GDE 500
6. Map that uses contour lines, symbols, and color to
CARTOGRAPHY show changes in the elevation of Earth's surface and
features, such as mountains, bridges, and rivers
1.Digital land surveying conducted in sequence of
a) Establishment of control point, Collection of field a. Contour interval
details, Automated mapping; b..Prime Meridian
b) Collection of field details, Establishment of control c. Contour Line
point, Automated mapping; d. Topographic Map
c) Establishment of control point, Automated mapping,
Collection of field details; Answer: d. Topographic Map
d) Automated mapping, Collection of field details,
Establishment of control point. 7. A line on a topographic map that connects equal
points of elevation
Answer:a) Establishment of control point, Collection of
field details, Automated mapping; a.map legend
b.Contour line
2. How is a map different from a globe? c.Cartography
d.International date line
a.A map is more accurate than globe
b.A is used for navigation, while globe is used for Answer: B.Contour line
decoration
c.A map is two-dimensional, while globe is three- 8. Difference in elevation between two side-by-side
dimensional contour lines on a topographic map
d.A map is larger than a globe
a.Equator
Answer: c. A map is two-dimensional, while globe is b.Contour interval
three-dimensional c.Cartography
d.Contour line
3. Steps for digital map making DOES NOT include: Answer: b. Contour interval
a)Preparation of grid;
b)Import of cloud of points; 9.The surface of zero elevation around the earth, which
c) Drawing of objects and contours; is slightly irregular and curved, is known as
d) Taking of printout.
a.Mean sea level
Answer:d) Taking of printout b.Geoid surface
c.Level surface
d.Horizontal surface
4. Imaginary line that lies at 0 degrees latitude and
circles the Earth midway between the north and south Answer: b. Geoid surface
poles, dividing the Earth into the northern hemisphere
and the southern hemisphere
10. Most important consideration for preparation of map
. is
a.Equator
b.Cartography a. Scale;
c.Remote Sensing b Plotting accuracy;
d.Topographic Map c Generalisation of details;
d. Contour interval.
Answer: a. Equator
Answer: a. Scale
5.Distance in degrees east and west of the prime
meridian; they RUN north and south and meet and the
poles
a.contour line
b.Latitude
c.Longitude
d.International Date Line
Answer: c. Longitude
GDE 500
7. A line on a topographic map that connects equal
CARTOGRAPHY points of elevation
1.Digital land surveying conducted in sequence of a.map legend
b.Contour line
a) Establishment of control point, Collection of field c.Cartography
details, Automated mapping; d.International date line
b) Collection of field details, Establishment of control
point, Automated mapping; 8. Difference in elevation between two side-by-side
c) Establishment of control point, Automated mapping, contour lines on a topographic map
Collection of field details;
d) Automated mapping, Collection of field details, a.Equator
Establishment of control point. b.Contour interval
c.Cartography
2. How is a map different from a globe? d.Contour line
a.A map is more accurate than globe 9.The surface of zero elevation around the earth, which
b.A is used for navigation, while globe is used for is slightly irregular and curved, is known as
decoration
c.A map is two-dimensional, while globe is three- a.Mean sea level
dimensional b.Geoid surface
d.A map is larger than a globe c.Level surface
d.Horizontal surface
3. Steps for digital map making DOES NOT include:
10. Most important consideration for preparation of map
a)Preparation of grid; is
b)Import of cloud of points;
c) Drawing of objects and contours; a. Scale;
d) Taking of printout. b Plotting accuracy;
c Generalisation of details;
4. Imaginary line that lies at 0 degrees latitude and d. Contour interval.
circles the Earth midway between the north and south
poles, dividing the Earth into the northern hemisphere
and the southern hemisphere
a.Equator
b.Cartography
c.Remote Sensing
d.Topographic Map
5.Distance in degrees east and west of the prime
meridian; they RUN north and south and meet and the
poles
a.contour line
b.Latitude
c.Longitude
d.International Date Line
6. Map that uses contour lines, symbols, and color to
show changes in the elevation of Earth's surface and
features, such as mountains, bridges, and rivers
a. Contour interval
b..Prime Meridian
c. Contour Line
d. Topographic Map
11. In 1:10000 scale with plotting dimension 0.2 19. Digital land surveying conducted in sequence of
millimeter, the least dimension of the object that a) Establishment of control point, Collection of field
may be plotted is details, Automated mapping;
b) Collection of field details, Establishment of control
a. 2 millimeter point, Automated mapping;
b. 2 centimeter c) Establishment of control point, Automated mapping,
c. 20 centimeter Collection of field details;
d. 2 meter d) Automated mapping, Collection of field details,
Establishment of control point.
12.Process of selecting important details and to leave out
irrelevant objects during map making is 20.Precision of a survey map depends on (select 2)
known as a) Dimension of object to be represented;
a) Scale; b) Precision of survey measurement;
b) Plotting accuracy; c) Plotting dimension;
c) Generalisation of details; d) Scale
d) Contour interval.
21.Specification for a map (select 2)
13.Accuracy of location and distances for preparation of (a) is required to provide a set of uniform standards for
a map should have confidence level guiding the production of maps
a) 85% (b) is defined in terms of accuracy coordinates of points,
b) 90% Clarity, ground distances and elevations at
c) 95% the 85% confidence level.
d) 99% (c) should be mentioned in the legend box of map.
(d) protects map consumer rights
14.______ does not belong to the category of
cartographic elements of a map. 22.Identify the incorrect statements: (select two)
a) Grid; a) Automated mapping is commonplace for map
b) Bar scale; drafting, now-a-days.
c) Cardinal direction; b) Most important component of automated mapping is
d) Legends computer hardware.
c) Automated mapping is done by operator making use
15.ArcMap is of mapping software.
a) An independent software for automated mapping; d) Automated map is produced by making use of
b) A module of ArcGIS for automated mapping; mapping software only.
c) A CADD software;
d) A design software for automated mapping 23.Steps for digital map making DOES NOT include:
a)Preparation of grid;
16.For making of a map, the operation which is not b)Import of cloud of points;
required for preparation of data is c) Drawing of objects and contours;
a) Transformation; d) Taking of printout.
b) Reduction;
c) Conversion; 24.Automated mapping consists of different steps in
d) Manipulation. sequence of
(a) Preparation of grid, Import of data, placing
17.Topographic map from planimetric map and contour cartographic elements, drawing contours.
map need (b) Preparation of grid, drawing objects, placing
a) Addition; cartographic elements, Import of data;
b) Superposition; (c) Preparation of control network, Import of data,
c) Registration; drawing objects, drawing contours.
d) Orientation. (d) Preparation of control network, Preparation of grid,
Import of data, drawing objects.
18.In digital land surveying, establishment of control
point does not consider 25.Elevation, relief, and slope on a topographic map are
a) Planning; shown using symbols called __.
b) Data preparation; a. GPS Units
c) Field survey; b. Spot Elevations
d) Processing. c. Contour Lines
d. Contour Intervals
e. Pixels
26.It refers to that part of the shore which is alternately e. Disaster Management Plan
covered and uncovered by the ebb and the flow of the
equinoctial tide. 33.Killing of animals disturbs _____.
a. Buffer zone a. None of these
b. Shoreline b. Good for man
c. Foreshore Land c. Good for the ecosystem
d. Salvage Zone d. The balance of nature
e. Easement e. Hierarchy of needs
27.It means any area where mineral resources, as herein 34.It pertains to the user definable angle (in degrees)
defined, are found. below which data measurements from a satellite will not
a. Mineral Land be used.
b. Mineral Deposits a. Angle of Depression
c. Mineral Claim b. Elevation Mask Angle
d. Mineral Reserve c. Satellite Mask
e. Mineral Lodge d. Reckoning Angle
e. Nadir Convergence
28.Under the Mining Code, it means the land or body of
water delineated under a Mineral agreement or Financial 35.The GNSS receiver height of instruments is the
or Technical Assistance Agreement (FTAA) subject to distance from the _____ to the survey ______.
the relinquishment obligations of the contractor and a. Antenna top, tripod foot
properly defined by longitude and latitude. b. Antenna phase center, control point
a. Contract Area c. Antenna phase center, tripod point
b. Mineral Lease d. Antenna top, control point
c. Lease Coverage
d. Permit Site
e. FTAA Permit
36.Mang Pablo is an applicant of a piece of public land
29.An electromagnetic wave falls on to a boundary for free patent in CENRO Guiguinto, Bulacan. Upon
between two losses less homogenous media with verification of his public land application, it was found
different refraction indices, a part of the wave is out that he is not the original survey claimant. What
reflected back to the incident medium and the rest is proof of ownership Mang Pablo should submit in order
transmitted on to the second media. This phenomenon is that his public land application shall be given further due
known as course?
a. Fresnel Refraction a. Letter from the PENRO
b. None of these b. Sketch Plan
c. Snell's Law c. Relocation Plan
d. Fresnel Reflection d. Deed of Transfer
e. Relative Refraction
37.Mang Pablo is an applicant of a piece of public land
30.The asteroid belt is between the orbits of planets for free patent in CENRO Guiguinto, Bulacan. How can
a. Venus and Earth we verify from CENRO Guiguinto, Bulacan if Mang
b. Mars and Jupiter Pablo was the original claimant or not?
c. Mercury and Venus a. Refer to the records of DAR
d. Neptune and Uranus b. Letter from the City Assessor
e. Jupiter and Saturn c. From the list of survey claimants
d. From available records of the Land Registration
31.______ is a type of image matching based on Authority
photometric intensities.
a. Edge matching 38.An individual who occupied a salvage zone is
b. Least squares matching required to pay rentals. Is this in order?
c. Nested modelling a. Yes, but he should first apply for a survey authority
d. Internal alignment b. No, he should immediately be evicted in the area
e. Stereo Modelling c. Yes, he should be required to pay rentals
d. No, he should first file his free patent applications
32.It refers to geographic-based instruments for planners
and decision-makers, which presents a description of the 39.In geodetic traverse, angular closure is the number of
environmental dissimilative capacity of an area. seconds allowable for any angle _____ by the _____
a. Land Use Profile root of the number of angles in the traverse.
b. Master Plan a. Multiplied, square
c. Ecological Profile b. multiplied, cube
d. Comprehensive Land Use Plan c. Divided, cube
d. divided square d. Thirty days after the registration of the deed of sale in
the office of RD.
40.Is an alluvial deposit on land formed by accretion
automatically belongs to the littoral owner? 46.Natural born citizens of the Philippines who is not an
a. Yes, the adjoining owner becomes the owner. owner of more than 24 hectares of land who since June
b. Yes, because it can be acquired through possession. 12, 1945 or prior thereto continuously occupied and
c. No, because it is a part of the public domain cultivated either by himself or through his predecessors
d. No, because the land is not yet surveyed by a in interest on public lands which is subject to disposition
Geodetic Engineer could obtain free patent thru:
41.Is tax declaration and payment of taxes thereon a Answer:Bureau of Lands
proof of ownership?
a. Yes, because there are no other applicants 47.All other actions whose periods are not fixed in this
b. No, you are not paying taxes religiously code or in other laws must be brought within
c. Yes, because you believe you are the owner of the ____________ years from the time the right of action
land accrues.
d. No, it is not a conclusive proof of ownership
Answer:5
42.The action for annulment of a contract where one of
parties is incapable of giving consent to a contract and 48.A type of obligation both parties are mutually bound
where the consent is vitiated by mistake, violence, to each other.
intimidation, undue influence or fraud shall be brought
within ________ years. Answer: Bilateral Obligation
a. 4 49.Real actions over immovable prescribe after
b. 5 _________ years.
c. 6
d. 3 Answer: 30
43.From the date of approval of the application and for a 50.The ownership of personal property also prescribes
term of ________ years from and after the date of through uninterrupted possession for ________ years
issuance of the patent or grant, lands acquired under the without need of any other condition.
free patent or homestead cannot be subject to
encumbrance or alienable, except in favor of the Answer: 8
government or any of its branches.
51.The right or power of a person to demand from
a) 4 another as a definite passive subject, the fulfillment of
b) 5 the latter obligation.
c) 6
d) 3 Answer:Personal Right
52.An obligation which is based on equity and natural
law is known as:
a. Pure
b. Quasi-contract
44.Who is the officer authorized under Public Land Act c. Civil
to administer oath relative to public land applications? d. natural
a. Judge of RTC
b. Director of Lands 53.In modes of titling as authorized by our laws, the
c. Chief of Survey Division of the Bureau of Lands resulting output from the Bureau of Lands , through
d. All of the above administration process is the patent (free patent) while
the resulting output from LRA through judicial process:
45.Each conveyance of the land acquired under free
patent or homestead provisions of the law, when proper, Answer:Certificate of Title
is subjected to repurchase by the applicant, his widow or
legal heirs, within a period of 5 years from:
a. The date of execution of the deed of sale or 54.Increase of the earth on a bank of river or on the side
conveyance of the sea is called
b. The date of registration of the office of the Register of a. Island formation
Deeds b. Alluvion
c. The date of approval of the transfer of the certificate c. Avulsion
of title d. Accession
55.What is the effect of continues payment of Real
Estate taxes over a parcel of land which is subject of 65.The ownership of movable prescribes through
application? uninterrupted possession for ________ years in good
a. Circumstantial evidence in possession of land faith.
b. Subject property is assured to the applicant
c. Application is processed earlier Answer:4
d. Application fees are reduced
66.A roughly straight-line configuration of three or more
56.Actions to recover movable shall prescribe ________ celestial bodies in a gravitational system.
years from the time the possession thereof is lost, unless
the possessor has acquired the ownership by prescription Answer:Syzygy
for a less period.
67.1 knot is ________ m/s
Answer: 8 Answer:0.514 m/s
57.Which agency of the government can bring action in 68.Notice of lis pendens can only be removed from
court in order to revert a private land back to the annotation on the title by:
government?
Answer: Court Order
Answer:Land Management Bureau
69.The immovable that which is the subject of the
58.Adverse claim over a title property can be subjected easement is called.
to a verified petition only after:
a. 30 days Answer:Servient Estate
b. 90 days
c. 45 days
d. 60 days
59.Who has direct executive control over classification,
leases, sales and other forms of concession and
disposition and management of public lands:
a. Director of Lands
b. President of the Philippines
c. Secretary of Agriculture and Natural Resources
d. Regional Trial Court
60.What office would you file an application for
purchase of public agricultural land?
Answer: Director of Land Management Bureau
61.A mortgage actions prescribes after _______ years.
Answer: 10
62.A decision of land registration cases is rendered by
the court as soon as the evidence of both parties have
been submitted. It does not become final until an
expiration of ___________ days from the date of the
notice.
Answer:30 days
63.Administration and disposition of public domain is
vested in the?
Answer:Land Management Bureau
64.The action to claim rescission must be within
_______ years.
Answer:4