The manual is intended to provide detailed information of product, installation, application, trouble
shooting, precautions and maintenance of iMars series grid-tied solar inverter. The manual does not
contain all the information of photovoltaic system. Please read this manual carefully and follow all safety
precautions seriously before any moving, installation, operation and maintenance to ensure correct use
The use of the iMars series grid-tied solar inverters must comply with local laws and regulations on
All rights reserved. The contents in this document are subject to change without notice.
There might be some deviations on actual inverter and data due to product updating, please refer to
i
Grid-tied single-phase solar inverter Contents
Contents
Preface ............................................................................................................................................................ i
Contents ......................................................................................................................................................... ii
4 Installation................................................................................................................................................. 18
ii
Grid-tied single-phase solar inverter Contents
6 Running ..................................................................................................................................................... 30
7 Troubleshooting ......................................................................................................................................... 33
9 Appendix ................................................................................................................................................... 38
iii
Grid-tied single -phase solar inverter Safety precautions
1. Safety precautions
iMars series grid-tied solar inverters are designed and tested strictly in accordance with relevant
international safety standards. As an electrical and electronic device, all relevant safety regulations must
be strictly complied during installation, operation, and maintenance. Incorrect use or misuse may result in:
Injury to the life and personal safety of the operator or other people.
Damage to the inverter or other property belonging to the operator or other people.
In order to avoid personal injury, damage to the inverter or other devices, please strictly observe the
This chapter mainly describes various warning symbols in operation manual and provides safety
instructions for the installation, operation, maintenance and use of the iMars series grid-tied solar
inverters.
Warning marks is alerting users to conditions which may cause serious physical injury or death, or
damage to the device. They also tell users how to prevent the dangers. The warning marks used in this
operation manual are shown below:
1
Grid-tied single -phase solar inverter Safety precautions
After receiving this product, first please confirm the product package is intact. If
any question, please contact the logistic company or local distributor
immediately.
The installation and operation of PV inverter must be carried out by professional
technicians who have received professional training and thoroughly familiar with
all the contents in this manual and the safety requirements of the electrical
system.
Do not carry out cable connection/disconnection, cover open for inspection and
unit replacement operations on the inverter when power is connected. Before
wiring and inspection, users must confirm the breakers on DC and AC side are
disconnected and wait for at least 5 minutes.
Ensure there is no strong electromagnetic interference caused by other
electronic or electrical devices around the installation site.
Do not refit the inverter unless authorized.
All the electrical installation must conform to local and national electrical
standards.
Do not touch the housing of the inverter or the radiator to avoid scald as they
may become hot during operation
Do not open the surface cover of the inverter unless authorized. The electronic
components inside the inverter are electrostatic sensitive. Do take proper
anti-electrostatic measures during authorized operation.
Discharging mark. Ensure that DC and AC side circuit breakers have been
disconnected and wait at least 5 minutes before wiring and checking.
2
Grid-tied single -phase solar inverter Safety precautions
Operators need to be fully familiar with the composition and operating principle of the entire
grid-tied photovoltaic power generation system and related standards of the
countries/regions in which the project is located.
Operators must wear personal protective equipment.
During storage or transport, ensure the inverter package and the chassis is intact,
dry and clean.
The movement and installation of the inverter require at least two persons due to
its heavy weight.
Select proper tools for movement and installation to ensure the inverter can
operate normally and avoid physical injury. The installation personnel must take
mechanical protective measures such as wearing anti-drop shoes or working
clothes to protect physical security.
The inverter must be installed by professional technicians.
Do not store or install the inverter on or close to flammable and explosive objects;
Do not install the inverter in the place where children and other public can easily
touch
Remove the metal accessories in hands eg ring or bracelet before device
installation and electrical connection to avoid electric shock.
The solar cell module exposed to the sunlight may generate dangerous voltage.
Users must cover the solar cell with fully-lightproof materials before electrical
connection
The inverter input voltage cannot exceed the max input voltage, otherwise the
inverter may be damaged.
PV grid-connected inverter is not applicable to the positive or negative ground
system of solar cell panel.
Ensure inverter PE is grounded properly, otherwise the inverter cannot run
normally.
Ensure the inverter is installed firmly and electrical wiring is reliable.
Note: PV grid-connected inverter is only suitable for crystalline silicon-type solar battery component.
Permissions by local electric power agency must be obtained and the inverter
grid-connected power generation operation must be done by professional
technicians.
All electrical connections must meet the electrical standards of the
3
Grid-tied single -phase solar inverter Safety precautions
The maintenance, inspection and repair of the inverter must be done by well
trained and qualified professional technicians.
Contact distributor or manufacture for inverter repairing.
In order to avoid irrelevant personnel entering the maintenance area during
maintenance, temporary warning labels must be placed to warn non-professionals
to enter or please isolate with fences.
Before carrying out any maintenance operations, users must disconnect the
breaker on grid side, then disconnect the breaker connected to the PV module and
wait at least 5 minutes until the internal parts of the inverter are fully discharged.
The internal of inverter are mostly electrostatic-sensitive circuits and parts, users
must follow electrostatic protection rules and take anti-electrostatic measures.
Do not use components provided by other companies when repairing the inverter.
The inverter can be started again for grid-connected power generation only after
confirming there is no fault that may impact the safety performance of the inverter.
Do not get close to or touch the grid or any metal conductive parts in the PV
power generation system during operation, otherwise electric shock or fire may
occur. Take note of any safety marks and instructions such as “Danger, electric
shock risk”.
Do not dispose of the inverter together with household waste. The user has the
responsibility and obligation to send it to the designated organization for recycling
and disposal.
4
Grid-tied single -phase solar inverter Product overview
2 Product overview
This chapter mainly introduces the appearance, package accessories, nameplate, technical
The PV grid-connected inverter is the core part of solar PV grid-connected power generation system.
The sunlight can be converted through PV panel to DC power, which further converted by grid-tied
inverter to the sine AC current with the same frequency and phase position as the public grid, then
feedback the AC power to the grid.
The PV grid-tied inverter is only for the solar PV power generation grid-tied system, and only uses
the Crystalline Silicon Solar Cells whose positive and negative electrodes are not grounded as the DC
input.
5
Grid-tied single -phase solar inverter Product overview
6
Grid-tied single -phase solar inverter Product overview
7
Grid-tied single -phase solar inverter Product overview
Icons Instruction
Single-phase(L、N、PE)
8
Grid-tied single -phase solar inverter Product overview
H W
9
Grid-tied single -phase solar inverter Product overview
The LED indicator panel as the human-computer interaction interface, may indicate the working
state of the inverter.
10
Grid-tied single -phase solar inverter Product overview
The LCD display shows the operating status of the inverter and various parameter information,
as well as setting the inverter parameters.
Short press Switch up or add 1 to the current number Switch down or current number minus 1
Long press Return to the previous level display or Go to the next level display or confirm
cancel
Run Fault
11
Grid-tied single -phase solar inverter Product overview
When the LCD display detects the key operation, it automatically turns on the backlight and enters the
display state; after 20 seconds of no operation, it automatically turns off the backlight and enters the hibernation
mode.
The main interface dynamically displays inverter error information, operation information, and power
generation information.
12
Grid-tied single -phase solar inverter Product overview
Press and hold DOWN in the main screen to enter the menu screen, and then press and hold the
key to enter the sub screen of each menu.
1.Basic information
2.Basic settings
3.Advanced options
After selecting the basic information, press and hold DOWN to enter the basic information menu,
and go through the information in the sub screens by operating the buttons.
13
Grid-tied single -phase solar inverter Product overview
After selecting basic settings, press and hold DOWN to enter the basic information menu, and view and set
the parameters of the sub interface by operating the keys.
After selecting the advanced option, press and hold DOWN to enter the basic information menu and view
and set the parameters of the sub interface by operating the keys.
14
Grid-tied single -phase solar inverter Product overview
15
Grid-tied single -phase solar inverter Product overview
16
Grid-tied single -phase solar inverter Inverter storage
3 Inverter storage
If the inverter is not put into use immediately, the storage of inverter should meet the following
requirements:
The inverter needs to be stored in a clean and dry place, and to prevent the erosion of dust and
moisture.
The storage temperature should be kept at -30℃~+70℃, and the relative humidity should be kept
at 5%RH~95%RH.
stacking layer number at the time of delivery. When stacking, please place the inverter carefully to
During storage, regular inspections are required. If insect bites or packaging damage are found,
the packaging materials must be replaced in time. After long-term storage, the inverter needs to be
17
Grid-tied single -phase solar inverter Installation
4 Installation
This chapter introduces the installation of the inverter and the connection of the inverter to the PV
power generation system. Connecting inverters to PV power generation systems mainly involves the
Please read this chapter carefully before installation, and ensure that all installation conditions are
The inverter has been thoroughly tested and rigorously checked before delivery, but damage may
still occur during transportation. Before unpacking, check carefully whether the product information in the
order is consistent with that on the nameplate of the package box and whether the product package is
intact. If any damage is detected, please contact the shipping company or the supplier directly. Please
also provide photos of the damage to get our fastest and best service.
When the inverter is left unused, please put it in the original packing box and take measures to
prevent moisture and dust.
Take out the inverter after unpacking, please check the following items:
(1) Confirm that the inverter is complete and not damaged;
(2) Confirm that there are manuals, interface accessories and installation accessories in the packing
box;
(3) Confirm that there is no damage or shortage in the delivery content in the packing box;
(4) Check whether the order is consistent with the product information on the nameplate of the
inverter;
(5) The standard delivery list is as follows.
Standard deliverables of single-phase inverter:
18
Grid-tied single -phase solar inverter Installation
1 Inverter 1
4 DC connector (pair) 1
5 User manual 1
Stainless Steel Expansion Bolts
6 2
M6*50
M6 combination bolt, M6 nut, M6
7 2
Flat Washer
Please check the above carefully. If you have any questions, please contact the supplier in time.
19
Grid-tied single -phase solar inverter Installation
20
Grid-tied single -phase solar inverter Installation
(1) The height of installation position shall ensure that the line of sight and LCD display light are on
the same horizontal plane, so as to check the inverter status conveniently .
(2) There is enough reserved space around the installation site to facilitate the disassembly and
assembly of inverter and air convection. As shown in Fig 4.4.
(3) When installing multiple inverters, a certain distance shall be reserved between the inverters, as
shown in Figure 4.4. At the same time, sufficient distance shall be reserved between the upper and
lower parts of the inverter to ensure good heat dissipation。
21
Grid-tied single -phase solar inverter Installation
(4) The installation surface should be perpendicular to the horizontal line, as shown in Figure 4.6.
Please install the inverter vertically or backward ≤15°to facilitate the heat dissipation of the machine.
Do not tilt the inverter forward, horizontally, upside down, leaning too far, or tilting to the side.
Step 1:Measure with a horizontal ruler, 250mm spacing, 2 points, marked with a marker.
Step 2: Use impact drilling to punch holes, and clean the holes, drive 2 M6×50 stainless steel
compression expansion bolts into the holes with a rubber hammer, use a wrench to tighten the nut to
fix the tail of the bolt, and then remove the nut, spring pad and flat pad.
22
Grid-tied single -phase solar inverter Installation
Step 1: Take the inverter out of the packaging box, If the installation location is high, the inverter is
transported to its destination under the premise of ensuring safety.
Step 2: After lifting the inverter, the machine radiator fixing hole is threaded into two M6×50 stainless
steel pressure burst expansion bolts, and then the flat pad, elastic pad and nut are installed
respectively. Tightening torque 2.5N•m.
23
Grid-tied single -phase solar inverter Electrical connection
5 Electrical connection
This section will introduce the electrical connection related content and related safety precautions in
detail.
24
Grid-tied single -phase solar inverter Electrical connection
The inverter must be grounded through the side screws to ensure reliable
grounding and reliable lightning protection.
Step 1: Connect the outlet line of the PV panel to the MC4 terminal delivered by the machine
The MC4 terminal crimping method is as follows:
(1) As shown in Fig 5.2, connect the output wire of the PV string to the DC connector of the inverter.
Loosen the fastening nut of the connector; strip off the 15mm insulation layer of the DC cable, and use
crimping pliers to press the standard metal terminal tightly. The tightening torque of the waterproof part at
the tail is 2.5-3Nm. The wiring method of the positive and negative connectors is the same. Confirm that
the positive and negative poles of the PV string correspond correctly to the positive and negative
connectors ,then connect them firmly;
(2) After the DC connector is connected, use a multi-meter to measure the voltage of the DC input
25
Grid-tied single -phase solar inverter Electrical connection
string, verify the polarity of the DC input cable, and ensure that the voltage of each string is within the
allowable range of the inverter, as shown in Fig 5.3.
a. Check the PV+ ground insulation impedance value of the PV series to ensure that the impedance
value of each series is greater than 1 MΩ.
b. Check the PV-to-ground insulation impedance value of the PV series to ensure that the
impedance value of each series is above 1MΩ.
The PV string connected to iMars series inverter must adopt the DC connector
configured especially for the inverter, do not use other connection devices without
authorization from our company, otherwise damage to the device, unstable
operation or fire may occur and our company will not undertake quality assurance
or assume
Step 2: After the DC terminal is connected, it is directly connected to the MC4 terminal of the
inverter.
(1) Connect the positive and negative connectors of the PV strings that have been connected to the
corresponding positions of the inverter DC interface, and confirm the tight connection, as shown in Fig
5.5;
26
Grid-tied single -phase solar inverter Electrical connection
(2) When disassembling the DC connector from the inverter, insert the tip of a slotted screwdriver
into the raised hole in the middle of the connector, and force the movable end of the connector to
withdraw.
27
Grid-tied single -phase solar inverter Electrical connection
1
485L-1 485L-1
2
485H-1 485H-1
3
485L-2 485L-2
4
485H-2 485H-2
5
External CT input positive CT+
6
External CT input negative pole CT-
7
+5V +5V
8
COM/DRM0 COM/DRM0
Inverter AC connector
Single-phase grid Remarks
interface
L live wire
N neutral line
28
Grid-tied single -phase solar inverter Electrical connection
(1) Unscrew the AC terminal block, pass the cable through the rubber nut, sealing ring, and thread
sleeve in turn, and then connect the cable to the corresponding terminal according to the polarity marking,
and twist the thread sleeve with force with the AC terminal block, as shown below;
Before installing the PV inverter, you need to confirm the working voltage of the AC side of the
product.
29
Grid-tied single -phase solar inverter Running
6 Running
This chapter introduces the related operations during the use of the inverter, which mainly involves
pre-operation inspections, grid-connected operation of the inverter, inverter shutdown, and precautions
The following items must be checked strictly before running the PV grid-connected inverter
(including but not limited to the following items):
(1) Confirm the installation site of the inverter meet requirements of section 4.2.2 to ensure
convenient installation, disassemble, operation and inspection on the inverter;
(2) Confirm the mechanical installation of the inverter meet requirements of section 5.3;
(3) Confirm the electrical connection of the inverter meet the requirements of section 4.4;
(4) Confirm all the switches are in “OFF” state;
(5) Confirm the open-circuit voltage of PV module conforms to the parameter requirements of
inverter DC side in appendix;
(6) Confirm the electrical safety marks on the installation site is clear enough.
In order to ensure a safe, normal and stable operation of the PV power generation
system, all the newly installed, renovated and repaired PV grid-connected power
generation system and its grid-connected inverter must undergo inspection
before running.
Please strictly follow the steps below to turn on the inverter and complete the grid-connected
operation of the inverter::
For the first operation of the inverter, a country must be selected to set
grid-connected standards.
Note Please keep the inverter powered on for at least 30 minutes, and complete the
charging of the built-in clock battery of the inverter to ensure the normal operation
of the clock!
(1) Make sure that the inspection items in Section 6.1 meet the requirements;
(2) Turn on the AC side circuit breaker of the inverter public grid;
(3) Turn on the DC switch integrated in the inverter;
(4) Turn on the switch on the DC input side of the photovoltaic string;
(5) Observe the status of the inverter's LED lights or the information displayed on the LCD screen
(refer to section 2.6 for LED status lights and LCD display information);
(6) Wait for the inverter to connect to the grid successfully.
30
Grid-tied single -phase solar inverter Running
When it is necessary to perform power failure maintenance, overhaul, and troubleshooting of the
inverter, please strictly follows the steps below to shut down the inverter:
(1) Disconnect the AC side circuit breaker of the inverter public grid;
(2) Disconnect the DC switch integrated in the inverter;
(3) Disconnect the line switch on the DC input side of the photovoltaic string;
(4) Wait at least 3 minutes until the internal components of the inverter are discharged, and the
inverter shutdown operation is completed.
In the PV grid-connected system, even if the day and night change and the season changes, the PV
grid-connected inverter can automatically complete grid-connected power generation, shutdown and
start-up operations without human control. In order to ensure and prolong the service life of the inverter,
in addition to using the inverter in strict accordance with the content specified in this manual, it is also
necessary to carry out the necessary daily maintenance and inspection of the inverter.
Maintenance
Check Item Inspection Method
Cycle
The monitoring software is used to read the data of the
inverter in real time, and the data recorded by the
monitoring software is regularly backed up. Save the
Save inverter Once per
inverter's operating data, parameters and logs recorded in
operating data quarter
the monitoring software to a file. Check the monitoring
software and check the inverter parameter settings
through the handheld keyboard.
Observe whether the inverter is installed firmly and
whether it is damaged or deformed. To listen whether
there’s any abnormal sound during inverter running.
Inverter running Once per half
When the system is connected to the grid, check various
status a year
variables. Check whether the heating of the inverter shell
is normal, and use a thermal imager to monitor the
heating of the system.
Clean the Check the RH and dust around the inverter, and clean the Once per half
inverter inverter when necessary. Refer to section 6.4.2. a year
Electrical Once per half
Check whether the system cable connection is loose,
connections a year
31
Grid-tied single -phase solar inverter Running
Maintenance
Check Item Inspection Method
Cycle
whether the inverter wiring terminal is loose, and then
tighten it according to the method specified in section 4.
Check whether the cable is damaged, especially whether
the rubber skin in contact with the metal surface has cut
marks.
For three-phase inverter products, observe whether the
Cooling fan air inlet and outlet are normal, and check whether there
maintenance are cracks in the fan blades. Listen for abnormal vibration Once per half
and when the fan is running. If necessary, clean the air inlet a year
replacement and outlet; if the fan is abnormal, it needs to be replaced
in time, see section 6.4.2.
Check the inverter LCD and the shutdown function of the
Security system. Simulate stop and check the stop signal Once per half
function communication. Check the warning labels and replace a year
them if necessary.
Inverter cleaning
The cleaning steps are as follows:
(1) Disconnect the input and output connections.
(2) Wait ten minutes.
(3) Use a soft brush or vacuum cleaner to clean the surface of the inverter and the air inlet and
outlet.
(4) Repeat the operation content in section 6.1.
(5) Restart the inverter.
Once the inverter stops due to an alarm, it is prohibited to start the inverter
Note immediately. You should find out the cause and confirm that all faults have been
eliminated before starting the inverter. The inspection should be carried out strictly
in accordance with the steps in section 6.1.
32
Grid-tied single -phase solar inverter Troubleshooting
7 Troubleshooting
This chapter introduces fault alarms and codes, which are used to quickly find inverter faults.
Table 7-1 Inverter fault codes
Fault
Number Fault types Fault information Solution
code
Check wether the PV
01-01 Low PV voltage terminal is plugged in
PV voltage properly
1
fault Check wether the panels
01-02 High PV voltage are connected in series
correctly
03-01 Low BUS voltage
BUS If the inverter does not
2 voltage 03-02 High BUS voltage work normally, please
error contact customer service
03-03 BUS voltage imbalance
33
Grid-tied single -phase solar inverter Troubleshooting
Fault
Number Fault types Fault information Solution
code
09-04 DSP2 SPI fault
34
Grid-tied single -phase solar inverter Troubleshooting
01-01 Fan1
01-04 Fan4
Lightning Please contact customer
02-01 Lightning protector
2 protector service
03-01 String 1
String 2
03-02
String 3
03-03 Unplug the faulty string,
String 4 and check if the positive
String 03-04
3 and negative terminals
current String 5
03-05 are reversed with a
String 6 multimeter.
03-06
String 7
03-07
String 8
03-08
35
Grid-tied single -phase solar inverter Troubleshooting
If any problem, please contact with the supplier and provide following information:
System version:
——version 1: ;
——version 2: ;
Fault code: ;
Fault description
36
Grid-tied single -phase solar inverter Contact information
8 Contact information
China·Shenzhen
Address: 2nd Floor, Block B, Yingweiteng Guangming Technology Building, Songbai Road, Matian
Email: [email protected]
37
Grid-tied single -phase solar inverter Appendix
9 Appendix
Table 9-1 Technical parameters of single-phase PV grid-connected inverter
XG1KTL XG1.5K XG2KT XG2.5KT XG3KTL XG3.68 XG4KT XG4.2KT XG4.6KT XG5KTL
Technical specifications
-S TL-S L-S L-S -S KTL-S L-S L-S L-S -S
Maximum input
1500W 2250W 3000W 3750W 4500W 5520W 6000W 6300W 6900W 7500W
power(W)
AC side
Rated output power 1000W 1500W 2000W 2500W 3000W 3680W 4000W 4200W 4600W 5000W
Efficiency
Maximum efficiency 97.3% 97.3% 97.3% 97.3% 97.6% 97.6% 97.8% 97.8% 97.8% 97.8%
Chinese efficiency 97.0% 97.0% 97.0% 97.0% 97.2% 97.2% 97.3% 97.3% 97.3% 97.3%
Protection function
DC switch option
islanding protection √
Output overcurrent
√
protection
DC reverse polarity
√
protection
System
weight ≤6.5KG
Operating
–30℃...+60℃
temperature range
Maximum allowable
≤4000m
altitude
communication RS485/WIFI/4G
Display LCD/LED/WIFI+APP
38