SAP PP Repetitive Manufacturing Guide

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
151 views15 pages

SAP PP Repetitive Manufacturing Guide

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 15

SAP PP Repetitive Manufacturing

❖ Overview:
➢ Company manufactures product in large numbers and production is quantity based and period based
not order based.
➢ Repetitive manufacturing is mainly used for the production scenarios with high product stability, high
repetition rates, and low product complexity.
➢ In master data production versions and cost collector is must where this is not mandatory in discrete
manufacturing.
❖ Application Areas:
Industry Type: Mechanical engineering, Consumer goods, electronics, and many more
✓ Tact-based Flow manufacturing

✓ Period based production

✓ Mass production

➢ REM Prerequisite
✓ REM Profile
✓ REM Indicator
✓ Production Version
✓ Product Cost Collector

Nilesh S. Pagar
SAP PP Consultant
P a g e 1 | 15
SAP PP Repetitive Manufacturing

➢ Create the REM Profile:


➔ SPRO  Production Rep manufacturing  Control Data  Create REM Profile Assistant (T-Codes: OPP3/OSP2)
• With help of the REM profile assistant create the Make-to-Stock REM Profile “003” (REM Profile for plant) here GI backflush
at GR posting check mark and RP backflush is mandatory/Optional (as per requirements)

Nilesh S. Pagar
SAP PP Consultant
P a g e 2 | 15
SAP PP Repetitive Manufacturing

Nilesh S. Pagar
SAP PP Consultant
P a g e 3 | 15
SAP PP Repetitive Manufacturing

Nilesh S. Pagar
SAP PP Consultant
P a g e 4 | 15
SAP PP Repetitive Manufacturing

• Create the finished material Repetitive mfg. indicator and REM profile 003 maintained in material master see view MRP - 4,
(MM01)

Nilesh S. Pagar
SAP PP Consultant
P a g e 5 | 15
SAP PP Repetitive Manufacturing

• Now create and maintained the BOM(CS01) and routing/Rate routing (CA01/CA21)
• Rate routing for top material and assigned control key to the operation see in below pic, (T-codes: CA21), here control key is PP03.
(Standard SAP control key with milestone confirmation is PP01)

Nilesh S. Pagar
SAP PP Consultant
P a g e 6 | 15
SAP PP Repetitive Manufacturing

➔ Create the Control key PP03, with ‘milestone confirmation’ with help of the T-codes OP00.
➔ The milestone confirmation is a special form of confirmation, in which the confirmation of one operation causes other
operations or suboperations to be automatically confirmed at the same time.

Nilesh S. Pagar
SAP PP Consultant
P a g e 7 | 15
SAP PP Repetitive Manufacturing

• Create the Production version for finished material with help of material master change (MM02)
• Production version is combination of the BOM and Routing/Rate Routing, more than one production version created as per
requirement and make sure current prod. Version not locked.

Nilesh S. Pagar
SAP PP Consultant
P a g e 8 | 15
SAP PP Repetitive Manufacturing

Nilesh S. Pagar
SAP PP Consultant
P a g e 9 | 15
SAP PP Repetitive Manufacturing

❖ As per REM profile selection for the product cost accounting


There are two different type of cost accounting exit.
✓ Standard cost estimate per material: -
➢ We can create this cost estimate once in a period with reference to a routing. We can post activities based on this cost
estimate if you produce a material using only one production version in one period.
➢ Using T-code: CK11N do the standard cost estimate for current date and period and release this standard cost estimate
through T-code: CK24.
✓ Preliminary costing for the product cost collector: -
➢ You can create this cost estimate per production version. This makes sense if you produce one material using different
production versions and routing in one period.
➢ Using T-code: KKF6N for create Preliminary cost estimation in REM.

Nilesh S. Pagar
SAP PP Consultant
P a g e 10 | 15
SAP PP Repetitive Manufacturing

➢ Here we selected preliminary costing for the product cost collector in REM profile

Nilesh S. Pagar
SAP PP Consultant
P a g e 11 | 15
SAP PP Repetitive Manufacturing

❖ Create the Planned Independent Requirement (PIR) for the finished material with help of the T-code: MD61

See the below pic of the stock requirement list after generating the demand without run MRP. (T-codes: MD04)

Nilesh S. Pagar
SAP PP Consultant
P a g e 12 | 15
SAP PP Repetitive Manufacturing

❖ After running the MRP with help of the MD02 for finished material,

Nilesh S. Pagar
SAP PP Consultant
P a g e 13 | 15
SAP PP Repetitive Manufacturing

❖ In REM, we can do backflush (REM Confirmation) through planned order or finished material using MFBF, here we selected
the planned order

• Checking with Post with correction in tool bar of REM confirmation page before saving and get the detail information of all
transaction variant with all detail.
• After saving system posted GR and GI document (As per REM profile setting GR and GI done at same time)

Nilesh S. Pagar
SAP PP Consultant
P a g e 14 | 15
SAP PP Repetitive Manufacturing

• After the confirmation of both planned order, good receipt done automatically, and available stock is 30. MD04 Screen

Nilesh S. Pagar
SAP PP Consultant
P a g e 15 | 15