Scaffolding Erection and Dismantling JSA

The document provides a job safety analysis form for the erection and dismantling of scaffolding. It lists 7 key activities involved and identifies the associated hazards for each activity. The hazards include things like gas leaks, falls, obstruction of access, and damage to nearby facilities or equipment. It also provides control measures to mitigate each hazard.

Uploaded by

AndoFritzzJr
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
217 views4 pages

Scaffolding Erection and Dismantling JSA

The document provides a job safety analysis form for the erection and dismantling of scaffolding. It lists 7 key activities involved and identifies the associated hazards for each activity. The hazards include things like gas leaks, falls, obstruction of access, and damage to nearby facilities or equipment. It also provides control measures to mitigate each hazard.

Uploaded by

AndoFritzzJr
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

JOB SAFETY ANALYSIS (JSA) FORM

Job Location/Site: JSA NO:11


Task/Activity: ERECTION AND DISMANTLING OF SCAFFOLDING PCR NO :
Download HSE Docs hseprof.com

PCR NO:
Work Area: Permit N0: Date:
Gas Leak / Fire /Any Emergency: In case of emergency, all works must be stopped, equipment must be switched off
Emergency situation /Evacuation and left in safe condition. All personnel shall reach the nearest muster point considering the wind direction (upward or
cross-ward)

SL.
WHO IS AT
NO ACTIVITY STEPS o INVOLVED CONTROL MEASURES
RISK

1 Morning tool box ●People Not Understanding What ● People ● Make Sure Everyone Is Involved With The JSA/JHA Discussion And
Meeting And JHA
Discussion The Plan Or Hazards Are; People Understands; Encourage Everyone To Ask Questions And Participate.
● Equipment
Afraid To Ask Questions Don't Make Anyone Feel For Speaking Up Or Questioning
●Presence Of H2S gas and Toxic ● Facility ●Try To Identify These Types Of things In Your Work Areas Before
gas In Work Areas ● Environment Starting the work; Clear Carefully Work Areas By gas testing and
●Presence of chemical or flammable ●daily site inspection
items
2 Work Permit
● Unauthorised commencement of ● People ● Authorised work permit holders shall ensure obtaining and maintaining
works valid work permits.
● Equipment
● May result in exposing people ● The supervisor responsible for this activity has to check the PPE of his
● Facility
and/or potential to harm or danger. staff to ensure that all required items are available and properly used.
● Environment ● Inform all people regarding permit conditions before work starts.

● Supervisors must conduct daily toolbox talk about nature of work and
associated potential hazards e~and their essential precautionary
measures.
3 Gas test
●May found toxic gas or H2S gas leak ● People ● Carryout gas test by QP Authorized gas tester time to time.
or extreme oxygen limit in air Environment
● All groups working in different area inside station shall have H2S
PJ247/JSA-11-REV-0 ERECTION AND DISMANTLING OF SCAFFOLDING
Page 1 of 4
JOB SAFETY ANALYSIS (JSA) FORM
SL.NO
ACTIVITY STEPS HAZARDS INVOLVED WHO IS AT RISK CONTROL MEASURES

personal gas monitor(certified)


4 ● Mobility restriction, access ● People ● Survey the area and confirm safe location of temporary of material prior
Scaffolding
Preparation of obstruction, congestion in the work to hauling.
● Equipment
area if hauling/storing of material in
Download HSE Docs hseprof.com

work/Hauling of ● Provide temporary holding area at location that will not congest/obstruct
materials not properly planned and ● Facility
coordinated. plant access or restrict mobility of other activities.
● Nearby existing facilities if any ● Obtain necessary permit
subject to physical damage during ● Provide temporary holding area at location that will not congest/obstruct
material hauling
site access or restrict mobility of other activities.
● Scaffold rack is a must for holding scaffolding material. No pipes,
couplers will be stored on the ground or anytime scattered on the
ground.
● Observe extra caution in mobilizing material at site
5 ● Erection & Use ● Damage to onsite detectors ● People ● Take extreme care during erection and override it if needed.
of Scaffolding /switches / transmitters etc
● Facility

● Equipment


6 ● Fall of objects / Tools. ● People ● Provide guardrail & toe board to prevent falling of tools /objects

● Facility ● Don’t keep the unnecessary materials on the scaffold platform

● Equipment ● Hand tools to be tied with permanent structure or person

● If required barricade the area during erection work.

7 ● Accidental Fall of Person ● People ● The Scaffolder must use Safety Harness/full body harness to prevent
accidental fall

8 ● Unstable Scaffold ● People ● The scaffold must be inspected, certified & tagged bythe competent
person confirming its suitability
● Facility
Page 2 of 3
PJ247/JSA-11-REV-0 ERECTION AND DISMANTLING OF SCAFFOLDING
JOB SAFETY ANALYSIS (JSA) FORM
SL.NO
ACTIVITY STEPS HAZARDS INVOLVED WHO IS AT RISK CONTROL MEASURES

● Equipment
9 ● Weak Scaffold ● People ● The scaffold tag must indicate the maximum load that itcan bear
Download HSE Docs hseprof.com

● Facility

● Equipment
10 ● Damaged Scaffold ● People ● The scaffolding is to be inspected at least weekly for any damage due
to weather condition (rain, high windetc) or other unsafe conditions.
● Facility

● Equipment
11 ● Modified Scaffold ● People ● In case of any modification, addition in the scaffold, ithas to be re-
inspected & certified
● Facility

● Equipment
12 ● Improperly Supported Scaffold ● People ● Ensure Scaffold is securely supported on a rigid groundand not on
process piping / vessel or equipment
● Facility

13 ● Incomplete Scaffold ● People ● Do not use if green Tag is missing

● Facility

● Do not use if red tag is available.

14 ● Old Scaffolding ● Doubtful Integrity ● Do not use if it does not have valid inspection tag attached

15 Housekeeping Slips trips and falls due to poor ● People ● Remove tools equipment and rubbish from worksite and maintain a
Clean up worksite housekeeping
clean work environment.
● Environment
● Arrange housekeeping on daily and every shift bases

Page 3 of 3
PJ247/JSA-11-REV-0 ERECTION AND DISMANTLING OF SCAFFOLDING
JOB SAFETY ANALYSIS (JSA) FORM
SL.NO
ACTIVITY STEPS HAZARDS INVOLVED WHO IS AT RISK CONTROL MEASURES

● Facility ● Supervisor shall conduct tool box meeting in this regards

● Equipment
Download HSE Docs hseprof.com

Project Engineer HSE/QA/QC Manager Project Manager

PREPARED BY: REVIEWED BY: APPROVED BY:

Page 4 of 3
PJ247/JSA-11-REV-0 ERECTION AND DISMANTLING OF SCAFFOLDING