0% found this document useful (0 votes)
148 views4 pages

Pausch Uroview FD I Maintenance Checklist - Form - 01167563 - 1

Uploaded by

Cale
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
148 views4 pages

Pausch Uroview FD I Maintenance Checklist - Form - 01167563 - 1

Uploaded by

Cale
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 4

Pausch Medical GmbH Uroview® FD Maintenance Seite 1 von 4

Checklist Page 1 of 4

Report number: Employee ID number:

Field Service Engineer: Print name: Signature: Date:

Click here

Hospital or Clinic Name: State: Post Code: Country:


Click here
City:

Date of Maintenance: Started: Completed:

Click here Click here


Serial Number: Table Uroview® FD: HIRIS: Generator:

Type: Click here Click here Click here


Type Number No.: No.: No.:

semiannual yearly three year

Remarks:

01167563 Rev. 01
Pausch Medical GmbH Uroview® FD Maintenance Seite 2 von 4
Checklist Page 2 of 4

Uroview® FD
semiannual

annual

three year

Check according to Uroview® FD Installation


Manual (12 Maintenance Guidance)
 Comment

☐ ☒ ☐  Floor anchor

☐ ☒ ☐  Handheld operating unit

☐ ☒ ☐  Tabletop drive

☐ ☒ ☐  Lift and tilt drive

☐ ☒ ☐  Multi-function foot switch

☐ ☒ ☐  Monitor support arm and monitors

 Fluoroscopy and exposure foot


☐ ☒ ☐ switch

☐ ☒ ☐  Moving the tube support arm

☐ ☒ ☐  Electrical components board

☐ ☒ ☐  Electronics – Parameter Settings

☐ ☒ ☐  Tabletop

☐ ☒ ☐  Accessories

☐ ☒ ☐  Manuals

☐ ☒ ☐  Emergency stop function

☐ ☒ ☐  General Information

01167563 Rev. 01
Pausch Medical GmbH Uroview® FD Maintenance Seite 3 von 4
Checklist Page 3 of 4

Generator Spellman
semiannual

annual

Three year

Check according to Service Manual of the


EDITOR HFe X-Ray generator's  Comment

☐☒ ☐  Operating console:

☐☒ ☐  X-Ray Generator cabinet

☐☒ ☐  H.V Cables:

☐ ☐☒  ZST2 Battery replacement 3,6V

System
semiannual

annual

Three year

 Comment

 KV – control measurement
Use TEST ATH testsheet
Switch off AEC
No filters
50mAs

Format Para target actual actual


meter sf lf
☐☒ ☐
25 cm x 25 cm 60kV 60kV
±5kV
25 cm x 25 cm 70kV 70kV
±5kV
25 cm x 25 cm 80kV 80kV
±5kV

sf: small focus lf: large focus

☐☒ ☐  cutoff dose
Use TEST ATH testsheet
Filter: 21mm Al
Grid out
Put the dosemeter onto the measuring chamber next to the
mean chamber
Take measurements for all three chambers in normal mode
And one measurement for all 4 modes with the mean cham-
ber

Parameter Target / actual / ist


soll
Normal, Mittlere 4µGy
µGy
Messkammer ±0.2µGy
Normal, Linke 4µGy
µGy
Messkammer ±0.2µGy
Normal, Rechte 4µGy
µGy
Messkammer ±0.2µGy
Option 2, Mittlere 2µGy
µGy
Messkammer ±0.1µGy
Option 3, Mittlere 3µGy
µGy
Messkammer ±0.15µGy
Option 4, Mittlere 5µGy
µGy
Messkammer ±0.25µGy
01167563 Rev. 01
Pausch Medical GmbH Uroview® FD Maintenance Seite 4 von 4
Checklist Page 4 of 4

 dose rate
Use TEST ATH testsheet
Filter: --
Grid: --
Format: 43x43
continuous fluoro
dosemeter 30cm above table
☐ ☒ ☐
Parameter dose
maximum kV and mA µGy/sec ≤ 1088 µGy/sec
maximum kV and mA µGy/sec ≤ *

* if the local max dose is lower

 dose rate HLF


Use TEST ATH testsheet
Filter: --
Grid: --
Format: 43x43
continuous fluoro HLF
dosemeter 30cm above table
☐ ☒ ☐
Parameter dose
maximum kV and mA µGy/sec ≤ 2175 µGy/sec
maximum kV and mA µGy/sec ≤ *

* if the local max dose is lower

HIRIS
Semiannual

annual

Three year

Check according to Hiris Technical Manual


 Comment

 Detector calibration
☒ ☐ ☐
 Acceptance Test
☐ ☒ ☐  use document 01167543

01167563 Rev. 01

You might also like