The document is a site safety inspection report for a construction project. It contains 25 sections reviewing different safety aspects on site such as electrical installation, fire safety, scaffolding, waste management, and worker welfare. For each section, observations and comments are included along with notes on corrective actions needed.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
55 views5 pages

Site SHE Inspection

The document is a site safety inspection report for a construction project. It contains 25 sections reviewing different safety aspects on site such as electrical installation, fire safety, scaffolding, waste management, and worker welfare. For each section, observations and comments are included along with notes on corrective actions needed.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 5

Soma Enterprise Limited

DFCC- Western Freight Corridor Project


Site SHE Inspection Report
(By site Safety Supervisor, Sub-contractor and Execution Supervisor)

Name of Construction Site / Bridge No.: ________________________ Date: _________________


Inspected By (Name): _______________________________________ Designation: _______________________________

REMARKS CLOSING DATE &


Sr. SIGN
SUBJECT OBSERVATIONS/COMMENTS (Corrective Action Taken/to be
No.
Taken)
01 Electrical Installation
 Provision of ELCB / RCCB - functional
 Proper earthing of equipment & Panel Boards
 Cable Connection & Laying
 Shed / Cover for Panel /switch boards
 Barricading transformer, panel/switch boards

02 Piling Rigs (Tripod)


 Third party certification of winch, pulleys, chain pulley
blocks & other lifting tackles
 Winch machines –provision of guards
 Tripod Shoe/ integrity of piling rig
 Condition of wire rope

03 Hydraulic Rigs
 Third party certification of rig
 Condition of the rig & hydraulic pump
 Regular maintenance records

Page No. 1 of 5
04 Gas Cutting & Welding Set :
 Condition of Pressure gauges, cylinder valve key
 Condition of Hoses, cutting torch and attachment with
nozzles with worm clips
 Provision of Flash back arresters
 Use of gas cylinder trolleys
 Use of Face PPE –Face shield/ spectacle/leather hand
gloves/apron.

05 Crain/Hydra/JCB used at site


 Working conditions of machines
 Provision of reverse horn
 Provision of flagman
 Third party certification for lifting equipments

06 Site Housekeeping Status at site


 Walkways, Passages kept clear of material
 Scrap bins / dust bins available on site
 Stacking of construction material in safe manner
 Condition of access road, work place

07 Fire Fighting Equipments


 Adequate provision of Fire extinguishers, Sand buckets,
Fire Stands
 Site personnel trained in using fire extinguishers
 Periodic Inspection of Fire extinguishers
 Empty/used fire extinguishers at site

08 Batching Plant
 General condition of equipment
 Electrical equipment
 Provision of hand rail on work platform and ladder
 Use of PPE –safety footwear, helmet, dust mask, hand gloves
 Washing of millers, batching plant and its disposal
 Access

Page No. 2 of 5
09 Site fencing and Barricading
 Fencing of the construction site
 Provision of barricades on access , cross over etc
 Provision of separate access for villagers (where
required).
 Open bores, excavations, any other area
 Barricading transformer, DG sets, Panel board

10 Scaffolding and work platforms


 Scaffolds standard
 Planks/Jalis provided on work platform
 Provision of base plates
 Provision of handrails, mid rails and toe boards.
 Provision of safe access to and from platform
 Use of safety harness by the workers

11 First Aid Box


 Availability of all the first aid items as per list
 Cleanliness and hygienic conditions of box
 Record of injuries maintained as per format

12 Chain Pulleys, Slings, Shackles etc. Observations


 Condition of lifting tackles
 Third party certification

13 Spent bentonite collection/ disposal


 Provision for collecting spent bentonite (Pits/pan)
 Provision of barricades and display board
 Overflow of bentonite solution into river stream
14 Waste concrete washing
 Provision for collecting washing of millers, batching plant
and waste concrete
 Area barricaded and board displayed

Page No. 3 of 5
15 Dust control
 Water sprinkling arrangements
 Workers with Nose masks, Goggle
 Proper material handling
16 Welfare related Observation
 Labor Camp status
 Provision of Toilets
 Provision of Drinking Water
 Provision of Rest Shed at site
17 PPEs Observation
 PPE- issued to all the workers. Any short fall?
 Use of PPE by the workers and staff?
 Non-compliance, if any.
18 Issuance of I D Cards to all workers
 All workers have been covered (Status)
 Workers attendance register/muster roll maintained
 Safety induction- All workers are covered?
 Status of medical check-up of the workers.

19 Gas cylinder storage / handling


 Cylinder storage area with shed, if required
 Fire Extinguisher
 Display board

20 Fuel storage / handling


 Fuel storage area with shed, if required
 Fire Extinguisher
 Display board
 No smoking sign

Page No. 4 of 5
21 Lighting and Illumination for night Work:
 Provision of adequate lighting in work area, access ways,
stores, offices, rest sheds, parking areas etc.
 Adequacy of illumination

22 Safety Signage
 Safety Boards
 Environmental Protection Boards
 Health & Hygiene Boards
 Electrical safety & Fire prevention Boards

23 SHE manual and other documents


 SHE Manual available at site
 SHE Procedure Manual
 Records of SHE activities
 Accident/injury record.

24 Display of SHE Policy & Drug & Alcohol Policy

25 Emergency Response Plan


 Availability on Site
 Emergency Contact nos. displayed?
26 List of Tie Up hospital with emergency Call Nos. etc.
displayed?

*NOTE- Write OK if there is no deficiencies / defects / deviation from safe practices. *Remarks: Corrective action taken

(Name & Sign):

_____________________ ________________________ _______________________ _________________


(1) Site Safety supervisor (2) Sub-contractor supervisor (3) Site Supervisor/ Engineer (4) Jr. SHE Manager

Page No. 5 of 5

You might also like