW30 to EW120
This is the system for flush-mounted, glazed, single and This is the system for flush-mounted glazed partitions, Single and double automatic sliding doors from EW30 to EW120 in accordance with EN 1634-1
double-leaf doors which can be constructed to form a screens and opening windows. The fixed partitions and Single action, rebated, unlatched swing doors (single and double-leaf) from EW30 to EW120 in accordance with EN 1634-1
wide range of applications, such as sliding, swing, double screens can be constructed to form a variety of design Double action, non-rebated, unlatched swing doors (single and double-leaf) from EW30 to EW60 in accordance with EN 1634-1

egress and double action. The system can be used in solutions, including traditional framing and butt joint Single action, non-rebated, latched swing doors (single and double-leaf), 1 and 1.5 hours non-temp. rise restricted (NT), UL 10C / NFPA 252
Single and double doors, 1 and 1.5 hours non-temp. rise restricted (NT), UL 10C / NFPA 252
both fire and non-fire applications – see technical data glazing solutions which provide maximum day light
Fixed screens, 90 minutes, UL9
for more information. openings. The system can be used in both fire and
Fire code compliance European and North American Standards
non-fire applications – see technical data for more
NFPA 101 and NFPA 80
Forster presto stands for security and safety and meets information.
GCC civil defence approved through local forster fabricators
maximum demands for technical functionality and
Tested design variants* Smoke-resistant doors, Sa, S200 in accordance with EN 1634-3
extreme long-term exposure to stress (durability). The Forster presto stands for security and safety and meets
Fire-resistant doors and screens
system is suitable for use wherever there are no maximum demands for technical functionality and
Metal sheet doors with tubular frames (please check with local forster representative)
special thermal insulation requirements. Forster presto extreme long-term exposure to stress. The system is Burglar-resistant doors, RC 1-3, in accordance with EN 1627-1630
is available in steel and stainless steel for elegant and suitable for use wherever there are no special thermal
Fittings UL listed hardware available
ambitious solutions. insulation requirements. Forster presto is available in steel
Concealed hinges
and stainless steel for elegant and ambitious solutions. Concealed door closer
Door closers complete with in-house cycling testing
Latch locks, lever handles, self-closing flush bolts
Roller latches (for unlatched doors)
Compatible with access control devices
System properties Extremely slender visible section widths and depth
Can be powder-coated or wet-paint-coated (to be checked with local applicator)
Large glass panels available for fire-rated systems
Extremely economical manufacturing without special equipment
Robust system, resistant to damage
Can be used in conjunction with forster thermfix vario facades
Sound insulation (hinged doors, depth 50 mm) up to 42 dB in accordance with EN ISO 140-3
Sound insulation (fixed screens, depth 50 mm) up to 46 dB in accordance with EN ISO 140-3
Sound insulation (hinged doors, depth 60 mm) up to 45 dB in accordance with EN ISO 140-3
Sound insulation (fixed screens, depth 60 mm) up to 48 dB in accordance with EN ISO 140-3
Environmental and Environmental Product Declaration (EPD) available, can apply online
sustainability credentials High recycle content, project specific declaration can be provided, on request
Country-specific approvals and requirements observed
*Refer to country-specific approvals

Project: Aman Hospital Doha, Qatar


forster system: presto & thermfix vario

10 11
forster presto xs
Flyer_prxs_Swissbau
Doors and fixed glazing
Ansichten von Broschüre presto XS Seite 7 übernehmen.
Combining elegance with purism, the non-insulated forster presto xs
system is suitable for the interior design of architecturally sophisticated
buildings. Door and glazing elements with a profile face width from
23 mm, a large selection of glazing beads and numerous other design
options are available.
Flyer_prxs_Swissbau

Technical data fixed glazing

7
Ansichten von Broschüre presto XS Seite 7 übernehmen.
Material variants Steel, bright
Dimensions Leaf height: up to 2400 mm

50
50

50
Leaf width: 400–1200 mm
Fixed glazing (WxH): unlimited x 3000 mm
Max. panel size 2800 x 2500 mm

7
8 15 23 4 18 23 22
Performance properties Accessible in accordance with DIN 18040
System properties Design variants:
Flyer_prxs_Swissbau 23 45 45

1 or 2 leaf doors with abutment and fanlight

7
Fixed glazing flush-mounted door
Face widths: door leaf with outer frame from 45 mm

50
Fixed glazing from 23 mm
Ansichten von Broschüre presto XS Seite 7 übernehmen.

50
Construction depth: 50 mm
50

50
8 15 15 8 15 15 3 15 15 8 15 15 8 15
Max. leaf weight: up to 120 kg
23 38 33 38 38
Max. filling element thickness: 24 mm

7
36.511 36.512 36.502 36.513 36.515
Glazing: wet glazing, dry glazing 8 15 23 4 18 23 22

Standard glazing beads and design glazing beads 23 45 45

Fittings: mounted

57
50

Fire glazing:
Single door EW120 in accordance with EN 1634-1 offset door
50

Fixed glazing EW120 in accordance with EN 1364-1 10 13 15 10 13 15 10 13 15 10 13

7
10 13 15 10 13 15 10 13
23 38 38 23 38 38 38
Country-specific approvals and requirements observed
37.511 37.512 37.513 37.611 37.612 37.613 37.615
8 15 15 8 15 15 3 15 15 8 15 15 8 15
50

23 38 33 38 38
50

50

36.511 36.512 36.502 36.513 36.515


50

50
7

8 15 23 4 18 23 22
57
50

23 45 45
25 13 15 25 13 15 25 13 50 13 15 50 13 15 50 13
38 53 53 63 78 78
37.521 37.522 37.523 37.551 37.552 37.553
10 13 15 10 13 15 10 13 10 13 15 10 13 15 10 13 15 10 13

23 38 38 23 38 38 38
50

37.511 37.512 37.513 15 20 25


37.611 30 37.61235 15
37.613 19 37.615 15 15 15 20
15
15

15
8 15 15 8 15 15 3 15 15 8 15 15 8 15
901350 901351 901352 901353 901354 901202 901203 901360 901361 901364 901363
23 38 33 38 38
50

50

36.511 36.512 36.502 36.513 36.515

25 13 15 25 13 15 25 13 50 13 15 50 13 15 50 13
57

38 53 53 63 78 78
50

37.521 37.522 37.523 37.551 37.552 37.553

10 13 15 10 13 15 10 13 15 20 10 13 25 15 10
30 13 35 15 10 13 15 15 10
19 13 15 15 15 20
23 38 38 23 38 38 38
15
15

15

37.511 37.512 37.513 37.611 37.612 37.613 37.615

901350 901351 901352 901353 901354 901202 901203 901360 901361 901364 901363
Project: Private villa
forster system: presto xs
50

50

25 13 15 25 13 15 25 13 50 13 15 50 13 15 50 13
12 13
38 53 53 63 78 78
37.521 37.522 37.523 37.551 37.552 37.553
forster unico
Glazed doors, windows
and fixed screens
The forster unico profile systems are ideal for thermally insulated windows, doors,
and fixed glazing. It consists of 100 % recyclable steel with no plastic insulators.
The system is slender and attractive, it can achieve a high performance in terms of
weather resistance, acoustics, and thermal insulation and is also suitable for blast,
ballistic, fire and burglar resistance applications.

Technical data
Material variants Galvanized steel
Dimensions Clear passageway, 1 leaf: 1370 x 3010 mm
Clear passageway, 2 leaf: 2700 x 2850 mm
Fixed glazing (WxH): unlimited x 5000 mm
Max. panel size 1500 x 3000 mm

Performance properties Heat transfer: UD > 1.3 W / (m²·K)


Smoke protection Sa or S200 in accordance with EN 1634-3
Durability test C5 in accordance with EN 16034 (up to 1 million cycles
tested in accordance with EN 1191 with rotating pivot drive)
Escape doors: 1 or 2 leaf escape and rescue routes
(partial and full panic system) in accordance with EN 179 and EN 12210
Watertightness class 3A in accordance with EN 12208
Air permeability class 4 in accordance with EN 12207
Impact resistance class 1 in accordance with EN 13049
Operating forces class 3 in accordance with EN 13115
Accessible in accordance with DIN 18040
Sound insulation up to Rw = 46 dB in accordance with EN ISO 140-3 max.
System properties CE marking in accordance with EN 16034 and EN 14351-1
Design variants:
1 or 2 leaf doors with abutment and fanlight
Fixed glazing
Insulated door threshold
Face widths: door leaf 85 mm, fixed glazing from 50 mm
Construction depth: leaf and frame profile 70 mm
Max. leaf weight: up to 410 kg
Max. filling element thickness: 56 mm
Glazing:
dry glazing, standard glazing beads
Standard glazing beads
Fittings: surface mounted and concealed
Fire resistance up to EW60 as per EN 1364-1 and EN 1634-1
Burglar resistance up to RC4 as per EN 1627
Blast resistance up to EPR1 as per EN 13123-1
Ballistic resistance up to FB6 as per EN 1522
Country-specific approvals and requirements observed

Project: Shed Hall Zug, Switzerland


forster system: unico & unico xs

14 15
forster unico xs
Heat-insulated windows
and fixed glazing
A uniquely slim profile construction made from 100% steel, the forster unico xs
heat-insulated window and fixed glazing system is suitable for use in private villas,
palaces, hotels, mosques and cultural buildings, as well as for modern buildings
where an industrial look is required. Various opening variants are available as well as
a wide range of applications for holding fillings up to 60 mm. This creates designs
with the lowest U-values and outstanding sound insulation properties.

Technical data
Material variants Galvanized steel, bright steel
Dimensions Leaf height: 520–2480 mm, for RC2 560–2480 mm
Leaf width: 360–1440 mm, for RC2 451–1440 mm
Fixed glazing (WxH): unlimited x 3000 mm
Max. panel size 2800 x 2500 mm

Performance properties Heat transfer: Uw > 0.84 W / (m²·K) window


Uw > 0.84 W / (m²·K) fixed glazing
Durability class 2 in accordance with EN 12400 (10,000 cycles EN 1191)
Burglar resistance RC2 in accordance with EN 1627
Resistance to wind class C5 / B5 in accordance with EN 12210
Watertightness class E 1050 in accordance with EN 12208
Air permeability class 4 in accordance with EN 12207
Operating forces class 2 in accordance with EN 13115
Sound insulation up to Rw = 48 dB in accordance with EN ISO 140-3
System properties CE marking in accordance with EN 14351-1
Minergie certified
Design variants:
Opens inwards: turn / turn-and-tilt windows 1 or 2 leaf
Opens outwards: turn / top-hung window, 1 leaf
Fixed glazing
Face widths: window leaf with outer frame from 55 mm
Fixed glazing from 23 mm
Construction depth: leaf profile 88 mm, frame profiles 70 mm
Max. leaf weight: 100 kg, 150 kg on request
Glazing: wet glazing, dry glazing
Standard glazing beads
Fittings: mounted, concealed flush
Country-specific approvals and requirements observed

Project: Private villa


forster system: unico xs

16 17
forster fuego light Technical data
Material variants Zinc magnesium (ZM) coated steel

Fire-rated glazing
Stainless steel grade 304 (brush finish grain 220–240)
Various profile depths available, depending on the fire rating

(swing and automatic Fire-rated glazed


Fire resistance options Fixed partitions from EI30 to EI120 in accordance with EN 1364-1
Single and double doors from EI30 to EI90 in accordance with EN 1634-1
Single and double automatic sliding doors from EI30 to EI90 in accordance with EN 1634-1
sliding doors) partitions and screens Double action, non-rebated, unlatched swing doors (single and double leaf), EI30 in accordance with EN 1634-1
Double egress doors / push-pull from EI30 to EI60 in accordance with EN 1634-1
Single action, non-rebated, unlatched swing doors (single and double leaf), EI30 / EI60 / EW90 in accordance with EN 1634-1
Flush-mounted sheet metal doors from EI30 to EI60 in accordance with EN 1634-1
For resistance in highly frequented areas, the forster The flush-mounted glass panels combined with forster
Fixed partitions, 1 and 2 hours temperature rise restricted (T), UL 263 / NFPA 251
fuego light glazed steel door offers fire protection and fuego light feature the tried-and-tested fire resistance
Fixed partitions with butt joint glazing from EI30 to EI120 in accordance with EN1634-1
security protection for high-quality and safe architectural function EI30–EI120 while also representing an Single action, non-rebated, latched swing doors (single and double leaf)
solutions. It is suitable for buildings heavily frequented aesthetically pleasing design element with a large Single and double doors, 1 and 1.5 hours temperature rise restricted (T), UL 10C / NFPA 252
by the public, like shopping centers, hospitals, schools, amount of glazing. The elegant, slim steel profiles Sound-absorbing / fire-rated panel, 2 hours, ASTM E119
airports, and tourist hot spots. The slim steel-and-glass allow for a transparent, open interior design, perfect Fire code compliance European and North American Standards
construction provides an attractive appearance with for contemporary architecture. NFPA 101 and NFPA 80
high glass transparency and is durable and robust. GCC civil defence approved through local forster fabricators
Tested design variants* Fire-resistant doors in combination with smoke rating requirements, Sa, S200 in accordance with EN 1634-3

Butt joint glazing option


Burglar-resistant doors, RC 1-3 in accordance with EN 1627–1630
Fittings UL-listed hardware available

(glass-on-glass design)
Door closers complete with in-house cycling testing
Latch locks and lever handles
Unlatched systems available with pull handles
Compatible with access control devices
The glass elements can be installed with a minimum System properties Extremely slender visible section widths and depth
butt joint, to form an entirely transparent, even and Can be powder-coated or wet-paint-coated (to be checked with local applicator)
stylish glass front. Large glass panels available for fire-rated systems
Large door sizes available for fire-rated systems
Extremely economical manufacturing without special equipment
Robust system, resistant to damage
Can be used in conjunction with forster thermfix vario facades
Sound insulation (hinged doors EI30) up to 45 dB in accordance with EN ISO 140-3
Sound insulation (fixed screens EI30) up to 48 dB in accordance with EN ISO 140-3
Sound insulation (hinged doors EI60) up to 47 dB in accordance with EN ISO 140-3
Sound insulation (fixed screens EI60) up to 48 dB in accordance with EN ISO 140-3
Sound insulation (hinged doors EI90) up to 47 dB in accordance with EN ISO 140-3
Sound insulation (fixed screens EI90) up to 48 dB in accordance with EN ISO 140-3
Environmental and Environmental Product Declaration (EPD) available, can apply online
sustainability credentials High recycle content, project-specific declaration can be provided, on request
Country-specific approvals and requirements observed
*Refer to country-specific approvals

Project: Cranleigh School Abu Dhabi, UAE


forster system: fuego light

18 19
Technical data
Material variants Black box steel profiles
Galvanized steel or stainless steel grade 304 profiles
Stainless steel (fire) or aluminium (non-fire) pressure plates, aluminium or stainless steel cover caps
Available profile depth: 45 and 60 mm
Fire resistance option Fixed partitions from EW30 to EW120 and from EI30 to EI120 in accordance with EN 1634-1
Facades from EW30 to EW120 in accordance with EN 1364-3
Structural glazed partitions / facades, EI60 in accordance with EN 1364-1
Fixed partitions, 1 and 2 hours insulated in accordance with UL 263 / ASTM E119
Fire code compliance European and North American Standards
NFPA 101
GCC civil defence approved via Forster fabricators
Tested design variants* Tested with single, double and triple glazed options
Classification from CE-tests in accordance with EN 13830
Thermal insulation U-values up to 1.0 W/m2·K
Resistance to wind load, 3 kN safety load 4.5 kN in accordance with EN 12179
Thermfix_Schnitte_Broschüre
Water penetration, RE 1200 in accordance with EN 12155
Air permeability, AE (>600) in accordance with EN 12153
Sound insulation, Rw up to 50 dB, EN ISO 140-3
Impact resistance, E5 / l5 in accordance with EN 14019
Burglar resistance, RC2, RC3, (RC4) in accordance with EN 1627–1630
Ballistic resistance, FB4, FB6 & FB7 in accordance with EN 1522
60
Blast resistance, EPR1 in accordance with EN 13123-1
Fittings UL-listed hardware available
Door closers complete with in-house cycling testing
Latch locks and lever handles
Unlatched systems available with pull handles

110
Compatible with access control devices
Project: Muscat International Airport, Oman System properties Can be used in conjunction with other forster systems, presto, fuego light and unico
forster system: thermfix vario Extremely slender face widths
Impressive static values for large single span curtain walls
Can be powder-coated or wet-painted
Large glass sizes available
Structural glazed options available for fire and non-fire applications
Robust and resilient to damage
Thermfix_Schnitte_Broschüre
forster thermfix vario Environmental and Environmental Product Declaration
20 20 (EPD)
20 available, can apply online

Curtain wall with sustainability credentials High recycle content, project-specific declaration can be provided, on request
Country-specific approvals and requirements observed

Curtain wall structural glazed design *Refer to country-specific approvals


60

for fire resistance for fire resistance


Offering transparency and maximum security, the forster Traditionally, fire-rated facades utilize the stick method

110
thermfix vario curtain wall meets all the international of construction, with mullion / transom spigots, dry-glazing
requirements for fire, security and comfort, with gaskets, pressure plates, and external snap-on capping

20
applications for low U-values, sound insulation, fire, to hold the fire-rated glass in place.
blast, ballistics and manual attack resistance.

60

20
For architects that desire a clean, uncluttered appearance,

20
Thanks to the outstanding structural properties of steel, with a flush glass surface and a seamless interface
75
impressive field sizes are possible with the narrowest between the fire-rated and non-fire-rated glazing
profile face widths of just 45 mm. Windows and doors elements, Forster has designed, tested and certified a
20 20 20
(swing & sliding) from the forster range can be integrated new structural glazed, fire-resistant facade, which can
within the curtain wall system without compromising achieve a fire rating of EI60. Horizontal section Vertical section
the safety and performance features.
The system utilizes the existing thermfix vario profiles
and gaskets, with the addition of new steel or stainless
steel toggles, and can be used internally or externally.

20 21

20
forster thermfix light
Facade with attachment profiles
Flexible, fast, economical. The system offers great configuration flexibility to both
planner and architect because of the unlimited choice in the sub-structures. Forster
thermfix light makes it possible to mount a sealing system on commercially-available
steel and aluminium profiles as well as on wooden sub-structures. The system is
characterized by basic and quick processing allowing improved economics.
Possible variants are vertical curtain walls, sloped glazing and sloped glazing with
fire protection. Combine the thermally insulated doors and windows from the system
forster unico and unico xs with it.

Technical data
Material variants Sub-structures in steel, aluminium, wood
Forster attachment profiles in steel or aluminium, pressure profiles in
aluminium, cover profiles in aluminium or stainless steel
Performance properties* Thermal insulation: Uf-value 1.0–2.2 W / (m2·K) (S)
(S) sloped glazing Thermal insulation: Uf-value 1.1–2.2 W / (m2·K) (V)
(V) vertical curtain wall (depending on the infill thickness) when using a rebate insulator
Tested fire-resistant sloped glazing EI30 / EI60 / E30 / E60
Tested based on the product standard EN 13830:
Reaction to fire of construction products acc. to EN 13501-1: class E (S)(V)
Curtain walls with increased volume of water (3 l / min*m2) (S)
Air permeability 1200 Pa (S) / AE 750 (V)
Rain impermeability 1200 Pa (S) / R7 600 Pa, dynamic Pmax 1125 Pa (V)
Resistance to wind load 2400 Pa, safety load 3600 Pa (S) / 3000 Pa (V)
Safety test: CSTB 3228 (50 kg, 2400 mm) 1200 Joule (S)
Impact resistance according to EN 14019: I 5 (internal), E 5 (external)
Slope 0–75º (inside), for outside use 10–75º (S)
System properties Extremely slender visible sections: rafter and transom 50 mm
Individual profile and surface design
Basic and quick processing because of few system components
Country-specific approvals and requirements observed
*Refer to country-specific approvals

Project: Église Saint-Christophe Vachères, France


forster system: thermfix light & fuego light

22 23
Our plans for the future
What’s Next?
Start of construction at the Forster Campus
Carbon-neutral production and office building
Taking place on 18th May 2022, the symbolic ground-breaking ceremony marked the start of work on the
construction of a new campus for Forster Profilsysteme AG in Romanshorn in the Swiss canton of Thurgau.
The manufacturer of high-quality doors, windows and facade systems made of steel and stainless steel is
investing CHF 52 million in the works. Measuring more than 30,000 m2, the Forster Campus is setting standards
in terms of design, technology and sustainability, bringing together employees who had previously been
spread across two locations into one state-of-the-art building complex. It is scheduled to be completed in time
to mark the company’s 150th anniversary in 2024.

Just ten kilometres from the current location, the Forster Campus blends harmoniously into the rural
environment. Employees can look forward not only to a green environment, but also to excellent transport
links. The campus itself consists of three different structures. The new building impressively demonstrates the
creative and technical possibilities that Forster products offer.

The production and logistics hall features a high-bay warehouse and is the largest building. Here, all processes
Three buildings, one idea: The new Forster Campus in Romanshorn brings together employees who were previously spread across
are optimized, digitized, resource-efficient and sensibly automated. The adjacent technology centre offers two locations – and sets standards in design, technology and sustainability.
space for the training centre, the production workshop and a test centre. The third building, which contains
office space, is unobtrusively positioned between its two “siblings”. The interior design is consistently geared
towards offering all employees healthy and motivating working conditions and encouraging interaction.
Recreational areas both inside and outside the building contribute to a sense of well-being – including its
own “lake” with a jetty.

Gold level for sustainability


Forster also has high standards when it comes to sustainability: almost all the roofs are equipped with solar
panels. With an output of up to 1.5 megawatts, it will power the entire production process with green
electricity. Due to measures like this, the Forster Campus will be the first commercial building in Switzerland
to receive the internationally renowned LEED certification at the particularly demanding gold level. While
the office buildings are due to be occupied by the end of 2023, Forster is planning to fully open the Forster
Campus by June 2024 – in time for the company’s 150th anniversary.

For the living spaces of today and tomorrow


Forster Profile Systems Ltd develops and manufactures safe, energy-efficient solutions in steel and stainless
steel for doors, windows and facades. Forster’s products and system solutions for both building envelope
and interior use meet the highest requirements and standards. The portfolio is rounded off by accessories and
comprehensive services for customers and business partners in architecture, planning and the construction
industry. As a globally active Swiss company, Forster Profile Systems is a leader in the fields of security
and fire protection. Forster develops and manufactures in Switzerland and has subsidiaries and sales partners
in around 30 countries.

24 25
Forster Middle East landmark projects
Forster has supplied our high-end fenestration systems to over 300 projects across the Middle East. We have worked with some of
the regions most prestigious clients, architects, designers and contractors, helping them to realise their visions by building striking,
award-winning buildings. Our solutions have helped improve the quality of lives for building occupants in a variety of key sectors.

Transportation infrastructure (air, rail & road) Industrial, petrochemical & pharmaceutical
• MC3 Muscat International Airport, Oman • Duq'm Refinery EPC 2 Utilities & Off sites, Oman
• Hamad International Airport, Qatar • LPG Facility, Salalah, Oman
• Qatar Airways Accommodation Buildings, Doha, Qatar • Kahramaa Customer Care Centre, Doha, Qatar
• King Abdulaziz International Airport (KAIA), • Chevrolet Showroom, Doha, Qatar
Jeddah, Saudi Arabia • NBKA Mercedes Benz Service Centre Refurbishment,
• Qasr Al Hokm, iconic underground metro station, Doha, Qatar
Riyadh, Saudi Arabia • QP District Cluster B & C, Doha, Qatar
• Midfield Terminal Building, Abu Dhabi • SABIC HQ Main Building, Al Jubail, Saudi Arabia
International Airport, U.A.E. • Shuqaiq Phase 3 Water Transmission Systems,
Al Shuqaiq, Saudi Arabia
Retail (shopping malls) • Pepsi Co Factory, Dubai, U.A.E.
• Kunouz mall, Kuwait • Schlumberger ACE BASE HQ, ICAD Abu Dhabi, U.A.E.
• Al Merqab Avenue Mall, Doha, Qatar
• Al Jawhara Mall, Jeddah, Saudi Arabia Government (police, military, embassy buildings &
• Wafi Hotel Complex & Mall Expansion 8, Dubai, U.A.E. government departments)
• Al Khail Avenue Mall, Dubai, U.A.E. • New Palace of Justice, Kuwait
• Ministry Of Interior HQ, Doha, Qatar
Healthcare (hospitals, laboratories & clinics) • Ministry Of Interior HQ, Riyadh, Saudi Arabia
• Jaber Al Ahmad Al Jaber Sabah Hospital, Kuwait • Integrated Public Security Operations 911 (IPSO) (MOI)
• Idealmed Hospital, Muscat, Oman various locations, Saudi Arabia
• Al-Ahli Hospital, Doha, Qatar • KAP 1, KAP2 & KAP 4, several sites throughout the Kingdom,
• Al Mafraq Hospital, Abu Dhabi, U.A.E. various locations, Saudi Arabia
• Al Jalila Children’s Hospital, Dubai, U.A.E. • Ministry of Energy & Industry ERIC 40, Dubai, U.A.E.

Education (schools, colleges & universities) Commercial & mixed use developments
• Bethlehem University Library, Palestine • MKH Tower, Lusail, Qatar
• New College of Pharmacy, Doha, Qatar • Seef Lusail D1 & D2, Lusail, Qatar
• 127 Qatar schools and kindergartens, Doha, Qatar • King Abdullah Financial District Parcel 4.04 & 1.17,
• Cranleigh School, Sadiyat Island, Abu Dhabi, U.A.E. Riyadh, Saudi Arabia
• New York University, Sadiyat Island, Abu Dhabi, U.A.E. • Dubai Trade Centre District C2 / C4 / C3 & C5, Dubai, U.A.E.
• ICD Brookfield Tower, Dubai, U.A.E.
Culture & tourism • Fountain Views – Podium Towers 1 & 2, Dubai, U.A.E.
• Dar Al Jinna & Dar Al Riffa, Music House Buildings, Bahrain • Qayarat Al Hidd, Sadiyat Island, Abu Dhabi, U.A.E.
• Qatar National Library, Doha, Qatar • Lusail Towers, Lusail, Qatar
• The Louvre Museum, Abu Dhabi, U.A.E.
• Dubai Opera House, Dubai, U.A.E. Hotels
• Sheikh Zayed Grand Mosque – Visitor center and plaza, • Lusail Katara Twin Tower Hotel Project, Lusail, Qatar
Abu Dhabi, U.A.E. • Castle Guest House, Makkah, Saudi Arabia
• Dubai Eye, Dubai, U.A.E. • Royal Atlantis Hotel, The Palm, Dubai, U.A.E.
• Sea World, Abu Dhabi, U.A.E. • Kempinski Hotel, Business Bay, Dubai, U.A.E.
• Jumeirah Gate, The Address Hotel, JBR, Dubai, U.A.E.
Sport & leisure
• Lusail Football Stadium FIFA World Cup, Lusail, Qatar
• Al Thumama Football Stadium & Precinct FIFA World Cup,
Doha, Qatar
• Qatar Olympic and Sports Museum, Khalifa International
Stadium FIFA World Cup, Doha, Qatar
• Royal pavilion at the Riyadh camel racing track, Riyadh, KSA

26
Forster Profile Systems Ltd

Dubai Digital Park, Silicon Oasis


P.O. Box 341484

tel: +971 4 501 5933


fax: +971 4 372 4060
e-mail: [email protected]
web: www.forster-profile.ch

David Mills
+971 55 7569385 | +971 56 6969718
[email protected]

Clayton Braggs
+971 56 6895010
[email protected]

Arjun Panackal Sreevallabhan


+971 50 4425728
[email protected]

Jessa Estocado
+971 50 1026985
[email protected]
Technical data for profiles & accessories for fire
rated fixed screens and hinged doors – forster
presto 50 series

Acoustic rating – 35dB


Nichtisoliertes Profilsystem für Türen und Fenster
Système de profilés non isolés pour portes et fenêtres
Non-insulated profile system for doors and windows
*O4UBIMVOE&EFMTUBIM&OBDJFSFUBDJFSJOPY*OTUFFMBOETUBJOMFTTTUFFM

/FVF4DIMPTT4FSJF/PVWFMMFTÏSJFEFTFSSVSFT/FXMPDLTFSJFT
4UBIM

71
50 "DJFS
4UFFM

Profile Profilés Profiles


Stahl Acier Steel

Profile / Profilés / Art. Nr. m L G Iy Wy IZ WZ ey eZ O


Profiles (1:4) art. no. [mm] [kg/m] [cm4] [cm3] [cm4] [cm3] [mm] [mm] [m2/m]

01.564 CMBOL         
 CSVU


Profilés
Profiles
CSJHIU

Profile
 


32.851 CMBOL         
 CSVU


CSJHIU
 
;.


02.531 CMBOL         
 CSVU


CSJHIU
  


02.564 CMBOL         
 CSVU


CSJHIU
  


32.852 CMBOL         
 CSVU


CSJHIU
  
;.


32.853 CMBOL         
 CSVU


CSJHIU
  
;.


32.854 CMBOL         
 CSVU


CSJHIU
 


32.855 CMBOL         
 CSVU


CSJHIU
  
;.


60.155 CMBOL         


CSVU
 CSJHIU



 


Z
Y 4DIXFSQVOLUBCTUBOE N .BUFSJBM 0  6NMBVGFOEF0CFSGMÊDIFQFS-BVGNFUFS
EY %JTUBODFBVDFOUSFEFHSBWJUÏ   .BUÏSJBV   4VSGBDFQÏSJQIÏSJRVFQBSNÒUSFDPVSBOU


EZ
%JTUBODFPGDFOUFSPGHSBWJUZ   .BUFSJBM   0VUMZJOHTVSGBDFQFSSVOOJOHNFUFS

www.forster-profile.ch
4UBIM
50 "DJFS
4UFFM 71

Profile Profilés Profiles


Stahl Acier Steel

Profile / Profilés / Art. Nr. m L G Iy Wy IZ WZ ey eZ O


Profiles (1:4) art. no. [mm] [kg/m] [cm4] [cm3] [cm4] [cm3] [mm] [mm] [m2/m]

32.810 CMBOL         
 CSVU

Profilés
Profiles

CSJHIU
Profile

 


32.800 CMBOL         
 CSVU


CSJHIU
 
;.


32.870 CMBOL         
 CSVU


CSJHIU
 


32.890 CMBOL         
 CSVU


CSJHIU
 


32.803 CMBOL         
 CSVU


CSJHIU
  
;.


32.804 CMBOL         
 CSVU


CSJHIU
  


32.892 CMBOL         
 CSVU


CSJHIU
  


32.805 CMBOL         
 CSVU


CSJHIU
  
;.


32.809 CMBOL         
 CSVU


CSJHIU
  


Z
Y 4DIXFSQVOLUBCTUBOE N .BUFSJBM 0  6NMBVGFOEF0CFSGMÊDIFQFS-BVGNFUFS
EY %JTUBODFBVDFOUSFEFHSBWJUÏ   .BUÏSJBV   4VSGBDFQÏSJQIÏSJRVFQBSNÒUSFDPVSBOU


EZ
%JTUBODFPGDFOUFSPGHSBWJUZ   .BUFSJBM   0VUMZJOHTVSGBDFQFSSVOOJOHNFUFS

www.forster-profile.ch
4UBIM &EFMTUBIM
50 "DJFS
4UFFM
"DJFSJOPY
4UBJOMFTTTUFFM 71

Beschläge Quincaillerie Beschläge


4DIMPTTHBSOJUVSFO (BSOJUVSFTEFTFSSVSFTM 4FUTPGMPDLT
3PMMGBMMFOTDIMPTT 4FSSVSFËSPVMFBV 3PMMFSMBUDIMPDL
Quincaillerie
Beschläge

Fittings


www.forster-profile.ch
4UBIM &EFMTUBIM
50 "DJFS
4UFFM
"DJFSJOPY
4UBJOMFTTTUFFM 71

Beschläge Quincaillerie Fittings


4DIMÚTTFS 4FSSVSFT -PDLT
3PMMGBMMFOTDIMPTT 4FSSVSFËSPMFBVY 3PMMFSMBUDIMPDL
Quincaillerie
Beschläge

Fittings


www.forster-profile.ch
4UBIM &EFMTUBIM
50 "DJFS
4UFFM
"DJFSJOPY
4UBJOMFTTTUFFM 71

Beschläge Quincaillerie Fittings


4DIMJFTTCMFDIF (ÉDIFT ,FFQT

!BBILDUNG "EZEICHNUNG 6ERKAUFSEINHEIT !RT.R


&IGURE $±SIGNATION 5NIT±ÆDEÆVENTE ARTÆNO
&IGURE $ESIGNATION 3ALESÆUNIT ARTÆNO
 %.Æ
Schliessblech

%.Æ
  
FÃR %INSTECKSCHLOSS UND
%INSTECKSCHLOSS MIT OBERER 6ERRIEGELUNG


%.Æ

%.Æ Gâche


POUR SERRURE ¨  BEC DE CANE


AVEC VERROUILLAGE SUP±RIEUR
 3TKPCE 

Keep


FOR SINGLE MORTISE DEADLOCK AND


SINGLE MORTISE DEADLOCK WITH TOP SHOOTBOLT











Quincaillerie
Beschläge

Fittings



  %.Æ
Schliessblech
%.Æ

FÃR 2OLLFALLENSCHLOSS


%.Æ Gâche


%.Æ

POUR SERRURE ¨ ROULEAU

 3TKPCE 
Keep
FOR ROLLER LATCH LOCK













%.Æ
Austauschstück
%.Æ

 FÃR % ¡FFNER $). LINKS UND $). RECHTS






%.Æ Pièce de replacement


%.Æ

POUR OUVERTURE ±LECTRIQUE $). GAUCHE ET $). DROITE




Replacement piece


 FOR ELECTRO DOOR OPENER $). LEFT AND $). RIGHT


$). LINKS $). GAUCHE $). LEFT


 3TKPCE 
$). RECHTS $). DROITE $). RIGHT


www.forster-profile.ch
4UBIM &EFMTUBIM
50 "DJFS
4UFFM
"DJFSJOPY
4UBJOMFTTTUFFM 71

Beschläge Quincaillerie Fittings


;VTBU[WFSSJFHFMVOH 7FSSPVJMMBHFTVQQMÏNFOUBJSF "EEJUJPOBMMPDLJOH
Quincaillerie
Beschläge

Fittings


www.forster-profile.ch
4UBIM &EFMTUBIM
50 "DJFS
4UFFM
"DJFSJOPY
4UBJOMFTTTUFFM 71

Beschläge Quincaillerie Fittings


%SàDLFSTUJGUF3PTFUUFO $BSSÏTEFQPJHOÏFTSPTBDFT )BOEMFTIBGUT3PTFUUFT
Quincaillerie
Beschläge

Fittings


www.forster-profile.ch
4UBIM &EFMTUBIM
50 "DJFS
4UFFM
"DJFSJOPY
4UBJOMFTTTUFFM 71

Beschläge Quincaillerie Fittings


"OTDIXFJTTCBOE 1BVNFMMFËTPVEFS 8FMEPOIJOHF
)ÚIFOWFSTUFMMCBS 3ÏHMBCMFFOIBVUFVS "EKVTUBCMFJOIFJHIU
Quincaillerie
Beschläge

Fittings


www.forster-profile.ch
4UBIM &EFMTUBIM

71
50 "DJFS
4UFFM
"DJFSJOPY
4UBJOMFTTTUFFM

Zubehör Accessoires Accessories


%JDIUVOHFO +PJOUT 8FBUIFSTUSJQQJOHT

Abbildung Bezeichnung Verkaufseinheit Art. Nr.


Figure Désignation Unité de vente art. no.
Figure Designation Sales unit art. no.
"OTDIMBHEJDIUVOHGàS5àSQSPGJMF
&1%.TDIXBS[
+PJOUEFCVUÏFQPVSQSPGJMÏTEFQPSUF
N 905306
&1%.OPJS
8FBUIFSTUSJQQJOHGPSEPPSQSPGJMFT
&1%.CMBDL

"OTDIMBHEJDIUVOHGàS5àSQSPGJMF
$3TDIXBS[ TDIXFSFOUGMBNNCBS
+PJOUEFCVUÏFQPVSQSPGJMÏTEFQPSUF N 905307
$3OPJSEJGGJDJMFNFOUJOGMBNNBCMF
8FBUIFSTUSJQQJOHGPSEPPSQSPGJMFT
$3OPJS EJGGJDVMUUPJOGMBNF

"OTDIMBHEJDIUVOH
$3TDIXBS[
+PJOUEFCVUÏF
$3OPJS
N 905406
8FBUIFSTUSJQQJOH
$3CMBDL

%JDIUVOHGàS4DIXFMMFVOE1FOEFMUàSFO
&1%.TDIXBS[
+PJOUQPVSTFVJMTFUQPSUFTWBFUWJFOU


&1%.OPJS N 905201


8FBUIFSTUSJQQJOHGPSCPUUPNSBJMBOE
  EPVCMFBDUJPOEPPST
&1%.CMBDL

4DIXFMMFOEJDIUVOH
$3TDIXBS[
+PJOUEFTFVJM
$3OPJS
#PUUPNSBJMXFBUIFSTUSJQQJOH
$3CMBDL N 905401

%JDIUVOHGàS1FOEFMUàSFO
Accessories
Accessoires
&1%.TDIXBS[
Zubehör

+PJOUQPVSQPSUFTWBFUWJFOU


&1%.OPJS
N 905200
8FBUIFSTUSJQQJOHGPSEPVCMFBDUJPOEPPST
&1%.CMBDL
 


www.forster-profile.ch
4UBIM &EFMTUBIM

71
50 "DJFS
4UFFM
"DJFSJOPY
4UBJOMFTTTUFFM

Zubehör Accessoires Accessories


%JDIUVOHFO +PJOUT 8FBUIFSTUSJQQJOHT

Abbildung Bezeichnung Verkaufseinheit Art. Nr.


Figure Désignation Unité de vente art. no.
Figure Designation Sales unit art. no.

7FSHMBTVOHTEJDIUVOHJOOFO
$3 TDIXBS[ GàS'VHFOCSFJUFVOENN
NJU(MFJUMBDL TJMJLPOGSFJ
+PJOUEFWJUSBHFJOUÏSJFVS
$3 OPJS MBSHFVSEFKPJOUEFFUNN N 905784
BWFDMBRVFMVCSJGJBOUF TBOTTJMJDPOF
*OOFSHMB[JOHTFBM
$3 CMBDL GPSKPJOUXJEUITPGBOENN
BOUJGSJDUJPODPBUJOH TJMJDPOGSFF

7FSHMBTVOHTEJDIUVOHJOOFO
$3 TDIXBS[ GàS'VHFOCSFJUFVOENN
NJU(MFJUMBDL TJMJLPOGSFJ
+PJOUEFWJUSBHFJOUÏSJFVS
$3 OPJS MBSHFVSEFKPJOUEFFUNN N 905785
BWFDMBRVFMVCSJGJBOUF TBOTTJMJDPOF
*OOFSHMB[JOHTFBM
$3 CMBDL GPSKPJOUXJEUITPGBOENN
BOUJGSJDUJPODPBUJOH TJMJDPOGSFF

7FSHMBTVOHTEJDIUVOHJOOFO
$3 TDIXBS[ GàS'VHFOCSFJUFVOENN
NJU(MFJUMBDL TJMJLPOGSFJ
+PJOUEFWJUSBHFJOUÏSJFVS
$3 OPJS MBSHFVSEFKPJOUEFFUNN N 905786
BWFDMBRVFMVCSJGJBOUF TBOTTJMJDPOF
*OOFSHMB[JOHTFBM
$3 CMBDL GPSKPJOUXJEUITPGBOENN
BOUJGSJDUJPODPBUJOH TJMJDPOGSFF

#SBOETDIVU[7FSHMBTVOHTCBOENN
FJOTFJUJHTFMCTULMFCFOE LFSBNJLGBTFSGSFJ XFJTT
#BOEFTEFWJUSBHFSÏTJTUBOUBVGFVNN
BVUPDPMMBOUGBDF TBOTGJCSFDÏSBNJRVF CMBOD
'JSFSFTJTUBOUHMB[JOHUBQFNN
VOJMBUFSBMTFMGBEIFTJWF DFSBNJDGJCSFGSFF XIJUF
X

YNN N 948003


 YNN N 948004
YNN N 948005
YNN N 948006
#SBOETDIVU[7FSHMBTVOHTCBOENN
FJOTFJUJHTFMCTULMFCFOE LFSBNJLGBTFSGSFJ XFJTT
Accessories
Accessoires

#BOEFTEFWJUSBHFSÏTJTUBOUBVGFVNN
Zubehör

BVUPDPMMBOUGBDF TBOTGJCSFDÏSBNJRVF CMBOD


'JSFSFTJTUBOUHMB[JOHUBQFNN
VOJMBUFSBMTFMGBEIFTJWF DFSBNJDGJCSFGSFF XIJUF
X

YNN N 948007


 YNN N 948008
YNN N 948009
YNN N 948010


www.forster-profile.ch
4UBIM &EFMTUBIM

71
50 "DJFS
4UFFM
"DJFSJOPY
4UBJOMFTTTUFFM

Zubehör Accessoires Accessories


&OUXÊTTFSVOH#àSTUFO &WBDVBUJPOEhFBV#SPTTF %SBJOBHF#SVTIFT

Abbildung Bezeichnung Verkaufseinheit Art. Nr.


Figure Désignation Unité de vente art. no.
Figure Designation Sales unit art. no.
,MFNNLOPQG/JFU
&EFMTUBIM
#PVUPOEFGJYBUJPOSJWFUQPQ
BDJFSJOPY 4ULQDT 906574
4UVEGBTUFOFS QPQSJWFU
TUBJOMFTTTUFFM

,MFNNLOPQGTDISBVCFTFMCTUCPISFOE 4ULQDT 906577


GàS(MBTIBMUFMFJTUFO 4UBIMDISPNBUJFSU
#PVUPOEFGJYBUJPOBVUPGPSFVS
4ULQDT 906578
QPVSQBSDMPTFT BDJFSDISPNBUÏ
4UVEGBTUFOFSTFMGESJMMJOH
GPSHMB[JOHCFBET DISPNBUFETUFFM .BH4ULQDT 906579
,MFNNLOPQGTDISBVCFTFMCTUGVSDIFOE
&EFMTUBIM
#PVUPOEFGJYBUJPOBVUPUBSBVEFVS 4ULQDT 906583
BDJFSJOPY
4UVEGBTUFOFSTFMGUBQQJOH
TUBJOMFTTTUFFM

8BTTFSBCMBVGUàMMF
1" TDIXBS[
%PVJMMFEhÏDPVMFNFOU 4ULQDT 900100


1" OPJS
%SBJOJOHQJQF
1" CMBDL

8BTTFSBCMBVGUàMMF
1" TDIXBS[
%PVJMMFEhÏDPVMFNFOU
1" OPJS 4ULQDT 900103
ÅXÅ

%SBJOJOHQJQF
1" CMBDL

&OUTQBOOVOHTVOE&OUXÊTTFSVOHTSÚISDIFOGàS
WFSEFDLUF&OUTQBOOVOHVOE&OUXÊTTFSVOH
51& TDIXBS[
5VCVMVSFJOWJTJCMFEFEÏDPNQSFTTJPOFU
EAÏWBDVBUJPOEAFBV 4ULQDT 980101
51& OPJS
%FDPNQSFTTJPOBOEESBJOBHFQJQFGPSIJEEFO Accessories
Accessoires

EFDPNQSFTTJPOBOEESBJOBHF
Zubehör

51& CMBDL

8FUUFSTDIFOLFM
"MVNJOJVN SPI
3FOWPJEhFBV
BMVNJOJVN CSVU


8FBUIFSCPBSE
NJMMGJOJTIFEBMVNJOJVN N 963302
#FGFTUJHVOHNJU-JOTFO#MFDITDISBVCFYNN
 'JYBUJPOBWFDWJTËUÙMFBWFDUÐUFDPOJRVFCPNCÏF
YNN
'BTUFOJOH XJUI SBJTFE DPVOUFSTVOL IFBE TFMGUBQQJOH TDSFX 
YNN


www.forster-profile.ch
4UBIM &EFMTUBIM

71
50 "DJFS
4UFFM
"DJFSJOPY
4UBJOMFTTTUFFM

Beschlagseinbau Montage de la quincaillerie Installation of the fittings


4JDIFSVOHTCPM[FO (PVKPOEFTÏDVSJUÏ -PDLJOHQJO
  

!LLGEMEINÆGILT
"RAND UND 2AUCHSCHUTZTÃREN MIT  "¬NDERN
UND EINEM 3ICHERUNGSBOLZEN ODER MIT  "¬NDERN


,$ ” MM

.OTEÆG±N±RALE
0ORTES PARE FLAMMES AVEC DEUX PAUMELLES
ET UN GOUJON DE S±CURIT± OU AVEC TROIS PAUMELLES

'ENERALÆNOTICE
&IRE AND SMOKE PROTECTED DOORS WITH TWO


HINGES AND ONE LOCKING SPIN OR WITH THREE HINGES

"EI JEDEM "AND IST ZUS¬TZLICH EIN


3ICHERUNGSBOLZEN   NOTWENDIG

Bänder, Drücker, Türschlösser


0OUR CHAQUE PAUMELLE IL EST N±CESSAIRE

Mise en œuvre quincaillerie


DE MONTER UN GOUJON DE
S±CURIT±   SUPPL±MENTAIRE

!T EACH HINGE AN ADDITIONAL LOCKING

Assembly fittings
907632 917013
907633 PIN   IS REQUIRED 917015
PR?EP?
 

    

3BINFO 'M›HFM
$BESF 7BOUBJM
'SBNF -FBG
¢

¢
¢ 

¢ 

 !NSCHWEISSEN
  3OUDER
7ELD ON

¢

¢

¢


www.forster-profile.ch
4UBIM &EFMTUBIM

71
50 "DJFS
4UFFM
"DJFSJOPY
4UBJOMFTTTUFFM

Senkdichtung Joint de seuil automatique Automatic drop seal


"UINFS4UBEJ5ZQ-54 "UINFS4UBEJ5ZQ-54 "UINFS4UBEJ5ZQ-54
GMàHFMJH WBOUBJM MFBG

Mise en œuvre accessoires


Verarbeitung Zubehör

Assembly accessories


www.forster-profile.ch
Stahl
Acier
Steel
27

Zubehör Accessoires Accessories


Brandschutzstreifen Bandes intumescentes Intumescent strips

Abbildung Bezeichnung Verkaufseinheit Art. Nr.


Figure Désignation Unité de vente art. no.
Figure Designation Sales unit art. no.
Brandschutzstreifen (grau)
24.5 einseitig selbstklebend, Einsatz im Glasfalz
1.5

Bande intumescente (gris)


25 m 948000
autocollant 1 face, pour feuillure du verre

Intumescent strip (grey)


unilateral self-adhesive, for glass rebate

Brandschutzstreifen (schwarz)
inkl. Befestigungsschrauben (900141) 50 Stk.
Einsatz im Türfalz
24
2.2

Bande intumescente (noir)


incl. vis de fixation (900141) 50 pcs 15 m 948002
pour feuillure de porte

Intumescent strip (black)


incl. fixing screws (900141) 50 pcs
for door rebate

Brandschutzstreifen (grau)
einseitig klebend, Einsatz im Glasfalz

Bande intumescente (gris)


25 m 948013
autocollant 1 face, pour feuillure du verre
1.5

29.5 Intumescent strip (grey)


unilateral self-adhesive, for glass rebate

Brandschutzstreifen (schwarz)
1.5

12 einseitig selbstklebend, Einsatz im Türfalz


Bande intumescente (noir) 12 m 948017
autocollant 1 face, pour feuillure de porte
Intumescent strip (black)
unilateral self-adhesive, for door rebate

Gleitband (weiss)
einseitig selbstklebend
0.18

25
Band de glissement (blanc) 16.5 m 958010
autocollant 1 face
Glide tape (white)
unilateral self-adhesive

Falzdichtband (schwarz)
35 PVC, einseitig selbstklebend
Ruban d'étanchéité de feuillure (noir) 10 m 958051
PVC, autocollant 1 face
2

Rebate sealing tape (black)


PVC, unilateral self-adhesive

Brandschutzstreifen (schwarz)
2.2

41
einseitig selbstklebend
Bande intumescente (noir)
autocollant 1 face 8 × 1.5 m 918003
Intumescent strip (black)
unilateral self-adhesive
01/22

www.forster-profile.ch
Acoustic certification
6RXQGUHGXFWLRQLQGH[DFFRUGLQJWR,62
/DERUDWRU\ PHDVXUHPHQWV RI DLUERUQH VRXQG LQVXODWLRQ RI EXLOGLQJ
FRPSRQHQWV

&OLHQW )RUVWHU3URILOV\VWHPH$*$UERQ 6ZLW]HUODQG 


3URGXFWGHVLJQDWLRQ IRUVWHUSUHVWR
7HVWHOHPHQW )UDPHGGRRUVLQJOHOHDIPDGHRIVWHHO 7HVWGDWH 
SURILOHV 7HVWVXUIDFH6 PuP Pð
'RRUIUDPH 2YHUDOOGLPHQVLRQV :u+ PPu 7HVWULJ DVSHU(1,62
PP
3DUWLWLRQZDOO 'RXEOHOHDIFRQFUHWHZDOOLQVHUW
&URVVVHFWLRQ :u7 PPu  PP IUDPHKLJKSHUIRUPDQFHVRXQGLQVXODWLQJZDOO
'RRUOHDI 2YHUDOOGLPHQVLRQV :u+ PPu HOHPHQWV
PP 7HVWQRLVH 3LQNQRLVH
&URVVVHFWLRQ :u7  PP u  PP
9ROXPHVRIWHVWURRPV 96 Pñ95 Pñ
*OD]LQJ &RQWUDIODPOLWHPP 3. 
0D[LPXPVRXQGUHGXFWLRQLQGH[
*OD]LQJPHWKRGJOD]LQJEHDGVRQRQHVLGHGU\JOD]LQJ
5ZPD[  G% UHODWHGWRWHVWDUHD 
5HEDWHVHDO SURILOHQƒLQIUDPHDQGLQOHDI
0RXQWLQJFRQGLWLRQV 'RRUIUDPHDOLJQHGDQG
)ORRUVHDO DXWRPDWLFIORRUVHDOFHQWHUHGIL[HG EROWHGLQWHVWRSHQLQJFRQQHFWLQJMRLQWVILOOHG
VHDOLQJZHGJHVLQGRRUFRUQHUV ZLWKLQVXODWLQJPDWHULDODQGVHDOHGZLWKSODVWLF
:HLJKW NJNJPð VHDODQWRQERWKVLGHV
&RPPHQWV  &OLPDWHRIWHVWURRPVƒ&U+
6WDWLFDLUSUHVVXUHK3D
 6KLIWHGUHIHUHQFHFXUYH
ILQ+] 5LQG%  0HDVXUHPHQWFXUYH
   )UHTXHQF\UDQJHFRUUHVSWRUHIHUHQFHFXUYHDVSHU(1,62
 
6RXQGUHGXFWLRQLQGH[5LQG%


 
 
 
 
  
 
 
 
  
 
 
 
 

 
 
 
 
  
 


      
)UHTXHQF\ILQ+]
5DWLQJDFFRUGLQJWR(1,62 LQWKLUGRFWDYHEDQGV 
5Z &&WU    G% &   G%&   G%&   G%
&WU   G%&WU   G%&WU   G%
7HVWUHSRUWQƒ35 3%&HQ 
'DWDVKHHW
7HVWQXPEHU =
LIW5RVHQKHLP/DERUDWRU\%XLOGLQJ$FRXVWLFV -RKDQQ%DXPH'LSO,QJ )+ 
 2SHUDWLQJ7HVWLQJ2IILFHU
Concept Details
IW-01-EW60-INTERNAL_35dB

View from outside M 1:35

3600
Section B-B M 1:7.5
B
6) 32851Z, 3600 mm

50
70

1) 32851Z, 1325 mm

2) 32852Z, 1225 mm

3) 32852Z, 1225 mm

4) 32851Z, 1325 mm
32851Z
901228
8

1325
A 01) 01) 01) A
1185

1209

1225
1325
14
901228
32851Z
8
70

5) 32851Z, 3600 mm
50

B
1208.3 1183.4 1208.3

Section A-A M 1:7.5


3600
50 1133.3 50 1133.4 50 1133.3 50

32851Z
901228 901228 32852Z
901228 901228 32852Z
901228 901228
32851Z

8 1117.3 8 8 1117.4 8 8 1117.3 8

70 1093.3 90 1093.4 90 1093.3 70

(01) 14 MM glass 1117 x 1209

ARAB INTERNATIONAL ACADEMY project in Lusail Obj 23303A2


Ref: CWB EXPORT
Pce: 5 28.12.23 Pos 101
IW-01-EW60-INTERNAL_35dB PRE-AZ #1

Forster Profilsysteme AG, Amriswilerstrasse 50, CH-9320 Arbon (F001)


IW-06-EW60-INTERNAL_35dB

View from outside M 1:25

Section B-B M 1:7.5 3000


B
5) 32851Z, 3000 mm

50
70

32851Z
901228
8

1) 32851Z, 1500 mm

2) 32852Z, 1400 mm

3) 32851Z, 1500 mm
1360

1384

1400
1500

1500
14 A 01) 01) A
901228
32851Z
8
70

50

4) 32851Z, 3000 mm
B
1500 1500

Section A-A M 1:7.5


3000
50 1425 50 1425 50

32851Z
901228 901228 32852Z
901228 901228
32851Z

8 1409 8 8 1409 8

70 1385 90 1385 70

(01) 14 MM glass 1409 x 1384

ARAB INTERNATIONAL ACADEMY project in Lusail Obj 23303A2


Ref: CWB EXPORT
Pce: 1 28.12.23 Pos 102
IW-06-EW60-INTERNAL_35dB PRE-AZ #1

Forster Profilsysteme AG, Amriswilerstrasse 50, CH-9320 Arbon (F001)


GP-E-EW60-INTERNAL_35dB
View from outside M 1:25

3050
C A
7) 32851Z, 1995 mm 8) 32800Z, 1055 mm
11) 32803Z, 975 mm
Section C-C M 1:7 Section A-A M 1:7

10) 32803Z, 2275 mm


50

50

9) 32803Z, 2275 mm
70

32851Z

32800Z
901228
8

130

70
901228
8

32803Z

1) 32851Z, 2325 mm

2) 32852Z, 2225 mm

clear opening: 2255


3) 32805Z, 2345 mm

4) 32800Z, 2325 mm
2325
B 01) 02) B
2185

2209

2225
2325

2325
03)

2095

2119

2135
2275
2275
Din R
14

901228

Handle Height 1050


32855Z
8
14
901228

70
32851Z
8

70
70

50

30

10
12) 32855Z, 835 mm
5) 32851Z, 1995 mm
C A

clear opening: 915


1000 1020 1030

Section B-B M 1:7


3050
50 925 50 970 50 955 50

975

70 835 70
32851Z
901228 901228 32852Z
901228 901228 901228 901228

32803Z 32803Z

32805Z 32800Z

8 909 8 8 954 8 8 819 8


1 x 905065 ATHMER STADI L-24/20 TS L 1050mm, 150mm cut
70 885 90 930 150 795 130
2 x 907353 ROSE PC, INOX round
1 x 907518 Roller latch lock PC, W 35mm, L/R
1 x 907572 Keep lock
3 x 907662 WELD-ON HINGE STEEL
1 x 917013 SECURITY BOLT STEEL
3 x 917040 Thermal locking

(01) 14 MM glass 909 x 2209


(02) 14 MM glass 954 x 2209
(03) 14 MM glass 819 x 2119 ARAB INTERNATIONAL ACADEMY project in Lusail Obj 23303A2
Ref: CWB EXPORT
Pce: 2 28.12.23 Pos 203
GP-E-EW60-INTERNAL_35dB PRE-AZ #1

Forster Profilsysteme AG, Amriswilerstrasse 50, CH-9320 Arbon (F001)


GP-P-EW60-INTERNAL_35dB
View from outside M 1:25

5050
C A
9) 32851Z, 3995 mm 10) 32800Z, 1055 mm
13) 32803Z, 975 mm
Section C-C M 1:7 Section A-A M 1:7

11) 32803Z, 2275 mm

12) 32803Z, 2275 mm


50

50
70

32851Z

32800Z
901228
8

130

70
901228
8

32803Z

1) 32851Z, 2325 mm

2) 32852Z, 2225 mm

3) 32852Z, 2225 mm

4) 32852Z, 2225 mm

clear opening: 2255


5) 32805Z, 2345 mm

6) 32800Z, 2325 mm
2325
B 01) 02) 02) 02) B
2185

2209

2225
2325

2325
03)

2095

2119

2135
2275
2275
Din R
14

901228

Handle Height 1050


32855Z
8
14
901228

70
32851Z
8

70
70

50

30

10
14) 32855Z, 835 mm
7) 32851Z, 3995 mm
C A

clear opening: 915


1020 1000 1000 1000 1030

Section B-B M 1:7


5050
50 945 50 950 50 950 50 950 50 955 50

975

70 835 70
32851Z
901228 901228 32852Z
901228 901228 32852Z
901228 901228 32852Z
901228 901228 901228 901228

32803Z 32803Z

32805Z 32800Z

8 929 8 8 934 8 8 934 8 8 934 8 8 819 8


1 x 905065 ATHMER STADI L-24/20 TS L 1050mm, 150mm cut
70 905 90 910 90 910 90 910 150 795 130
2 x 907353 ROSE PC, INOX round
1 x 907518 Roller latch lock PC, W 35mm, L/R
1 x 907572 Keep lock
3 x 907662 WELD-ON HINGE STEEL
1 x 917013 SECURITY BOLT STEEL
3 x 917040 Thermal locking

(01) 14 MM glass 929 x 2209


(02) 14 MM glass 934 x 2209
(03) 14 MM glass 819 x 2119 ARAB INTERNATIONAL ACADEMY project in Lusail Obj 23303A2
Ref: CWB EXPORT
Pce: 3 28.12.23 Pos 204
GP-P-EW60-INTERNAL_35dB PRE-AZ #1

Forster Profilsysteme AG, Amriswilerstrasse 50, CH-9320 Arbon (F001)


Technical data for profiles & accessories for fire
rated fixed screens and hinged doors – forster
presto 60 series

Acoustic rating – 45dB


Nichtisoliertes Profilsystem für Türen und Fenster
Système de profilés non isolés pour portes et fenêtres
Non-insulated profile system for doors and windows
*O4UBIMVOE&EFMTUBIM&OBDJFSFUBDJFSJOPY*OTUFFMBOETUBJOMFTTTUFFM

/FVF4DIMPTT4FSJF/PVWFMMFTÏSJFEFTFSSVSFT/FXMPDLTFSJFT
4UBIM

71
60S "DJFS
4UFFM

Profile Profilés Profiles


Stahl Acier Steel

Profile / Profilés / Art. Nr. m L G Iy Wy IZ WZ ey eZ O


Profiles (1:4) art. no. [mm] [kg/m] [cm4] [cm3] [cm4] [cm3] [mm] [mm] [m2/m]

01.635 CMBOL         

CSVU

Profilés
Profiles


CSJHIU

Profile
 


01.685 CMBOL         

CSVU


CSJHIU

 


02.635 CMBOL         

CSVU


CSJHIU

  


02.685 CMBOL         

CSVU


CSJHIU

  


03.685 CMBOL         

CSVU


CSJHIU

  


35.855 CMBOL         

CSVU


CSJHIU

  


35.800 CMBOL         

CSVU


CSJHIU

 


35.803 CMBOL         

CSVU


CSJHIU

  


35.805 CMBOL         

CSVU


CSJHIU

  


Z
Y 4DIXFSQVOLUBCTUBOE N .BUFSJBM 0  6NMBVGFOEF0CFSGMÊDIFQFS-BVGNFUFS


EY %JTUBODFBVDFOUSFEFHSBWJUÏ   .BUÏSJBV   4VSGBDFQÏSJQIÏSJRVFQBSNÒUSFDPVSBOU


EZ
%JTUBODFPGDFOUFSPGHSBWJUZ   .BUFSJBM   0VUMZJOHTVSGBDFQFSSVOOJOHNFUFS

www.forster-profile.ch
4UBIM

71
60S "DJFS
4UFFM

Glashalteleisten Parcloses Glazing beads


aus Stahl en acier of steel

Profile     


Profilés









Profiles
    
(1:4)
Art. Nr.

Profilés
Profiles
Profile
901245 901241 901226 901231 901227
art. no.
m ;.
L [mm] 
G [kg/m]     
O [m /m]
2     

Profile       
Profilés













Profiles
  
(1:4)    

Art. Nr.
901228 901246 901247 901248 901204 901205 901206
art. no.
m ;.
L [mm] 
G [kg/m]       
O [m /m]
2       

Glashalteleisten Parcloses Glazing beads


Aluminium Aluminium Aluminium

Profile       


Profilés










Profiles
      
(1:4)
Art. Nr.
901332 901333 901334 901326 901339 901327 901328
art. no.
L [mm] 
G [kg/m]       
O [m /m]
2       

Profile   
Profilés





Profiles
(1:4)   

Art. Nr.
901335 901336 901337
art. no.
L [mm] 
G [kg/m]   
O [m /m]
2   

N .BUFSJBM 0  6NMBVGFOEF0CFSGMÊDIFQFS-BVGNFUFS


  .BUÏSJBV   4VSGBDFQÏSJQIÏSJRVFQBSNÒUSFDPVSBOU


  .BUFSJBM   0VUMZJOHTVSGBDFQFSSVOOJOHNFUFS

www.forster-profile.ch
4UBIM
60S "DJFS
4UFFM 71

Beschläge Quincaillerie Fittings


%SàDLFS 1PJHOÏFT )BOEMFT
Quincaillerie
Beschläge

Fittings


www.forster-profile.ch
4UBIM
60S "DJFS
4UFFM 71

Beschläge Quincaillerie Fittings


%SàDLFSTUJGUF3PTFUUFO $BSSÏTEFQPJHOÏFTSPTBDFT )BOEMFTIBGUT3PTFUUFT
Quincaillerie
Beschläge

Fittings


www.forster-profile.ch
4UBIM
60S "DJFS
4UFFM 71

Beschläge Quincaillerie Fittings


"OTDIXFJTTCBOE 1BVNFMMFËTPVEFS 8FMEPOIJOHF
)ÚIFOWFSTUFMMCBS 3ÏHMBCMFFOIBVUFVS "EKVTUBCMFJOIFJHIU
Quincaillerie
Beschläge

Fittings


www.forster-profile.ch
4UBIM

71
60S "DJFS
4UFFM

Zubehör Accessoires Accessories


%JDIUVOHFO +PJOUT 8FBUIFSTUSJQQJOHT

Abbildung Bezeichnung Verkaufseinheit Art. Nr.


Figure Désignation Unité de vente art. no.
Figure Designation Sales unit art. no.
"OTDIMBHEJDIUVOHGàS5àSQSPGJMF
&1%.TDIXBS[
+PJOUEFCVUÏFQPVSQSPGJMÏTEFQPSUF
N 905306
&1%.OPJS
8FBUIFSTUSJQQJOHGPSEPPSQSPGJMFT
&1%.CMBDL

"OTDIMBHEJDIUVOHGàS5àSQSPGJMF
$3TDIXBS[ TDIXFSFOUGMBNNCBS
+PJOUEFCVUÏFQPVSQSPGJMÏTEFQPSUF N 905307
$3OPJS EJGGJDJMFNFOUJOGMBNNBCMF
8FBUIFSTUSJQQJOHGPSEPPSQSPGJMFT
$3CMBDL EJGGJDVMUUPJOGMBNF

"OTDIMBHEJDIUVOH
$3TDIXBS[
+PJOUEFCVUÏF
$3OPJS
N 905406
8FBUIFSTUSJQQJOH
$3CMBDL

%JDIUVOHGàS4DIXFMMFVOE1FOEFMUàSFO
&1%.TDIXBS[
+PJOUQPVSTFVJMTFUQPSUFTWBFUWJFOU


&1%.OPJS N 905201


8FBUIFSTUSJQQJOHGPSCPUUPNSBJMBOE
  EPVCMFBDUJPOEPPST
&1%.CMBDL

4DIXFMMFOEJDIUVOH
$3TDIXBS[
+PJOUEFTFVJM
$3OPJS
#PUUPNSBJMXFBUIFSTUSJQQJOH
$3CMBDL N 905401

 )BMUFQSPGJM[V4DIXFMMFOEJDIUVOH
Accessories
Accessoires
BVTGFVFSWFS[JOLUFN#BOETUBIM
Zubehör

1SPGJMÏEFGJYBUJPOQPVSKPJOUEFTFVJM


FOGFVJMMBSEEhBDJFS[JOHVÏBVGFV N 903204


)PMEJOHQSPGJMFGPSCPUUPN
SBJMXFBUIFSTUSJQQJOH
NBEFGSPNIPUEJQHBMWBOJ[FETUSJQ


www.forster-profile.ch
4UBIM

71
60S "DJFS
4UFFM

Zubehör Accessoires Accessories


%JDIUVOHFO +PJOUT 8FBUIFSTUSJQQJOHT

Abbildung Bezeichnung Verkaufseinheit Art. Nr.


Figure Désignation Unité de vente art. no.
Figure Designation Sales unit art. no.

7FSHMBTVOHTEJDIUVOHJOOFO
$3 TDIXBS[ GàS'VHFOCSFJUFVOENN
NJU(MFJUMBDL TJMJLPOGSFJ
+PJOUEFWJUSBHFJOUÏSJFVS
$3 OPJS MBSHFVSEFKPJOUEFFUNN N 905785
BWFDMBRVFMVCSJGJBOUF TBOTTJMJDPOF
*OOFSHMB[JOHTFBM
$3 CMBDL GPSKPJOUXJEUITPGBOENN
BOUJGSJDUJPODPBUJOH TJMJDPOGSFF

7FSHMBTVOHTEJDIUVOHJOOFO
$3 TDIXBS[ GàS'VHFOCSFJUFVOENN
NJU(MFJUMBDL TJMJLPOGSFJ
+PJOUEFWJUSBHFJOUÏSJFVS
$3 OPJS MBSHFVSEFKPJOUEFFUNN N 905786
BWFDMBRVFMVCSJGJBOUF TBOTTJMJDPOF
*OOFSHMB[JOHTFBM
$3 CMBDL GPSKPJOUXJEUITPGBOENN
BOUJGSJDUJPODPBUJOH TJMJDPOGSFF

#SBOETDIVU[7FSHMBTVOHTCBOENN
FJOTFJUJHTFMCTULMFCFOE LFSBNJLGBTFSGSFJ XFJTT
#BOEFTEFWJUSBHFSÏTJTUBOUBVGFVNN
BVUPDPMMBOUGBDF TBOTGJCSFDÏSBNJRVF CMBOD
'JSFSFTJTUBOUHMB[JOHUBQFNN
VOJMBUFSBMTFMGBEIFTJWF DFSBNJDGJCSFGSFF XIJUF
X

YNN N 948003


 YNN N 948004
YNN N 948005
YNN N 948006
#SBOETDIVU[7FSHMBTVOHTCBOENN
FJOTFJUJHTFMCTULMFCFOE LFSBNJLGBTFSGSFJ XFJTT
#BOEFTEFWJUSBHFSÏTJTUBOUBVGFVNN
BVUPDPMMBOUGBDF TBOTGJCSFDÏSBNJRVF CMBOD
'JSFSFTJTUBOUHMB[JOHUBQFNN
VOJMBUFSBMTFMGBEIFTJWF DFSBNJDGJCSFGSFF XIJUF
X

YNN N 948007


 YNN N 948008
YNN N 948009
YNN N 948010
Accessories
Accessoires

7FSHMBTVOHTCBOEGàS/BTTWFSHMBTVOH
Zubehör

FJOTFJUJHTFMCTULMFCFOE 1&4DIBVN BOUISB[JU


#BOEFQPVSWJUSBHFBVTJMJDPOF
BVUPDPMMBOUGBDF 1& BOUISBDJUF
5BQFGPSXFUHMB[JOH
VOJMBUFSBMTFMGBEIFTJWF 1& BOUISBDJUF
X

YNN N 988002



YNN N 988003
YNN N 988004
YNN N 988006
'BM[EJDIUCBOE
3VCBOEAÏUBODIÏJUÏEFGFVJMMVSF N
3FCBUFTFBMJOHUBQF 3PMMFËN
988051
SPVMFBVËN

 YNN SPMMËN


www.forster-profile.ch
4UBIM

71
60S "DJFS
4UFFM

Zubehör Accessoires Accessories


&OUXÊTTFSVOH#àSTUFO &WBDVBUJPOEhFBV#SPTTF %SBJOBHF#SVTIFT

Abbildung Bezeichnung Verkaufseinheit Art. Nr.


Figure Désignation Unité de vente art. no.
Figure Designation Sales unit art. no.
,MFNNLOPQGTDISBVCFTFMCTUCPISFOE 4ULQDT 906577
GàS(MBTIBMUFMFJTUFO 4UBIMDISPNBUJFSU
#PVUPOEFGJYBUJPOBVUPGPSFVS
4ULQDT 906578
QPVSQBSDMPTFT BDJFSDISPNBUÏ
4UVEGBTUFOFSTFMGESJMMJOH
GPSHMB[JOHCFBET DISPNBUFETUFFM .BH4ULQDT 906579
8BTTFSBCMBVGUàMMF
1" TDIXBS[
%PVJMMFEhÏDPVMFNFOU 4ULQDT 900100


1" OPJS
%SBJOJOHQJQF
1" CMBDL

8BTTFSBCMBVGUàMMF
1" TDIXBS[
%PVJMMFEhÏDPVMFNFOU
1" OPJS 4ULQDT 900103
ÅXÅ

%SBJOJOHQJQF
1" CMBDL

&OUTQBOOVOHTVOE&OUXÊTTFSVOHTSÚISDIFOGàS
WFSEFDLUF&OUTQBOOVOHVOE&OUXÊTTFSVOH
51& TDIXBS[
5VCVMVSFJOWJTJCMFEFEÏDPNQSFTTJPOFU
EAÏWBDVBUJPOEAFBV 4ULQDT 980101
51& OPJS
%FDPNQSFTTJPOBOEESBJOBHFQJQFGPSIJEEFO
EFDPNQSFTTJPOBOEESBJOBHF
51& CMBDL

8FUUFSTDIFOLFM
"MVNJOJVN SPI
3FOWPJEhFBV
BMVNJOJVN CSVU


8FBUIFSCPBSE
NJMMGJOJTIFEBMVNJOJVN N 963302
#FGFTUJHVOHNJU-JOTFO#MFDITDISBVCFYNN
 'JYBUJPOBWFDWJTËUÙMFBWFDUÐUFDPOJRVFCPNCÏF
YNN
'BTUFOJOH XJUI SBJTFE DPVOUFSTVOL IFBE TFMGUBQQJOH TDSFX 
YNN Accessories
Accessoires

;VTBU[QSPGJMGàS#àSTUFOEJDIUVOH
Zubehör

"MVNJOJVNSPI
1SPGJMÏTVQQMÏNFOUBJSFQPVSCSPTTFT



BMVNJOJVNCSVU N 963301


"EEJUJPOBMQSPGJMFGPSCSVTIFT
NJMMGJOJTIFEBMVNJOJVN



www.forster-profile.ch
4UBIM
60S "DJFS
4UFFM 71

Zubehör Accessoires Accessories


'àMMTUàDLF 1JÒDFTEFSFNQMJTTBHF 'JMMFSQJFDFT

Abbildung Bezeichnung Verkaufseinheit Art. Nr.


Figure Désignation Unité de vente art. no.
Figure Designation Sales unit art. no.
#àSTUFO#SPTTFT#SVTIFT

YNN


YNN N 9 0 5 9 0 0
Y NN N 9 0 5 9 0 2
Y NN N 9 0 5 9 0 4
 X N 905905
 'BMMFOTDIVU[
&EFMTUBIM
1JÒDFEFQSPUFDUJPOGSPUUFNFOUCFDEFDBOF


"DJFSJOPY
-BUDIQSPUFDUJPO 4ULQDT 907062
4UBJOMFTTTUFFM

'àMMTUàDLGàS1SPGJMXFDITFM
4UBIM

1JÒDFEFSFNQMJTTBHFQPVSDIBOHFNFOUEF
QSPGJMÏ 4ULQDT 916303
BDJFS

'JMMFSQJFDFGPSQSPGJMFDIBOHF
TUFFM

'àMMTUàDLGàS1SPGJMXFDITFM
4UBIM

1JÒDFEFSFNQMJTTBHFQPVSDIBOHFNFOUEF
QSPGJMÏ 4ULQDT 916304
BDJFS

'JMMFSQJFDFGPSQSPGJMFDIBOHF
TUFFM

%JDIUVOHTTUàDLPCFO
1JÒDFEhÏUBODIÏJUÏTVQÏSJFVS
5PQXFBUIFSTUSJQQJOH

%*/SFDIUT %*/ESPJUF %*/SJHIU


%*/SJHIU 4ULQDT 905702
%*/MJOLT %*/HBVDIF %*/MFGU 4ULQDT 905703
Accessories
Accessoires
Zubehör



www.forster-profile.ch
4UBIM

71
60S "DJFS
4UFFM

Beschlagseinbau Montage de la quincaillerie Installation of the fittings


4JDIFSVOHTCPM[FO (PVKPOEFTÏDVSJUÏ -PDLJOHQJO
  

!LLGEMEINÆGILT
"RAND UND 2AUCHSCHUTZTÃREN MIT  "¬NDERN
UND EINEM 3ICHERUNGSBOLZEN ODER MIT  "¬NDERN


,$ ” MM

.OTEÆG±N±RALE
0ORTES PARE FLAMMES AVEC DEUX PAUMELLES
ET UN GOUJON DE S±CURIT± OU AVEC TROIS PAUMELLES

'ENERALÆNOTICE
&IRE AND SMOKE PROTECTED DOORS WITH TWO


HINGES AND ONE LOCKING SPIN OR WITH THREE HINGES

"EI JEDEM "AND IST ZUS¬TZLICH EIN


3ICHERUNGSBOLZEN  NOTWENDIG

Bänder, Drücker, Türschliesser


0OUR CHAQUE PAUMELLE IL EST N±CESSAIRE

Mise en œuvre quincaillerie


DE MONTER UN GOUJON DE
S±CURIT±  SUPPL±MENTAIRE

!T EACH HINGE AN ADDITIONAL LOCKING

Assembly fittings
907632
PIN  IS REQUIRED 917014
907633

  PR?EP?

    

3BINFO 'M›HFM
$BESF 7BOUBJM
'SBNF -FBG
¢

¢
¢ 

¢ 

 !NSCHWEISSEN
 3OUDER
7ELD ON

¢

¢

¢


www.forster-profile.ch
4UBIM

71
60S "DJFS
4UFFM

Verarbeitung Flügel Mise en œuvre du vantail Processing of leaf


Einbau Dichtung Montage des joints Installation of seal
Stulpflügel vantaux semi-fixes overlapping casement

Mise en œuvre accessoires


Verarbeitung Zubehör

Assembly accessories


www.forster-profile.ch
4UBIM
60S "DJFS
4UFFM 71

Senkdichtung Joint de seuil automatique Automatic drop seal


"UINFS4UBEJ5ZQ-84 "UINFS4UBEJ5ZQ-84 "UINFS4UBEJ5ZQ-84
GMàHFMJH WBOUBVY MFBGT

 

3CHRAUBEN VON (AND EINDREHEN


4OURNER LES VIS ¨ LA MAIN
3CREWS MANUALLY ADJUSTABLE


 

"ODENDICHTUNG IM "EREICH DER


"ODENMULDE EINSCHNEIDEN
#OUPER LE JOINT DE SEUIL DANS LA
ZONE DE LA GªCHE AU SOL
#UT THE DROP SEAL IN THE AREA OF
THE BOTTOM RECESS
MAX 



 

!NSICHTÆVONÆUNTENÆ3TANDFLÃGEL
Mise en œuvre accessoires

6UEÆDEÆDESSOUSÆVANTAILÆSEMI FIXE
Verarbeitung Zubehör

Assembly accessories

$ICHTUNGSPROFIL ANPASSEN 6IEWÆFROMÆBELOWÆFIXEDÆLEAF !USL½SEKNOPF


!DAPTER LE JOINT "OUTON DE D±CLENCHEMENT
!DAPT WEATHERSTRIPPING 2ELEASE BUTTON

 &LÃGELFALZMASS  $IMENSION DE FEUILLURE DU VANTAIL  2EBATEWIDTH DIMENSION  


%INSCHWEISSBLECH
 4»LE ¨ SUDER
7ELD IN STEEL



¢

 





‚ "AND
0AUMELLE
(INGE
 ,¬NGE  ,ONGUEUR  ,ENGTH !THMER 3TADI , 73 

&LÃGELBREITE  ,ARGEUR DU VANTAIL  7IDTH OF LEAF




www.forster-profile.ch
4UBIM &EFMTUBIM
50 "DJFS
4UFFM
"DJFSJOPY
4UBJOMFTTTUFFM 71

Beschläge Quincaillerie Fittings


4DIMPTTHBSOJUVSFO (BSOJUVSFTEFTFSSVSFT 4FUTPGMPDLT
'BMMFOSJFHFMTDIMPTT 4FSSVSFQPJOU 4JOHMFNPSUJTFMPDL
"OUJQBOJL(FHFOLBTUFO $SÏNPOFBOUJQBOJRVF "OUJQBOJDPQQPTJUFMPDL
(BSOJUVSÌ/S
HBSOJUVSFÌOP
TFUÌOP

 

!BBILDUNG $). RECHTS 


FIG $). DROITE 
FIG $). RIGHT

%.Æ %.Æ






X X 
3CHLIESSBLECH  GªCHE  KEEP
Quincaillerie

X X 
Beschläge

3CHALTSCHLOSS  SERRURE DE
Fittings

MAINTIEN  SWITCH LATCH

X X 


3TANGENFÃHRUNG  GUIDE DE
TRINGLE  ROD GUIDE

X X  
4REIBRIEGELSTANGE  TRINGLE DE
VERROUILLAGE  DRIVE BOLT ROD

4DIMPTTBVTXBIM
X X  4«MFDUJPOÌEFÌMBÌTFSSVSF
!NTIPANIK 'EGENKASTEN 
CR±MONE ANTI PANIQUE  4FMFDUJPOÌPGÌMPDL
 MM  MM
ANTI PANIC OPPOSITE LOCK



 2:
 0:

Varianten Antipanik-Gegenkasten /
Variantes crémone anti-panique /
Variants anti-panic opposite lock

WAHLWEISE  AU CHOIX  AT CHOICE %.Ì


%.Ì
 
X 
4REIBRIEGELSTANGE  TRINGLE DE
VERROUILLAGE  DRIVE BOLT ROD

X  
3TANGENFÃHRUNG  GUIDE DE
TRINGLE  ROD GUIDE


X 
3CHLIESSMULDE  GªCHE AU SOL  
FLOOR BUSH 


www.forster-profile.ch
4UBIM &EFMTUBIM
50 "DJFS
4UFFM
"DJFSJOPY
4UBJOMFTTTUFFM 71

Beschläge Beschläge Beschläge


4DIMÚTTFS 4FSSVSFT -PDLT
'BMMFOSJFHFMTDIMPTT 4FSSVSFQPJOU 4JOHMFNPSUJTFMPDL
"OUJQBOJL BOUJQBOJRVF BOUJQBOJD
Quincaillerie
Beschläge

Fittings


www.forster-profile.ch
4UBIM &EFMTUBIM
50 "DJFS
4UFFM
"DJFSJOPY
4UBJOMFTTTUFFM 71

Beschläge Quincaillerie Fittings


4UBOEGMàHFM7FSSJFHFMVOHFO 7FSSPVJMMBHFEVWBOUBJMTFNJGJYF **OBDUJWFMFBGMPDLT
Quincaillerie
Beschläge

Fittings


www.forster-profile.ch
4UBIM &EFMTUBIM
50 "DJFS
4UFFM
"DJFSJOPY
4UBJOMFTTTUFFM 71

Beschläge Quincaillerie Fittings


4DIMJFTTCMFDIF (ÉDIFT ,FFQT

!BBILDUNG "EZEICHNUNG 6ERKAUFSEINHEIT !RT.R


&IGURE $±SIGNATION 5NIT±ÆDEÆVENTE ARTÆNO
&IGURE $ESIGNATION 3ALESÆUNIT ARTÆNO
 %.Æ
Schliessblech

%.Æ
  
FÃR %INSTECKSCHLOSS UND
%INSTECKSCHLOSS MIT OBERER 6ERRIEGELUNG


%.Æ

%.Æ Gâche


POUR SERRURE ¨  BEC DE CANE


AVEC VERROUILLAGE SUP±RIEUR
 3TKPCE 

Keep


FOR SINGLE MORTISE DEADLOCK AND


SINGLE MORTISE DEADLOCK WITH TOP SHOOTBOLT











Quincaillerie
Beschläge

Fittings



  %.Æ
Schliessblech
%.Æ

FÃR 2OLLFALLENSCHLOSS


%.Æ Gâche


%.Æ

POUR SERRURE ¨ ROULEAU

 3TKPCE 
Keep
FOR ROLLER LATCH LOCK













%.Æ
Austauschstück
%.Æ

 FÃR % ¡FFNER $). LINKS UND $). RECHTS






%.Æ Pièce de replacement


%.Æ

POUR OUVERTURE ±LECTRIQUE $). GAUCHE ET $). DROITE




Replacement piece


 FOR ELECTRO DOOR OPENER $). LEFT AND $). RIGHT


$). LINKS $). GAUCHE $). LEFT


 3TKPCE 
$). RECHTS $). DROITE $). RIGHT


www.forster-profile.ch
4UBIM &EFMTUBIM
50 "DJFS
4UFFM
"DJFSJOPY
4UBJOMFTTTUFFM 71

Beschläge Quincaillerie Fittings


;VTBU[WFSSJFHFMVOH 7FSSPVJMMBHFTVQQMÏNFOUBJSF "EEJUJPOBMMPDLJOH
Quincaillerie
Beschläge

Fittings


www.forster-profile.ch
4UBIM &EFMTUBIM

71
50 "DJFS
4UFFM
"DJFSJOPY
4UBJOMFTTTUFFM

Beschläge Quincaillerie Fittings


;VTBU[WFSSJFHFMVOH 7FSSPVJMMBHFTVQQMÏNFOUBJSF "EEJUJPOBMMPDLJOH

!BBILDUNG "EZEICHNUNG 6ERKAUFSEINHEIT !RT.R


&IGURE $±SIGNATION 5NIT±ÆDEÆVENTE ARTÆNO
&IGURE $ESIGNATION 3ALESÆUNIT ARTÆNO
¢ %.Æ %.Æ
%.Æ Treibriegelstange

%.Æ
Tringle de verrouillage
Drive bolt rod
    

Ø 6 mm - 1550 mm  3TKPCE 


Ø 6 mm - 2000 mm  3TKPCE 
Ø 6 mm - 2500 mm  3TKPCE 


-

- %.Æ %.Æ
Treibriegelstange
%.Æ

%.Æ

Tringle de verrouillage
Drive bolt rod


Ø 10 mm - 924 mm


 3TKPCE 

Quincaillerie
Beschläge


nur für Antipanik-Gegenkasten, unten

Fittings
seulement pour Crémone anti-panique, basse
¢ only for opposite lock anti-panic-version, low

%.Æ
Stangenführung unten
%.Æ


Guide de tringle de verrouillage basse
    Rod guide low
%.Æ
%.Æ
 


 3TKPCE 




 



 %.Æ
Schliessmulde unten
%.Æ

   Gâche au sol inférieur


Floor sodret

 

%.Æ
%.Æ

Verstellbereich +/- 2.5 mm


 3TKPCE 



Plage de réglage +/- 2.5 mm


Adjustment range +/- 2.5 mm


%.Æ
Schliessblech unten
%.Æ

ALTERNATIV FÃR 




%.Æ Gâche au sol


%.Æ

ALTERNATIVE POUR 


 3TKPCE 
Floor keep


ALTERNATIV FOR 










www.forster-profile.ch
4UBIM &EFMTUBIM
50 "DJFS
4UFFM
"DJFSJOPY
4UBJOMFTTTUFFM 71

Beschläge Quincaillerie Fittings


;VTBU[WFSSJFHFMVOH 7FSSPVJMMBHFTVQQMÏNFOUBJSF "EEJUJPOBMMPDLJOH
Quincaillerie
Beschläge

Fittings


www.forster-profile.ch
Stahl Edelstahl
Acier Acier inox
3.3.27 Steel Stainless steel

Beschläge Ferrements Fittings


Antipanik-Stangengriff Barre anti-panique Anti-panic push-bar

Abbildung Bezeichnung Verkaufseinheit Art.Nr.


Figure Désignation Unité de vente art. no.
Figure Designation Sales unit art. no.
Antipanik-Stangengriff
16 für Gangflügel mit 30° Drehwinkel,
99 Flach-Oval-Rohr 38.5 x 19.5 mm
h
gt
en
ur
/L DIN links und DIN rechts verwendbar
ue
ng inkl. Befestigungsmaterial, Edelstahl matt
/ Lo
ge
än
L Barre anti-panique
pour vantail de service avec angle d'ouverture 30°
16 tube oval-plate 38.5 x 19.5 mm
Utilisable DIN gauche ou DIN droite
accessoires de fixation inclus, inox mat.
Anti-panic push-bar
103

for active leaf with 30° angle of tilt,


flat and oval tube 38.5 x 19.5 mm
Using for opening left and right,
G
including fixing kit, stainless steel

Länge / Longueur / Length 750 - 1369 mm 907286

Quincaillerie portes
th
/ Le
ng 1 Stk./pce

Beschläge Tür
ur

Door fittings
ue e Länge / Longueur / Length 1370 - 1719 mm 907288
o ng nd
/L sio af
nge m en of le
ä i
L / D sion
48 a s s me n
lm i
l ü ge il / D
F ta
va n
EN 1125

2 1 G = Länge / Longueur / Length - 219 mm

Antipanik-Stangengriff
16 für Standflügel mit 45° Drehwinkel,
99 Flach-Oval-Rohr 38.5 x 19.5 mm
h
gt
en
ur
/L DIN links und DIN rechts verwendbar
ue
ng inkl. Befestigungsmaterial, Edelstahl matt
/ Lo
ge
än
L Barre anti-panique
pour vantail semi-fixe avec angle d'ouverture 45°
16 tube oval-plate 38.5 x 19.5 mm
Utilisable DIN gauche ou DIN droite
accessoires de fixation inclus, inox mat.
Anti-panic push-bar
103

for passive leaf with 45° angle of tilt,


flat and oval tube 38.5 x 19.5 mm
Using for opening left and right,
G
including fixing kit, stainless steel

Länge / Longueur / Length 750 - 1369 mm 907287


1 Stk./pce
Länge / Longueur / Length 1370 - 1719 mm 907289
48
gth
Len
r/ e
u eu ond f
ng si a
/ Lo m en of le
i
ge / D on
Lä n a ss ensi
lm im
ge / D G = Länge / Longueur / Length - 219 mm
F l ü t ai l
va n
EN 1125

2 1
VUT 03/19

www.forster-profile.ch
Stahl
Acier
Steel
27

Zubehör Accessoires Accessories


Brandschutzstreifen Bandes intumescentes Intumescent strips

Abbildung Bezeichnung Verkaufseinheit Art. Nr.


Figure Désignation Unité de vente art. no.
Figure Designation Sales unit art. no.
Brandschutzstreifen (grau)
24.5 einseitig selbstklebend, Einsatz im Glasfalz
1.5

Bande intumescente (gris)


25 m 948000
autocollant 1 face, pour feuillure du verre

Intumescent strip (grey)


unilateral self-adhesive, for glass rebate

Brandschutzstreifen (schwarz)
inkl. Befestigungsschrauben (900141) 50 Stk.
Einsatz im Türfalz
24
2.2

Bande intumescente (noir)


incl. vis de fixation (900141) 50 pcs 15 m 948002
pour feuillure de porte

Intumescent strip (black)


incl. fixing screws (900141) 50 pcs
for door rebate

Brandschutzstreifen (grau)
einseitig klebend, Einsatz im Glasfalz

Bande intumescente (gris)


25 m 948013
autocollant 1 face, pour feuillure du verre
1.5

29.5 Intumescent strip (grey)


unilateral self-adhesive, for glass rebate

Brandschutzstreifen (schwarz)
1.5

12 einseitig selbstklebend, Einsatz im Türfalz


Bande intumescente (noir) 12 m 948017
autocollant 1 face, pour feuillure de porte
Intumescent strip (black)
unilateral self-adhesive, for door rebate

Gleitband (weiss)
einseitig selbstklebend
0.18

25
Band de glissement (blanc) 16.5 m 958010
autocollant 1 face
Glide tape (white)
unilateral self-adhesive

Falzdichtband (schwarz)
35 PVC, einseitig selbstklebend
Ruban d'étanchéité de feuillure (noir) 10 m 958051
PVC, autocollant 1 face
2

Rebate sealing tape (black)


PVC, unilateral self-adhesive

Brandschutzstreifen (schwarz)
2.2

41
einseitig selbstklebend
Bande intumescente (noir)
autocollant 1 face 8 × 1.5 m 918003
Intumescent strip (black)
unilateral self-adhesive
01/22

www.forster-profile.ch
Acoustic certification
Sound reduction index according to ISO 10140 - 2
Laboratory measurements of airborne sound insulation of building
components

Client: Forster Profilsysteme AG, 9320 Arbon (Switzerland)


Product designation forster presto 60S
Test element Framed door, single leaf made of steel Test date 14.11.2018
profiles Test surface S 1.39 m × 2.35 m = 3.27 m²
Door frame Overall dimensions (W × H): 1,364 mm × Test rig as per EN ISO 10140-5
2,377 mm
Partition wall Double-leaf concrete wall, insert
Cross section (W × T): 72 mm × 60 mm frame, high-performance sound insulating wall
Door leaf Overall dimensions (W × H): 1,284 mm × elements
2,289 mm Test noise Pink noise
Cross section (W × T): 92 mm × 60 mm
Volumes of test rooms VS = 104 m³, VR = 67.5 m³
Glazing Contraflam lite 30 Climalit Silence, 38 mm
(PK47071/11) Maximum sound reduction index
Rw,max = 62 dB (related to test area)
Glazing method glazing beads on one side, dry glazing
Mounting conditions Door frame aligned and
Rebate seals grouted
bolted in test opening, connecting joints filled
Floor seal grouted with insulating material and sealed with plastic
Weight 194 kg, 59 kg/m² sealant on both sides.
Comments Leaf value: Door leaf grouted circumferential, Climate of test rooms 22°C / 35% rH
Door not ready for operation Static air pressure 974 hPa
Shifted reference curve
f in Hz R in dB Measurement curve
50 33.5 Frequency range corresp. to reference curve as per EN ISO 717-1
Sound reduction index R in dB

63 29.1 60
80 30.4
100 23.3
125 26.6
160 31.9
50
200 32.8
250 36.3
315 38.4
400 40.8
500 44.3 40
630 46.6
800 47.6
1,000 48.9
1,250 48.5 30
1,600 48.9
2,000 46.8
2,500 44.3
3,150 45.9
4,000 50.2 20
5,000 52.7

10
63 125 250 500 1000 2000 4000
Frequency f in Hz
Rating according to EN ISO 717-1 (in third octave bands)
Rw (C; Ctr) = 45 (-2; -6) dB C50-3,150 = -2 dB; C100-5,000 = -1 dB; C50-5,000 = -1 dB
Ctr,50-3,150 = -6 dB; Ctr,100-5,000 = -6 dB; Ctr,100-5,000 = -6 dB
Test report n° 18-002619-PR04 (PB-C01-04-de-03)
Data sheet 26
Test number Z46
ift Rosenheim, Laboratory Building Acoustics Johann Baume, Dipl.-Ing. (FH)
05.12.2019 Operating Testing Officer
Concept Details
GP-A-EW60-INTERNAL_45dB

View from outside M 1:40


Section C-C M 1:7 Section D-D M 1:7
8575
C D
19) 01685, 8575 mm

5) 02685, 475 mm

7) 02685, 475 mm
B B

550
50

50
05) 05) 05) 06) 07) 08)
70

70
01685

01685
901245

901245
8

8
13) 02685, 1535 mm 14) 02685, 1535 mm 15) 02685, 1535 mm 16) 35805, 1890 mm 17) 02685, 947.5 mm 18) 02685, 922.5 mm
22) 35803, 901 mm 26) 35803, 901 mm
435

459

475

435

459

475

24) 35803, 2225 mm

25) 35803, 2225 mm


43.5 43.5
901245

901245

1) 01685, 2800 mm

2) 02685, 2700 mm

3) 02685, 2700 mm

8) 02685, 2700 mm

9) 01685, 2800 mm
8

2800
90

50

90

50

clear opening: 2203


4) 35805, 2295 mm

6) 35805, 2295 mm
02685

02685
901245

901245
8

2250
A 01) 01) 01) 04) 04) 02) 03) A
2800

2800
Din R

20) 35803, 2225 mm

21) 35805, 2225 mm

Handle Height 1050


2135

2159

2175

2135

2159

2175
23) 35855, 757 mm 27) 35855, 757 mm
10) 01685, 4755 mm 12) 01685, 1970 mm
C D clear opening leaf: 837
43.5 43.5
clear opening: 1706
901245

901245
01685

01685

1610 1585 1585 1800 997.5 997.5


8

8
70

70
50

50

Section A-A M 1:7


8575
50 1535 50 1535 50 1535 50 1750 50 947.5 50 922.5 50
901
72 757 72
901

72 757 72
01685
901245 901245 02685
901245 901245 02685
901245 901245 35803 901245 901245 35803 901245 901245 35803 901245 901245 02685
901245 901245
01685

2 x 905056 ATHMER STADI L-24/20 WS L 900mm, 150mm cut


2 x 905056 ATHMER STADI L-24/20 WS L 900mm, 150mm cut
1 x 907014 FLOOR BUSH 35805 35805 35805

1 x 907043 Drive bolt rod Ø10, 924mm


8 1519 8 8 1519 8 8 1519 8 8 741 8 8 741 8 8 931.5 8 8 906.5 8
1 x 907044 Drive bolt rod Ø6, 2500mm
1 x 907286 Anti-panic-push-bar EPN950 750-1369mm, 30° 70 1495 90 1495 90 1495 152 717 152 717 152 907.5 90 882.5 70

1 x 907287 Anti-panic-push-bar EPN950 passive leaf 750-1369mm, 45°


1 x 907319 DOOR HANDLE SHAFT anti-panic nut spindle 9mm, length 133mm
1 x 907350 DOOR HANDLE INOX nut spindle 9mm
2 x 907353 ROSE PC, INOX round
1 x 907508 Mortice deadlock PC, B 35mm, L/R
Section B-B M 1:7
1 x 907577 Keep lock top 8575
50 1535 50 1535 50 1535 50 1750 50 947.5 50 922.5 50
1 x 907583 Switch latch with top bolt guide inactive leaf
1 x 907591 Rod guide, 35mm
6 x 907662 WELD-ON HINGE STEEL
2 x 917014 SECURITY BOLT STEEL
1 x 917054 Rod guide low Ø 10mm 01685
901245 901245 02685
901245 901245 02685
901245 901245 02685
901245 901245 02685
901245 901245 02685
901245 901245
01685

1 x 917303 Door handle shaft standard nut spindle 9mm


1 x 917723 AP opposite lock

8 1519 8 8 1519 8 8 1519 8 8 1734 8 8 931.5 8 8 906.5 8

(01) 43.52MM GLASS <43.5mm = 13.52-16-14> 1519 x 2159 70 1495 90 1495 90 1495 90 1710 90 907.5 90 882.5 70
(02) 43.52MM GLASS <43.5mm = 13.52-16-14> 932 x 2159
(03) 43.52MM GLASS <43.5mm = 13.52-16-14> 907 x 2159
(04) 43.52MM GLASS <43.5mm = 13.52-16-14> 741 x 2065
(05) 43.52MM GLASS <43.5mm = 13.52-16-14> 1519 x 459
(06) 43.52MM GLASS <43.5mm = 13.52-16-14> 1734 x 459
(07) 43.52MM GLASS <43.5mm = 13.52-16-14> 932 x 459
(08) 43.52MM GLASS <43.5mm = 13.52-16-14> 907 x 459

ARAB INTERNATIONAL ACADEMY project in Lusail Obj 23303A2


Ref: CWB EXPORT
Pce: 1 28.12.23 Pos 202
GP-A-EW60-INTERNAL_45dB PRE60S-A #1

Forster Profilsysteme AG, Amriswilerstrasse 50, CH-9320 Arbon (F001)


VETROTECH
FIRE-RESISTANT
GLASS
Life-safety, fire-resistant glazing solutions that will not only keep
people safe, but will protect the building itself. Our glass solutions
suit the requirements of a complete range of building applications.

INTEGRITY
Stop flames, smoke and hot toxic gases

EW

RADIATION REDUCTION
Keep the level of radiant heat transmission low.

EI

INSULATION
Compartmentalize fire and block heat transfer
thereby acting as a barrier to heat transmission.
HIGH-SECURITY
GLASS
Protecting people and property is our mission – with our range of
high-security glass we enable customers and partners to join us in
making this world a safer place. When it comes to protection of people
there can be no compromise in the choice of security precautions.

ATTACK RESISTANCE

P6B - P8B

BULLET RESISTANCE

BR1-BR7/ SG1-SG2
Splinter (S) & Non-Splinter (NS) variants

UL Level 3, 4, 5 & 6

BLAST RESISTANCE

ER1-ER4
Splinter (S) & Non-Splinter (NS) variants
MULTI
FUNCTIONALITY
We at Vetrotech are dedicated to delivering glass solutions with
industrial excellence and reliable delivery but also to making your
projects as special as possible. This is why, in addition to delivering
standard solutions, we offer you an extensive range of glazing
options & features.
SUSTAINABILITY
Double glazing
Triple glazing
Solar control
Tinting
Self-cleaning

SAFETY
Protection
Floors
Clear view

COMFORT
Noise control
Dynamic privacy
Screen
Extra clear
Climate control

DESIGN
Coloring
Screen printing
Digital printing
Shapes
Curving
Etching
SOLUTION FOR
EVERY APPLICATION
Here are some key locations in a building where fire-resistant & high-security
glazed solutions find application. Our broad range of products deliver solutions
for uncompromised safety, addressing any glazing challenge.

All our solutions are tested as per the most stringent regional and
international standards (BS, EN, UL, NFPA) and approved for use
by the CIVIL DEFENCE.

LOAD BEARING GLAZED FLOORS

BUTT-JOINT
GLAZED PARTITIONS

FIRE DOORS WITH VISION PANEL

GLAZED CURTAIN WALLS


MULTIFUNCTIONAL
SAFETY SOLUTIONS
FOR ALL NEEDS

CONTRAFLAM fire-rated glass successfully endures 5000 hours of


NEW exposure to UV radiation, 2.5 times longer than the normative
requirement (EN ISO 12543-4:2011)
HEALTHCARE

GLAZED PARTITIONS
HOSPITALITY
& LEISURE

COMMERCIAL

GLAZED WINDOWS

PUBLIC & TRANSPORT

EXIT CORRIDORS EDUCATION

SOLUTIONS
AVAILABLE FOR
GLAZED FIRE DOORS NEW CONSTRUCTIONS &
LIFT LOBBY ENCLOSURES RETROFIT APPLICATIONS
IN EXISTING BUILDINGS.
Verified EPD’s are now available for our
fire-resistant glass products. Contact us
for any special EPD requirements in your
project.
MADE IN INDIA.
MADE FOR THE WORLD.
Vetrotech Saint-Gobain’s fire-resistant & high-security range of products are
manufactured at the ‘World Glass Complex’ in Sriperumbudur, Chennai.
Housed in a total area of 177 acres, this state of the art facility is the largest
single investment of Saint-Gobain worldwide.

As fire-resistant and high-security specialists, it is our responsibility to


guarantee all sites worldwide produce to the same exacting standards to
provide consistent quality and reliable performance thereby ensuring life
safety and property protection, as well as complete customer satisfaction.

The manufacture of our life safety products is audited and certified for
compliance by independant certification bodies including TUV Rheinland,
Underwriters Laboratory Inc. (UL), Warringtonfire Certifire and others.
A complete range of bullet
resistant glass certified to both
European norms (EN) and
Underwriters Laboratory (UL)
standards.

Inside Vetrotech Saint-Gobain’s


bullet resistance test facility in Cologne, Germany
Our technical teams continue to
develop, test and certify new
solutions and applications that
protect life and property while
better meeting your
requirements.

International Fire Testing & Services (IFTS) –


Vetrotech Saint-Gobain’s fire testing laboratory
in Herzogenrath, Germany.
SAFETY
SOLUTIONS
FOR DOORS
with fire-resistant & high-security range of glass
SWING DOORS
Fire-resistant & High-security solutions for doors

KERALITE® - R (5mm) PYROSWISS® (6, 8 & 10mm)


120 minutes fire-rated glass 60 minutes fire-rated glass
Available for steel doors Available for steel doors
E E

CONTRAFLAM® LITE CONTRAFLAM® (20mm - 60mm)


(14, 16 & 20mm) Fire-rated glass for up to
120 minutes fire-rated glass 120 minutes
EW
Available for steel, stainless steel EI
Available for steel and
and aluminium doors aluminium doors

ALSO AVAILABLE WITH VETROGARD®


HIGH-SECURITY GLASS

Attack resistance Bullet resistance Blast resistance


SWING DOOR WITH PULL HANDLE
Fire-resistant solutions for swing door with pull handle

CONTRAFLAM® LITE (14, 16 & 20mm) CONTRAFLAM® (20mm - 60mm)


120 minutes fire-rated glass 60 minutes fire-rated glass
Available for steel doors Available for steel doors
EW EI
SLIDING DOORS
Fire-resistant & High-security solutions for sliding doors

CONTRAFLAM® LITE CONTRAFLAM®


(14, 16 & 20mm) (20mm - 40mm)
120 minutes fire-rated glass Fire-rated glass for
up to 90 minutes
EW EI
Available for steel doors Available for steel and
(up to 120 minutes fire-rating) aluminium doors
Available for aluminium doors
(up to 60 minutes fire-rating)

ALSO AVAILABLE WITH VETROGARD®


HIGH-SECURITY GLASS

Attack resistance Bullet resistance Blast resistance


LUNAX PORTA
EI 30 - EI 60
Fully glazed and frameless double acting fire-rated door system

CONTRAFLAM® (20mm) CONTRAFLAM® (27mm)


30 minutes fire-rated glass 60 minutes fire-rated glass
Available in single and Available in single and
EI double leaf configurations EI double leaf configurations
LUNAX Porta is a fully glazed and frameless double acting SYSTEM BENEFITS
fire rated door system, suitable for indoor applications in
new build or renovation projects. Door panels are composed Safety
of CONTRAFLAM fire-resisting glass, thereby maximizing + EI 30 to EI 60 double sided fire resistance
visibility and favoring natural daylighting, while providing
Comfort
discrete protection in case of fire. The pivot design allows + Maximum transparency
door swing openings from both sides. With its minimized + Optimized passing
design and greater transparency, this innovative single + Double acting
or double door can enhance the quality and safety of any
interior space bounded by fire resistive construction.
Glass options
+ Contraflam 30-2 or Contraflam 60-3
+ Digital and screen printing
+ Extra clear

LUNAX PORTA ACCESSORIES


Hold open
Handles Locks devices

or or

Large choice Electric Mechanical Magnetic Electro-magnetic


holders and closers
LUNAX PORTA ACCESSORIES
Smoke Seal Closers

Floor springs
Dorma or GEZE
FIRE DOORS WITH VISION PANELS
Fire-resistant solutions for Steel & Timber doors

KERALITE® - R (5mm) KERALITE® - R (5mm)


240 minutes fire-rated glass 180 minutes fire-rated glass
Tested as per BS & EN standards 'Fire-Protection' rated as per
E E UL standards
Available for steel doors
(up to 240 minutes fire-rating)
Available for timber doors
(up to 120 minutes fire-rating)

KERALITE® - F (5mm)
KERALITE® - L (8mm)
Available in filmed (F) and
laminated (L) variants
E
for up to 180 minutes
'Fire-Protection' rating
as per UL standards
SAFETY
SOLUTIONS
FOR PARTITIONS
& CURTAIN
WALLS
with fire-resistant & high-security range of glass
FIXED PARTITIONS
Fire-resistant & High-security solutions for glazed partitions

PYROSWISS® (6, 8 & 10mm) VETROFLAM®


60 minutes fire-rated glass 120 minutes fire-rated glass
Available for steel partitions Available for steel partitions
(up to 60 minutes fire-rating) (up to 120 minutes fire-rating)
E E
Available for aluminium partitions Available for aluminium partitions
(up to 30 minutes fire-rating) (up to 60 minutes fire-rating)

CONTRAFLAM® LITE (14, 16 & 20mm) CONTRAFLAM® (20mm - 60mm)


120 minutes fire-rated glass Fire-rated glass for up
Available for steel and aluminium to 120 minutes
partition systems Available for steel and
EW EI
aluminium partition systems

ALSO AVAILABLE WITH VETROGARD®


HIGH-SECURITY GLASS

Attack resistance Bullet resistance Blast resistance


BUTT-JOINT PARTITIONS
Fire-resistant solutions for butt-joint partitions

CONTRAFLAM® STRUCTURE CONTRAFLAM® STRUCTURE LITE


(23mm - 73mm) (20mm)
Available for steel systems 60 minutes fire-rated glass
(up to 120 minutes fire-rating) Available for steel systems
EI Available for aluminium systems EW
(up to 60 minutes fire-rating)

NEW
CONTRAFLAM® STRUCTURE Vibrance
Butt-joint fire-resistant glass with
colored edges in virtually any RAL shade
CURVED PARTITION
Fire-resistant glass for curved partition systems

CONTRAFLAM® 30 CONTOUR (18mm) CONTRAFLAM® 30 CONTOUR (18mm)


120 minutes fire-rated glass 30 minutes fire-rated glass
Available for steel systems Available for steel systems
EW EI
WINDOWS & CURTAIN WALL
Fire-resistant & High-security solutions for exterior facades

VETROFLAM® CONTRAFLAM® LITE


60 minutes fire-rated glass (14, 16 & 20mm)
Available for steel curtain 120 minutes fire-rated glass
wall systems Available for steel and
E EW
aluminium curtain wall systems

CONTRAFLAM® (20mm - 60mm)


Fire-rated glass for up to 120 minutes
Available for steel and
EI aluminium curtain wall systems

ALSO AVAILABLE WITH VETROGARD®


HIGH-SECURITY GLASS

Attack resistance Bullet resistance Blast resistance


SAFETY
SOLUTIONS
FOR WINDOWS
with fire-resistant range of glass
WINDOWS
Fire-resistant glass for fixed (F) and openable (O) windows

KERALITE-R® (5mm)
PYROSWISS® (6, 8 & 10mm) 120 minutes fire-rated glass
60 minutes fire-rated glass Available for steel systems (F & O)
Available for steel systems (F) ‘Fire-Protection’ rated
E E
as per UL standards

VETROFLAM® CONTRAFLAM® LITE


120 minutes fire-rated glass (14, 16 & 20 mm)
Available for steel systems (F) 120 minutes fire-rated glass
EW EW Available for steel systems (F & O)

CONTRAFLAM® (20mm - 60mm)


120 minutes fire-rated glass
Available for steel systems (F & O)
EI
SAFETY
SOLUTIONS
FOR SKYLIGHTS
AND FLOORS
with fire-resistant range of glass
SKYLIGHTS & FLOORS
Fire-resistant glass for load-bearing & non load-bearing applications

KERALITE® – R CONTRAFLAM® LITE


240 minutes fire-rated glass 120 minutes fire-rated glass
Available for steel systems Available for steel systems
E EW

LITEFLOOR
CONTRAFLAM® 31mm thick load-bearing glass
Fire-rated glass for up to 120 minutes for interior application
Available for steel systems Load-bearing capacity up to
EI 500 kg / sq.m (for select sizes)
LIST OF CONTENTS

1. Items for Approval


2. Performance Data Sheet
3. Classification report for fire resistance glass
4. CE Certificate for Glass Processing and Assembly
5. Certificates of Production Facility
6. Declaration of Organic components
7. Environmental Product Declaration
8. Draft Warranty
9. Letter- Country of origin
10. Quality Guidelines – Fire Resistant Glass
11. Conditions of Use – Fire Resistant Glass
12. Quality Control Plan
13. Reach Declaration
14. Recycled Content Declaration
15.Previous projects approval
16. Project Show Case
17. Project References

VETROTECH SAINT-GOBAIN MIDDLE EAST, ASIA & OCEANIA


Head Quarters: Vetrotech Saint-Gobain International AG, Bernstrasse 43, CH 3175, Flamatt, SWITZERLAND
Commercial office: c/o Saint-Gobain Gyproc Middle East, Three Street, Community 598, DIP 1, Dubai, UAE
Manufacturing plant: c/o Saint-Gobain India Pvt Ltd, World Glass Complex, Sriperumbudur, Tamil Nadu, INDIA
ITEMS FOR
APPROVAL
PROJECT DETAILS

Project Name : Construction of Arab International Academy Schools


Location : Qatar

PRODUCT DETAILS

1) Product -1
Product : Contraflam Lite 120 IGU
Rating : EW 120
Thickness :39.5 mm
Combination : 66.4 + 12mm Air + 14mm Contraflam Lite
Glazing Type 120 : Double Glazed Unit (DGU)
Application : External

2) Product -2
Product : Contraflam Lite 120
Rating : EW 120
Thickness : 14 mm
Combination : 14mm Contraflam Lite 120
Glazing Type : Single Glazed Unit (SGU)
Application : Internal

VETROTECH SAINT-GOBAIN MIDDLE EAST, ASIA & OCEANIA


Head Quarters: Vetrotech Saint-Gobain International AG, Bernstrasse 43, CH 3175, Flamatt, SWITZERLAND
Commercial office: c/o Saint-Gobain Gyproc Middle East, Three Street, Community 598, DIP 1, Dubai, UAE
Manufacturing plant: c/o Saint-Gobain India Pvt Ltd, World Glass Complex, Sriperumbudur, Tamil Nadu, INDIA
Calumen III 1.26
Sunday, December 31, 2023

PLANILUX INDIA (6 mm)


Pane 1 PVB standard (4 x 0.38 mm)
PLANILUX INDIA (6 mm)

Cavity 1 AIR (100%) / 12 mm

Pane 2 CFL120 55 IND (14 mm)

VETROTECH SAINT-GOBAIN
Technical Manager
SURYA PRAKASH

[email protected]

LUMINOUS CIE015:2018 ENERGY FACTORS EN410:2011

FACTORS Transmission (Te) 49 %


Light transmission (TL %) 76 % Reflection (Ree) 11 %
Outdoor reflection (RLe %) 14 % Indoor (Rei) 11 %
Indoor (RLi %) 15 % Absorption (AE1) 25 %
Absorption (AE2) 15 %

SOLAR FACTORS EN410:2011

Solar factor (g) 0.62


THERMAL EN673:2011

Shading Coefficient (SC) 0.71 TRANSMISSION


Ug 2.6 W/m².K
COLOR RENDERING CIE015:2018 0° related to vertical position
Transmission (Ra) 95.1
Reflection (Ra) 94.9 MANUFACTURING
SIZES
CARBON EN15804:2012+A2:2019
Nominal thickness 39.5 mm
FOOTPRINT Weight 63 kg/m²
Global warming potential 'GWP' N/A
(A1-A3)

Calumen III calculates the photometric characteristics and thermal transmission of glass using calculation algorithms which comply with the following standards: the European standards EN 410 and EN 673, the
international standard ISO9050, the Japanese standard JIS R 3106/3107 and the Korean standard KS L 2514/2525. The functional output and calculation rules of Calumen for standards EN 410 and EN 673 have
been validated by TÜV Rheinland (report 89212153-01). The technical performances obtained according to these standards are provided for information only and are subject to amendment.
Only the values entered in the performance declaration available on the CE marking site of Saint-Gobain Glass are official.
The sound attenuation indices are measured under laboratory conditions according to the standards EN ISO 10140 and EN 12758. The calculated indices are provided for information only. The accuracy for Rw
index lies within a range of +/-2dB.The glass thickness calculations comply with the 2012 version of the DTU39-P4 description. The USER is responsible for ensuring that the correct calculation hypotheses are
entered and the DTU39 is applied appropriately for the project concerned.
COMPUTATION OF SOUND TRANSMISSION LOSS
Modeling and computation done by Saint-Gobain Research Compiègne
Computation hypothesis defined to model a measurement according to EN ISO 140

All the results, notices, measures, diagrams or charts and any other elements in this document have been obtained in Saint-Gobain's
laboratories under specific circumstances. They are for information purposes only and have no contractual value. Saint-Gobain
will not be liable for them in any circumstances.
Ratings: According to ISO 717-1 100Hz - 3150Hz ASTM E413 125Hz - 4000Hz ASTM E1332 80Hz - 4000Hz
Rw(C;Ctr) = 45 (-3;-9) dB RA = 42 dB RA,tr = 36 dB STC = 45 dB OITC = 33 dB

Results: Sound Transmission Loss by third-octave band

60 Frequency R
(Hz) (dB)

50 24.7
63 29.0
50 80 27.0
100 18.0
125 27.7
160 28.5
40 200 31.2
250 36.9
315 38.7
400 39.4
TL (dB)

30 500 40.7
630 43.9
800 46.9
1000 48.2
20 1250 49.1
1600 53.2
2000 53.2
2500 51.3
10 3150 56.1
4000 61.2
5000 67.8

Frequency (Hz)

Computation details:
- Date of computation: 03/13/23 - ISACO 2
- Overall dimensions: 1.48m x 1.23m
- SGG details:
66.4 -- 12Air -- CFL60 55

SAINT-GOBAIN GLASS FRANCE


Saint-Gobain Reseach Compiègne – BP 40103 – 60777 Thourotte – Tél 03 44 92 36 00 – Fax 03 44 92 36 99
Saint-Gobain Glass France – Société Anonyme au capital de 219.001.680 € – R.C.S. Nanterre B 998 269 211 – N° T.V.A. CEE FR 6099 8269 211
Siège Social : Les Miroirs – 18 avenue d'Alsace – 92400 Courbevoie – Tél : 01 47 62 34 00 – Adresse Postale : Les Miroirs – 92096 La Défense Cedex
www.saint-gobain-glass.com
SOUND INSULATION ACCORDING TO ISO 140-3
Laboratory measurements of airborne sound insulation of building elements

Client VETROTECH SAINT-GOBAIN INTERNATIONAL AG


Glasstraße 1 / D - 52134 Herzogenrath
Product Fire Protection Glass
Product name SGG CONTRAFLAM Lite 60 - 14/38
Manufacturer KINON-Aachen GmbH
Jülicher Straße 495 / D - 52070 Aachen
Test specimen 14 mm SGG CONTRAFLAM Lite 60
TSG 5 / int. 4 / TSG 5

Date of test October 11, 2006


Description Area of the glass pane 1,82 m²
Mass per unit area 31,0 kg/m²
Thickness at the edge 14,0 mm
Thickness in the centre 14,0 mm
Spacer TPS
Sealant Polysulphide

70
Test facility P3 for windows
ISO 140-1:2004
Upper limit of
sound insulation Rw,max = 65 dB
Air temperature ϑ = 23 °C
60
Air humidity ϕ = 55 %
Source room volume VS = 58 m³
Receiving room volume VR = 51 m³

f (Hz) R (dB) 50
Sound reduction index R (dB)

50 23,0
63 25,3
80 30,3
100 29,8 19 dB
125 32,1 22 dB 40

160 29,5 25 dB
200 30,7 28 dB
250 30,0 31 dB
315 31,9 34 dB
30
400 34,2 37 dB
500 36,8 38 dB
630 39,2 39 dB
800 40,6 40 dB
1000 41,6 41 dB 20
1250 42,3 42 dB
1600 42,8 42 dB
2000 39,7 42 dB
2500 32,6 42 dB
3150 34,9 42 dB 10 7
4000 38,9 50 100 200 400 800 1600 3150
5000 42,1 Frequency f (Hz)

Shiftet curve of Rating according to ISO 717-1:2006


_______________
reference values ISO 717-1 Rw = 38 dB C = -1 dB C100-5000 = -1 dB
Curve of Ctr = -2 dB Ctr,100-5000 = -2 dB
sound reduction index R(f) o These results are based on test under laboratory conditions with third octave band filters.

Test report L - LAD 06/286/11 Schall- und Wärmemeßstelle Aachen GmbH


Annex Figure 1 52074 Aachen - Lütticher Straße 139 - 0241/9108585
Date November 29, 2006
(Dipl.-Ing. B. Gebing)
D A T A S H EE T
Laminated glass in conformance with EN 14449

CONTRAFLAM® LITE 120


Fire resistant safety glass for interior application

classification available OPTIONS

EW = Radiation reduction + Alarm + Coloring


Ability to withstand fire exposure without + Clear view + Digital printing
transmission of fire to the non-fire side as a + EMS shielding + Matt finished
result of the passage of flames, hot gases or + Protection + Screen printing
significant conduction of heat, thereby + Shapes
causing ignition of the non-fire exposed
surface or materials adjacent. Also + Climate control + Double glazing
maintains radiated heat in front of the + Dynamic privacy + Self-cleaning
glazing below a specified level to provide for + Extra clear + Solar control
safer seperation distances and escape ways. + Noise control + Tinting
+ Triple glazing

Contact us to personalize your solution


to meet your project requirements.

TECHNICAL SPECIFICATIONS*
Fire resistance EW 120 (EN 13501-2)
Reaction to fire A2-s1, d0 (EN13501-1)
Impact resistance 1(B)1 (EN 12600)
UV Stability Yes (EN ISO 12543-4), no formation of bubbles or yellowing after 2000 hours of exposure to radiation
Application conditions Avoid prolonged exposure to elevated temperatures. See Quality Guideline, Application Instructions
Certificate of constancy of performance 0336-CPR-5064C-IL
Hazardous material contained None
Dimensional tolerances (height/width) ≤1000mm: -1/+2mm | ≤2000mm: -1/+2.5mm | >2000mm: -1/+3mm

Product CONTRAFLAM LITE 120


Nominal thickness 14 mm 16 mm 20 mm
Maximum glass size Based on Certification; Please get in touch with Vetrotech representative for more information
Thickness tolerance +2 / -1 mm +2 / -1 mm +2 / -1 mm
Basic glass Planilux India Planilux India Planilux India
Weight 31 kg/m² 36 kg/m² 46 kg/m²
Sound reduction Rw (EN 140-3) 38 (-1,-2) dB 39 (-2,-2) dB 39 (-1,-2) dB
Light transmission (EN 410) 86% 86% 84%
Light reflection pL ext./int. (EN 410) 9% / 9% 9% / 9% 8% / 8%
U value (EN 673) 5.0 W/m²K 5.0 W/m²K 4.9 W/m²K
g value (EN 410) 0.72 0.72 0.68
Energy transmission tE (EN410) 66% 66% 61%

*Valid for products manufactured at the 'World Glass Complex' of Saint-Gobain India Pvt. Ltd. - Vetrotech Business.
Shapes: dimensional tolerance may vary +1mm
August 2019 / Version 3.1 IMEA en

vetrotech.com
© Vetrotech Saint-Gobain
Product characteristics are subject to change without notice and may vary depending on manufacturing size and composition.
Available options are dependent on product type and application. Contact your Vetrotech representative for further support.
Invoice Number: Place: Chennai, ddmmyyyy
Invoice Date :

LIMITED / EXPRESS 5 YEARS WARRANTY

Vetrotech Saint-Gobain warrants that its CONTRAFLAM range of fire rated glazing supplied vide invoice
and date supplied to name of the party are free of substantial obstruction of vision from dust or other foreign
substances, film formation or moisture accumulation between glass panes resulting from seal failure due to
defective materials or workmanship for a period of 5 years from the date of invoice. We guarantee to the
legal warranty with regards to the fulfillment of the basic protection objectives as mentioned in clause 11.2
as per test standard EN 1363-1: 2020. The Contraflam range is an engineered special fire resistant glazing
material, fire rated for integrity and insulation, tested as per various standards and when installed as per the
test evidences. Certain optical and visual faults are inherent to the production process. The interlayer
materials used in the production of laminated safety glass for the outer glass pane(s) are lightly hygroscopic
and depending on climatic conditions, small delamination and bubbles (≤30mm) along the glass edge may
occur due to migrations of humidity or softener of sealing materials. These characteristics can be evaluated
according to the manufacturer’s quality standards, but do not impair the transparency or affect the
performance of glass in case of fire, and shall not be considered cause for rejection. Deviations in
dimensions, weight, content, thickness and colors resulting from the manufacture are permissible within the
scope of the tolerances customary in the industry, provided that no express and written guarantee for
specific product characteristics is provided. The fire protection guarantee for internal applications refers to
the glass-frame systems in which we have tested our products as well as a typical interior climate of a
normally air-conditioned building in local latitudes. At the time of ordering the glass, it is assumed that the
end user has verified and permanently ensures the climatic conditions in the building according to our
application conditions.

The product warranty is subject to transportation and storage of Contraflam in a vertical and dry state. It is
to be noted that excessive ambient temperatures (e.g. heating, IR radiators, direct sun-light, heat traps in
louvers or blinds, curtains, awnings, etc.) can cause signs of hazing in the product which does not affect the
fire-protection function / property of the product. Extreme climatic conditions and exposure to direct sunlight
will make the warranty void. When the glass is installed in a non-temperature controlled building, above
storage conditions apply likewise. This warranty will become void in case of usage of glazing materials
different from the test evidence and that have not been approved by Vetrotech. Usage of the product in
exterior application without low-e and solar control coatings in IGU configuration will void the warranty.
Published functionality data of glasses with specific characteristics, e.g. thermal transmittance coefficient,
sound reduction value, light transmission, total energy transmission, etc. are determined according to the
boundary conditions defined in the valid standards. If the current conditions differ from the respective valid
standard conditions or the product-specific valid application conditions, such deviations are not covered by
the warranty. Re-exporting the glass without informing us will also void the warranty. However, warranties
do not apply to subsequent purchasers of processed glass, modified glass, as-is/distressed pieces or
display items. It shall be the responsibility of the original purchaser to communicate the limitations on the
warranty to the end user. SGIPL shall in no circumstances be liable to the end-user in the event of such

VETROTECH SAINT-GOBAIN MIDDLE EAST, ASIA & OCEANIA


Head Quarters: Vetrotech Saint-Gobain International AG, Bernstrasse 43, CH 3175, Flamatt, SWITZERLAND
Commercial office: c/o Saint-Gobain Gyproc Middle East, Three Street, Community 598, DIP 1, Dubai, UAE
Manufacturing plant: c/o Saint-Gobain India Pvt Ltd, World Glass Complex, Sriperumbudur, Tamil Nadu, INDIA
warranty terms not communicated to the end user by the original purchaser of Glass. Any costs incurred by
the end user for processing, glazing and installation of glass are not covered under the warranty under any
circumstance. This warranty does not apply to defects that result from processing, modification of the glass,
negligence, misuse, abnormal use, accident or commercial use. In the cases as mentioned hereafter, any
warranty in the context of legal admissibility is excluded if, glasses are damaged after delivery or installation;
in case of non-compliance with application guidelines, installation instructions, product information, glazing
guidelines and technical requirements of the underlying proof of suitability, which lead to product damage,
elimination or restriction of the suitability of the expected properties; in the case of improper cleaning
operations, in particular cleaning with abrasive agents; in case of modifications and post processing after
delivery to the goods by the contract partner or third parties without our prior written consent. The basis for
assessment is the quality and installation guidelines valid at the time of purchase contract as well as the
terms and conditions of use for Contraflam® attached to this document or already sent/made available.
These documents are also available on our website under www.vetrotech.com.

This warranty is a limited warranty and constitutes only the express warranty extended by SGIPL
(Vetrotech division). This warranty shall not apply if the failure is caused by acts of God, intervening cause,
mishandling, abuse, improper installation, not installing as per test evidences, installation by unqualified
glaziers or by any other cause whatsoever not within our exclusive control, and shall not apply unless the
failure occurs within 5 years after the date of invoice. The obligation of this warranty is only to replace the
defective glass, F.O.B. manufacturer’s warehouse and not to remove or install the defective glass, including
consequential penalties or damages that are not covered under this warranty. Any glass replaced under
this warranty is limited to the original warranty period and shall not be extended beyond the original 5 years.
Glass breakage, under any circumstances, is not covered under this warranty.

VETROTECH SAINT-GOBAIN MIDDLE EAST, ASIA & OCEANIA


Head Quarters: Vetrotech Saint-Gobain International AG, Bernstrasse 43, CH 3175, Flamatt, SWITZERLAND
Commercial office: c/o Saint-Gobain Gyproc Middle East, Three Street, Community 598, DIP 1, Dubai, UAE
Manufacturing plant: c/o Saint-Gobain India Pvt Ltd, World Glass Complex, Sriperumbudur, Tamil Nadu, INDIA
Additionally, such defect shall be duly demonstrated by the client and attributable to SGIPL (Vetrotech
division). Where defective glasses are detected the procedure shall be as follows:

 The Buyer shall notify SGIPL by mail or registered fax of the claimed defect within 3 months of their
becoming recognizable by the initial buyer, by a subsequent buyer, or by the users of the building into
which CONTRAFLAM has been installed before removing the Glass attaching a negative quality report.
Liability will therefore expire at the latest within 3 months after the end of the warranty period, should
the defect not have been recognizable before that point in time.
 If SGIPL deems within a period of fifteen days that there is no defect in the relevant Glass, it shall notify
the Buyer thereof in writing attaching a technical justification.
 If the Parties do not agree upon the existence of a defect, the matter shall be referred to a sole arbitrator
mutually agreed by the both the parties. Such arbitration shall be governed by the Arbitration and
Conciliation Act, 1996 and the place of arbitration will be Chennai, INDIA.
 The warranty holds good only if the payments are received against invoice in full.

All implied warranties of merchantability of fitness for a particular purpose are hereby expressly
excluded.

For Saint-Gobain India Private LTD. –


VETROTECH BUSINESS

Managing Director
Saint-Gobain India Private Limited

VETROTECH SAINT-GOBAIN MIDDLE EAST, ASIA & OCEANIA


Head Quarters: Vetrotech Saint-Gobain International AG, Bernstrasse 43, CH 3175, Flamatt, SWITZERLAND
Commercial office: c/o Saint-Gobain Gyproc Middle East, Three Street, Community 598, DIP 1, Dubai, UAE
Manufacturing plant: c/o Saint-Gobain India Pvt Ltd, World Glass Complex, Sriperumbudur, Tamil Nadu, INDIA
Dubai,31st December 2023

Project Name : Construction of Arab International Academy Schools


Location : Qatar

Subject: Confirmation on the country of origin of the Contraflam range of products

Dear Sir,

We are pleased to have the opportunity to quote you for the supply of fire resisting glass through our
authorized partners for the project Construction of Arab International Academy Schools.

This is to confirm that we will supply the Contraflam Lite 120 products required for this project from our
manufacturing unit located in India. Geographically, the plant located in India is the closest and the biggest
facility of Saint-Gobain to service the requirements for India, Middle East, Asia and Oceania region.

Operating under the “multiple-line” scheme, our products produced in India conform to the same European
Norms by a Notified Certification Body (NCB) – in our case TÜV Rheinland. In addition, the Chennai site
will also operate under Underwriters Laboratory Inc. (UL) global certification and audits schemes.

As certain markets require Certifire certification scheme from Warringtonfire, a large part of our product
range is also covered under “Certifire”.

Nevertheless, every shipment of glass will come with the chamber of commerce attested COO with the
shipping documents.

Thanking you,
Yours sincerely,

Surya Prakash S.
Vetrotech Saint-Gobain
Technical Engineer.

VETROTECH SAINT-GOBAIN MIDDLE EAST, ASIA & OCEANIA


Head Quarters: Vetrotech Saint-Gobain International AG, Bernstrasse 43, CH 3175, Flamatt, SWITZERLAND
Commercial office: c/o Saint-Gobain Gyproc Middle East, Three Street, Community 598, DIP 1, Dubai, UAE
Manufacturing plant: c/o Saint-Gobain India Pvt Ltd, World Glass Complex, Sriperumbudur, Tamil Nadu, INDIA
.)
dormakaba�

LISTED
BHMA
CERTIFIED

DDC2016
Surface Applied Door Closer
The DDC2016 door closer is For light to medium daily

reliable with modern style for application, suitable for Hollow

new era of safe and secure Metal, Timber and Aluminum

access solutions. doors. Including standard

common hole pattern to

various applications as well as

for replacement and upgrading

of existing openings.
How to order

Article no. Description


5507734 DDC2016 RA PA-BKT BC 689
5508732 DDC2016 HO PA-BKT BC 689
RA Regular Arm
HO Hold Open Arm
PA-BKT Parallel Arm Bracket
BC Back Check
689 Wet Sprayed Aluminum Finish
WN 053 230 51532, 12/12, TS 90 Impulse EN 3/4, GB, 12/17
Subject to change without notice

dormakaba
Dorma UK Ltd
Wilbury Way
Hitchin
Herts
SG4 0AB
T: 01462 477600
E: [email protected]
www.dormakaba.com www.dormakaba.co.uk
Silicon Sealant - NULLIFIRE & TREMSTOP
TREMSTOP® ACRYLIC
Gunnable, Acrylic Latex
Firestop Sealant

__________________________________________________________________________________________
PRODUCT DESCRIPTION
TREMstop® Acrylic is a gunnable, acrylic latex sealant designed for use in firestopping applications, including both joints and through-
penetrations.

__________________________________________________________________________________________
BASIC USES
TREMstop Acrylic is intended for use in fire-rated concrete, wood, floor/ceiling, and gypsum assemblies, including the following:
• Metal, plastic, or insulated pipes
• Cables and cable trays
• Ducts
• Static joints
• Dynamic joints
• Acoustically rated assemblies

__________________________________________________________________________________________
FEATURES & BENEFITS
TREMstop Acrylic is an easy to apply, all-purpose sealant that accepts paint once fully cured. It features excellent movement and
superb unprimed adhesion to a wide range of substrates. When installed in accordance with a tested firestop system, TREMstop
Acrylic affords code compliance for both through-penetrations and fire-rated joints.

TREMstop Acrylic meets or exceeds the requirements of the following specifications:


• UL 1479 (ASTM E814)
• UL 263 (ASTM E119)
• UL 723 (ASTM E84)
• UL 2079 (ASTM E1966)
• ASTM E1399
• ASTM E90
• CAN/ULC-S115
• CAN/ULC-S101M

The Greenguard Gold certification on TREMstop Acrylic ensures safety for use in the most sensitive indoor environments including
hospitals and schools.

__________________________________________________________________________________________
AVAILABILITY
Immediately available from your local Tremco Sales Representative, Tremco Distributor, or Tremco Warehouse in 10.1 oz (300 mL)
cartridges, 20 oz (600 mL) sausages, 28.7 oz (850 mL) quart cartridges, and 5 gal (19 L) pails.

__________________________________________________________________________________________
COLORS
Available in Rust Red, Limestone, and White. Custom colors are available upon request. Contact Tremco Customer Service for more
information.

__________________________________________________________________________________________
LIMITATIONS
Not recommended for use with passive fire containment systems not listed or approved by Tremco. Refer to UL listings at
www.UL.com. Contact Tremco Technical Services for additional information.
__________________________________________________________________________________________
WARRANTY
A repair or replacement warranty is available on all Tremco products. Visit https://www.tremcosealants.com/warranties/ for details.

TYPICAL PHYSICAL PROPERTIES


PROPERTY TEST METHOD TYPICAL RESULTS
Flame Spread ASTM E84 20
Smoke Development ASTM E84 55
Movement Capability ASTM C719, UL2079; Class I, II, III ± 33%
Peel Strength ASTM C794 15 to 25 (substrate dependent)
VOC Content 35 g/L

Please refer to our website at www.tremcosealants.com for the most up-to-date Product Data Sheets.

NOTE: All Tremco Safety Data Sheets (SDS) are in alignment with the Globally Harmonized System of Classification and
Labelling of Chemicals (GHS) requirements.

TSA-DS/1123
Project Logo
Project Name : Construction of Arab International Academy Schools - Tarsheed
Project No. : Form Ref. No. : P07-F21 / Rev. 0 / Feb. 2012

Client Project Manager: Consultant: Contractor

arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau ara

Block / Building Name : Material Submittal Ref. No. :


Location of Use : Name of Material : Fire Rated Partitions and Door
Date Submitted : Submitted by : Enyinnaya.

INSTALLATION RECOMMENDATIONS AND/OR APPLICATION GUIDELINES.


Project Logo
Project Name : Construction of Arab International Academy Schools - Tarsheed
Project No. : Form Ref. No. : P07-F21 / Rev. 0 / Feb. 2012

Client Project Manager: Consultant: Contractor

arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau ara

Block / Building Name : Material Submittal Ref. No. :


Location of Use : Name of Material : Fire Rated Partitions and Door
Date Submitted : Submitted by : Enyinnaya.

QCDD CERIFICATES.
Project Logo
Project Name : Construction of Arab International Academy Schools - Tarsheed
Project No. : Form Ref. No. : P07-F21 / Rev. 0 / Feb. 2012

Client Project Manager: Consultant: Contractor

arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau ara

Block / Building Name : Material Submittal Ref. No. :


Location of Use : Name of Material : Fire Rated Partitions and Door
Date Submitted : Submitted by : Enyinnaya.

VALID TEST REPORTS AND/OR CERTIFICATES (OTHERS APPLICATOR CERTIFICATES IF REQUIRED).


Project Logo
Project Name : Construction of Arab International Academy Schools - Tarsheed
Project No. : Form Ref. No. : P07-F21 / Rev. 0 / Feb. 2012

Client Project Manager: Consultant: Contractor

arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau ara

Block / Building Name : Material Submittal Ref. No. :


Location of Use : Name of Material : Fire Rated Partitions and Door
Date Submitted : Submitted by : Enyinnaya.

SAFETY MATERIAL DATA SHEET (SMDS) / HANDLING & STORAGE REQUIREMENTS.


Product: SGG Planilux® Clear Float Glass SGG Parsol® Body Tinted Float Glass

Safety data sheet according to 91/155/EEC

1. Substance-/Preparation- and Company Identification

Trade name: SGG Planilux Clear Float Glass SGG Parsol Body Tinted Float Glass
Company: Saint-Gobain Glass India Limited
Plot A-1 SIPCOT Ind. Park
Sriperumbudur 602105
INDIA
Emergency phone no.: +91 44 27162832

2. Composition / Information on ingredients

The product is not subject to the directives 67/548/EEC and 88/379/EEC

Chemical characterization

Glass: The product, glass is manufactured and marketed in form of sheet-glass. It is


under normal environmental conditions inert. The glasses are manufacture from
mostly natural raw materials; merely soda and sulphate are chemical products.

Ingredients of the glass % w/w

SiO2 Approx. 71%

Na2O Approx. 14%

MgO Approx. 4%

CaO Approx. 9 %

K2O Approx. 1%

SO3 Approx. 0,4 %

Fe2O3 Approx. 0.5 %

For the manufacturing of the products SGG Planilux Clear Float Glass SGG Parsol Body
Tinted Float Glass none of the following substances is used:
Lead (Pb) or lead-containing mixtures, cadmium (Cd) or cadmium-containing mixtures, mercuri
(Hg) or mercuri-containing mixtures, brome (Br), dibutylphthalate, chlorinated hydrocarbons,
nonylphenoletoxylate, octylphenoletoxylate, organotin compounds.

Glass India - PLX and Parsol Page 1 of 5 Code: Q-PSK33-SDE02-C


Date: MSDS Saint Gobain
3. Hazards identification

Hazard designation: None required

Information pertaining to particular dangers to man and environment:


R-phrases: None

4. First Aid measures

After inhalation: Not applicable

After skin contact: Wash off with water and soap

After eye contact: Rinse eyes with water


After ingestion: Not applicable

5. Fire fighting measures

Suitable extinguishing agent: Depends on the environment

Special exposure hazards: Not applicable

Protective equipment not applicable

for fire fighters:


Further information: None

6. Measures in case of accidental release

Personal precautions: Not applicable

Measures for cleaning up: Not applicable


Measures for environmental protection: Not applicable

7. Handling and storage


Handling/Storage: Note: For quality reasons special requirements, which are laid down in the
corresponding guidelines on processing, apply to the handling and storage of the coated glasses.

8. Exposure control and personal protection

Personal protection equipment:


Respiratory protection: Protection against dust/breathing filter; in case sheets are sanded in a

work area without proper air suction device.

Glass India - PLX and Parsol Page 2 of 5 Code: Q-PSK33-SDE02-C


Date: MSDS Saint Gobain
3
Limit value for the fraction that can be inhaled: 10 mg/m
3
Limit value for the fraction that can pass the alveoli: 3 mg/m

Eye protection: Safety glasses; Required to protect from glass splinters during the de-coating of
the edges of the sheet

Hand protection: Cut-proof safety gloves with artery protection; Required during the de-coating of

the edges of the sheet

Head protection: Helmets have to be worn when sheets reach or exceed the height of the head

due to their own height, or during transportation or processing.

Hygienic measures in the workplace:


Do not smoke, eat or drink while handling the glasses. Wash hands at the end of the work.
Preventive skin protection is recommended.
The de-coating of the edges should only be performed with functioning dust collection unit with
proper air filtration. The cleaning of used filters should be performed only according to the
corresponding instructions and the appropriate protection measures should be taken. In general it
is preferable to exchange the filters rather than to clean them.

9. Physical and chemical properties

Form: Solid

Colour(s): Clear and Tinted

Odour: Odourless
Value / range Unit Method
Change in physical condition
Melting point : Not applicable
Boiling point : Not applicable
Flame point : Not applicable
Ignition temperature : Not applicable

Explosion limits
Lower : Not applicable
Upper : Not applicable
Density of the liquid at 20 °C : Not applicable
Solubility in water at 20 °C : Not applicable
PH-value at 20 °C : Not applicable

Glass India - PLX and Parsol Page 3 of 5 Code: Q-PSK33-SDE02-C


Date: MSDS Saint Gobain
10. Stability and reactivity

Conditions to avoid : Not applicable

Materials to avoid : Not applicable

Hazardous decomposition products : Not applicable


Further information : None

11. Toxicological information


Acute toxicity : Not applicable
Further toxicological information : Not applicable
Further information : Not applicable
----------------------------------------------------------------------------------------------------------------------------------
12. Ecological information

Eco toxicological effects : Not applicable


Further ecological information : Not applicable
----------------------------------------------------------------------------------------------------------------------------------

13. Disposal considerations

Product:
® ®
Glass, SGG Planilux Clear Float Glass SGG Parsol Body Tinted Float Glass including coated
® ® ® ®
glass like SGGBIOCLEAN II/SGGPLANITHERM /SGGCOOL-LITE / SGGCOOL-LITE ST /
®
SGGMIRASTAR , is ideal for recycling and should be brought to sheet-glass recyclers. Pieces
that cannot be separated any more can be used as inert rubble or disposed of.

Please contact the responsible office (either authority or waste management company) where you
can receive information on re-use or disposal.

Packaging:
Dispose according to the official instructions.
Filter/filter-dust after de-coating the sheet edges:
Dispose according to the official instructions; see also comments under point 8.

14. Transport information

Land transport ADR/RID and GGVS/GGVE :Not applicable


Inland navigation transport ADN/ADNR :Not applicable
Maritime transport IMDG/GGVSee (Not applicable)

Air transport ICAO-TI and IATA-DGR (Not applicable)


The regulations on transport are cited in their international version. Possible deviations in other
countries are not taken into account.

Glass India - PLX and Parsol Page 4 of 5 Code: Q-PSK33-SDE02-C


Date: MSDS Saint Gobain
15. Regulatory information

The product is not subject to 67/548/EEC and 88/379/EEC

Designation according to EC-Guidelines/GefStoffV:

Symbols: Not applicable

R-phrases: Not applicable

S-phrases: Not applicable


German regulations
Water hazard classification: Not applicable
Storage classification VCI: Not applicable

16. Other information

None

The information presented is based on present knowledge and does not constitute a guarantee for
any product properties. It is the sole responsibility of the receiver of our product to comply with
existing regulations and instructions.
During the processing of glass, new hazards may arise that are characteristic for the applied
procedure and measures. In these cases the user has to become acquainted with the
corresponding regulations of the professional trade association and legal regulations.

This safety data sheet was prepared by: M/S. SAINT- GOBAIN GLASS

Glass India - PLX and Parsol Page 5 of 5 Code: Q-PSK33-SDE02-C


Date: MSDS Saint Gobain
Project Logo
Project Name : Construction of Arab International Academy Schools - Tarsheed
Project No. : Form Ref. No. : P07-F21 / Rev. 0 / Feb. 2012

Client Project Manager: Consultant: Contractor

arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau ara

Block / Building Name : Material Submittal Ref. No. :


Location of Use : Name of Material : Fire Rated Partitions and Door
Date Submitted : Submitted by : Enyinnaya.

QUALITY ASSURANCE & QUALITY CONTROL LITERATURE (MANUFACTURER/SUPPLIER)


Project Logo
Project Name : Construction of Arab International Academy Schools - Tarsheed
Project No. : Form Ref. No. : P07-F21 / Rev. 0 / Feb. 2012

Client Project Manager: Consultant: Contractor

arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau ara

Block / Building Name : Material Submittal Ref. No. :


Location of Use : Name of Material : Fire Rated Partitions and Door
Date Submitted : Submitted by : Enyinnaya.

MATERIAL SOURCES (COUNTRY OF ORIGIN CERTIFICATE)


Reynaers Middle East WLL
Forster Profile Systems
A4 - U11-14, Dubai Digital Park
Dubai Silicon Oasis
Att. Mr. Sanjo John P O Box 341484, Dubai, UAE.
Senior Sales Engineer
M/s NABINA ALUMINIUM & GLASS FACTORY P.O.Box : 130 Contact person
Doha, Qatar Clayton Braggs
Tel : +974 778 8625
Email : [email protected] [email protected]
T +971 566895010

15.12.2023
Subject: Clarification letter

Project: Arab International Academy Schools

Dear Mr. Sanjo,

Forster Profile System Middle East is the regional office (Middle East and South Asia region) for Forster Profile
Systems Switzerland. The country of origin for all Forster products supplied by forster profile systems is,
Switzerland.

The country of origin letter was issued as a preliminary document only. The final country of origin document will be
issued, only once the forster material for the project has been ordered and dispatched. This country of origin
document will be issued by the Swiss chamber of commerce (stamped and signed).

Enclosed along with this letter, is a previous country of origin document, for an past order placed by Nabina
Alumnium and glass factory.

We trust the above is self-explanatory however should you have any problems or queries, please do not hesitate
to contact us.

Kind Regards

Clayton Braggs
Technical and Estimation Manager - Middle East & South Asia
Sales Manager – Qatar
Forster Profile Systems - Middle East

forstersystems.com
T +9714 501 59 33
   
   
 







 








 

 




 
 
 
 


 
 
 
 



 



 




















  


vetratech SAINT-GOBAIN

Dubai, 20 th December 2023

Project Name : Arab International Academy Schools


Location : Qatar

Subject: Confirmation on the country of origin of the Contraflam range of products

Dear Sir,

We are pleased to have the opportunity to quote you for the supply of fire resisting glass through our
authorized partners for the project Arab International Academy Schools in Qatar.

This is to confirm that we will supply the Contraflam Lite 120 products required for this project from our
manufacturing unit located in India. Geographically, the plant located in India is the closest and the biggest
facility of Saint-Gobain to service the requirements for India, Middle East, Asia and Oceania region.

Operating under the "multiple-line" scheme, our products produced in India conform to the same European
Norms by a Notified Certification Body (NCB) - in our case TOV Rheinland. In addition, the Chennai site
will also operate under Underwriters Laboratory Inc. (UL) global certification and audits schemes.

As certain markets require Certifire certification scheme from Warringtonfire, a large part of our product
range is also covered under "Cerlifire".

CE: .. (l)
TUVRheinland
@ �certifire
Nevertheless, every shipment of glass will come with the chamber of commerce attested COO with the
shipping documents.

Thanking you,
Yours sincerely,


Surya Prakash S.
Vetrotech Saint-Gobain
Technical Engineer.


SAINT-GOBAIN
VETROTECH SAINT-GOBAIN MIDDLE EAST, ASIA & OCEANIA
Head Quarters: Vetrotech Saint-Gobain International AG, Bernstrasse 43, CH 3175, Flamatt, SWITZERLAND
Commercial office: c/o Saint-Gobain Gyproc Middle East, Three Street, Community 598, DIP 1, Dubai, UAE
Manufacturing plant: c/o Saint-Gobain India Pvt Ltd, World Glass Complex, Sriperumbudur, Tamil Nadu, INDIA
Project Logo
Project Name : Construction of Arab International Academy Schools - Tarsheed
Project No. : Form Ref. No. : P07-F21 / Rev. 0 / Feb. 2012

Client Project Manager: Consultant: Contractor

arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau ara

Block / Building Name : Material Submittal Ref. No. :


Location of Use : Name of Material : Fire Rated Partitions and Door
Date Submitted : Submitted by : Enyinnaya.

PROJECT REFERENCES LIST


PROJECT PREFERENCE LIST (PREVIOUS & CURRENT)

Start-End Dates Completion Certificate


Sr.No. Project No.& Title Brief Scope of Works Client Main Contractor Consultant Total Project Value Remarks
(YES/NO)*

FABRICATION, SUPPLY, INSTALLATION AND MAINTENANCE NBKA Mercedes Benz Service Centre
1 NG-PROJECT-00005-NATIONAL INDUSTRIAL CONTRACTING COMPANY NATIONAL INDUSTRIAL CONTRACTING COMPANY GHD GLOBAL PVT LTD 18-Sep-21 28-May-22 914,223.02 No Completion Certificate Requested
OF FIRE RATED GLASS PARTITION AND DOORS Refurbishment
QATAR ARMED FORCES
NG-PROJECT-00010-QATAR EMIRI SIGNAL CORPS NEW CAMP PROJECT ENGINEERING, FABRICATION, SUPPLY & INSTALLATION OF BAHADIR CONSTRUCTION ENGINEERING CONTRACTING
2 QATAR ARMED FORCES QATAR EMIRI CORPS OF 29-Jun-22 30-Jun-23 705,923.63 YES Attached
(Q-102-01) FIRE RATED WINDOW CURTAIN WALL SYSTEM & TRADING INC. CO.
ENGINEERS

4 NG-PROJECT-00013-QH-4768 HILTON HOTEL (INTERNAL WORKS) SUPPLY AND INSTALLATION OF FIRE RATED WINDOW AL JERYYAN HOLDING INVESTMENT QATAR BELGIUM ALUMINIUM CO. W.L.L ERGA QATAR 10-Apr-22 15-May-22 133,000.00 No Completion Certificate Requested

QATAR ARMED FORCES


SUPPLY AND INSTALLATION OF FIRERATED ALUMINIUM BAHADIR CONSTRUCTION ENGINEERING CONTRACTING
6 NG-PROJECT-00022-(C-108-01) QATAR ARMED FORCES QATAR EMIRI CORPS OF 19-Feb-22 27-Nov-22 101,590.87 YES Attached
WORKS & TRADING INC. CO.
ENGINEERS
NG-PROJECT-00023-PPP SCHOOLS DEVELOPMENT PROGRAMME -
7 SUPPLY AND INSTALLATION OF FIRE RATED WINDOWS ASHGAL M/S. AL JABER TRADING & CONTRACTING CO. W.L.L AEB ENGINEERS 14-Feb-22 20-May-22 410,000.00 No Completion Certificate Requested
PACKAGE 1 COMPRISING EIGHT SCHOOLS

SUPPLY & INSTALLATION CW-11 EW -120-FR GLASS


9 NG-PROJECT-00041-BUS DEPOT - INDUSTRIAL AREA ASHGAL REDCO INTERNATIONAL AECOM 14-Aug-22 11-Sep-22 39,546.42 No Completion Certificate Requested
PARTITION.

SUPPLY & INSTALLATION CW-11 EW -120-FR GLASS


10 NG-PROJECT-00041-BUS DEPOT - INDUSTRIAL AREA ASHGAL REDCO INTERNATIONAL AECOM 24-Jan-22 21-Feb-22 39,546.42 No Completion Certificate Requested
PARTITION.

SUPPLY & INSTALLATION CW-11 EW -120-FR GLASS


11 NG-PROJECT-00041-BUS DEPOT - INDUSTRIAL AREA ASHGAL REDCO INTERNATIONAL AECOM 24-Jan-22 21-Feb-22 39,546.42 No Completion Certificate Requested
PARTITION.

SUPPLY & INSTALLATION CW-11 EW -120-FR GLASS


12 NG-PROJECT-00041-BUS DEPOT - INDUSTRIAL AREA ASHGAL REDCO INTERNATIONAL AECOM 14-Aug-22 11-Sep-22 39,546.42 No Completion Certificate Requested
PARTITION.

SUPPLY & INSTALLATION OF FIRE RATED WINDOWS IN


13 NG-PROJECT-00056-QETAIFAN ISLAND NORTH WATERPARK AT LUSAIL Qetaifan Projects REDCO ALMANA WS Atkins & Partners Overseas 20-Oct-22 19-Dec-22 40,716.57 No Completion Certificate Requested
KITCHEN AREAS
ENGINEERING, DESIGN, FABRICATION, SUPPLY, DELIVERY,
QATAR DESIGN CONSORTIUM
NG-PROJECT-00096-C0040, CONSTRUCTION OF EXTENSION TO NGL 3-4 AND INSTALLATION OF BLAST PROOF & 120MINS. FIRE- 04-12-
14 QATAR ENERGY CONTRACO W.L.L 6-May-23 112,453.73 On Progress
CONTROL BUILDINGS, MESAIEED RATED STEEL WINDOWS,60 MINS FIRE-RATED INTERNAL 2023.
STEEL WINDOWS AND MIRRORS
AMANA QATAR CONTRACTING CO .W.L.L/ALUMINIUM ALKHALEEJ ENGINEERING &
15 NG-PROJECT-00117-NEW LIGHT INDUSTRIAL UNIT FOR CITY NEON(54) FIRE RATED AUTOMATIC SLIDING DOOR QATAR FREE ZONE AUTHOTRITY 4-Jul-23 24-Oct-23 120,536.11 No Completion Certificate Requested
TECHNOLOGY AUXILIARY INDUSTRIES W.L.L INDUSTRIAL CONSULTANCY

SUPPLY, DELIEVERY & INSTALLATION OF FIRE RATED DOORS, HBK CONTRACTING CO.W.L.LGROUP FOR WOODEN DAR(DAR AL HANDASAH On Progress. Mainscope completed
16 NG-PROJECT-00131-KATARA TOWER KATARA TOWERS HOTEL MANAGEMENT W.L.L 8-Jul-23 31-Dec-23 1,230,000.00
PARTITIONS & WINDOWS INDUSTRIES W.L.L CONSULTANTS) waiting for variation.
SUPPLY, INSTALLATION OF VETROTECH SAINT-GOBAIN QATAR DESIGN CONSORTIUM
17 NG-PROJECT-00146-NCSA DATA CENTER PROJECT GLASS,EI-120 FIRE RATED BUTT JOINT SYSTEM & EI-90 FR NATIONAL CYBER SECURITY AGENCY MANNAI TRADING CO. W.L.L. W.L.L 5-Jul-23 31-Dec-23 775,296.35 No Completion Certificate Requested
HINGED, APPROVED BY QCDD.
HBK CONTRACTING CO. WLL/ALUMINIUM
SUPPLY & INSTALLATION OF FIRE RATED SINGLE LEAF
18 NG-PROJECT-00157-MILITARY MEDICAL COMPLEX-MMC-HBK(88) MEINHARDT TECHNOLOGY QATAR ARMED FORCES 2-Oct-23 12/31/2023 83,662.50 No Completion Certificate Requested
AUTOMATIC SLIDING DOOR
AUXILIARY INDUSTRIES W.L.L.
SUPPLY AND INSTALLATION OF FIRE RATED GLAZING AMERICAN INTERNATIONAL CONTRACTORS AMERICAN INTERNATIONAL CONTRACTORS (SPECIAL
19 NG-PROJECT-00161-NEW EMBASSY COMPOUND 11-Oct-23 2/7/2024 1,080,000.00 On Progress
PARTITIONS (SPECIAL PROJECTS), INC. PROJECTS), INC.

SUPPLY AND INSTALLATION OF FIRE RATED GLAZING AMERICAN INTERNATIONAL CONTRACTORS AMERICAN INTERNATIONAL CONTRACTORS (SPECIAL
20 NG-PROJECT-00187-MANNAI CORPORATION QPSC 5-Nov-23 5-Dec-23 10,550.00 On Progress
PARTITIONS (SPECIAL PROJECTS), INC. PROJECTS), INC.

26-0ct-
21 NG-PROJECT-00188-FALCON-5 BED DOWN PROJECT SUPPLY & INSTALLATION OF FIRE RATED GLAZED DOORS. TARGET METAL INDUSTRIES TARGET METAL INDUSTRIES 26-Sep-23 28,048.28 On Progress
2023
Project Logo
Project Name : Construction of Arab International Academy Schools - Tarsheed
Project No. : Form Ref. No. : P07-F21 / Rev. 0 / Feb. 2012

Client Project Manager: Consultant: Contractor

arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau ara

Block / Building Name : Material Submittal Ref. No. :


Location of Use : Name of Material : Fire Rated Partitions and Door
Date Submitted : Submitted by : Enyinnaya.

M.A.R APPROVALS FROM PREVIOUS PROJECTS.


Inspection Request (IR)
Date: 14-Nov-2023

Request No.: KH-PK4a(i)-HBK-IR-A-10603


Project No. & Title: Lusail Katara Twin Tower Hotel Project - (PK4a(i)) Rev. No.: 0

Project Design &


Employer: Project & Construction Nominated
Construction Supervision Main Contractor:
Katara Towers Hotels Management Consultant: Sub-Contractor:
Service Consultant: HBK Contracting Company
Management W.L.L. Qatar Project Management Group for Wooden Industries
Dar Al Handasah

Discipline: Architectural Civil Structural Electrical Mechanical Instrumentation General

We request your attendance to inspect the following works :Inspection for the Installation of Fire Rated Glass Doors & Partition with Ironmongeries
in Tower 4 & 5 - Uniform Issue Room (T4-251-P1 [FR-24]) & Office (T5-482-P1 [FR-26]) at Promenade

1. Type : Buildings

2. Inspection Time: 9:00 AM Date : 15-Nov-2023

3. Location : Zone: Building: Floor: Element: Drawing No.:

Tower No. Tower 4 & 5 Tower 4 & 5 Promenade Rooms 251A & 482A (See Attached)

4. Purpose of the Inspection:

1. Surveying 3. Structure 5. Architecture


Setting out Reinforcement Blockwork
Drywall
Levels Formwork Plaster Waterproofing
Concreting Floor Finish
Verticality Ceilings

TBM Metals Painting

4. Electro-Mech. Woods & Plastics Wall Finish


2. Earthworks
First Fix
Doors & Windows Glazing
Formation
Second Fix
Roofing Furniture
Sides of Excavation Third Fix
Facade
T&C

Others (specify): Tower 4 & 5 - Uniform Issue Room (T4-251-P1 [FR-24]) & Office (T5-482-P1 [FR-26]) at Promenade

Particular Details: HBK-T4-SDW-PR-GLP-8975-R1

Submitted By (Nominated Sub Contractor) Verified By (Main Contractor)


Group for Wooden Industries HBK Contracting Company W.L.L

Initiated by: (GWI-CM) Checked by: (GWI-QA/QC)


Name: Maher Shahen Name: Marvin Sy Name: Joey Mayor
Signature : Signature : Signature:

Date: 14-Nov-2023 Date: 14-Nov-2023 Date: 14-Nov-2023

5. Inspection Report
No. Discription
No objection subject to full compliance with comments at the attached
rejected shop drawings for final approval and T&C IR approval for door
hardware /RFS

Inspection by (Name) : ……………………………… Signature: ………………………… Date: ……………….

6. Project Design & Construction Supervision Service Consultant (DAR) Comments:


The works are :
A - Approved B - Approved as Noted C - Revise and Resubmit D - Rejected N - Noted

06-12-2023
DAR Name: Mohamed Rimawi Position: Resident Engineer Signature: Date:

Attach all relevant particular test forms


Approval shall not relieve Contractor of his liabilities under the Contract or constitute authorization of any change to Contract Documents. Please note that the response
provided does not constitute a time or cost impact to the project.

KH-PK3-QF011 Rev. 02, Dated 27.10.2020 Page 1 of 2


Inspection Request (IR)
Date: 14-Nov-2023

Request No.: KH-PK4a(i)-HBK-IR-A-10604


Project No. & Title: Lusail Katara Twin Tower Hotel Project - (PK4a(i)) Rev. No.: 0

Project Design &


Employer: Project & Construction Nominated
Construction Supervision Main Contractor:
Katara Towers Hotels Management Consultant: Sub-Contractor:
Service Consultant: HBK Contracting Company
Management W.L.L. Qatar Project Management Group for Wooden Industries
Dar Al Handasah

Discipline: Architectural Civil Structural Electrical Mechanical Instrumentation General

We request your attendance to inspect the following works :Inspection for the Installation of Fire Rated Glass Doors & Partition with Ironmongeries
in Tower 3 - 5* Open Workstation (T3-115-L03 [FR-22 & FR-23]) at Level 3

1. Type : Buildings

2. Inspection Time: 9:30 AM Date : 15-Nov-2023

3. Location : Zone: Building: Floor: Element: Drawing No.:

Tower No. Tower 3 Tower 3 Level 3 Rooms 115A (See Attached)

4. Purpose of the Inspection:

1. Surveying 3. Structure 5. Architecture


Setting out Reinforcement Blockwork
Drywall
Levels Formwork Plaster Waterproofing
Concreting Floor Finish
Verticality Ceilings

TBM Metals Painting

4. Electro-Mech. Woods & Plastics Wall Finish


2. Earthworks
First Fix
Doors & Windows Glazing
Formation
Second Fix
Roofing Furniture
Sides of Excavation Third Fix
Facade
T&C

Others (specify): Tower 3 - 5* Open Workstation (T3-115-L03 [FR-22 & FR-23]) at Level 3

Particular Details: HBK-ALL-SDW-ALL-GLP-8919-R2

Submitted By (Nominated Sub Contractor) Verified By (Main Contractor)


Group for Wooden Industries HBK Contracting Company W.L.L

Initiated by: (GWI-CM) Checked by: (GWI-QA/QC)


Name: Maher Shahen Name: Marvin Sy Name: Joey Mayor
Signature : Signature : Signature:

Date: 14-Nov-2023 Date: 14-Nov-2023 Date: 14-Nov-2023

5. Inspection Report
No. Discription
No objection subject to full compliance with comments at the attached shop
drawings for final approval and T&C IR approval for door hardware /RFS

Inspection by (Name) : ……………………………… Signature: ………………………… Date: ……………….

6. Project Design & Construction Supervision Service Consultant (DAR) Comments:


The works are :
A - Approved B - Approved as Noted C - Revise and Resubmit D - Rejected N - Noted

DAR Name: Mohamed Rimawi Position: Resident Engineer Signature: Date:


06-12-2023

Attach all relevant particular test forms


Approval shall not relieve Contractor of his liabilities under the Contract or constitute authorization of any change to Contract Documents. Please note that the response
provided does not constitute a time or cost impact to the project.

KH-PK3-QF011 Rev. 02, Dated 27.10.2020 Page 1 of 2


Inspection Request (IR)
Date: 20-Nov-2023

Request No.: KH-PK4a(i)-HBK-IR-A-10605


Project No. & Title: Lusail Katara Twin Tower Hotel Project - (PK4a(i)) Rev. No.: 0

Project Design &


Employer: Project & Construction Nominated
Construction Supervision Main Contractor:
Katara Towers Hotels Management Consultant: Sub-Contractor:
Service Consultant: HBK Contracting Company
Management W.L.L. Qatar Project Management Group for Wooden Industries
Dar Al Handasah

Discipline: Architectural Civil Structural Electrical Mechanical Instrumentation General

We request your attendance to inspect the following works :Inspection for the Installation of Fire Rated Glass Partition in Tower 2 & 3 -
Display Area - Katara Hall Storage (T2-237-B1 [FR-04, FR-07 & FR-08]) at Basement 1

1. Type : Buildings

2. Inspection Time: 9:00 AM Date : 21-Nov-2023

3. Location : Zone: Building: Floor: Element: Drawing No.:

Tower No. Tower 2 & 3 Tower 2 & 3 Basement 1 Room 237A (See Attached)

4. Purpose of the Inspection:

1. Surveying 3. Structure 5. Architecture


Setting out Reinforcement Blockwork
Drywall
Levels Formwork Plaster Waterproofing
Concreting Floor Finish
Verticality Ceilings

TBM Metals Painting

4. Electro-Mech. Woods & Plastics Wall Finish


2. Earthworks
First Fix
Doors & Windows Glazing
Formation
Second Fix
Roofing Furniture
Sides of Excavation Third Fix
Facade
T&C

Others (specify): Tower 2 & 3 - Display Area - Katara Hall Storage (T2-237-B1 [FR-04, FR-07 & FR-08]) at Basement 1

Particular Details: HBK-T2-SDW-B1-GLP-(8912 & 8913)-R2

Submitted By (Nominated Sub Contractor) Verified By (Main Contractor)


Group for Wooden Industries HBK Contracting Company W.L.L

Initiated by: (GWI-CM) Checked by: (GWI-QA/QC)


Name: Maher Shahen Name: Marvin Sy Name: Joey Mayor
Signature : Signature : Signature:

Date: 20-Nov-2023 Date: 20-Nov-2023 Date: 20-Nov-2023

5. Inspection Report
No. Discription

No objection subject to full compliance with comments at the attached rejected shop
drawings for final approval and T&C IR approval for door hardware /RFS

Inspection by (Name) : ……………………………… Signature: ………………………… Date: ……………….

6. Project Design & Construction Supervision Service Consultant (DAR) Comments:


The works are :
A - Approved B - Approved as Noted C - Revise and Resubmit D - Rejected N - Noted

DAR Name: Mohamed Rimawi Position: Resident Engineer Signature: Date:


06-12-2023

Attach all relevant particular test forms


Approval shall not relieve Contractor of his liabilities under the Contract or constitute authorization of any change to Contract Documents. Please note that the response
provided does not constitute a time or cost impact to the project.

KH-PK3-QF011 Rev. 02, Dated 27.10.2020 Page 1 of 2


Inspection Request (IR)
Date: 25-Nov-2023

Request No.: KH-PK4a(i)-HBK-IR-A-10607


Project No. & Title: Lusail Katara Twin Tower Hotel Project - (PK4a(i)) Rev. No.: 0

Project Design &


Employer: Project & Construction Nominated
Construction Supervision Main Contractor:
Katara Towers Hotels Management Consultant: Sub-Contractor:
Service Consultant: HBK Contracting Company
Management W.L.L. Qatar Project Management Group for Wooden Industries
Dar Al Handasah

Discipline: Architectural Civil Structural Electrical Mechanical Instrumentation General

We request your attendance to inspect the following works :Inspection for the Installation of Fire Rated Sliding Glass Doors & Partition with
Ironmongeries in Tower 2 - Display Area - Katara Hall Storage (T2-237-B1 [FR-05]) at Basement 1

1. Type : Buildings

2. Inspection Time: 9:00 AM Date : 26-Nov-2023

3. Location : Zone: Building: Floor: Element: Drawing No.:

Tower No. Tower 2 Tower 2 Basement 1 Rooms 237A (See Attached)

4. Purpose of the Inspection:

1. Surveying 3. Structure 5. Architecture


Setting out Reinforcement Blockwork
Drywall
Levels Formwork Plaster Waterproofing
Concreting Floor Finish
Verticality Ceilings

TBM Metals Painting

4. Electro-Mech. Woods & Plastics Wall Finish


2. Earthworks
First Fix
Doors & Windows Glazing
Formation
Second Fix
Roofing Furniture
Sides of Excavation Third Fix
Facade
T&C

Others (specify): Tower 2 - Display Area - Katara Hall Storage (T2-237-B1 [FR-05]) at Basement 1

Particular Details: HBK-T2-SDW-B1-GLP-8912-R2

Submitted By (Nominated Sub Contractor) Verified By (Main Contractor)


Group for Wooden Industries HBK Contracting Company W.L.L

Initiated by: (GWI-CM) Checked by: (GWI-QA/QC)


Name: Maher Shahen Name: Marvin Sy Name: Joey Mayor
Signature : Signature : Signature:

Date: 25-Nov-2023 Date: 25-Nov-2023 Date: 25-Nov-2023

5. Inspection Report
No. Discription
No objection subject to full compliance with
comments at the attached rejected shop drawings
for final approval and T&C IR approval for door
hardware

Inspection by (Name) : ……………………………… Signature: ………………………… Date: ……………….

6. Project Design & Construction Supervision Service Consultant (DAR) Comments:


The works are :
A - Approved B - Approved as Noted C - Revise and Resubmit D - Rejected N - Noted

06-12-2023
DAR Name: Mohamed Rimawi Position: Resident Engineer Signature: Date:

Attach all relevant particular test forms


Approval shall not relieve Contractor of his liabilities under the Contract or constitute authorization of any change to Contract Documents. Please note that the response
provided does not constitute a time or cost impact to the project.

KH-PK3-QF011 Rev. 02, Dated 27.10.2020 Page 1 of 2


Qatar Armed Forces ��I W""41All wlji.11
Qatar Emiri Corps of Engineers ($�I c.p_»:1-JI ��I t:�L.u
P.O. Box: 9575 I 5735 5735 - 9575 :1.:-1 �
DOHA-QATAR �-��.i.ll
Tel : 44612780 / 44612111 44612111 / 44612780: 6Jil:i
Fax: 44605300 / 44612811. 44612811 / 44605300: �Ls
('----�-�_M_E_"S._'S._rA_G_E
____,,)
Msg. No. QECE/FAX/W2/Q-102-01/23 / bt) ·2. Date 'Jl, /02/2023

Fax To M/s. BAHADIR Construction Engineering Fax No. 44651663


Attention The Manager No. of Pages

New Camp at Qatar Emiri Signal Corps - Design and Build (Q-
Sub: 102-01) Vendor Approval: M/s Nabina Interiors W.L.L., for Supply
& Installation of Fire rated Glazed Curtain wall, Doors & Windows
References:
a) Your Letter No. SSC-BAH-PM-QECE-LT-08718 dated 26/01/2023

With reference to the above-mentioned subject, please find attached documents for
your above proposed vendor with corresponding comments:

SL. NO Reference No. VENDOR Comments


M/s Nabina Interiors W.L.L., for
SSC-NBC-0001-VAR­ Supply & Installation of Fire rated
1 Approved
AR-00342 Glazed Curtain wall, Doors &
Windows

1
Refer to the attached document submittal form for detailed comments

For your information and action -· rn ����,�R!i�


Ql:f,C. NEW U,MP PRl;J:CT. DES!Gti-& P.U!I.D I
(Q-102-01)

=
r
�s:m:su- E 1JN!Icnmf

��==�-=:J=�- +�
------·-·-··--+-·-
COtHl�i\CTS I
________j__.__ _______

.d>
Regards, :>Ci\•1 ; t
Mf::P ��---- _._- -�--�?________ _

Signed: ....
Captain Engr.
Nasser Mohammed AI-Hajri
Commander, QECE Wing - 2 1/o>'v
n -

,;.,vi/
·,;;;y Transmitted
On:

By:

AMK HK SJ
Ref: SSC-BAH-PM-QECE-LT-08718
Date: 26 January 2023

FAO: For the Attention of


Captain Engr. Nasser Mohammed AI-Hajri
Commander, QECE Wing - 2

Subject: Qatar Emiri Signal Corps New Camp Project- Design & Build (Q-102-01)
(ARC) - Prequalification Vendor Approval for M/s Nabina Interiors W.L.L.,
for Supply & Installation of Fire rated Glazed Curtain wall, Doors &
Windows

Dear Sir,

Please find attached Prequalification Vendor Approval Request for Qatar Emiri Signal Corps
New Camp Project-Design and Build (Q-102-01).

No. Document No. Service Vendor


Supply & Installation of Fire
SSC-NBC-0001-VAR-AR- M/s Nabina Interiors
1 rated Glazed Curtain wall,
00342 RO W.L.L.,
Doors & Windows

This is for your kind review and approval.

�.--------=-------. Q.i:C.S
PMU -WING 2
i..:D:.::2-.::::
te.:...
: ·-=�oi_,,:.U2.,2. � _: _2._5:"...,_----1
A·•: ..,� Ar1c; i Info

l--------
----t---t---
-·' �-lr�l----1-· ----1
KPL, NDR To Red.

·-=i--.
Encl:
1. PQ Submittal SSC-NBC-0001-VAR-AR-00342 ROO [237 Pages],
2. Soft Copy - 1 CD. --

I------ ·1 --;

Bahadir Construction Engineering Contracting & Trading Inc. Co


Qatar Branch: Office No. 1, 10th Floor, Burj Al Gassar Tower, West Bay, Doha - Qatar, PO Box 207229
T: +974 44 81 81 49 ! F: +974 44 81 82 90 I W: www.bimcompany.com I E:[email protected]
CR No.57360 I ISO 9001 · ISO 14001 · ISO 45001 Certified Company

Doc. No.: BAH-MGT-LT01 Rev. No.: 02 Rev. Dale: 20-0ct-2020 Page 1 of 1


c..11gl..,Ao..Uc!l....cl-a.1�0-.S>,,III
t.ATIONAl IAbdilfAt C0Hlltll(itN4 COWIA.41 TECHNICAL SUBMITTAL
SUBMITTAL PACKAGE SUBMlffAL REFERENCE REVISION CYCLE SUBMITTAL DATE
SUBMITTAL ARCHITECTURAL NICC/J220/MAT/ARCH/084 0

Project Nome NBKA MERCEDES-BENZ SERVICE CENTRE REFURBISHMENT

Supervising Consultant GHD GLOBAL PTY. LTD.

Moin Contractor NATIONAL INDUSTRIAL CONTRACTING COMPANY

SUBMITTAL TYPE

D Shop Drowings D Somples D Certificates


D As-Built Drawings D Progress Report D Method Stole
[Kl Moferiol D Design Doto D
D Construction Photographs D Test Reports D
ITEM DESCRIPTION

Moteriol Submittal for Steel Fire Roted Woll System

� Review ond Approval D For lnformotion

Contractor's Signature Date 9•Avg-21

D Revis eon dResubmit D No !Approved

nically, subjected to submission of QCDD approval, all certificates for proposed materials
prior execution of works. Final approval subjected to QCDD.
comply with approved approved FLS requirements and regulations.
Material as not been certified and approved by QCDD. Contractor to resubmit and include QCDD required
approva e ate.

M ria s r approved with comments, Contractor might proceed under their own risk, as authority approval has
no g n to the proposed supplier/ Sub-Contractor
onal cost nor extension of time will be consider in the subject matter. NBKA Mercedes
Benz Service Centre
de ays will be under contractor's responsibility and cost. Refurbishment Project

ALBERTO CAMPOS

PE
DRAFTSMAN
HSE
QS
AECOM

Reviewer Name : Zeinab Hassan\ Ahmed Hussein Date: 712'2022

Dlsposltloner Name Jefferson Alberto Date:

Review Status: 0 S�luiC- �and !'flUbmit,..ithin 14 da� OS1a1u1E-Addi1iooilinlorm,tion,"1uire<I


Project Logo
Project Name : Construction of Arab International Academy Schools - Tarsheed
Project No. : Form Ref. No. : P07-F21 / Rev. 0 / Feb. 2012

Client Project Manager: Consultant: Contractor

arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau ara

Block / Building Name : Material Submittal Ref. No. :


Location of Use : Name of Material : Fire Rated Partitions and Door
Date Submitted : Submitted by : Enyinnaya.

Sample board for hardware & accessories


I

1)+ rt ,&NABINA ALUMIN,IUM


GLASS FACTORY
PROJECT: LPS PROJECT
TITLE: HARDWARE/ACCESSORIES FOR FIRE RATED
GLAZED ODORS & PAffffflON
KET

FIIIE f!AlEO DOOR OLOSl'R


(dannak,ah.a T1l 9D IMFULSHN 111)

D(]Of!KANDLE
fflJRSTER. 073�Di1

1-iO�l lOf: UE;.Lll 00 i'e


lf0A3ftit00750B) /'!.'iOHOII aon
!FISCliCReslfR "1il>SD)

sar DR.ti •Ne sruo


(l'0/ISTCR!!ICJij57ijJ
K.E"J' 1-0fl LC)CK
(rof1$tm;BD r.i72)

IN rur,iESC�NT smrp
(fORS-tEfl:94�01 7/

Loe CVUNDCll
1cooso111,aH>Ml

flRE RlSISfA� TGlAZING lAl'E WEATl1 ERSTFtlPl'lN!J t(JR D0011


(F'OltSll'H-s<,J04/94,!!Dils1 iFO��IEJl:90�71

STEEL WELD , H111<1� DOOR �IANDLE Sf-'Al't


I rD�ST£R:907V<i21 jFO!tSTER;9!?30al

--
-=--� _ _.:._� ---
- �- - - -- -- ' Finl' RA1Yl AOCr V."OOL
tOf\W'51P�Cl50Nl5(]mtt1TI I :Jk;GlM.10FN..'wTY)

fl'I[ fV,tl,!156\1.Al'll
INU\J.lrl�lcl·li7UI

You might also like