NTXR Inspection LHB

The document lists 13 proposed modifications and upgradations for NTXR inspections during shop schedules. It provides descriptions of the modifications, references, status of work, and remarks. Key items include modifications to bogie frames, suspension elements, under-slung mountings, air brake and wiring systems, and checking of bogie frames and bolsters for corrosion.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
1K views3 pages

NTXR Inspection LHB

The document lists 13 proposed modifications and upgradations for NTXR inspections during shop schedules. It provides descriptions of the modifications, references, status of work, and remarks. Key items include modifications to bogie frames, suspension elements, under-slung mountings, air brake and wiring systems, and checking of bogie frames and bolsters for corrosion.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 3

List of modification/Upgradation items proposed for NTXR inspection during shop schedule attention (SS-II/SS-III)

Shop S. No. Description of Modification / Reference Letter Remarks Remarks and Material procurement
Upgradation status

BOGIE 1 CAI regarding identification for SV.FIAT Dated 27.12.2023 with RCF Being Done -
differentiating LHB bogie frames CAI No. CAI/RCF/MECH/LHB/053.
based on primary bump stop height.

BOGIE 2 Suspension elements (primary outer & SV.FIAT Spring dated 21.12.2023 Being Followed 100% -
inner springs with their colour codes,
thickness of discs/compensating rings
& type of bogie frames) in primary
suspension of LHB AC & Non-AC
coaches

CF,POH, 3 Inspection of under-slung mounting MC/LHB/MM Dated 19.09.2023 For workshop 5 items. Action to be taken for DPT of major
ELECT brackets during workshop schedules Everything being done except DPT of mounting brackets in under frame
of ICF & LHB design coaches major mounting brackets during SS-II, during SS-II, SS-III and POH.
SS-III and POH.

CF, 4 Instructions for proper fitment of SV. AS. FIBA, dated 20.02.2023 Being followed.
BOGIE installation lever assembly of air
suspension control equipment

CF 5 Instructions for provision of dirt SV. AS. FIBA, dated 20.02.2023 with Being Done but not 100% due to Action to be taken for 100 % attention
collector in BP line. RCF CAI No. CAI/RCF/MECH/LHB/040 manpower shortage.
Rev.00 and ICF CAI No. B-2022/07
regarding provision of dirt collector in
BP line.
BOGIE 6 Modification in pneumatic pipeline SV. AS. FIBA, dated 16.08.2022 with Pneumatic arrangement with 4/5 Being Done Action to be taken for 100 %
layout of air spring, air suspension RCF CAI No. CAI/RCF/MECH/LHB/024 FIBA except attention
control equipments and FIBA with Rev.01, CAI/RCF/MECH/LHB/034 modification of
provision of SAE 100 R3 grade Hose Rev.00 and ICF CAI No. B-2021/02 Piping from
Pipe. Rev. 01 dome to
levelling valve

BOGIE Bolster for RCF bogie with Being Done. To be initiated for Material
Air spring (Presently old procurement as per new drg.
drg. Brkt. being
used. New drg.
Bracket to be
procured)
Air suspension & FIBA Not being done Action to be taken for 100 %
arrangement for AC/NAC attention

BOGIE

Welding parts on under Not being done Action to be taken for 100 %
frame attention

CF Protection cover for levelling Not being done Action to be taken for 100 %
valve attention
POH Pipe laying for water under Not being done Action to be taken for 100 %
the coach attention
POH Pipe laying for water on Not being done Action to be taken for 100 %
underframe for LHB AC attention
Chair Car
CF 7 Modification in air brake pipeline & MC/LHB/Brake Dated 24.06.2019, Being Done
associated fittings in LHB Coaches 23.08.2019, 17.12.2019, 04.08.2020 &
07.12.2020.
BOGIE 8 Revised wiring scheme for WSP MC/LHB/Brake Dated 27.02.2019 Not being done. 100 nos sanctioned in RSP 22-23.
system of LHB Coaches. . NSR under preparation.
100 nos to be initiated through out souorce
CF 9 Provision of tertiary locking pin MC/BLB/CBC Dt 07.07.2021 and Being done. -
arrangement in AAR H type tight lock MC/BLB/CBC Dt 28.02.2023
CBC with BDG to RDSO spec
RDSO/2011/CG-03 (Rev-03)

CF 10 Inspection and replacement of silent MC/BLB/CBC Dt 10.06.2022 Being followed. -


block during SS-II schedule in AAR H
type tight lock CBC with BDG to
RDSO spec RDSO/2011/CG-03

CF 11 Projection of BP and FP metal pipe RDSO’s letter no. MC/LHB/Brake dtd Not followed Started from 20.03.2024
from headstock as specified 31.01.24

CF 12 Modification in wire rope arrangement RDSO L. No. MC/LHB/Brake dated Being done.
fitted with M/s Faiveley Transport 27.07.2020 But not regularly
brake system Advised FTIL for
implementing else will be
done departmentally.
BOGIE 13 Bogie Frame and Bogie Bolster Para 10.6 of CAMTECH manual for Being followed Action to be taken for 100 % attention
attention during SS-II/SS-III for LHB coaches (2022)
corrosion checking and painting

*Shop in charges is advised monitoring the above modification activities and Necessary Material procurement planning to be initiated immediately.