Bago River Flood Control Plan
Bago River Flood Control Plan
DATE:
DATE: DATE:
INDEX OF DRAWINGS
SHEET NO. DESCRIPTION
1
INDEX OF DRAWINGS
7
2 LAYOUT PLAN
7 VICINITY MAP
3 GENERAL NOTES
7
5
SUMMARY OF QUANTITIES
7
6 SCHEDULE OF ITMES
7
7
PROJECT SIGNBOARD/BILLBOARD
7
W E
TO S
DO
N
SA
LV
AD
LUZON
OR
BE
NE
DI
CT
O
BAGO BRIDGE
STA. 0+550 (RIGHT SIDE) STA. 0+000 (RIGHT SIDE)
ALONG JCT. MURCIA-DSB-SAN
CARLOS CITY RD.
a
Se
ine
Pac
ipp
ific
hil
tP
Oc
es
ean
W
VISAYAS
Project Site
U
P
S
T
D R
MINDANAO
E
O
W M
A
N
S
T
R E A M
LOCATION MAP
Sagay City
Victorias City
Escalante City
Silay City
Talisay City
Negros Occidental 1st DEO
Toboso
The Site
Bacolod City
Bacolod City DEO
Murcia
Calatrava
Bago City
Salvador Benedicto
Pulupandan
San Carlos City
Valladolid Negros Occidental 4th DEO
TO
San Enrique
La Carlota
Pontevedra
SA
Canlaon
La Castellana Vallehermoso
NC
Moises Padilla
Hinigaran (Magallon)
AR
Isabela
LO
Binalbagan
Negros Occidental 2nd DEO
S
CIT
Himamaylan Guihulngan City
Y
Ilog Negros Oriental 1st DEO
La Libertad
Kabankalan City Jimalalud
Cauayan
DE S
AL
Tayasan
CI RO
NT
OC NEG
Ayungon
Candoni
Bindoy (Payabon)
Sipalay City
Negros Occidental 3rd DEO Mabinay
Manjuyod
Hinoba-an (Asia)
STA. 0+550.00 (LEFT SIDE) STA. 0+450.00 (LEFT SIDE) STA. 0+000 - STA. 0+020 STA. 0+100 (LEFT SIDE) STA. 0+000 (LEFT SIDE) Bais City
(ONE SIDE)
IEN OS
Tanjay City
Kalumboyan
L
TA
OR EGR
Pamplona
Amlan (Ayuquitan)
N
San Jose
Basay
Negros Oriental 2nd DEO Sibulan
Bayawan City
(Tulong) Santa Catalina Dumaguete City
Valencia
(Luzurriaga)
Bacong
Negros Oriental 3rd DEO
Dauin
Siaton Zamboanguita
L A Y - O U T P L A N
VICINITY MAP
SCALE N.T.S.
IN THE INTERPRETATION OF DRAWINGS, INDICATED DEFORMED STEEL BAR FOR CONCRETE UNLESS OTHERWISE SPECIFIED, THE CONCRETE
DIMENSIONS, DISTANCES AND SIZES SHALL NOT BE REINFORCEMENT SHALL CONFORMED TO THE SLABS SHALL NOT BE GREATER THAN 4m BY 4m AND
SCALED FOR CONTRACTION PURPOSES REQUIREMENTS AND SPECIFICATIONS OF AASHTO SHALL HAVE BETWEEN SLABS, PLAIN VERTICAL
M31 (ASTM A 615/PNS 49). STRAIGHT JOINTS WITH NO JOINT FILLER OR SEALER.
ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHER
SPECIFIED 3. EMBANKMENT ALL REINFORCING BARS SHALL BE COLD-BENT TO THE
SHAPE SHOWN ON THE PLANS. BARS SHALL BE BENT
ALL STATIONING ARE IN KILOMETERS + METERS, ALL EMBANKMENT MATERIALS USE SHALL CONFORM AROUND A CIRCULAR PIN HAVING THE FOLLOWING
ELEVATIONS ARE IN METERS UNLESS OTHERWISE TO THE REQUIREMENTS OF ITEM 104 OF DPWH. DIAMETERS (D) IN RELATION TO THE NOMINAL
SPECIFIED DIAMETER OF THE BAR (d).
4. COCONET
DESIGN CRITERIA
COCONET C400 SHALL CONFORM TO THE THIS
TABLE;
DESIGN SPECIFICATIONS
Nominal Diameter, d, mm Pin Diameter (D)
DPWH DESIGN CRITERIA, GUIDELINES, AND
PROPERTIES C 400
SPECIFICATIONS 2015 EDITION VOLUME 3,
10 to 20 6d
WATER ENGINEERING PROJECTS
THICKNESS, mm 10.0 Min
25 to 28 8d
ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHER
WIDTH, m 1.0 Min
SPECIFIED 32 and greater 10d
LENGTH, m 25.0 Min
ALL STATIONING ARE IN KILOMETERS + METERS,
ELEVATIONS ARE IN METERS
d
UNIT WEIGHT, 1 g/sq.m 400±20
d
DIAMETER OF TWINE, mm 5.0mm±0.50mm
MATERIALS
NUMBER OF TWINES/m
D D
1. GABIONS/MATTRESS CROSSWISE DIRECTION 40.0 Min.
THE WIDTH, HEIGHT, AND LENGTH OF GABION SHALL LENGTHWISE DIRECTION 40.0 Min.
NOT DIFFER MORE THAN +-5% OF THE REQUIRED Woven Netting made from High ALL REINFORCEMENT SHALL BE ACCURATELY PLACED
SIZE PRIOR TO FILLING MATERIAL Strength 100% Coconut Fiber Twine IN THE POSITION SHOWN ON THE PLANS AND FIRMLY
COLOR HELD THERE DURING THE PLACING AND SETTING OF
THE MINIMUM SIZE OF GALVANIZED WIRE TO BE Natural Earth Tone
THE CONCRETE.
USED IN THE FABRICATION OF GABIONS AND
TENSILE STRENGTH, N/Twine 150 Min.
MATTRESSES SHALL BE AS FOLLOWS; ALL REINFORCEMENT SHALL BE FURNISHED IN THE
MACHINE DIRECTION 26 Min. FULL LENGTHS INDICATED ON THE PLANS. SPLICING
ELONGATION OF BARS, EXCEPT WHERE SHOWN ON THE PLANS,
DIAMETER, mm CROSS MACHINE DIRECTION 32 Min.
GABIONS AND MATTRESSES WILL NOT BE PERMITTED WITHOUT WRITTEN
WIRES GABION MATTRESS APPROVAL OF THE ENGINEER.
"C" FACTOR 0.002
BODY WIRE 3.05 2.20
WATER VELOCITY, m/sec 0.002
SELVEDGE WIRE 3.80 2.70
WATER ABSORPTION, % 163 Min.
TIE WIRE 2.20 2.20 3) EMBANKMENT
SLOPE INCLINATION, H:V ≤ 1:1
ALL CONTRUCTION METHODS FOR THIS ITEM SHALL
CONFORM TO THE REQUIREMENTS AND PROCEDURES
ROCKS USED IN GABIONS AND MATTRESSES SHALL
OF ITEM 104 OF DPWH VOLUME II.
CONSISTS OF HARD, DURABLE ROCK PIECES THAT
WILL NOT DETERIORATE WHEN SUBMERGED IN
WATER OR EXPOSED TO SEVERE WEATHER CONSTRUCTION
CONDITIONS
1.) MATTRESSES
ROCK PIECES SHALL BE GENERALLY UNIFORMLY
GRADED IN SIZES RANGING FROM 100mm TO 200mm GABIONS AND MATTRESSES SHALL BE INSTALLED IN
WORKMANLIKE MANNER.
NO ROCK SIZE SHALL EXCEED 2/3 THE MATTRESS
DEPTH AND AT LEAST 85% BY WEIGHT OF THE BEFORE THE FILLING MATERIALS IS PLACED, THE
STONE SHALL HAVE A SIZE GRATER THAN 80mm GABIONS AND MATTRESSES SHALL BE CAREFULLY
SELECTED FOR UNIFORMITY OF SIZE, AND THE PIECES
2. CONCRETE SLOPE PROTECTION SHALL BE HANDPLACED TO PROVIDE NEAT
APPERANCE.
ALL MATERIALS NECESSARY FOR ITEM 1712(2) SHALL
CONFORM TO THE REQUIREMENTS OF DPWH ITEM FILTER FABRIC SHALL BE PLACED BETWEEN
510 MATTRESSES STRUCTURES AND EARTH SURFACE.
1000 1000
600
200 1
VARIABLE
1
3000
1
200mm THICK CONCRETE
SLAB WITH 12mm Ø RSB
20
0
250mm O.C. B.W
N.G.L.
1000
VARIABLE
1 100mmØ PVC WEEPHOLES STAGGERED @
2000 HOR. & 1000 VERT. WITH 0.60m OF
1
20mm GRAVEL BAGGED IN POLYESTER
NON-WOOVEN FILTER CLOTH ON EACH
GABION MATTRESSES HOLE.
2 - 1.00m x 1.00m x 2.00m
VARIABLE
1000 1000
900 TYPICAL SECTION AT FILL
SCALE 1:20M
4000
00
10
600
20
200 00
1
3000
1
200mm THICK CONCRETE
SLAB WITH 12mm Ø RSB
20
0
250mm O.C. B.W
1000
1000
ORDINARY WATER LEVEL
ROCK BACKING
VARIABLE
900
TYPICAL SECTION AT CUT
SCALE 1:20M
4000 GABIONS
SCALE 1:50M
ITEM
DESCRIPTION UNIT QUANTITY
NO.
A.1.1 (8) PROVISION OF FIELD OFFICE FOR THE ENGINEER (RENTAL BASIS) MOS. 6.47
2440
75
CONSTRUCTION OF (Name of Project and Location) DATE STARTED
CONTRACT COMPLETION DATE
CONTRACT COST
:
: 2" x 2" x 8' COCO LUMBER
30
45 CONTRACTOR :
DEPARTMENT OF
30
45 DATE STARTED : PUBLIC WO
25
45 CONTRACT COMPLETION DATE : 2220
TEXT 2920 or
www.dpwh
30
45 CONTRACT COST :
1220
25
45 CONSTRUCTION CONSULTANT : 2820
25
45 IMPLEMENTING OFFICE :
45 SOURCES OF FUND : 1000
225
20
45 DEPARTMENTOF PUBLIC WORKS AND HIGHWAYS NGL
15 Text 2920 or call (02) 165-02 for any concern on this project
20
15 www. dpwh.gov.ph
95
600
80 280
NOTE : DPWH AND DA BILLBOARD SHALL BE LOCATED AT THE BEGINNING AND END OF PROJECT
COA BILLBOARD SHALL BE LOCATED AT THE BEGINNING OF PROJECT ONLY.