Moisture Correction Sheet

The document provides a moisture correction sheet for materials used in concrete mixes for a highway construction project. It lists the target mix designs by grade and component and adjusts the quantities based on measured moisture contents to determine the corrected mix designs.

Uploaded by

SUDHAKAR
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
32 views2 pages

Moisture Correction Sheet

The document provides a moisture correction sheet for materials used in concrete mixes for a highway construction project. It lists the target mix designs by grade and component and adjusts the quantities based on measured moisture contents to determine the corrected mix designs.

Uploaded by

SUDHAKAR
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

: Ministry of Road Transport & Highways QF 9.

16
Client

: TPF Engineering Pvt Ltd in JV with SA Infrastructure Consultants Pvt Ltd. Revision 0
Authority's Engineer

: Afcons Infrastructure Limited Date 11/24/2021


EPC Contractor

Project : Construction of New 4-Lane Bridge across River Kosi at Phulaut including Rehabilitation and Upgradation of existing Birpur-Bihpur Section of NH-106 from Km 106+000 to Km 134+918 to 2-Lane with Paved Shoulder in the State of Bihar on EPC Mode.

Moisture Correction Sheet (Ultratech)

Material Moisture(%) Water Absorption Difference Materials 20 mm Agg. 10 mm Agg. River Sand 16.04.2024
20 mm 0.00 0.38 -0.38 Wt of sample in gram [A] 1000 1000 1000

10 mm 0.00 0.73 -0.73 Wt of oven dry sample in gm[B] 1000 1000 960

River Sand 4.17 1.2 2.97 Wt of Water in gm[C] 0 0 40

Moisture Content (%) [D]=[A-B]/B*100 0.00 0.00 4.17

Corrected
Water Moisture
Ingredients As per Design Mix (Kg/ M 3) Moisture Corrected Design Mix (Kg/M 3)
Absorption Content
Content

M50F M60F M25 M50F M60F


M25 Bottom M55F M55F
Grade of Concrete M15F M20F RCC M30F RCC M35F RCC M40F Pier/Well Pier/Pier (%) (%) (%) M15F M20F RCC Bottom M30F RCC M35F RCC M40F RCC Pier/Well Pier/Pier
Plug Segment Segment
Cap Cap Plug Cap Cap

A B C D E F G H I J K L=(K-J) M N O P Q R S T U

Cement 1 200 221 363 285 301 308 400 447 450 200 221 363 285 301 308 400 447 450

Flyash 2 105 114 0 136 135 132 100 69 70 105 114 0 136 135 132 100 69 70

20 mm 3 667 596 568 544 614 613 624 621 619 0.38 0.00 -0.38 664 594 566 542 612 611 622 619 617

10 mm 4 543 594 566 542 501 500 509 506 504 0.73 0.00 -0.73 539 590 562 538 497 496 505 502 500

Sand 5 805 792 818 784 742 741 694 691 688 1.2 4.17 2.97 829 815 842 807 764 763 715 711 708

Water 7 134 134 152 143 144 145 140 143 146 117 117 134 126 128 129 125 129 132

Admixture 8 2.44 3.35 2.54 4.63 3.92 4.84 6.5 4.69 5.2

Total Wt. of Material before Correction 2456.44 2454.35 2469.54 2438.63 2440.92 2443.84 2473.5 2481.69 2482.2 Total Wt. of Material After Correction

Remarks:

Afcons Authority's Engineer

Representative Representative
: Ministry of Road Transport & Highways QF 9.16
Client

: TPF Engineering Pvt Ltd in JV with SA Infrastructure Consultants Pvt Ltd. Revision 0
Authority's Engineer

: Afcons Infrastructure Limited Date 11/24/2021


EPC Contractor

Project : Construction of New 4-Lane Bridge across River Kosi at Phulaut including Rehabilitation and Upgradation of existing Birpur-Bihpur Section of NH-106 from Km 106+000 to Km 134+918 to 2-Lane with Paved Shoulder in the State of Bihar on EPC Mode.

Moisture Correction Sheet

Material Moisture(%) Water Absorption Difference Materials 20 mm Agg. 10 mm Agg. River Sand 17.04.2024
20 mm 0.00 0.38 -0.38 Wt of sample in gram [A] 1000 1000 1000

10 mm 0.00 0.73 -0.73 Wt of oven dry sample in gm[B] 1000 1000 965

River Sand 3.63 1.2 2.43 Wt of Water in gm[C] 0 0 35

Moisture Content (%) [D]=[A-B]/B*100 0.00 0.00 3.63

Corrected
Water Moisture
Ingredients As per Design Mix (Kg/ M 3) Moisture Corrected Design Mix (Kg/M 3)
Absorption Content
Content

M55F M50F M60F M25 M55F M50F M60F


M25 Bottom M55F M55F
Grade of Concrete M15F M20F RCC M30F RCC M35F RCC Segment Pier/Well Pier/Pier (%) (%) (%) M15F M20F RCC Bottom M30F RCC M35F RCC Segment Pier/Well Pier/Pier
Plug Segment (JK) Segment (JK)
(UT) Cap Cap Plug (UT) Cap Cap

A B C D E F G H I J K L=(K-J) M N O P Q R S T U

Cement 1 200 221 363 285 301 447 400 447 450 200 221 363 285 301 447 400 447 450

Flyash 2 105 114 0 136 135 69 100 67 68 105 114 0 136 135 69 100 67 68

20 mm 3 667 596 566 544 614 621 601 608 607 0.38 0.00 -0.38 664 594 564 542 612 619 599 606 605

10 mm 4 543 594 564 542 501 506 490 496 497 0.73 0.00 -0.73 539 590 560 538 497 502 486 492 493

Sand 5 805 792 816 784 742 691 660 677 675 1.2 3.63 2.43 825 811 836 803 760 708 676 693 691

Water 7 134 134 152 143 144 143 165 156 157 121 121 138 130 132 132 155 146 147

Admixture 8 2.44 3.35 4.36 4.63 3.92 4.69 6.00 6.26 5.85

Total Wt. of Material before Correction 2456.44 2454.35 2465.36 2438.63 2440.92 2481.69 2422 2457.26 2459.85 Total Wt. of Material After Correction

Remarks: