0% found this document useful (0 votes)
89 views3 pages

Offshore Wind Project 5-Year Plan

The document contains templates for 5-year work programs for wind energy projects including activities and timelines. It includes templates for feasibility studies, offshore wind work plans, and work plans for wind energy operating contracts.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
89 views3 pages

Offshore Wind Project 5-Year Plan

The document contains templates for 5-year work programs for wind energy projects including activities and timelines. It includes templates for feasibility studies, offshore wind work plans, and work plans for wind energy operating contracts.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

TEMPLATE FIVE (5)-YEAR WORK PROGRAM FOR WESC ANNEX - I.

6
WIND WORK PROGRAM

Wind Project Name: _________________________


Location: __________________________________
RE Developer: _____________________________

Year 1 Year 2 Year 3 Year 4 Year 5 Financial Commitment (PhP)


ACTIVITIES
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 Year 1 Year 2 Year 3 Year 4 Year 5
A FEASIBILITY STUDY
1 Market Study (Identify potential market/off-
taker and rates
2 Technical Study
a. Installation of meteorological mast/
LIDAR/SODAR
b. Wind data gathering, processing,
analysis and interpretation
c. System/Distribution Impact Study (SIS
or DIS)
d. Identification of Production Area
e. Detailed Wind Farm Modeling
3 Management Study
a. Implementation strategy of
development and construction of the
project
b. Identification and short listing of
potential EPC Contractor, Owner's
Engineer and O & M
4 Social and Environmental Study (Applicable
permits, licenses and agreements for the
conduct of feasibility study)

5 Financial Study
a. Financial modelling
b. Financial Closing
B DECLARATION OF COMMERCIALITY/NON-COMMERCIALITY
C OTHERS
TOTAL COMMITMENT -

Prepared by: Approved by:

Signature over Printed Name Signature over Printed Name


Designation, Company Designation, Company
TEMPLATE FIVE (5)-YEAR WORK PLAN FOR CERTIFICATE OF AUTHORITY ANNEX ___
OFFSHORE WIND WORK PLAN
Wind Project Name: __________________________________
Location: ____________________________________________
RE Developer: __________________________________________

TIMELINE COST (PHP)


WORK COMMITMENT Year 1 Year 2 Year 3
Year 1 Year 2 Year 3
1 2 3 4 1 2 3 4 1 2 3 4
A. ACQUISITION OF PERMITS AND OTHER APPROVALS*
1 Stakeholder engagement and public consultations
2 Local Government Units
a. Barangay (if applicable)
b. Municipal (if applicable)
c. Provincial (if applicable)
3 Department of Environment and Natural Resources
a. Environmental Management Bureau
b. Biodiversity Management Bureau
c. Forest Management Bureau (if applicable)
d. Land Management Bureau (if applicable)
4 Department of Agriculture
a. Bureau of Fisheries and Aquatic Resources
5 Department of Transportation
a. Civil Aviation Authority of the Philippines
b. Maritime Industry Authority
c. Philippine Coast Guard
d Philippine Ports Authority
National Commission on Indigenous People (if applicable)
6
Other applicable agencies/authorities with jurisdiction over
7
the OSW operations
B. PRELIMINARY RESOURCE ASSESSMENT/PRE-
FEASIBILITY STUDY
1 Site Survey
2 Resource Assessment
3 Geophysical and Bathemetry Survey
4 Micro-Siting for the Installation/Deployment of
Meteorological Mast/Remote Sensing Device
5 Energy Yield Estimate
6 Wind Farm Modelling/Conceptual Design
7 Port and Supply Chain Assessment
8 Transmission and Interconnection Assessment
9 Market Study
10 Financial and Economic Study
C. INVESTMENT DECISION
1 Signing of OSWESC; or
2 Relinquishment of OSWEC Application
D. OTHERS

Note:
* Tentative list of agencies/bureaus/authorities, subject to change depending on the results of DOE's Study on Permitting and Consenting of Offshore Wind Projects

Prepared by: Approved by:

Signature Over Printed Name Signature Over Printed Name


Designation, Company Designation, Company
TEMPLATE FIVE (5)-YEAR WORK PLAN FOR WEOC ANNEX - __
WIND WORK PLAN
Wind Project Name: _________________________
Location: __________________________________
RE Developer: _____________________________

TIMELINE FINANCIAL COMMITMENT (PhP)


WORK COMMITMENT Year 1 Year 2 Year 3 Year 4 Year 5
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 Year 1 Year 2 Year 3 Year 4 Year 5
A PRE-CONSTRUCTION
1 Identify and secure market/off-taker and
rates
2 System/Distribution Impact Study (SIS or
3 Identification of Production Area
4 Detailed Wind Farm Modeling
5 Implementation strategy of development
and construction of the project
6 Negotiation and Contract Signing with EPC
Contractor, Owner's Engineer and O & M

7 Application and acquisition of applicable


permits, licenses and agreements
8 Financial modelling
9 Financial Closing
10 Submission of EPC and Work Schedule to
DOE
4 Detailed Engineering Design
B CONSTRUCTION
1 Start of Construction
2 Electromechanical Completion
3 Full Completion of Construction
C POST CONSTRUCTION
1 Testing and Commissioning
D OPERATION AND MAINTENANCE
1 Commercial Operation
2 Repair and Maintenance
E OTHERS
TOTAL COMMITMENT -

Prepared by: Approved by:

Signature over Printed Name Signature over Printed Name