SK Pharma-12022023151112
SK Pharma-12022023151112
Location UMBERGAON
Engineering
Production
Qua‖ty Assurance
PURPOSE .................................................................................................................. w
RESPONSIBILITIES ..................................................................................................... w
REQUALIFICATI0N .................................................................................................... w
MACHINE DESCRIPTION ............................................................................................ 鼻
EQUIPMENT IDENTIFICATION .................................................................................... 驿
EQUIPMENT LOCATION ............................................................................................. 霸
INSTALLATION QUALIFICATION PROCEDURE ............................................................. …
TECHNICAL SPECIFICATIONs OF EQUIPMENT′S .......................................................... m
ooooo EQUIPMENT COMPONENTS ...................................................................................... m
ob MATERIAL OF CONSTRUmON ................................................................................ H 。、
Hb IDENTIFICATION OF COMPONENTS FOR CALIBRATION ............................................ H 黜
Nb VERIFICATION FOR INSTALLATION .......................................................................... H 黜
wb METHOD FOR CHECKING THE LEVEuNG OF THE EQUIPMENT AND ALIGNMENT ....... H 黜
pb DRAWINGS ............................................................................................................. H 阗
…b DEHCIENCY (IF ANY) AND CORREC寸WE ACTION REPORT.......................................... H 阗
mb ACCEPTANCE CRITERIA ........................................................................................... H 阗
黜 o REMARKS (IF ANY) .................................................................................................. H 阗
阗b SUMMARY.............................................................................................................. H o
o) b CONCLUSION .......................................................................................................... H u)
ob POST-APPROVAL SIGNATURES ................................................................................ H “>
Hb LIST OF ABBREVIATIONS ......................................................................................... H 也
Nb APPENDIX ............................................................................................................... N o
′ ′j
Rev No. oO/13.07-2019 翊巳壹RG丸〇N ′
,)"
'
"`′: 【
DOC NO. sKPMPL/Qua"ty/02 Page 2 of 20
Lo PURPosE
1.1 The purpose of this protocol is to provide an outline for the InSta‖ation Qua‖fiCation of
Equipment for Static attributes to Ver询 that :一
1,1.1 Each insta‖ed sub Component Comp"es With the engineering design and equipment data
sheets/ specifications, agreed upon With the manufacturer.
1,1.z A‖ supporting utilities are connected.
1.1.3 A‖ critical instruments have been identified for calibration.
1,1.4 The equipment is insta‖ed as per the laid down specifications.
1.1.5 No unauthoriZed or unrecorded modifications have taken place.
1,1.6 Required testing reports are available.
1,1,7 Standard Operating Procedures (SOPs) have been identified and listed.
2-0 REsPoNslBluTlEs
2-1 The validation group Comprising of a representative from each of the fo‖oWing departments sha"
be responsible for the overa‖ compliance With this protocol.
2-1.1 Project Depa枕ment
2-1.2 Engineering Department
z-1-3 Production Depa忱ment
2-1.4 Quality Assurance Department
z.2 The Projects and Engineering Department sha" be responsible for checking proper insta‖ation
and recording installation data as per the procedure outlined in this protocol.
2.3 The Quality Assurance Department sha" be responsible for the final review of the Qualification
Documents and its compliance to meet the acceptance criteria of the Insta‖ation Qualification
Protocol.
2.4 The summary repo忱 sha" be approved by the head of Project, Engineering, Production and
Quality Assurance.
3.o REQUAL旧CATmN
3-1 Insta‖ation Qua1ification to be re 一 qualified on:
3.1.1 Replacement of major component of the equipment With a neW component。
3,1.2 Any major modification in the existing equipment.
3,1.3 Shi代ing of the equipment from one 1ocation to another.
5.0 EQ…PMENT…ENT一F一cAT一oN
The subjected equipment is identified as
Model No. sKPMPL一 MV- 2000 L (Given by manufacturer)
60 EQUIPMENT LOCATION
sr. No. subject Remarks
1. Location
2. Location Code
3. Floor
4. Area
5. Room Name
7.1.1 Identi抨 the Critical Components of equipment and Veri抨 that the Components are
COmp一ying as per deSired specifications. Record the ObseWatiOns in the data sheet.
Check the MOC of the component. Record the obse…ation of the MOC in the data sheet.
Identi碲 the Ut‖ity Supp‖eS required for equipment operation. Veri押 that Utilities.
Identi坪 the critical instruments supp‖ed with the equipment or insta‖ed on the ut…ty
supply line. Veri坪 that instruments are as per the desired specifications. Review the
calibration status of the instruments Record the availability of the Calibration record
provided bv the supplier.
7,1.5 Check the installation of equipment:
7.1.5.1 To Veri抨 the location of installation as per the equipment layout.
7.1.5.z To veri抨 the proper assembly of the components as per the equipment drawings.
Record the insta‖ation location and verification of assembly in Test Data-
7.1.5.3 To check the leveling and alignment as per the procedure given. Record the
obseWation in the Data Sheet.
7.1-6 List the avai1able drawing and record the Ref. No. for their location /availability in the
format.
7.1-7 Record the Deficiency (if any) and report the Details of Action Taken.
7.z Note:
7.2.1 Record a‖ the observations against the respective specifications, mentioned in the specific
check points, (the specifications are extracted from the Purchase order / Manua1 /
Manufacturer′s Recommendations).
7.z.2 WhereVer specifications are not mentioned, record the observations as per the statement
of the data sheet.
7.2.3 ln case of non-compliance, give the eXplanation/justificati0n in the deViation format.
7-2.4 When more than one unit of the same type exists, replicate the corresponding data sheet
to match and uniquely identi抨 each page.
7.z.5 ln case of multiple options; clearly identi种 the one, Which has been supplied.
7.2.6 The calibration certificates of the instruments sha" be traceable to National/International
standards.
7,2,7 Define a‖ technical terms and abbreViatiOns in the appendiX.
8,z vesse一:
8,3 jacket :
9.5 Mechanical seal for Top EntrY Padd一e Anchor with scrapper Agitator 一 1 No.
Description specifications Yes/No checked By
Type Single Ca枕ridge
Make Leak proof engineering
Size 70 mm
seal face SiC/SiC
Location On Top Motor
一DE- Code MS…s70
serial NO” 22090816
MOC SS 304
Location 1. co0‖ng Water inlet
2. coo‖ng Water outlet
3. Jacket Drain
1DE, Code PBV40
Operating Voltage 24 V Dc
Moc Brass
Location On Vacuum Pump
一DE. Code SV-1
MoC SS 316L
Location On Bottom DiSh
一DE. Code Ts一1
MOC SS 316L
Location On Top DiSh
一DE. Code CG-100
Serial No. PG220801360002
checked BY Verified BY
Date : Date :
16.0AccEPTANcE cRITERIA
1. Insta‖atiOn Qua‖ficati0n sha" be considered acceptabie When a‖ the conditions specified in
Various forms have been met.
2. Any deViati0n from the acceptance criteria of the specific check point sha" be reported and
decision should be taken for the rejecti0n, replacement or rectification of the
equipment/component.
19.0coNcLUSIoN
MANUFACTURING VEssEL bearing Machine No. 754 ls / ls Not Qua‖抨ing the InSta‖ation
Qualification test as per the guideline described in this Protocol. Can Be / Not Be tested for its
Operational Qualification as per Protocol No. I吖754/2022-23.
(HoD- Pmduction)
(HOD 一 Engineering)
21.ousT OF ABBREV一AT一oNs
URS User Requirements Specification
CGMP Current Good Manufacturing Practices
DQ Design Qualification
FAT Facto吖 Acceptance Test
HZ HertZ
V Voltage
HP HorsepoWer
KW KiloWatt
RPM Revolutions per minute
P&lD Piping & Instrumentation Drawing
TC TricloVer
VFD Variable Frequency Drive
sKPMPL S. K. Pharma MachineW PVt Ltd
MV Manufacturing Vessel
PG Pressure Gauge
Max- Maximum
oW Quantity
粳毽
Rev NO. 00/13.07.2019 堕
藿斌 <
1. Manufacturer′s Manual
2. To be Supp‖ed With the InSta‖ati0n qualifiCati0n documents-
sr, No. Description
1. Operational manual.
2. Test Certificate of Components.
3. Material of Construction Ce忱1fiCateS.