219-04a - VENDOR OPERATING AND SERVICING DOCUMENTATION AND SPARES
219-04a - VENDOR OPERATING AND SERVICING DOCUMENTATION AND SPARES
CONTENTS
1. PURPOSE....................................................................................................................
2. SCOPE.........................................................................................................................
3. REFERENCES.............................................................................................................
4. DEFINITIONS.............................................................................................................
5. RESPONSIBILITIES...................................................................................................
6. INSTRUCTIONS.........................................................................................................
1 PURPOSE
The purpose of this Procedure is to ensure that spare parts together with instructions
dealing with assembly and installation, commissioning, operation, spares or parts
lists and servicing, are comprehensive and supplied in a timely manner.
2 SCOPE
3 REFERENCES
Management Documents
QAP-206 Procurement
QAP-215 Handling, Storage, Packaging, Preservation and Delivery
4 DEFINITIONS
Operating and Servicing Documentation - Instructions for use, dealing with the
assembly, installation, commissioning, operation, spares or parts list and servicing of a
product
5 RESPONSIBILITIES
The Project Engineering Manager is responsible for ensuring that the operating and
servicing documentation and spares required for a project are defined, specified
and ordered.
The Project Procurement Manager is responsible for the purchase and delivery of
these items.
The Site Manager is responsible for the correct handling of spare parts delivered to site.
6 INSTRUCTIONS
Engineering
a. Co-ordinate spare parts for each project in accordance with GPP 7EG 406,
which defines the Company requirements for spare parts.
c. Review the quotations for spares in accordance with GOP 7EG 021, to verify
that specified requirements are included.
e. The final checking, collation into manuals, issuing to Clients, microfilming and
archiving of all documentation provided by suppliers and subcontractors and
including any such data prepared directly by the Company, shall be in
accordance with the following Procedures GPP 7EG 114, GPP 7EG 110, GOP
7EG 011, and GPP 7EG 213.
Procurement
Construction
When spare parts are delivered to a Company site, Construction shall receive,
check, store and issue to the relevant users the spare parts ordered, all in
accordance with QAP-215.