0% found this document useful (0 votes)
58 views29 pages

AV100

Uploaded by

DILSHAD AHEMAD
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
58 views29 pages

AV100

Uploaded by

DILSHAD AHEMAD
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 29

TASK

task_code status_code wbs_id task_name start_date


Activity ID Activity Status WBS Code Activity Name (*)Start
A1000 Not Started AV100.1 Excavation 18-Dec-17 8:00:00 AM
A1010 Not Started AV100.1 Blinding 20-Dec-17 8:00:00 AM
A1020 Not Started AV100.1 Foundation 22-Dec-17 8:00:00 AM
A1030 Not Started AV100.1 Columns 05-Jan-18 8:00:00 AM
A1040 Not Started AV100.1 roof slab 23-Jan-18 8:00:00 AM
A1050 Not Started AV100.2 Block Work 23-Jan-18 8:00:00 AM
A1060 Not Started AV100.2 Plastering 01-Feb-18 8:00:00 AM
A1070 Not Started AV100.2 Painting 08-Feb-18 8:00:00 AM
A1080 Not Started AV100.2 Doors and Windows 13-Feb-18 8:00:00 AM
A1090 Not Started AV100.3 Procurement 18-Dec-17 8:00:00 AM
A1100 Not Started AV100.3 Installing Bulbs 11-Jan-18 8:00:00 AM
A1110 Not Started AV100.3 Wiring 08-Jan-18 8:00:00 AM
A1120 Not Started AV100.4 HVAC 20-Feb-18 8:00:00 AM
A1130 Not Started AV100.4 Firefighting 20-Feb-18 8:00:00 AM
A1140 Not Started AV100.4 Piping 13-Feb-18 8:00:00 AM

Page 1
TASK

end_date resource_list delete_record_flag


(*)Finish (*)Resources Delete This Row
29-Dec-17 5:00:00 PM
21-Dec-17 5:00:00 PM Masons, Concrete, Masons, Concrete
04-Jan-18 5:00:00 PM
22-Jan-18 5:00:00 PM
12-Feb-18 5:00:00 PM operator
31-Jan-18 5:00:00 PM
07-Feb-18 5:00:00 PM Masons, CEMENT, SAND, Masons, CEMENT
12-Feb-18 5:00:00 PM Water
19-Feb-18 5:00:00 PM
05-Jan-18 5:00:00 PM
17-Jan-18 5:00:00 PM
10-Jan-18 5:00:00 PM Wires, Electrician, Wires
05-Mar-18 5:00:00 PM
28-Feb-18 5:00:00 PM
19-Feb-18 5:00:00 PM Pipe Fitter, Plumbers, Pipes, Pipe Fitter, Plumbers, Pipes

Page 2
TASKPRED

pred_proj_ proj_id PREDTASK TASK__PRpred_task_ task_id PREDTASK TASK__ta pred_type lag_hr_cnt PREDTASK
(*)Predeces(*)Successo(*)Predec (*)Succes PredecessoSuccessor (*)Predece (*)Success Relationsh Lag(d) (*)Predeces
AV100 AV100 AV100.1 CAV100.1 CA1000 A1010 ExcavationBlinding FF 0 Not Starte
AV100 AV100 AV100.1 CAV100.1 CA1010 A1020 Blinding FoundationFS 0 Not Starte
AV100 AV100 AV100.1 CAV100.1 CA1020 A1030 FoundationColumns FS 0 Not Starte
AV100 AV100 AV100.1 CAV100.1 CA1030 A1040 Columns roof slab FS 0 Not Starte
AV100 AV100 AV100.1 CAV100.1 CA1030 A1050 Columns Block Wor FS 0 Not Starte
AV100 AV100 AV100.2 AAV100.2 AA1050 A1060 Block Wor Plastering FS 0 Not Starte
AV100 AV100 AV100.2 AAV100.2 AA1060 A1070 Plastering Painting FS 0 Not Starte
AV100 AV100 AV100.2 AAV100.2 AA1070 A1080 Painting Doors and FS 0 Not Starte
AV100 AV100 AV100.3 EAV100.3 EA1110 A1100 Wiring Installing FS 0 Not Starte
AV100 AV100 AV100.3 EAV100.3 EA1090 A1110 Procureme Wiring FS 0 Not Starte
AV100 AV100 AV100.4 AV100.4 A1140 A1120 Piping HVAC FS 0 Not Starte
AV100 AV100 AV100.1 CAV100.1 CA1040 A1120 roof slab HVAC FS 0 Not Starte
AV100 AV100 AV100.4 AV100.4 A1140 A1130 Piping Firefighti FS 0 Not Starte
AV100 AV100 AV100.1 CAV100.1 CA1040 A1130 roof slab Firefighti FS 0 Not Starte
AV100 AV100 AV100.1 CAV100.1 CA1040 A1140 roof slab Piping FS 0 Not Starte

Page 3
TASKPRED

TASK__staPREDTASK TASK__rsrdelete_record_flag
(*)Successo(*)Predece (*)Success Delete This Row
Not Starte OP-1
Not Starte OP-1
Not Starte
Not Starte op
Not Starte
Not Starte OP-1
Not Starte OP-1
Not Starte
Not Starte OP-2
Not Starte OP-2
Not Starte OP-3
Not Starte op
Not Starte OP-3
Not Starte op
Not Starte op OP-3

Page 4
PROJCOST

task_id cost_name TASK__status_code target_cost


Activity ID Expense Item (*)Activity Status Budgeted Cost(SR)
A1090 Buy air tickets Not Starte 1500
A1000 rent of site Not Starte 50000

Page 5
PROJCOST

act_cost remain_cost total_cost delete_record_flag


Actual Cost(SR) Remaining Cost(SR) At Completion Cost(SR) Delete This Row
0 1500 1500
0 50000 50000

Page 6
RSRC

rsrc_short_name
Resource ID
Project Costs
Site L
Design
Structure L
Ext. Finishes L
Int.Finishes L
Mech L
Elev L
Elec L
Site NL
Site M
Structure NL
Structure M
Ext. Finishes NL
Ext Finishes M
Interior Finishes NL
Interior Finishes M
Elev NL
Elev M
Mech NL
Mech M
Electrical NL
Electrical M
Foundation L
Foundation NL
Foundation M
Foundation A
Foundation L-1
Structure L-1
Subcontractors
Survey
Innovative Resources
IS
Purchasing
Design Engineers
Management
Highway Project
Construct
PRINTCST
ENGR Project
School
GR
PK
WR
AC
JY
CostEng
PMs

Page 7
RSRC

OR
StructEng
InstrEng
Highway Labor
School Subs
Construct Nonlabor
ENGR Labor
ED
ElecEng
Exec
CivilEng
Construct Labor
AM
Schedulers
Highway Material
Arch
MechEng
Programmer
Fld Eng1
Rghcarp
Machinist
Painter
Electrcn
GENCNTR
Sfwr Eng
HV2KATYD
Plumber
Hvac Tec
Excavatr
HV1TEDG
Finisher
Irwk
Fld Eng2
Op Eng
ME1MARKH
Fld Eng3
Elev Inst
ST2JENM
PM1BOBP
PM1SUEW
Mason
CT2FRANK
CV2MIKEH
EE1BARBW
EE2BILLS
Hdwr Spec
PE3
PEXEC
Fnshcarp
Flrlyr

Page 8
RSRC

ME2DEBO
Laborer
ME1GREGV
PAVER
ST1LISAH
ST2GREGM
STRIPPER
SHEETING
CARP
FOREMAN
DRIVER
ELEC
LABOR-G
LABOR-S
Piping Mat
IE2PAULK
IE2PETEL
CV1KERIB
IE1BRETS
AR1LORIW
CT1KELLY
OPERL
LANGPAV
POSTDRVR
OPERATOR
BRISTLE
JOLT
STONY
HASKLE
CNTYLN
ALPHA
LOADER
SPREADER
CV2WILLS
ROLLER1
ROLLER2
TRUCK
TRUCKD
VIBRATOR
CRANE
DOZER
COMPR
GOCRETE
REGENT
Edison Resources
Cont
02
Demo
Lofty Resources
LH Labor

Page 9
RSRC

LH Non-Labor
LH Expenses
LH Material
LH Subs
01
11
07
15
08
05
03
10
06
09
12
14
16
04
Curb
Earth
Pave
Conc
Drain
Surv
Irrig
Mas
Tilt
Door
Fin
Win
Glaz
Landsc
Dry
Plas
Tile
AccC
WdFlr
Oflr
Paint
Steel
Spec
Clean
Insul
Roof
Clear
Ath
Blind
Elev
HVAC
Plum

Page 10
RSRC

FS
Punch
Ins
FGC
Bond
Conting
OHP
CF
Environmental
Geotech
Demolition
Concrete
Masonry
Structural Steel
Specialty Metals
Rough Carpentry
Finish Carpentry
Millwork Carpentry
Thermal Protection
Sheet Metal
Roofing
Glass
Drywall
Finishes
Flooring
Painting
Specialties
Pools
Conveying
Fire Suppression
Plumbing
HVAC Sub
Integrated Automatio
Electrical
Communications
Electronic Safety
Earthwork
Paving
Utilities
Process
Landscaping
Carptr
Electr
EMA
JLA
KAN
JRO
LBA
ATE
BBU

Page 11
RSRC

MMA
MNE
SRO
BFE
TCA
JGA
DLO
HEP
TNI
JME
SKE
SFO
JMI
SJE
CSA
JDI
BSM
JMO
ACO
JMA
RCR
MMO
ASW
GC
Frame
Cranes
Stucco
LABOR-H
Project Specific
CV1ERUA
EXT
IMC
MKC
School Labor
School Carp
mikeb
bobm
trents
johnm
charlesn
frankl
georgea
rajp
team
op
OP-1
OP-2
OP-3
OP-4
MAC-1

Page 12
RSRC

MAT-1
MAT-2
MAT-3
MAT-4
MAT-5
MAT-6
MAT-7
MAC-2
MAT-8

Page 13
RSRC

rsrc_name rsrc_type unit_id


Resource Name (*)Resource Type Unit of Me
Project Cost Breakdown Nonlabor
Sitework Labor Costs Labor
Design Costs Labor
Structural Labor Costs Labor
Exterior Finishes Labor Cost Labor
Interior Finish Labor Costs Labor
Heating, Air Conditioning & Plumbing Labor Costs Labor
Elevator Labor Costs Labor
Electrical Labor Costs Labor
Site Non Labor Nonlabor
Site Material Material Hour
Structure NL Nonlabor
Structure Material Material Hour
Exterior Finishes Nonlabor Nonlabor
Exterior Finishes Material Material Hour
Interior Finishes NL Nonlabor
Interior Finishes Material Material
Elevator Nonlabor Nonlabor
Elevator Material Material Hour
Heating, Air Conditioning, Plumbing Nonlabor Nonlabor
Heating, Air Conditioning, Plumbing Material Material Hour
Electrical Nonlabor Nonlabor
Electrical Material Material Hour
Foundation Labor Labor
Foundation Nonlabor Nonlabor
Foundation - Material Material Hour
Foundation Added Work Force Labor
Steve Steelman Labor
Gary Heinrichs Labor
Subcontractor Labor
Site Survey Subcontractor Labor
Innovative Construction Internal Resources Labor
Information Systems Department Labor
Purchasing Department Labor
Design Engineering Department Labor
Management Labor
Resources for Highway Project Labor
Construction Department Labor
Printing Costs Nonlabor
Resources for ENGR Project Labor
School Project Labor
George Roberts Labor
Paul Kim Labor
Wendy Resner Labor
Ace Corp Labor
Jeff Young Labor
Cost Engineers Labor
Project Managers Labor

Page 14
RSRC

Oliver Rock Labor


Structural Engineers Labor
Instrumentation Engineers Labor
Highway Labor Labor
Subcontrators Nonlabor
Material Resources Material
Engineer Labor Labor
Ed Wood Labor
Electrical Engineers Labor
Executive Labor
Civil Engineers Labor
Labor Resources Labor
Ashok Mehta Labor
Project Managers Labor
Highway Material Material
Senior Architects Labor
Mechanical Engineers Labor
Programmer Labor
Field Eng-Senior Labor
Rough Carpenter Labor
Machinist Labor
Painter Labor
Electrician Labor
General Contractor Personnel Labor
Software Engineer Labor
Katy Dunn, HVAC Engineer Labor
Plumber Labor
Heating Ventilation & AC Technician Labor
Excavator Labor
Ted Green, HVAC Designer Labor
Finisher Labor
Ironworker Labor
Field Engineer Labor
Operating Engineer Labor
Mark Hall, Junior Mechanical Engineer Labor
Field Eng-Assistant Labor
Elevator Installer Labor
Jen Martin, Structural Engineer Labor
Bob Patterson, Project Manager Labor
Sue White, Project Manager Labor
Mason Labor
Frank Danson, Cost Engineer Labor
Mike Hall, Civil Designer Labor
Barb Wire, Senior Electrical Engineer Labor
Bill Sanders, Junior Electrical Engineer Labor
Hardware Specialist Labor
Planning Engineer Labor
Project Executive Labor
Finishes Carpenter Labor
Floor and Carpet Layer Labor

Page 15
RSRC

Deb O'Brien, Junior Mechanical Engineer Labor


Laborer-Construction Labor
Greg Van, Senior Mechanical Engineer Labor
Asphalt Paver, 130 H.P. Labor
Lisa Hall, Structural Designer Labor
Greg Miller, Structural Engineer Labor
Paint Stripper, S.P. Labor
Sheeting Driver Labor
Carpenter Labor
Foreman Labor
Truck Driver - Heavy Labor
Electrician Labor
General Laborer Labor
Skilled Laborer Labor
Piping Material Material Cubic yards
Paul Kelly, Instrumentation Engineer Labor
Pete Lopez, Instrumentation Engineer Labor
Keri Brown, Civil Engineer Labor
Bret Sanders, Instrumentation Engineer Labor
Lori White, Senior Architect** Labor
Kelly Frank, Cost Engineer Labor
Equipment Operator - Light Labor
Lang Paving Nonlabor
Post Driver Labor
Equipment Operator Labor
Bristle Paint and Paper Material Hour
Jolt Electrical Contractors Nonlabor
Stony Masonry Contractors Nonlabor
Haskle Mechnical Contractors Nonlabor
County Line Steel Nonlabor
Alpha Plumbing Material Hour
Loader/Backhoe 80 H.P. Material Each
Aggregate Spreader Material Each
Will Summers, Civil Engineer Labor
Roller, Tandem Material Each
Roller, Steel Wheel Material Each
Truck - Flatbed, 3 Ton Material Each
Dump Truck Material Each
Gas Engine Vibrator Material Each
Truck Crane Material Each
Dozer, 200 H.P. Material Each
Air Compressor & Hoses Material Each
Go Concrete Nonlabor
Regent Contractors Nonlabor
Edison High Nonlabor
Contractor Nonlabor
Division 02 Nonlabor
Demolition Crew Nonlabor
Lofty Heights Resources Nonlabor
LH Labor Labor

Page 16
RSRC

LH Non-Labor Nonlabor
LH Expenses Nonlabor
LH Material Material Lump Sum
LH Sub-Contractor/Trades Nonlabor
Division 01 Nonlabor
Division 11 Nonlabor
Division 07 Nonlabor
Division 15 Nonlabor
Division 08 Nonlabor
Division 05 Nonlabor
Division 03 Nonlabor
Division 10 Nonlabor
Division 06 Nonlabor
Division 09 Nonlabor
Division 12 Nonlabor
Division 14 Nonlabor
Division 16 Nonlabor
Division 04 Nonlabor
Curb & Walks Crew Nonlabor
Earthwork Crew Nonlabor
Paving Crew Nonlabor
Concrete Crew Nonlabor
Storm Drainage Crew Nonlabor
Survey Crew Nonlabor
Irrigation Crew Nonlabor
Masonry Crew Nonlabor
Tiltwall Crew Nonlabor
Doors & Frame Crew Nonlabor
Finish Hardware Crew Nonlabor
Window Frame Crew Nonlabor
Glass Crew Nonlabor
Landscape Crew Nonlabor
Drywall Crew Nonlabor
Plaster Crew Nonlabor
Tile Crew Nonlabor
Accoustical Ceiling Crew Nonlabor
Wood Flooring Crew Nonlabor
Other Flooring Crew Nonlabor
Painting Crew Nonlabor
Steel Crew Nonlabor
Specialties Crew Nonlabor
Cleaning Crew Nonlabor
Insulation Crew Nonlabor
Roofing Crew Nonlabor
Site Clearing Crew Nonlabor
Athletic Equipment Crew Nonlabor
Blind & Shade Crew Nonlabor
Elevator Crew Nonlabor
HVAC Crew Nonlabor
Plumbing Crew Nonlabor

Page 17
RSRC

Fire Suppression Crew Nonlabor


Punch Crew Nonlabor
Insurance Nonlabor
Field General Expenses Nonlabor
Project Bonds Nonlabor
Contingency Nonlabor
Overhead & Profit Nonlabor
Construction fee Nonlabor
Environmental Consulting Subcontractor Labor
Geotechnical Engineering Labor
Demolition Subcontractor Labor
Concrete Foundation Subcontractor Labor
Masonry Subcontractor Labor
Structural Steel Subcontractor Labor
Specialty Metal Fabricator Subcontractor Labor
Rough Capentry Subcontractor Labor
Finish Carpentry Subcontractor Labor
Millwork Subcontractor Labor
Thermal Protection Subcontractor Labor
Sheet Metal Subcontractor Labor
Roofing Subcontractor Labor
Glass & Glazing Subcontractor Labor
Drywall Subcontractor Labor
Finishes & Fit-out Subcontractor Labor
Flooring Subcontractor Labor
Painting Subcontractor Labor
FF&E Specialties Labor
Pool Installation Subcontractor Labor
Conveying Subcontractor Labor
Fire Suppression Subcontractor Labor
Plumbing Subcontractor Labor
Heating, Ventilation and Air-conditioning Subcontractor Labor
Integrated Automation, Computers, LAN Subcontractor Labor
Electrical Subcontractor Labor
Telecommunications Subcontractor Labor
Electronic Safety Subcontractor Labor
Earthwork Subcontractor Labor
Paving & Roadways Subcontractor Labor
Utilities Subcontractor Labor
Process Integration Subcontractor Labor
Landscaping Subcontractor Labor
Carpentry Crew Nonlabor
Electrical Crew Nonlabor
Ed Mallard Labor
Jeff Lange Labor
Ken Anderson Labor
John Rock Labor
Lourdes Barietto Labor
Angel Tejada Labor
Buck Buchanon Labor

Page 18
RSRC

Mark Malloy Labor


Mark Newton Labor
Steve Rohaz Labor
Bill Feeley Labor
Tom Campbell Labor
Juan Garcia Labor
Don Louser Labor
Harry Epstein Labor
Tim Nichols Labor
Jose Mendez Labor
Sean Kennedy Labor
Sally Foon Labor
Jane Miller Labor
Scott Jefferson Labor
Chris Sawyer Labor
Juan Diaz Labor
Barb Smith Labor
Joe Monmouth Labor
Alice Cooper Labor
Jorge Martin Labor
Ray Crammer Labor
Michael Moore Labor
Al Switcher Labor
General Contractor Labor
Framing Contractor Labor
Cranes Labor
Stucco Labor
Highway Laborer Labor
Project Specific Resources Labor
Erun Azia, Civil Engineer Labor
External resources Labor
IMC Nonlabor
MKC Nonlabor
Labor Labor
School Carpenter Labor
Mike Brown, CIO Labor
Bob McArthur, Dir of Marketing Labor
Trent Smith, PMO Director Labor
John McDougal Labor
Charles North Labor
Frank Lee Labor
George Abrams, VP of Development Labor
Raj Patel, Dir of Programming Labor
TEAM MEMBER Labor
operator Labor
Masons Labor
Electrician Labor
Pipe Fitter Labor
Plumbers Labor
Excavator Nonlabor

Page 19
RSRC

CEMENT Material 100KG BAG


Wires Material METER
Pipes Material METER
SAND Material CUBIC METER
Rocks Material CUBIC METER
SOIL Material CUBIC METER
Water Material GALLONS
LIFTER Nonlabor
Concrete Material CUBIC METER

Page 20
RSRC

role_id def_qty_per_hr
(*)Role ID Default Units / Time(h/d)
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
24
8
8
8
8
8
8
8
8
8

8
IT 8
8
8
Accountin 8
Manage 8

Page 21
RSRC

Accountin 8

8
8
24
8
8

8
IT 8
8
8

IT 8
IT 8
Trades 8
Trades 8
Trades 8
Trades 8

IT 8

Trades 8
Trades 8
Trades 8

Trades 8
Trades 8
IT 8
Trades 8

IT 8
Trades 8

Trades 8

IT 8

Trades 8
Trades 8

Page 22
RSRC

Trades 8

Manage

Cubic yards

Site 8

8
Elec 8
Mason 8
HVAC 8
Struct 8
8
8

Conc 8
CW 8
8
8
8
8
8
Corp 8

Page 23
RSRC

8
8
Lump Sum 8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8

Page 24
RSRC

8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
PE 8
Supt 8
PM 8
8
Controls 8
Controls 8
Supt 8

Page 25
RSRC

Foreman 8
Supt 8
Engineer 8
Labor 8
Inspector 8
Labor 8
Controls 8
PM 8
Foreman 8
Foreman 8
Supt 8
Clerical/A 8
Clerical/A 8
Labor 8
Supt 8
EOper 8
EOper 8
EOper 8
Labor 8
EOper 8
EOper 8
Labor 8
EOper 8
8
8
8
8

8
8
8
8
Carpentry 8
8
8
PM 8
PM 8
BA 8
PM 8
8
SD 8
SN 8
8
8
8
8
8
8

Page 26
RSRC

100KG BAG 8
8
8
CUBIC METER 8
CUBIC METER 8
CUBIC METER 8
GALLONS 8
8
CUBIC METER 8

Page 27
TASKRSRC

task_id TASK__starsrc_id role_id acct_id rsrc_type cost_per_q start_date end_date delete_record_flag


Activity I (*)ActivityResource I Role ID Cost Accou(*)Resourc(*)Price / (*)Start (*)Finish Delete This Row
A1040 Not Starte op Labor 4 23-Jan-18 12-Feb-18 5:00:00 PM
A1010 Not Starte OP-1 Labor 2.6666666 20-Dec-17 21-Dec-17 5:00:00 PM
A1010 Not Starte MAT-8 Material 53.333333 20-Dec-17 21-Dec-17 5:00:00 PM
A1060 Not Starte OP-1 Labor 2.6666666 01-Feb-18 07-Feb-18 5:00:00 PM
A1060 Not Starte MAT-1 Material 13.333333 01-Feb-18 07-Feb-18 5:00:00 PM
A1060 Not Starte MAT-4 Material 8 01-Feb-18 07-Feb-18 5:00:00 PM
A1070 Not Starte MAT-7 Material 0.8 08-Feb-18 12-Feb-18 5:00:00 PM
A1110 Not Starte MAT-2 Material 13.333333 08-Jan-18 10-Jan-18 5:00:00 PM
A1110 Not Starte OP-2 Labor 3.2 08-Jan-18 10-Jan-18 5:00:00 PM
A1140 Not Starte OP-3 Labor 2.6666666 13-Feb-18 19-Feb-18 5:00:00 PM
A1140 Not Starte OP-4 Labor 2.6666666 13-Feb-18 19-Feb-18 5:00:00 PM
A1140 Not Starte MAT-3 Material 2.6666666 13-Feb-18 19-Feb-18 5:00:00 PM
A1010 Not Starte OP-1 Labor 2.6666666 20-Dec-17 21-Dec-17 5:00:00 PM
A1010 Not Starte MAT-8 Material 53.333333 20-Dec-17 21-Dec-17 5:00:00 PM
A1060 Not Starte OP-1 Labor 2.6666666 01-Feb-18 07-Feb-18 5:00:00 PM
A1060 Not Starte MAT-1 Material 13.333333 01-Feb-18 07-Feb-18 5:00:00 PM
A1110 Not Starte MAT-2 Material 13.333333 08-Jan-18 10-Jan-18 5:00:00 PM
A1140 Not Starte OP-3 Labor 2.6666666 13-Feb-18 19-Feb-18 5:00:00 PM
A1140 Not Starte OP-4 Labor 2.6666666 13-Feb-18 19-Feb-18 5:00:00 PM
A1140 Not Starte MAT-3 Material 2.6666666 13-Feb-18 19-Feb-18 5:00:00 PM

Page 28
USERDATA

user_data
UserSettings Do Not Edit

Page 29