Larsen & Toubro Limited
Construction
@ LARSEN & TOUBRO Heavy Cul Infrastructure
MAHSR ~ C4, Swastik Universal,
Unit No. 202, 2 Floor Building No. B,
Rundh Village, Piplod ~ Dumas Road,
Surat, Gujrat = 395007, India
Ref. No: LTC/MAHSR/Pkg-C4/QMS/2022/4346 11” August 2022
To,
The Engineer,
TCEL-CEGL-AARVEE ASSOCIATES-PADECO JV,
8-1007 to 1012, 10" Floor, Tower B,
Swastik Universal, Opp. Central Mall,
Dumas Road, New Magdalla, Piplod,
Surat, Gujrat ~ 395007, India
Email id:
[email protected]
Kind Attn.: Mr, S Sreedharan, Engineer's Representative
SUB: C4 Package - Design and Construction of 237 km long Viaduct (Ch. 156.6 - 393.7) including 4 stations
(Vapi, Bilimora, Surat, Bharuch) & Surat Depot for MAHSR Project
Reg.: Addendum to the Method statement for Prestressing Works for Segmental Span, |-Girder and
T-Girder (by BBR India Pvt Ltd.)
Ref:
i) LOANo, NHSRCL-CO/MA/CA/O1/PACKAGE-Ca/6/.2/0HQ975; Dated: 28.10.2020
ii) Clause 5.0; Division 02000; Section VI-3. Employer's Requirements (Technical Specifications) of the
Contract Agreement.
ill) LTC/MAHSR/Pkg-C4/OMS/2021/2285 dated 18.12.2021
iv) Engineers Reply on our Letter no. 2285 dated 27.01.2022
Vv) LTC/MAHSR/Pkg-C4/QMS/2022/3369 dated 20.04.2022
i) Engineers Reply on our Letter no, 3369 dated 16.05.2022
vii) LTC/MAHSR/Pkg-C4/QMs/2022/3772 dated 08.06.2022
Viii) Engineers Reply on our Letter no. 3772 dated 21.06.2022 (NONO)
Dear Sir,
This is in reference to the above cited subject and Contract Clause mentioned in Ref. (i) In continuation to
the Contractor's submission vide Letter under Ref (ii, v & vii), and Engineer's comments vide letter under
Ref. (iv, vi & viii), the Contractor under the cover of this Letter submits the Addendum to the Method
statement for Prestressing Works for Segmental Span, I-Girder and T-Girder (by BBR India Pvt Ltd.).
‘The Contractor requests kind review and approval, please
Thanking you and assuring our best services at all the times,
Page 1 of 2
Te: 491443319 2000 3319 3000 Fax: ¥91 443319 2950 / 4811 wnintecccom
hegistered Office: L&T House, NM. Mora, ollord ste, Mumbo 400 001 ~ HA
{a Consteution — Heavy Cuil infrastructure isa brondofarsen& Tout Limited
(GW 8999entsaspicona7EsLarsen & Toubro Limited
Construction
Heavy Civil Infrastructure
Ep) tarsen a rousro Set
Unit No. 201, 2” Floor Building No. B,
Rundh Village, Piplod — Dunas Road,
Swe cur S8007 nd
Yours faithfully,
For Larsen & Toubro Limited
fay mavisr \E"\
(Slcisse)s )
Enclosed: Addendum to the Method statement for Prestressing Works for Segmental Span, I-Girder and T-
Girder (by BBR India Pvt Ltd.) - MAHSR-L&T-PKG-C4-QAQC-MS-01261, Rev 0
Copy: The Employer (Mr. Amiyansu Das, Chief Project Manager / Surat, NHSRCL)
Page 2 of 2
Tel: 491 4 3319 2000, 3319 3000 Fox #9144 3319 2950/8811 wo. Intec cam
Registered Office: LT House, H.M. Marg, llr Estate, Mumbo ~ 400 001 ~ INDIA
LET Construction ~ Heavy Cuil infrastructure is a brand of Larsen & Toubro Limited
(GW LoassaMHzo4ePLCOON768BBR (INDIA) PVT LTD
No318, 01* & 02% Floors 15# Cross, 06! Main
Sadashivanagar, Bangalore ~ 560080
Karnataka ~ INDIA, Ph No: +91-80-40250000
Em:
[email protected], Web Site: www.bbrindia.co.in
Main Contractor Mis. L&T Construction Ltd i
Project MAHSR Project, C4 Package a
Client Mis. L&T Construction Ltd
W.O. RefNo L&T/MAHSRC4/PROC/LOVAKV/CHM/AH/290921/01,
date : 29/09/21
Document Ref No MAHSR-L&T-PKG-C4-QAQC-MS-01261, Rev 0
Addendum to Method statement for Prestressing
Works for Segmental Span, I-Girder and T-
Girder (by BBR India Pvt Ltd.)
SINO DATE. [ REV NO DESCRIPTION
fi | 18/12/2021 jo For Approval
2 2010472022 a1 Incorporated with comments
3 080672022 @ Incorporated with comments
4 110s?2022 00 AddendumBBR (INDIA) ADDENDUM TO Document No. | MS-NECL-01
PVTLTD METHOD STATEMENT |
#318, 01" & 02"
Floors Prestressing works for Segmental Rev No. a
Eerireesssereten Span, I-Girder &T-Girderat x,y
Bangalore 560080 MAHSR Package-C4 \
Date | 11/08/2022
CONTENTS
10 OBJECTIVE
2.0 SCOPE OF WORK '
3.0 REFERENCES
40 RESOURSES
5.0 CONSTRUCTION METHODOLOGY
60 SAFETY MEASURES
70 INSPECTION, TESTING AND CONTROL
3.0 ILLUSTRATIVE PHOTOS OF POST TENSIONING JACKS
9.0 ANNEXURES
MAHSR-L&T-PKG-C4-QAQC-MS-01261, Rev 0BBR (INDIA) ADDENDUM TO | Document No. | MS-NECL-O1
2vELED| METHOD STATEMENT
#318, 01" & 02
\
: ple Prestressing works for Segmental | Rev No. {oz
aietioaage” Span, 1-Girder & T-Girder at is
| Bangalore-360080 MAHSR Package-C4 age No |
i | Date | 11/08/2022
1.0 Objective i
‘The objective of this method statement is to describe in detail all the operation connected
with the prestressing works at Segmantal Span, I Girder & T Girder at MAHSR, Package-
(C4 with the help of 406/506/306 jacks as applicable. There are no changes in the following
2.0 Scope of Work: Addemdum Includes
‘Wedge locking pressure calculation '
Calculation part of grip length elongation
Slip at dead end not considered in format |
Calculation of gross clongation — added in stressing format
406 & 506 multi jack diagram and technical speci
3.0 References
No Change
4.0 RESOURCES
4.1 Materials
‘No Change
i 4.1 Plant and Equipment if
42.1 Equipments Required for Stressing i
a) Hydraulic Jack with wedge seating device (306/ 406/506) -3 nos I
5.0 CONSTRUCTION METHODOLOGY A
No Change |
5.2.3. STRESSING OPERATION OF TENDONS 4
‘The jack grip length elongation is predetermind value and it may vary jack to jack
and depends on the jack’s length. The grip length elongation shall be added only
to figure out the gross elongation and it should be subtracted from the actual
cumulative elongation to calculate Net elongation. And it's not necessary to added
MAHSR-L&T-PKG-C4-QAQC-MS-01261, Rev'O_ |BBR (INDIA) | ADDENDUM TO Document No, | MS-NECL-01
PVILTD METHOD STATEMENT
#318, 01% & 029
Is Crecoct ain, PTesttessing works for Segmental Rev No. | 02
085,06 Main, | ,
: | Span, I-Girder & T-Girder at |
Sadashivanagar, — | Page N 9
Bangalore-560080 ‘MAHSR Package-C4 ‘age No |
| Date 11/08/2022
6.0
1.0
8.0
‘on modified elongation (or) + 5 percentage calculation carried out with modified |
elongation value.
The slip at dead end is called wedge engagement into anchorage system and the
movement of wedge seating shall not be considered as wedge draw-in/slip and the |
movement of wedge is compensated at live end anchorage and mm wedge |
draw-in is already considered in design |
‘The wedges are locked by wedge seating device (WSD) and the load is slowly |
transferred to the anchorage system by operating slowly the shutoff valve and D.C |
valve in the purnp. Locking pressure of the WSD is 300K /sq.em for longidutinal |
cables. However, BBR system found 1.5MT is suitable load per wedges/strand |
required for proper locking of wedges in transverse cables. The wedge locking
pressure calculated with the consideration of following
(1) No. of strands in tendon. (2.) effective wedge locking cylinder area, I
“Pressure = Load / Effective Area” |
© Load to be applied for 4 strands = 4x1.5MT = 6,0MT (or) 6000 kgs.
© Load to be applied for 3 strands = 3x1.SMI = 4,5MT (or) 4500 kgs.
© Effective area of the wedge locking device = 46.15 sq.cm (or) 17.561
quem (of) 37.69 sq.om
Pre-Grouting Operations
No Change
SAFETY ya
No Change i
INSPECTION, TESTING AND CONTROL |
‘No change |
ILLUSTRATIVE PHOTOS OF POST TENSIONING COMPONENTS AND |
SPECIAL EQUIPMENTS - Additions as appended i
MAHSR-L&T-PKG-C4-QAQC-MS-01261, Rey 0BBR (INDIA) ADDENDUM TO Document No. MS-NECL-01
PvT LTD METHOD STATEMENT
#318, 01% & 02!
aout Prestressing works for Segmental Rev No. 02
Diciekeesee Span, I-Girder & T-Girder at i
sadshivanagar, .
Bangalore-560080 MAHSR Package-C4 age
Date 11/08/2022,
| i \
! ;
A Oo as I
- ae 1 -
50
406 FLAT BEARING PLATE dee ANCHOR RLOCE
406 ANCHORAGE SYSTEM 406 Wedge
MAHSR-L&T-PKG-C4-QAQC-MS-01261, Rev 0BBR(NDIA4y) ADDENDUM TO Document No. MS-NECL-O1 5
rere METHOD STATEMENT
#318, O1% & 02"
Lh Cees ain, Peestressing works for Segmental Rev No. 02
ross,00% Main, Span, I-Girder & T-Girder at
Se MAHSR Package-C4 | Page No "
| | ate + wosi2022
ate |
at AC
Emr was eo ses
‘rasan
{TORE Db SFR FR 1
i . 06 wu yok ‘|
MAHSR-L&T-PKG-C4-QAQC-MS-01261, Rev 0BBR (INDIA)
PVT LTD
#318, 01% & 02"
Floors
15% Cross,06" Main,
Sadashivanagar,
Bangatore-560080
ADDENDUM TO
METHOD STATEMENT
Prestressing works for Segmental
Span, I-Girder & T-Girder at
MAHSR Package-C4
Document No.
Rev No.
Page No
Date
MS-NECL-01
02
12
11/08/2022
MAHSR-L&T-PKG-C4-QAQC-MS-01261, Rev 0BBR (INDIA) ADDENDUM TO Document No. MS-NECL-01
ee METHOD STATEMENT
#318, O1% & 02"
ioe eee Prestressing works for Segmental Rev No. 02
it eaieat eee Span, I-Girder & T-Girder at
Bangalore-560080 MAHSR Package-C4 Page No 13
Date 11/08/2022
Wedge Locking Pressure Calculation for 406 Jack
Wedge Locking Device -
The Wedge Locking device is a hydraulic Cylinder operated with a hydraulic
power pack used for proper lacking / seating of wedges into the Anchor head by hydraulic force
alter stressing
Force Required for Locking :
[As por BBR system 1.5 MT load per wedge/strand required for proper locking of
wedges. Depending on no of strands the wedge locking load to be calculated & applied
accordingly, As this jack is designed for 4 strands, 6 MT load to be applied for lacking of 4nos.of
strands. Depending on the effective area of the wedge lack cylinder, the pressure tobe applied
as allows
Load to be applied = 6 MT = 6000 kg
{ectve area ofthe wedge locking device = 46.15 s4.cm,
Pressure = Load Effective area = (6x1000)/46.15 = 130 kg/sq.em
Ctajapalts Koc
Authorised Signatory
MAHSR-L&T-PKG-C4-QAQC-MS-01261, Rev 0BBR (INDIA) | ADDENDUM TO | Document No. MS-NECL-OL
PVTLTD = | METHOD STATEMENT
#318, 01% & 02" |
| it
Semone | Prestressing works for Segmental Rev No. 102
cement | Span, -Girder & T-Girder at 4
Bangalore-560080 | AHIR Package-C4 Page No it
i Date i 11/08/2022
3a
vex coat oA
y
i
|
506 JACK
MAHSR-L&T-PKG-C4-QAQC-MS-01261, Rev 0BBR (INDIA) ADDENDUM TO Document No. MS-NECL-01
PVT LTD METHOD STATEMENT
#318, 01% & 02"
eee Prestressing works for Segmental _ Rev No. 02
Seen Span, I-Girder & T-Girder at,
Bangalore-S60080 MAHISR Package-C4 eee a
| Date 11/08/2022
Technical Data & Specifications of 506 Multi pull Jack i
Sino Specification Units | Type of Jack (140MT Multi
Jack)
i Maximum Force MT 140 |
2 Maximum Pressure Kg/Sq.cm 620 |
3 ~~ Active piston area ‘Sqem 226.194
4 Maximum stroke mam 100
3 Length of ack mm 540
6 | ___ Width of jack mm 258x591
Technical data & Specification for wedge locking cylinder
1 Effective Area Sqem 17.56
2 Load at 340 Bar Mr 6
3 ‘Working pressure Kg/Sq.cm 340
MAHSR-L&T-PKG-C4-QAQC-MS-01261, Rev 0BBR (INDIA) ADDENDUM TO Document No. MS-NECL-01
ee METHOD STATEMENT
Floors Prestressing works for Segmental Rev No. 02
15 Grose (Mai, Span, I-Girder & T-Girder at
Sadashivanagar, Page No 16
Bangalore-560080
Date 11/08/2022,
Wedge Locking Pressure Calculation for 506 Jack
Wedge Locking Device -
The Wedge Locking device is a hydraulic Cylinder operated with a hydraulic
power pack used for proper locking / seating of wedges into the Anchor head by hydraulic force
after stressing,
Force Required for Locking :-
As per BBR system 1.5 MT load (Force) per wedge/strand required for proper
locking of wedges. Depending on no. of strands the wedge locking load to be calculated &
applied accordingly. As this jack is designed for 4 strands, 6 MT load to be applied for locking of
nos of strands. Depending on the effective area of the wedge lock cylinder, the pressure to be
applied as follows
Load to be applied = 6 MT = 6000 kg
Effective area of the wedge locking device = 17.561 sq.cm.
Pressure to be applied = Force/ Effective area = (6x1000}/17.561 = 340 kg/sqjcm
Con fapatte Keo
Authorised Signatory
MAHSR-L&T-PKG-C4-QAQC-MS-01261, Rev 0BBR (INDIA)
PVT.LTD
#318, 01% & 02
Floors
15 Cross,06" Main,
Sadashivanagar,
Bangalore-560080
ADDENDUM TO
METHOD STATEMENT
Prestressing works for Segmental
Span, I-Girder & T-Girder at
MAHSR Package-C4
Document No.
Rev No.
Page No
Date
MS-NECL-01
02
17
11/08/2022
MAHSR-L&T-PKG-C4-QAQC-MS-01261, Rev 0BBR (INDIA)
PVT LID
#318, 01" & 02"
Floors
15% Cross,06" Main,
Sadashivanagar,
Bangalore-560080
140 TON HYDRAULIC JACK WITH WSD_
ADDENDUM TO
| Document No. | Ms.NECL-O1
METHOD STATEMENT |
LRevNo. | 02
Prestressing works for Segmental
Span, I-Girder & T-Girder at |
MAHSR Package-C4 Page No 18
Date 11/08/2022
406 JACK -01
MAHSR-L&T-PKG-C4-QAQC-MS-01261, Rev 0BBR (INDIA) ADDENDUM TO
Document No. MS-NECL-O1
PVTLTD METHOD STATEMENT
#318, 018 & 024
aoa eae a Prestressing works for Segmental Rey No. 02
eee Span, I-Girder & T-Girder at
Sadashivanagar, a | Page Ne 19,
Bangalore-560080 MAHSR Package-C4 peene |
| Date 11/08/2022
‘Technical Data & Specifications of 406-01 Multi pull Jack
Slno Specification Units ‘Type of Jack (140MT
‘Multi Jack)
i Maximum Force MT 140
2 Maximum Pressure |“ Kg/Sq.cm 620
3 ~~ Active piston area Sqcm ~ 226.194
i 4 Maximum stroke [mm 100
3 Length of Tack mm 540
6 Width of jack | mm 258x310
Technical data & Specification for wedge locking cylinder
1 Effective Arca Sq.om 37.69
2 Toad at 160 Bar MT 6
3 Working pressure KgiSqem 160
MAHSR-LAT-PKG-C4-QAQC-MS-01261, Rev 0200
|
140 (OD)
110 (OD)
= ae
a
a REDUCER
qf: (HDPE )
ssouon free Bt eae
|
(SURFACE FINISH
IRa VALUE - m
HOPE REDUCER | r
DRAWING No.) BM - 04 - 03
©50 390
44
. WAR RRIRLE Gp
s 35 x 3
ga 3 ao
a 8 8 3s .5
a —< LPS
SOR RRRPRBELP LILI LILI
4)
DET-X .
. 19 06 TRUMPET |
gl 7 (HDPE )
g N
z ol
z “
2
5 ed sue [pou samen a
Be Hore mUWFET 905 ee ©
i 8 BBR (INDIA) Pvt. Ltd. | |
2 SPECIAL THREAD, & ) -04-
gs SPECIAL THREAD, RIGHT HAND HELIX SUITABLE TO BEARING PLATE CASTING od ey ee | DRAWING No. BM - 04 - 03
22 Sencalumi~seatt', wamatacemodules of elascity of sand)
BBR INDIA PVT. LTD. PRESTRESSING FORMAT MAHSR C4
[Name ofthe work #
Span Ne. Dae.
[Location Start Time:
Span Length (Mis): Finish Time:
[Span No [Date of Last Segment Concrting
No of Strands [Min. Cube Strength Sepment for Span
No of Cables (Totaly [Cube Strength for Stsssing:
stressing Cable No: [Prestressing jack informtion
THT Strands Details Make & No.
[Coa No: [Stessing Ram area in Gr
es Value in KNisma™ (eotual [Lock off Ram area in Cx
[Locking Presure in Kyu
[Aste Value in mex (actual ross
sectional of area elastity of strand)
[Grip Length with Jack (eum)
| Wedge Set Final Slip (mm)
Length of Strand (Anchor to Anchor
end)
[Yack effeieney «
Pressure Gauge No. Siessing End):
ane De Data(As Drawing)
a sig Dat sper Drawing)
Wedges:
Sheathing Dewtats [GEC Danger No
[EVE Valu of Sdn Kwan
JMAKE Teoretca! Modulos of Elasticity of
1D (om) Stand)
roves [AY Valo Stands nm
Maer Tt CTheoreteat Dein Elongation (an)
hicks on Lak Free (KN)
Design longs Ther, charea AWS 7
Modified Elongation | "Thero, Modulus of lastilty Es? Max. 45%
Actual Area A'a'x Actual Bsa mien
[Gros ongaton alain: Model dongatlon + grip Inga clongaton nm) + wedge dan lowancet@inm)
Ma. 5%
Modified Pressure acing Force
= Ram Area Jack eft
ren x Tack effceney ah
STRESSING REPORT
TCorrespondeace Cable N
Peswre Tlongaton Gam Tongaton Gam)
Psion Radin SLN ston
(Ky/Sqem) ot * [Ditference|Cumulath P (Ky/Sqem) Piston Reading Difterence| Cumuls
3 30 1 0 [350
50__| “100 2 [3500
100 [150 aan 450
50200 [480500
Tato Concion 3300550
30050 5
250. 300. 7
4) Camutave Eongton om)
ip Length Elongation cam) ‘6 lengnion
1C) Slip at Live end (mm) % Pressure
[Net Elongation (mm) A - (BHC) After 24 hrs Slip
extension achieved i ess than requfe Wh desired jacking force Yes/No
tees inereate Jacking force (6 % Maximum)
Percentage Rxcest/ Lex Hongation Achieved
BBR GNDIA) PYTLTD IFAT Consructon Tinga? Reprosatave
Date: Date:
ame: Name:
senate: stenatre: