Oil Gas Welding Quiz Questions Answers
Oil Gas Welding Quiz Questions Answers
1. What type of log could be ran to determine if the primary cementing job was leaking?
a. cement bond log
b. gamma ray
c. neutron porosity
d. SP log
Ans: A
2. Which one of the following is not an indication of a kick?
a. decrease in pump
b . pit gain
c. decrease in pump stroke
d. increase in flow rate
Ans: C
3. What is the name for the longest string of casing rain in a well?
a. surface casing
b. intermediate casing
c. production casing
d. conductor casing
Ans: c
4. Which of the following statements is incorrect about blind rams?
a. they are designed to close when no pipes is in the hole
b. they flatten drill pipe if accidentally used
c. they can stop the flow from the well if used when the drill string is in the table
d. a and b
Ans: c
5. ______ are two large blocks of steel that are designed to close the around the pipe in the well
a. pipe rams
b. shear rams
c. blind rams
d. none of the above
Ans: a
6. Which of the following factors is essential to hole cleaning?
a. flow rate
b. rheology
c. pipe rotation
d. drilling rate
Ans: b
7. The length of the wellbore measured along the actual well path is known as
a. measured depth
b. true vertical depth
c. both of these
d. none of the above
Ans: a
8. ‘Journal Angle’ is related to
a. Rig design
b. casing design
c. drill string design
d. bit design
Ans: b
9. A measure of how rapidly the teeth of a milled tooth will wear when drilling the formation is
known as
a. abrasiveness
b. corrosiveness
c. journal angle
d. fleet angle
Ans: a
10. The process of directing the well bore along some trajectory to a predetermined target is called
a. directional drilling
b. side tracking
c. horizontal drilling
d. none of the above
Ans: a