CTSB Construction Methodology
CTSB Construction Methodology
The scope of work consists of construction of CT Sub Base of 150 mm thickness single layer
MATERIALS:
Topcem OPC -43 grade Cement, Crushed aggregate & crushed dust from Dyna river source
PROPRTIES OF MATERIALS:
Specification Limits
Achieved
Type of Test as Per MORT&H
Results
403.2
Maximum Dry Density (MDD)
2.310 g/cc -
Optimum Moisture Content (OMC)
5.65 % -
Liquid Limit
17 % Max. 45 %
Plasticity Index
Non Plastic Max. 20 %
Uniformity Coefficient
42 >5 %
Water Absorption
< 2% <2 %
Cement Content
2.50 % Min. 2%
7 Days Unconfined Compressive Strength by 2.5%
3.7 MPa Min. 2.2 MPa
cement
Min. 900 MPa as
Elastic Modulus, E for CTSB 6150
per Pavement Design
EQUIPMENT:
100 TPH Capacity OF CTSB PLANT with 4 bins containing 40, 20, 10 & dust. Percentages in
gate opening have been set as per design mix and plant calibration data.
Adjustable water spraying system given to maintain Optimum Moisture Content in mix.
Arrangement for mixing of cement has provided by 50 MT silo, feeding hopper & frequency
controlling motor.
Frequency controller motor controls the required quantity in weight of cement added as
per design mix.
Sieve Analysis and Moisture content should be checked before dispatching the material to
site.
TRANSPOTATION:
The CTSB mix is transported through dumpers by covering tarpaulin cloth to avoid
evaporation losses.
Placing:
Curing:
Curing shall be made with water for the entire laid stretch by covering hessian clothes upon
the laid CTSB Surface to keep the area in continuous moist condition for minimum of 7 days.
Construction Joints:
At the end of each day’s work, a construction joint shall be made transverse to the centre
line of the road by cutting back into the work to provide a full depth vertical joint.