April 14resume Abhishekk

The document is a curriculum vitae for Abhishek Dubey outlining his professional experience in water projects. It details his roles as a senior mechanical engineer on water treatment plants and pipelines from 2018 to present, including responsibilities like overseeing plant operations, equipment installation and maintenance.

Uploaded by

abhi.alld01
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
40 views4 pages

April 14resume Abhishekk

The document is a curriculum vitae for Abhishek Dubey outlining his professional experience in water projects. It details his roles as a senior mechanical engineer on water treatment plants and pipelines from 2018 to present, including responsibilities like overseeing plant operations, equipment installation and maintenance.

Uploaded by

abhi.alld01
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

CURRICULUM VITAE

Abhishek Dubey
(Professional Water Experience)
Location: 145B/13U Salori Prayagraj (U.P.), Pin Code-211004
Telephone: +91-9838002014
Email: [email protected]

Professional profile
To secure a position where, I can efficiently add my skills and abilities for the growth of the
Organization and build my professional career.

Education & qualifications


 B.Tech. in Mechanical Engineering – BBSCET Prayagraj (AKTU)– 2017

Career Summary
Period Employing organization and Summary of activities performed relevant to
title/position. the Assignment

July 2023 to Employing organization:  Supervision of Water treatment plant(14 MLD)


December Teerth Gopicon Limited, Sagar
2023  Installation of Centrifugal pumps.
Title/ Position: Sr Engineer Mechanical

Project Cost-162 Cr.  Testing of Centrifugal pumps.

Project Name: Sanudha Multi Village  Installation of Valves, and Blowers


Scheme (JJM), Sagar

Client: Madhya Pradesh Jal Nigam  Errection and commissioning of centrifugal


Maryadit
pumps

 Operation and maintenance of Pump House,


Intakewell and WTP.

 Operation and maintenance of different types


of valves like Air Valve, Gate valve butterfly
valve and Zero velocity valve

 AirValve, Sluice Valve , Score Valve, Globe valve,


Butterfly valve, NRV Reparing and Errection as
per drawing .

 Construction of Plant Boundaries and Staff Quarters.

 Construction of Filter bed and Cascade Areator.


July 2020 Employing organization: OM
to Construction company
June Shivpuri (M.P)
2023  Butterfly valve, Gate Valve, NRV, Zero
Title/ Position: Sr Engineer Velocity Valve, Air Cushion Valve etc.
Mechanical
erection.
Project Cost: - 150 Cr.
 Screw pump , HSC pump , Submersible pump
Project Name: Shivpuri Water erection.
Augmentation Project.
 Thickner Bridge 25mtr. Dia erection with complete
Client: Urban Administration assembly.
Development Department (UADD),
Government of Madhya Pradesh.
 Centrifugal pump Erection & Commissioning done.

 Supervision of construction work of water supply project


ofShivpuri (M.P.)

 Planned to prepare preliminary layout and detailed design

 In this project we are connected 18 OHT on Shivpuri with


water treatment plant & also connected Intake well to
WTP(42 MLD)

 Excavation, Laying , Jointing & testing for HDPE pipe for


Dia 100-150mm

 Excavation , Laying ,Jointing & testing for DI pipe for Dia


200-500mm

 Excavation, Laying ,Jointing ,Testing M.S. pipe for 800mm


dia for 26km length

 GI pipe laying , jointing , testing for 100mm dia

 M.S. pipe Trenchless system laying , jointing & Testing

 Maintaining daily progresses of different type cans

 Work distriute to related person.

 Maintining Quality as per standard

 Supervision to Inlet to out let complete product.


 Maintaining minimum Rejection.

 Maintaining weekly & Monthly Programe.


 Maintaing all related equipments proper.

October Employing organization: Om  Inspection of M.S. pipe Dia


2018 to July Construction Company 3000mm fabrication & coating .
2020
Title / position: Mechanical
engineer  Excavation , Laying , Jointing , Testing M.S. pipe
for 3000mm dia for 16km length
Project Name:
Shivpuri Water Augmentation Project.
 In plant Fabrication work done by SAW
Project Cost- 50 Cr processes .
Client: Urban Administration
Development (UADD), Government  IN site jointing by SMAW proesses
of Madhya Pradesh.

 Sand Bedding done in all trench 300mm thick.

 Pipe jointing coating patch work done at site


by QAP

 DPT & RT done at site as per QAP.

 Project Planning ,Review of daily progress of


site.

 AirValve, Butterfly Valve & Score Valve


Erection as per drawing .

 Cnducting site preprations , Mobilization of


contractor for carrying out all fabrication ,
Erection & Commissioning of Equipments.

 Preparing and Raising Bills of item Recipt at


site.

 Water Treatment Plant for 40MLD Monitoring


with Civil & Mechanical Team.

 Monitoring of 40MLD WTP, Pump House etc.


 Plant internal unite connectivity pipe laying.

 Monitoring of All Thrust Block , Anchor Block ,


Encasing , Valve Chamber etc with Civil team

 Chemical House it's operation and maintance.

 Filter bed 5 Nos.it's operation and maintance.

 Maintaining Inflow & outflow of water.

 Maintaining water quality as per required


standard.

Declaration
I hereby declare that the above-furnished information is true to the best of my knowledge and belief.

Date: 1st April 2024


Place: Prayagraj U.P. ABHISHEK DUBEY