RDS

The document provides details of an HVAC design project for a pharmaceutical research center in Ghana. It includes ambient weather conditions, specifications for multiple rooms including area, volume, occupancy, and selected HVAC equipment with design parameters such as airflow and cooling/heating loads.

Uploaded by

santosh yadav
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
25 views1 page

RDS

The document provides details of an HVAC design project for a pharmaceutical research center in Ghana. It includes ambient weather conditions, specifications for multiple rooms including area, volume, occupancy, and selected HVAC equipment with design parameters such as airflow and cooling/heating loads.

Uploaded by

santosh yadav
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

CLIENT NAME M/s ENTRANCE PHARMACEUTICALS AND RESEARCH CENTRE

LOCATION Ghana
PROJECT M/s ENTRANCE PHARMACEUTICALS AND RESEARCH CENTRE
PROJECT NO 1944
PREPARED BY HVAX TECHNOLOGIES PVT LTD, MUMBAI
DOCUMENT NO 1944/HVAC/RDS/R0

AMBIENT CONDITIONS
SUMMER Temp: 99 F / RH: 60 %
MONSOON Temp: 90 F / RH: 80 %

ROOM DEHUMIDIFI TOTAL FUME


Sr Sys ROOM AREA LTH WDTH AREA Ht VOL. CLASS MIN RH Press Grad MINIMUM EQUIPMENT EQP. SELECTED DESIGN PROCESS DUST EXHAUST SELECTED COOLING REHEAT Fresh Bleed Coil AHU
TEMP. ED AIR HOOD
OCCUPENC
No NO. NO NAME M M Ft2 M Ft3 ACPH DEG C % Pascal SUPPLY ELECTRICAL LOAD LOAD SUPPLY INFILT EXFILT EXH. EXH. EQUIP EXH RETURN RETURN AIR LOAD LOAD Air Air Bypass CAPACITY
Y
above atm CFM HP CFM CFM ACPH CFM CFM CFM CFM CFM CFM CFM CFM (TR) (KW) CFM CFM CFM CFM

PACKING MATERIAL SAMPLING 2.79 1.72 51.63 3.00 508.01 D 30.00 NMT 25 NMT 60 25 2.00 254.01 4.00 2.80 456.01 456 54 79 377 377
1 AHU-01
AIRLOCK 2.50 1.72 46.26 3.00 455.21 D 30.00 NMT 25 NMT 60 15 227.60 - 249.23 249 33 79 90 238 238

TOTAL 97.89 963.22 2.00 481.61 4.00 2.80 705.24 705 615 615 2 1 100 10 10 715

SF-60 M-A/L 2.04 2.89 63.49 3.00 624.77 D 30.00 NMT 25 NMT 40 30 312.39 - 251.40 312 30 221 91 91

2 AHU-02 SF-61 P-A/L 2.04 1.46 32.13 3.00 316.17 D 30.00 NMT 25 NMT 40 30 158.08 - 127.22 332 63 332 (174) -

SF-62 CAPSULE FILLING-2 4.48 4.42 212.94 3.00 2,095.30 D 30.00 NMT 25 NMT 40 15 2.00 1,047.65 10.00 7.00 1,166.09 1,166 33 262 250 1,178 1,178

TOTAL 308.56 3,036.24 2.00 1,518.12 10.00 7.00 1,544.71 1,810 - 1,096 1,269 7 3 541 - 266 1,810

SF-36 M-A/L 1.54 1.57 25.96 3.00 255.47 D 30.00 NMT 27 NMT 40 30 127.73 - 136.64 192 45 192 (55) -

3 AHU-03 SF-37 P-A/L 1.54 1.11 18.44 3.00 181.45 D 30.00 NMT 27 NMT 40 30 90.73 - 97.05 383 127 383 (286) -

SF-38 COMPRESSION-4 3.84 3.44 142.11 3.00 1,398.40 D 30.00 NMT 27 NMT 40 15 2.00 699.20 10.00 7.00 1,004.02 1,004 43 262 250 1,016 1,016

TOTAL 186.52 1,835.32 2.00 917.66 10.00 7.00 1,237.72 1,579 - 675 1,016 7 3 563 - 341 1,579

FF-75 PACKING-2 9.29 4.61 460.95 3.00 4,535.74 D 30.00 NMT 27 NMT 55 30 5.00 2,267.87 5.00 3.50 2,191.56 2,268 30 2,268 2,268
AHU-04
4 FF-82 PACKING-1 9.27 4.61 459.86 3.00 4,525.00 D 30.00 NMT 27 NMT 55 30 5.00 2,262.50 5.00 3.50 2,187.02 2,262 30 166 2,096 2,096

FF-91 AIR LOCK 1.76 1.78 33.70 3.00 331.65 D 30.00 NMT 27 NMT 55 20 165.82 - 140.14 166 30 166 166 166 166

TOTAL 954.51 9,392.38 10.00 4,696.19 7.00 4,518.72 4,696 4,530 4,530 12 17 322 156 333 4,852

FF-31 PACKING 5.21 4.31 241.61 3.00 2,377.44 D 30.00 NMT 27 NMT 55 30 10.00 1,188.72 5.00 3.50 1,746.36 1,746 30 217 1,529 1,529

2.88 1.60 49.49 3.00 486.93 D 30.00 NMT 27 NMT 55 30 243.47 - 308.69 309 30 309 309

FF-32 DE-BLISTERING 2.27 1.54 37.45 3.00 368.46 D 30.00 NMT 27 NMT 55 30 184.23 - 233.59 234 30 234 234

FF-48 PACKING-1 3.06 1.47 48.38 3.00 476.06 D 30.00 NMT 27 NMT 55 30 10.00 238.03 5.00 3.50 540.97 541 30 217 324 324

5 AHU 05 5.52 2.63 155.93 3.00 1,534.31 D 30.00 NMT 27 NMT 55 30 767.16 - 972.68 973 30 973 973

FF-49 DE-BLISTERING 2.40 1.41 36.46 3.00 358.75 D 30.00 NMT 27 NMT 55 30 179.37 - 227.43 227 30 227 227

FF-59 PACKING-2 5.52 2.55 151.42 3.00 1,489.94 D 30.00 NMT 27 NMT 55 30 10.00 744.97 5.00 3.50 1,183.72 1,184 30 217 967 967

3.02 1.36 44.05 3.00 433.44 D 30.00 NMT 27 NMT 55 30 216.72 - 274.78 275 30 275 275

FF-60 DE-BLISTERING 2.44 1.30 34.07 3.00 335.28 D 30.00 NMT 27 NMT 55 30 167.64 - 212.55 213 30 213 213

TOTAL 798.84 7,860.62 30.00 3,930.31 15.00 10.50 5,700.78 5,701 - 5,050 5,050 18 24 651 - - 5,701

You might also like