The document provides a detailed cost breakdown for a construction project divided into multiple activities and materials. It lists various construction materials and labor costs totaling over 3 million dollars. Activities include site works, concrete works, masonry, roofing, carpentry, plumbing, electrical, and painting.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
50 views2 pages

Cost Estimation CMPM Exam

The document provides a detailed cost breakdown for a construction project divided into multiple activities and materials. It lists various construction materials and labor costs totaling over 3 million dollars. Activities include site works, concrete works, masonry, roofing, carpentry, plumbing, electrical, and painting.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

ACTIVITY DESCRIPTION MATERIAL COST LABOR COST TOTAL COST

A. Site Works:
1. Excavation 22,750.00 22,750.00
2. Backfill 32,000.00 14,000.00 46,000.00
32,000.00 36,750.00 68,750.00
B. Concrete Works
1.Portland Cement 119,600.00
2. Sand 15,000.00
3. Rebars 821,280.00
4. Form (Cocu lumber, plywood,tirewire,etc.) 143,600.00
1,099,480.00 230,350.00 1,329,830.00
C. Masonry/ Wall
1. (Portland Cement,Sand, Mixed Gravel etc.) 350,000.00 75,612.000 425,612.00

D. SLAB on FILL
1. (Portland Cement,Sand, Mixed Gravel etc.) 42,500.00 12,650.00 55,150.00
E. ROOF FRAMING
1. Trusses 200,170.00 70,310.00 270,480.00
F. ROOFING
1. Polycarbonate 220,300.00
2. Vents Moulding 58,000.00
278,300.00 95600.00 373,900.00
G. CARPENTRY
1. Ceiling 105,200.00 37,000.00 142,200.00
2. Stair,Balcony w/ Railings 36,000.00 16,000.00 52,000.00

H. FINISHING
1. Plastering (Cement, Sand etc.) 130,860.00 60,590.00 191,450.00
2. Tile works (1st and 2nd Floor) 70,000.00 23,500.00 93,500.00
3. Kitchen 85,000.00 37,000.00 122,000.00
4. Closets 29,000.00 13,000.00 42,000.00
314,860.00 134,090.00 448,950.00
I. DOORS AND WINDOWS
1. Doors (1st and 2nd floor) 65,350.00
2. Windows (1st and 2nd Floor) 203,852.30
269,202.30 88,000.00 357,202.30

J. PLUMBING
1. Fixtures 106,550.00 32,665.00 139,215.00
2. Water Line 67,710.00 22,000.00 89,710.00
3. Sewer Line (UPVC) (Septic Tank etc.) 65,486.00 20,345.80 85,831.80
314,756.80

K. ELECTRICAL
1. Panel Boards 4,600.00
2. Main Breakers 4,000.00
3. Others 149,895.00
158,495.00 48,248.50 206,743.50

L. PAINTING
1. Exterior 49,600.00 20,000.00 69,600.00
2. Interior 97,000.00 39,360.00 136,360.00
3. Cabinets, Doors, Railings 27,460.00 14,000.00 41,460.00
247,420.00