Overfill Protection & Earthing System
Model SLA-S-Y
Overfill Protection & Earthing System
Contents
Foreword
1.0 General Information....................................................................................1
1.1 Application.............................................................................................1
1.2 System Introduction.............................................................................1
1.3 Technical Specifications .......................................................................1
2.0 System Elements and Working Principle.....................................................2
2.1 System Elements and Function........................………………................2
2.2 Working Principle… … … .......................................................................2
3.0 Installation and Checkout............................................................................3
3.1 Cautions during Installation....................................................................3
3.2 Connecting with Automatic Fueling System...........................................3
3.3 Installation and Checkout.......................................................................3
3.3.1 Electrical Installation...........................................................................3
3.3.2 Mechanical Installation .......................................................................4
3.3.3 Technique Requirements....................................................................4
4.0 Operation Procedures ................................................................................4
4.1 Working Status ..........….…………………………….........……………...4
4.2 Operation Procedures..........….……………………………………..........5
4.3 Dial Switch...........................….……………………………………..........5
5.0 Troubleshooting...........................................................................................6
Appendix 1 Power Wiring Diagram...........................................................….....7
Appendix 2 Installation Wiring Diagram......................................................… 8
Appendix 3 Controller Outline Drawing.....................................…....…..........…9
Foreword
This manual introduces the SLA-S-Y Overfill Protection & Earthing System’s
working principle, technical specifications, installation, system application and
precautions.
The system is explosion-proof and intrinsically safe. Its controller is explosion-
proof, the earthing clamp and plug & cable are intrinsically safe parts. The
installer, operator and maintenance personnel must have basic knowledge of
safety and a general understanding of intrinsically safe electrical equipment
when using this product in hazardous areas like oil terminals, gasoline stations
and chemical plants. The system meets the general requirements of
EN60079-0, EN60079-1 and EN60079-11 for intrinsically safe circuit boards
and electric equipments.
Model no. naming rule:
SLA S
Product serial number : A,B,C and etc.
Product class number (can be none )
Signal output(S: Abbreviation of switch signal output)
Abbreviation of operating mode and function
E.g. SLA-S-Y stands for alarming instrument for liquid level monitor and static
earthing, outputting switch signal, Y is the serial number.
Qingdao Alptec Safety Equipment Co., Ltd (Alptec for short hereinafter) has
the exclusive copyright of the content of this manual. Alptec reserves the right
to update or change the content of this manual without prior notice. Please
contact Alptec or log on www.alptec.com for updated information.
Issue date: Oct.22,2020.
Overfill Protection & Earthing System
1.0 General Information
1.1 Application
The system is explosion-proof and intrinsically safe. It comprises explosion-
proof part and 2 intrinsically safe parts. The controller is explosion-proof,
which can be used in zone1 or 2, while the Earthing Clamp and Plug & Cable
can be used in zone1 or 2.
The system will effectively prevent the overfill of liquid and guarantee that the
static earthing resistance meets the prescription of relevant safety regulations.
Recommended application for the system includes but is not limited to:
1)Tank truck loading and railway loading.
2)Loading control systems.
1.2 System Introduction
The system monitors the earthing status and liquid level, and interlocks with
other apparatus. Its main features are as following.
1) Interlocking function. It provides switch signal of liquid level and earthing.
2) Stable performance.
3) Provides visual alarm.
4)The associated equipment protected by the explosion-proof enclosure,
outputting and controlling circuit, primary instrument and its processing
circuit are intrinsically safe circuit.
1.3 Technical Specifications
85VAC to 250VAC Ambient
Working voltage -20℃ to+55℃
50Hz temperature
Working current <60mA Monitoring set point ≤10Ω
Alarm type Visual alarm Ex-mark II 2(1) G Ex db ia [ia Ga] IIB T5 Gb
Response time <2s Certification No. Presafe 16 ATEX 8909X
Degrees of protection(IP Code):
IP65 (only applicable for controller of the product)
Output safety parameters
Earthing clamp:
Um:250VAC,Uo:14.28VDC,Io:27.2mA,Po:97mW,Co:4.17μF,Lo:192mH
Plug:
Um:250VAC,Uo:21.42VDC,Io:149mA,Po:798mW,Co:1.19μF,Lo:6.4mH ( for overfill sensor )
Um:250VAC,Uo:14.28VDC,Io:96.2mA,Po:343mW,Co:4.28μF,Lo:15.4mH ( for earthing sensor )
1
Overfill Protection & Earthing System
3.0 Installation and Checkout
3.1 Cautions during Installation
1. Field repairs of flameproof joints should not be undertaken by the end user.
In the event that flameproof joint must be repaired, contact the manufacturer.
Repairs of flameproof joints must be made in compliance with the structural
specifications in manufacturer's drawings. Repairs must not be made on the
basis of values specified in tables 1 and 2 of IEC 60079-1.
2. Overfill protector shall be installed at the location where its display can be
seen and maintenance can be easily made.
3. Specification requirements for ground cable of the enclosure: Single core
yellow green line, its sectional area shall not be less than 4 mm².
4. Connection impedance between the device earthing point and main power
supply earthing point shall not be more than 1Ω at the installation site.
5. Do not open with energized, P02 plug and spiral cable only are allowed to
be wiped with wet cloth, and all the operations that may produce electrostatic
are prohibited.
6. When the product is connected with device of Zone 0, connection to
isolated transformer required in clause 16.3 of IEC/EN 60079-14 shall be
considered.
7.When connecting to the cable, the moment of force for the pressing nut is
13Nm, and 15Nm for pressing connector of the cable entries.
8.The installation, operation and maintenance of this system should meet the
related requirements of EN60079-19, EN60079-14 and EN60079-17.
3. 2 Connecting with Automatic Refueling System
The signal interface of the automated refueling systems is different, so we
have to debug the interface.
The system provides two kinds of signals: static earthing signal and overfill
protection signal. Each signal can be normal open or normal close; the two
signals can be combined or separately output.
1. Choose normal open or normal close.
Status Power off Normal Alarming
Terminal
Static No.5 and No.4 Close Open Close
earthing
signal No.5 and No.6 Open Close Open
Overfill No.8 and No.7 Close Open Close
protection
signal No.8 and No.9 Open Close Open
2. Signals combined output or separately output can be adjusted via dial switch.
3.3 Installation and Checkout
3.3.1 Electrical Installation
3
See Appendix 1 Power Wiring.
3.3.2 Mechanical Installation
See Appendix 2 Installation Wiring Diagram.
See Appendix 3 Controller Dimensions.
3.3.3 Technical Requirements
1. Connect the wires according to the power wiring diagram.
2. Make the wires in order and in good connection.
4.0 Operation Procedures
4.1 Working Status
Top loading
1. Normal earthing
When the earthing clamp is clipped onto the tank truck, the
indicators are flashing green if the earthing connection is
4.1.1
effective, the relay outputs normal working signal.
2.Earthing alarm
When the earthing clamp is clipped onto the tank truck, the
indicators turn to flashing red if the earthing connection is
ineffective, the relay outputs alarming signal.
4.1.2
Bottom loading
1. Normal working status
When the P02 plug is connected with the socket, if the earthing
connection is effective and without overfill, the indicators for
Earthing Overfill
both earthing and overfill are flashing green, the relay outputs
4.1.3
normal working signal.
2. Earthing alarm
When the P02 plug is connected with the socket, if the earthing
connection is ineffective and there is no overfill, the earthing
Earthing Overfill indicator turns to flashing red and the overfill indicator turns to
4.1.4 flashing green, the relay outputs earthing alarm signal.
3. Overfill alarm
When the P02 plug is connected with the socket, if the earthing
connection is effective and there is overfill, the earthing
Earthing Overfill
indicator turns to flashing green and the overfill indicator turns
4.1.5 to flashing red, the relay outputs overfill alarm.
4. Earthing alarm and overfill alarm at the same time
When the P02 plug is connected with the socket, if the earthing
connection is ineffective and the overfill sensor detects liquid,
Earthing Overfill the indicators for both earthing and overfill turn to flashing red,
4.1.6 the relay outputs signals of earthing alarm and overfill alarm.
4
Overfill Protection & Earthing System
1.0 General Information
1.1 Application
The system is explosion-proof and intrinsically safe. It comprises explosion-
proof part and 2 intrinsically safe parts. The controller is explosion-proof ,
which can be used in zone1 or 2, while the Earthing Clamp and Plug & Cable
can be used in zone1 or 2.
The system will effectively prevent the overfill of liquid and guarantee that the
static earthing resistance meets the prescription of relevant safety regulations.
Recommended application for the system includes but is not limited to:
1)Tank truck loading and railway loading.
2)Loading control systems.
1.2 System Introduction
The system monitors the earthing status and liquid level, and interlocks with
other apparatus. Its main features are as following.
1) Interlocking function. It provides switch signal of liquid level and earthing.
2) Stable performance.
3) Provides visual alarm.
4)The associated equipment protected by the explosion-proof enclosure,
outputting and controlling circuit, primary instrument and its processing
circuit are intrinsically safe circuit.
1.3 Technical Specifications
85VAC to 250VAC Ambient
Working voltage -20℃ to+55℃
50Hz temperature
Working current <60mA Monitoring set point ≤10Ω
Alarm type Visual alarm Ex-mark II 2(1) G Ex db ia [ia Ga] IIB T5 Gb
Response time <2s Certification No. Presafe 16 ATEX 8909X
Degrees of protection(IP Code):
IP65 (only applicable for controller of the product)
Output safety parameters
Earthing clamp:
Um:250VAC,Uo:14.28VDC,Io:27.2mA,Po:97mW,Co:4.17μF,Lo:192mH
Plug:
Um:250VAC,Uo:21.42VDC,Io:149mA,Po:798mW,Co:1.19μF,Lo:6.4mH ( for overfill sensor )
Um:250VAC,Uo:14.28VDC,Io:96.2mA,Po:343mW,Co:4.28μF,Lo:15.4mH ( for earthing sensor )
1
Overfill Protection & Earthing System
4.2 Operation Procedures
Top loading
Step 1: Put the earthing clamp onto the tank truck, loading begins when the
indicator becomes flashing green.
Step 2: Take the earthing clamp off from the tank truck and put it back to its
original place after using.
Bottom loading
Step 1: Connect the P02 Plug with the socket on the tank truck, loading begins
when all the indicators becomes flashing green;
Step 2: The corresponding indicator will turn to flashing red if there is earthing
alarm or overfill alarm, and the loading operation is stopped.
Step 3: Disconnect the P02 Plug from the socket and put it back to its original
place after using.
4.3 Dial Switch
UP/BOT:Position ON is for top loading;
position 1 is for bottom loading.
S_BP: Position ON is for earthing shielding,
position2 is for normal earthing status.
UP/BOT 1
ON
S_BP 2
0_BP 3
O_BP:Position ON is for overfill shielding for
BS_UHOAX 4 bottom loading, position3 is for normal status.
C_OUT 5
BS_UHOAX Position ON is for earthing
shielding for bottom loading, position4 is for
normal earthing status.
C _ O U T: P o s i t i o n O N i s f o r s i g n a l s
combination output, that is, the system
outputs alarm signal whatever it is earthing
alarm or overfill alarm, position 5 is for single
signal outputs.
5
5.0 Troubleshooting
Failure 1: The indicator light does not light up after power-on.
Use a multimeter to test the voltage of 220V AC, and check whether the power
supply is normal. If it is not normal, it indicates there is an open circuit, please
check the circuit; if the input power is normal, please contact us at +86 (0)532
86894009 in time to solve the problem, so as not to affect your normal use.
Failure 2: When the earthing clamp is not clipped to any conductor, the
system is still in normal working state and output normal signal.
Unplug the terminal connected to the earthing clamp. If the system enters the
earthing alarm state and the output changes to an earthing alarm signal, it
indicates that the wire of the earthing clamp is short-circuited, please check
and deal with it; if it cannot be dealt with, please contact us +86 (0)532
86894009 in time so as not to affect your normal use.
Failure 3: When the earthing clamp is clipped to the vehicle body or
other conductors, the system is still in an earthing alarm state, and
output earthing signal.
a. Check whether the earthing clamp has a broken tip or whether the end plug
connector is loose or pulled off, resulting in poor contact. If so, please contact
us to replace the earthing clamp in time, so as not to affect your normal use.
b. Check whether there is a phenomenon that the circuit resistance is too
large due to the disconnection of the earthing cable or the excessive oil
pollution on the tip. Please check the line or wipe the tip clean with a cloth. If
the problem still cannot be solved, please contact us in time to avoid affecting
your normal use.
6
Overfill Protection & Earthing System
Appendix 1 Power Wiring Diagram
1
2
Non-Is-Terminal
3
S_R
Safety barrier
Safety barrier
Safety barrier
Safety barrier
Non-Is-Terminal
S_G
O_R
O_G
4 VCC
5
Non-Is-Terminal
6 NO 16
7 C Relay CLAMP CLAMP
15
8 NC
S_BP
0_BP
UP/BOT
C_OUT
BS_UHOAX
Non-Is-Terminal
9 NO Is-Terminal
C Relay
NC WHT RED BLK ORN YEL
Is-Terminal
10 11 12 13 14
VCC
O_G
O_R
Display Board S_G
S_R
Terminal No. Terminal Wiring Terminal No. Terminal Wiring
1 Pow er ground 9 Overfill relay normal close
2 Alternating current input 10 Plug w hite w ire
3 Alternating current input 11 Plug red w ire
4 Earthing relay normal open 12 Plug black w ire
5 Earthing relay public end 13 Plug orange w ire
6 Earthing relay normal close 14 Plug yellow w ire
7 Overfill relay normal open 15 Clamp red w ire
8 Overfill relay public end 16 Clamp blue w ire
7
Appendix 2 Installation Wiring Diagram
Top loading
Controller
85VAC to 250VAC
3x1.5mm² Cable
External diameter:φ8.5 toφ10
Signal output
2x1.0mm²Cable
External diameter:φ8.5 toφ10
Ground Cable for Enclosure
Earthing clamp
Bottom loading
Controller
85VAC to 250VAC
3x1.5mm² Cable
External diameter:φ8.5 toφ10
Signal output
4x1.0mm²Cable
External diameter:φ8.5 toφ10
Ground Cable for Enclosure
Plug & Cable
8
Overfill Protection & Earthing System
Appendix 3 Controller Outline Drawing
G3/4"
9
QINGDAO ALPTEC SAFETY EQUIPMENT CO.,LTD.
Add: No.13 Hancheng Road, Qingdao Free Trade Zone,
Shandong Province, 266555, P.R.China.
Tel: +86 (0)532 8689 4009
Fax: +86 (0)532 8689 4005
Web: www.alptec.com
E-mail:[email protected]