26071-100-VSC-ME3.3-40001-REV.00A - HSE PLAN (1) (Recovered)
26071-100-VSC-ME3.3-40001-REV.00A - HSE PLAN (1) (Recovered)
3-40001
HSE PLAN
Page 1 of
Doc. No. : 26071-100-VSC-ME3.3-40001
REVISION LOG
Page 2 of
Doc. No. : 26071-100-VSC-ME3.3-40001
TABLE OF CONTENTS
COVER.............................................................................................................................................1
REVISION LOG..............................................................................................................................2
TABLE OF CONTENS....................................................................................................................3
1. INTRODUCTION..................................................................................................................4
2. PURPOSE...............................................................................................................................4
3. SCOPE....................................................................................................................................4
6. REFERENCE.........................................................................................................................9
8. RISK MANAGEMENT.......................................................................................................22
9. MANAGEMENT OF CHANGE.........................................................................................28
20. LIFTING..............................................................................................................................56
26. ATTACHMENT...................................................................................................................68
Page 3 of
Doc. No. : 26071-100-VSC-ME3.3-40001
1. INTRODUCTION
This health and Safety Environment and Security Plan (HSESP) intend to include,
describe and highlight all activities and programs pertaining to Environment Health
and Safety issues on RDMP Balikpapan JO. This HSES plan includes relevant update
procedure and standard from PT FEY from time to time and serves as an overview of
HSES requirements and standards for site personnel, sub‐contractors, vendors and
suppliers working under PT FEY. All site personnel are to reference to this HSES
Plan, procedures and standards for overall understanding of the HSES requirements
for execution of their works on site and on their fabricationshop.
2. PURPOSE
The purpose of this plan is to assure that the safety activities and programs are being
elaborated and described, the dates of completion of each event is being scheduled,
the mandatory regulations are being complied with, the responsibilities are being
properly delegated, and the budget is being set to carry out the plan successfully.
Program such as Communication Evaluation are also being covered in order to check
on the effectiveness, sufficiency and applicability of the HSES plan.
3. SCOPE
This HSES PLAN is applicable for carrying out of all CRT tank, all activities
shall be carried out in accordance with PERTAMINA Standards, RDMP
Balikpapan JO, applicable Codes & Specifications, and government regulation.
Page 4 of 73
Doc. No. : 26071-100-VSC-ME3.3-40001
4.3. STRATEGY
The following sets out the HSE Strategy, achievement of which will ensure compliance
with the Project’s HSE Policy and stated goals and targets:
4.3.1 Ensure that a proactive safety program is applied throughout the project.
4.3.2 Thorough investigation of all accidents and incidents to identify causes and
initiate preventive measures to prevent reoccurrence.
4.3.3 Convene regular safety meeting throughout the execution of the project.
4.3.4 Conduct regular HSE inspection and audits.
4.3.5 Ensure that HSE training is carried out in accordance with the needs of
individuals and the work on hands.
Page 5 of 73
Doc. No. : 26071-100-VSC-ME3.3-40001
Page 6 of 73
Doc. No. : 26071-100-VSC-ME3.3-40001
Page 7 of 73
Doc. No. : 26071-100-VSC-ME3.3-40001
Page 8 of 73
Doc. No. : 26071-100-VSC-ME3.3-40001
6. References
Contractor shall implement HSE Management System refer to Government Regulations,
National & International Standard, Rules and others Regulation, such as but not limited:
6.1. Law No.1/1970 regarding Occupational HSE (Consists of Health and Safety)
6.2. Law No. 23/1992 regarding Occupational Health
6.3. Law No. 32/2009 regarding Protection and Management of Life and
Environment
6.4. Regulation of Indonesian Government No. 11/1979 regarding Work Safety at
MIGAS Refinery
6.5. Law No. 24/2011 regarding Social Security Organizing Body
6.6. Law No. 22/2001 regarding Oil and Gas
6.7. Regulation of Indonesian Government No. 50 / 2012 regarding Implementation of
Occupational Health and Safety Management System Law No. 1/1970 regarding
Occupational Health.
6.8. Regulation of Indonesian Government No. 101 / 2014 regarding Hazardous
Waste Management
Page 9 of 73
Doc. No. : 26071-100-VSC-ME3.3-40001
Page 10 of
Doc. No. : 26071-100-VSC-ME3.3-40001
Page 11 of
Doc. No. : 26071-100-VSC-ME3.3-40001
7.1.1 Establish Health, Safety and Environment (HSE) as a priority in every work
in order to achieve the best level of quality and optimum time completion.
7.1.2 Increase the level of Health, Safety and Environment, in order to prevent all
unsafe action and / or condition, workplace accidents, and environment
pollution in RDMP project.
Page 12 of
Doc. No. : 26071-100-VSC-ME3.3-40001
Managemen PT. Fajar Eka Youone berupaya The Management of PT. Fajar Eka Youone aim
memenuhi atau melebihi harapan pelanggan dengan to fulfill or even exceed customer expectation with
menerapkan konsep kegiatan operasi yang tepat, good implementation, continous improvement, truly, and
kemajuan yang berkelanjutan, kejujuran dan kerjasama, cooperation, through environment efficiency, providing,
dengan menegakkan efisiensi jasa lingkungan, environment friendly energy, and Comportable work
Penyediaan Energi yang ramah lingkungan serta place.
menyediakan suatu tempat kerja yang sehat dan aman.
Untuk mewujudkannya, Managemen PT. Fajar Eka To realize the aim , PT. Fajar Eka Youone
Youone berkomitmen mengedepankan dan commit to conduct the principles
melaksanakan prinsip PT. FEY yang meliputi:
Balikpapan,
Director
Page 13 of
Doc. No. : 26071-100-VSC-ME3.3-40001
Page 14 of
Doc. No. : 26071-100-VSC-ME3.3-40001
LEADING INDICATOR
11 Closure of CAR and NCR issued by Contractor CAR and NCR 100% at the
HSE end of each
Page 15 of
Doc. No. : 26071-100-VSC-ME3.3-40001
The progress of KPI and program shall be updated regularly (refer to Attachment 5. HSE
Programs). Contractor shall submit, on a weekly basis, a formal report summarizing
Contractor and Subcontractors’ HSE performance to the Owner representative. The report
will be including total man-hours, leading and lagging indicator as stated on HSE
Objectives, Target, Programs, and any related additional data.
Coordinator
position Need to
This part of document describes FEY organizational structure for HSE and outlines the
duties and responsibilities of the key personnel who have significant contributions to make
the successful implementation of Project HSE Plan.
7.3.1.1 Overall responsible for the implementation of deliverables in the HSE Plan.
7.3.1.2 To lead Quarterly HSE Management Walk downs.
7.3.1.3 Provide sufficient resources for the implementation of this HSE plan.
7.3.1.4 Ensure that all Contractor's HSE Plan and procedures are
being well implemented at RDMP project
7.3.1.5 Achieve the HSE performance determined by Contractor's HSE policy for
RDMP project.
7.3.1.6 Take necessary corrective and preventive action to gaps and weakness
to procedures and their implementations.
Page 17 of
Doc. No. : 26071-100-VSC-ME3.3-40001
Page 18 of
Doc. No. : 26071-100-VSC-ME3.3-40001
7.3.5.1 Monitor and ensure that the operations under their supervision are
conducted in accordance with HSE requirements and take immediate and
appropriate action to prevent unsafe work practices or other infringements
of the fore going
7.3.5.2 Liaise and co-operate with the Safety Personnel and ensure that any defects
brought to their attention are promptly remedied
7.3.5.3 Provide adequate instruction and supervision for personnel under their
supervision, and encourage them to report defects or other problems that
may adversely affect their health or safety.
Page 19 of
Doc. No. : 26071-100-VSC-ME3.3-40001
7.3.6 FOREMAN
The foreman is responsible for incorporating the HSE instruction in their routine
orders and follow up that they are obeyed in order to prevent their men from
taking undue risk.
The Foreman shall:
7.3.6.1 Ensure that necessary protective equipment is used and used in a correct
manner.
7.3.6.2 Report defects in facility/equipment promptly to their superior
7.3.7.1 All personnel shall wear or use the appropriate safety equipment or do
thing and use the appropriate safety devices.
7.3.7.2 All personnel will familiarize themselves with the relevant
requirements of the Project HSE Plan
7.3.8.1 SAFETY MAN Safetyman and first aider shall stand by full
7.3.8.1.1 Take reasonable care fortime at site.
safety & health of yourself and your
buddy as well;
7.3.8.1.2 Co-operate with your immediate superior and top management on
safety & health requirements that been set up.
7.3.8.1.3 Wear all Personal Protective Equipment in properly at all times
provided by your company (employer)
Page 20 of
Doc. No. : 26071-100-VSC-ME3.3-40001
Page 21 of
Doc. No. : 26071-100-VSC-ME3.3-40001
8. RISK MANAGEMENT
8.1. Hazard Identification, Risk Assessment and Control (HIRAC)
PT FEY shall develop HIRAC (Hazard Identification, Risk Analysis and Control)
throughout project phase. HIRAC will be used as reference to develop JSA for specific
activities at site. At minimum HIRAC shall be consisted of following stages:
8.1.1. Hazard and Risk Identification Stage Execution of Hazard Identification shall be
conducted for all project stages.
8.1.2. Hazard and Risk Assessment Stage Risk assessment is based on identified hazards.
Below Risk Assessment Matrix will be used during this stage
Probability
Almost
Severity Level (Severity) Unlikely Rare Moderate Likely
Certain
1 2 3 4 5
Category Score
Extree Risk 15 – 25
High Risk 8 – 12
Risk (R) =severity (S) x Probability (P)
Medium Risk 3–6
Low Risk 0–2
Figure 2. Risk Categories
Page 22 of
Doc. No. : 26071-100-VSC-ME3.3-40001
Consequence to Object
Significant
Reputati
Safety Health Production Environment on / Legal Financial
Media
Massive
Massive Massive Catastrophi Massive
5 Catastrophic Disaster Disaster Impact (Big
Disturbance Effect c Damage
Impact)
Major
Major Moderate Impact Major
4 Significant Fatality Fatality Significant
Disturbance Effect (National Damage
Scale)
Moderate
Heavy Heavy Moderate Impact
3 Moderate Moderate Moderate Moderate
Injury Injury Effect (Region Scale)
Minor
Medium Medium Minor Minor Minor
2 Minor Impact Minor
Injury Injury Disturbance Effect Damage
(Limited)
Damage Or
0 No Impact No Impact No Impact Disturbance No Impact No Impact No Impact No Impact
Not Happens
Page 23 of
Doc. No. : 26071-100-VSC-ME3.3-40001
Page 24 of
Doc. No. : 26071-100-VSC-ME3.3-40001
Page 25 of
Doc. No. : 26071-100-VSC-ME3.3-40001
Page 26 of
Doc. No. : 26071-100-VSC-ME3.3-40001
8.3.3. Develop control measures to eliminate or reduce them to an acceptable risk. Supervisor
or Foreman shall be responsible to provide JHA and to ensure that the work crew aware
and understand all the associated hazards with the jobs they will be performing. and
also know what are the preventive measures to be taken to eliminate or reduce them
into acceptable risk. Supervisor and Foreman need to conduct periodical review to JHA
to ensure that it remains relevant to reduce workplace incidents. Supervisor and
Foreman shall be delivered and discuss about JHA with their work crews just before
starting the work (Pre-Job Safety Meeting).
During Pre-Job Safety Meeting, Supervisor or Foreman and their work crew will have
a final discussion to review on the JHA then approval to proceed with the Work. Pre-
job Safety Meetings will be conducted at each work site prior to the start of job
activities. During these meetings the contents of the JHA shall be discussed and
confirmation/check to ensure all precaution already at place.
After completing final JHA discussion, JHA are accurately documented on the
appropriate JHA form. The JHA is signed by each crew member, and Supervisor or
Crew Lead.
Page 27 of
Doc. No. : 26071-100-VSC-ME3.3-40001
8.
4.
The Change Management System consist of six (6) step process as follow:
Page 28 of
Doc. No. : 26071-100-VSC-ME3.3-40001
“yes” is the response to any of the questions then the Change Initiator must move to the next
step.
Step 2 Risk Assessment
This Step need to determine the level of risk for a variety of change impact types. The change
impact types include:
The Change Initiator is also required to make comment on the risks of undertaking and not
undertaking the proposed change. Based on the level of risk identified, the following levels of
risk assessment will be required to be completed and details attached to the Change
Management Request Form:
Page 29 of
Doc. No. : 26071-100-VSC-ME3.3-40001
- List any Technical Expert who needs to be consulted about / approve the proposed change.
- List the people / groups who need to be consulted on the proposed change.
- List systems, policies, procedures, plans, schedules, competencies, etc. Which affected
by these changes.
A Technical Expert is generally the person who may own legal obligation/business
accountability in the area covering the change and may not necessarily be the Change
Authorizer. The Change Initiator is required to seek approval from the Technical Expert for the
proposed change if the risk is deemed to be high.
Step 5 Action Plan
This step requires the Change Initiator to develop an Action Plan for the successful
implementation of the proposed change. It is required to review the effectiveness of the change
at an agreed period following the change.
Step 6 Approval
- The Risk Category for the requested change is the highest risk rating from Step 2. That is,
if one category has a risk rating of Medium, but another has a risk rating of High, the
overall risk rating is high
- This step is break down into two stages. The first stage, if required, is the review and
approval by a Technical Expert. This shall apply for all High-risk changes.
- The second stage is the approval by the Change Authorizer. The Change Authorizer is
identified by completing Step 2 Risk Assessment of the Change Management Request
Form. The Change Authorizer depends on the level of risk as defined in the following
table.
Page 30 of
Doc. No. : 26071-100-VSC-ME3.3-40001
- Copy of valid competence certificate (including driving license) for specific position such
as heavy and light vehicles driver, heavy equipment operator, welder, scaffolder, rigger,
etc.;
- Copy Medical Check Up (MCU) result;
- Complete filled of man power register form (for each personnel);
- Formal photograph (3x4) with Red color as a background;
- Copy of identity card (for each personnel);
- Copy of Kartu Keluarga (for each personnel);
- Copy of Surat Domisili (for each personnel);
- Copy of employment card / BPJS (for each personnel);
- Attend HSE induction and matrix training (based on work position).
Page 31 of
Doc. No. : 26071-100-VSC-ME3.3-40001
All of man power data will be documented on a man power register web-based system called
HSE e-Board. This data could be accessed regularly in line with RFID card system.
Page 32 of
Doc. No. : 26071-100-VSC-ME3.3-40001
10.4. PERSONNEL
- Only authorized personnel are allowed onsite.
- All visitors shall get written authorization from the “CLIENT” HSE Department prior to
site access
- No fighting, horseplay, gambling, or “hash” run son work site.
- Personnel Identification
- Only an authentic ID card issued by “CLIENT” is valid on site.
10.5. MEDICAL
- All personnel in the project, shall pass a medical examination initially before being
allowed to work in the project
- To determine the individual’s capability and fitness to work safely
- To assess the physical and mental capability for a particular job or work task
including development and advancement in that job
- To provide a baseline for health so as to allow subsequent assessments to be carried
out and for interpretation of results.
- Report all injuries to the medical station and supervisor immediately.
- If you feel ill, or suspect that others may be ill, seek medical assistance.
11.1. PT FEY shall ensure that the tank construction passed the CSMS (Contractor Safety
Management System) before PQ (Pre-Qualification). CSMS scoring system not only based
on documentation (paper based) but also based on the scoring during shop visit in related
Subcontractor workshop.
11.2. PT FEY shall responsible to Health, Safety, Security, and Environmental performance
within the project site and fabricationshop area as appropriate to it’s relevant scope of
work.
Page 33 of
Doc. No. : 26071-100-VSC-ME3.3-40001
11.3. PT FEY shall meet the requirements of Contractor that contained in document
RDMPSHRP000-S0-PRC-900-00039 HSE Minimum Requirement document. This
document covers all requirements that shall be met in carrying out RDMP project.
11.4. PT FEY shall conduct HSE workshop to present their HSE management plan including
but not limited to man power plan (shall fulfill the requirements of 1 HSE Coordinator
+ HSE Officer with ratio 1: 50 workers + First Aider with ratio 1:100 workers +
Paramedic with ratio 1:250 workers).
11.5. PT FEY shall provide their employees with proper equipment and skill certification from
relevant authorized government institution, provide adequate work tools and provide all
Refer to JO required personal protective equipment as required in the government rules regulations
HSE
Minimum and applicable with national industrial standard
11.6. PT FEY’s personnel shall be given a Health, Safety, and Environmental induction by the
Contractor HSE trainer or other appointed personnel at the workplace area.
11.7. PT FEY and outsource parties that contribute directly with subcontractor is obliged to
provide health/safety and employment insurance facility to workers, both individually and
in groups.
Please make a additional detail point regarding
Fitness to Work, Heat Stress and health program.
12. HEALTH MANAGEMENT Extended work/ shift work, Hygiene Occupational
All employees will undergo pre-employment medical checks to confirm fitness for duty, in line
with local government regulations. The primary goal is to provide a healthy workforce and a
workplace that is, as far as reasonably practicable, free from recognized workplace health
hazards by:
Page 34 of
Doc. No. : 26071-100-VSC-ME3.3-40001
12.3. Training
- Hazards associated with use and storage of hazardous chemical/materials
- Correct understanding of the hazardous substances warning labels.
- Awareness of the impacts and risks arising from the mismanagement of hazardous
Page 35 of
Doc. No. : 26071-100-VSC-ME3.3-40001
- Work at height for tank erection works and the associated risk of falls of persons or
objects.
- Confined space for tank works
- Scaffolding and temporary supports
- The use of construction equipment including cranes, lifting appliances/machine,
generators.
Page 36 of
Doc. No. : 26071-100-VSC-ME3.3-40001
Page 37 of
Doc. No. : 26071-100-VSC-ME3.3-40001
- It is mandatory that the personnel of Construction Team sets up daily Tool Box Talks
with the workforce before the works start. This is to ensure that the personnel on site
receive specific safety instruction and that feed backs from the workforce about safety
hazards can also be obtained.
- HSE Training
All employees should understand the required training programs and to be attended
the necessary trainings prior to commence the work, in order to carry out their task
safely.
Page 38 of
Doc. No. : 26071-100-VSC-ME3.3-40001
Page 39 of
Doc. No. : 26071-100-VSC-ME3.3-40001
PPE mandatory is safety helmet with chin strap, clear safety glasses or goggle, ear plug,
coverall with high visibility reflector, and safety shoes. The standard PPE must be worn are:
TYPE OF PPE STANDARDS
All head protection with chinstrap shall meet
requirements set out in EN 397, ANSI Z89.1 –2003
Color requirements of safety helmet
Head protection Contractor’s Supervisor and above: White color
Sub-contractor helmet: Yellow color
Contractor & Sub-contractor HSE Personal: Red
color
Eye and face All eye and face protection shall meet the requirements
protection set out in EN 166, ANSI Z87.1 –2003
All respiratory protection shall meet the requirements set
out in ANSI Z88.2 –1992, filter respirator set out in BS
Respiratory
EN 4275, 1997;Airline mask BS EN 139, 1995; Self
protection
Contained Breathing Apparatus (SCBA) BS EN 137,
1993
Page 40 of
Doc. No. : 26071-100-VSC-ME3.3-40001
will investigate of any accident or incident arising from construction activities at the work
site. Safety Supervisor is responsible for ensuring prompt and proper reporting of all
accidents to “Client” including post incident monitoring of any injured parties.
Need more
explanation. refer
13.10. Equipment/Lifting Gears Inspection & Color Coding
to JO HSE Plan
All safety related tools, equipment and PPE are formally inspected every quarterly and
tagged on a scheduled basis to indicate that they are safe for use by a competent person.
This standard applies to all portable electrical and pneumatic hand held tools, safety harness
and slings of all types used on the project and must be checked prior to every usage.
13.11.1. Persons shall be provided safe access and egress to all work areas. Access ways such
as ladders shall be provided for personnel who must perform work at elevatedareas.
13.11.2. Supervisors shall analyze all elevated tasks as to fall protection needs to ensure
adequate fall protection systems are provided. After analyzing the tasks, supervisors
shall instruct personnel involved in the specifics of the fall protection measures to be
used.
13.11.3. In principle, for work where a fall exposure of 2 meters or more exists,
maximum use will be made of primary fall prevention systems such as
scaffolding, personnel hoists and aerial lifts.
13.11.4. Approved full-body safety harnesses complete with double lanyards and shock
absorbers, are to be used for employee fall protection where primary fall protection
systems are inadequate and fall exposures exist.
Page 41 of
Doc. No. : 26071-100-VSC-ME3.3-40001
13.11.5. Persons who are observed not utilizing fall protection equipment will be identified
and the appropriate supervisor or subcontractor notified. The person will be expelled
from the project.
13.11.6. Double lanyards shall not be joined “hook to hook” around structures as an
anchorage as the 100% fall protection fails when hooks are disengaged.
13.11.7. In situations where a fall could result in impalement or other injury (e.g.
working over a hot process, operating equipment, rebar), fall protection
equipment shall be utilized regardless of the potential falling distance.
13.11.8. When working from within the handrails of approved scaffolding a full body safety
harness complete with 2 lanyards and shock-absorbers must be worn. If the task
entails the creation of a fall risk (e.g. leaning over the handrails) then the lanyards
must be hooked on to a secure anchor point.
13.11.9. Auxiliary fall protection equipment such as static lines, perimeter guards, or other
suitable means of anchoring safety harnesses, shall be utilized by personnel traveling
from one location to another in elevated locations.
13.11.10. Lifelines may be mounted either vertically or horizontally and must be
capable of supporting at least 2,000 KG per employee. Lifelines must be
installed and maintained by persons competent in rigging practices.
13.11.11. Horizontal lifelines shall be secured at each end by at least three cable clamps
and should be positioned so as to provide points of attachment at least waist level or
higher for persons utilizing them.
13.11.12. Where personnel lifting devices are being used (aerial lifts, man-baskets) the
occupants must wear full body harnesses and be hooked up to a secure point within
the equipment. Where holes exist in the flooring, walls or handrails of elevated
structures sufficient action shall be taken in order to minimize the risk of falls.
13.11.13. Floor openings shall be fitted with temporary covers capable of supporting at
least twice the weight of employees, equipment and materials that may be imposed on
the cover at any one time.
13.11.14. The floor covers shall be stenciled “OPEN HOLE-DANGER, DO NOT
REMOVE”.
Page 42 of
Doc. No. : 26071-100-VSC-ME3.3-40001
Page 43 of
Doc. No. : 26071-100-VSC-ME3.3-40001
inspection checks on the lifting machine, lifting gears and appliances, lifting area and
signaling requirement. A test lift will be performed before actual lift performs. A rigging
study shall be prepared and approved for all lifts of 30 up or 50 tons or more and for
multi-crane lifts. A competent flagman shall be used to direct movement of the machine
during reversing.
- The correct method of earthling is used. A welding return lead shall be provided from
the neutral terminal of each phase of an AC welding transformer on the
Page 44 of
Doc. No. : 26071-100-VSC-ME3.3-40001
Page 45 of
Doc. No. : 26071-100-VSC-ME3.3-40001
- Be equipped with a protective guard which allows only the working part of the
wheel to be exposed and marked with their maximum running speed.
- Be equipped with a protective guard which allows only the working part of the
wheel to be exposed and marked with their maximum running speed.
- Have the grinding wheels and discs marked with their correct running speed.
- Have the correct wheel or disc fitted to the grinder by a competent person.
- NOT to be modified to fit non-standard wheels or discs.
- Have the appropriate rest and guard fitted on fixed grinding wheels. Have a
maximum gap of 3 mm between rest and wheel on small fixed grinders.
Page 46 of
Doc. No. : 26071-100-VSC-ME3.3-40001
- Keep cylinders in a location free from vehicle traffic, excessive heat and electrical
circuits.
- Keep empty cylinders away from full ones.
Handling/moving:
- Handle cylinders with care and avoid dropping or hitting them against anything.
- Follow proper procedures and use the right equipment, including safety glasses,
heavyduty Gloves and protective footwear.
- Ensure safety measures, such as caps or guards, are securely installed.
- Use a cart or hand truck instead of dragging or rolling cylinders.
- Use proper cradles, nets or platforms if using a crane.
- Avoid lifting cylinders by their caps or guards or with magnets or slings, which can
damage the valves
Safety Violation
An act that is contrary to the requirements or intent of a safety rule or regulation, but does
not immediately expose the individual or others to serious injury or death.
Serious Safety Violation- An act that is contrary to the requirements or intent of a safety
rule or regulation, and immediately exposes the individual or other to serious injury or
death.
Major Serious Safety Violation
An inexcusable act that is contrary to the requirements or intent of a safety rule or
regulation, i.e. gross negligence, willful misconduct or disregard of basic HSE policies,
which endangers the individual or other to serious injury or death.
Reprimand
An official written notice to any personnel that his or her performance with respect to safety
is unacceptable. Reprimanding a Safety Violation
Page 47 of
Doc. No. : 26071-100-VSC-ME3.3-40001
Safety Violation
A verbal or written reprimand is issued for the first Safety Violation. A combination of
two (2) Safety Violation reprimands may result in suspension of two (2) days without pay.
A combination of three (3) Safety Violation reprimands may result in termination subject
to the discretion of the Construction Manager.
Serious Safety Violation
A written reprimand is issued for the first Serious Safety Violation, which may result in a
suspension for two (2) days without pay or termination. A combination of two (2) Serious
Safety Violation reprimands may result in immediate termination.
Major Serious Safety Violation
A reprimand is issued for any Major Serious Safety Violation, and may result in
immediate termination; a written reprimand is not required before discharge.
- “CLIENT” input/complain
- HSE Accidents, Incidents, and Near Misses,
- Construct ability issues,
- HSE inspection findings.
Page 48 of
Doc. No. : 26071-100-VSC-ME3.3-40001
- Priority
- Required resources, and
- Impact on cost and schedule
Construction Manager will evaluate Corrective or Preventive Action Requests and makes
the final decision on the implementing action.
Page 49 of
Doc. No. : 26071-100-VSC-ME3.3-40001
- Temporary electric supply that includes the design, connections, equipment, cabling,
temporary lighting.
- Waste materials arising from the temporary site facilities, including offices, accommodation
and canteen facilities will be collected and disposed of offsite at the local authority
Bins shall be placed in offices, construction site, camp. A sufficient number of bins shall
be placed for each type of waste at waste collection points, depending on the variety and
quantity of the wastes expected from the location.
These bins shall be placed and emptied in an effective and timely manner in the various the
waste disposal areas. No waste collection bin will be allowed to overflow before it is
emptied, and waste storage receptacles shall be replaced promptly, in the event of damage.
Bins shall be cleaned immediately after being empties. The project areas including offices,
pioneer camp, canteen, and clinic shall be kept in a neat, clean, and safe condition. Remove
and properly dispose of all debris and rubbish.
Page 51 of
Doc. No. : 26071-100-VSC-ME3.3-40001
16.4. Housekeeping
- Housekeeping is the foundation of Safety at site. An orderly arrangement of
materials and equipment shall be maintained at all times.
- Construction areas shall be cleaned and arranged by safe means on a daily basis to
preclude the creation of slip, trip and fire hazards.
- All scrap metal, wood and general waste material shall be removed from the
immediate work area as work progresses. Appropriate trash containers shall be
strategically placed on the site to receive such waste.
Page 52 of
Doc. No. : 26071-100-VSC-ME3.3-40001
16.6. Smoking
Owing to the large quantities of flammable products within the job site, cigarette smoking is strictly confined to
Safety Manager or its delegates instructs all personnel to comply with this regulation and anyone found in breac
Page 53 of
Doc. No. : 26071-100-VSC-ME3.3-40001
Page 54 of
Doc. No. : 26071-100-VSC-ME3.3-40001
Argon and in some cases Liquefied Petroleum Gases (LPG). All these compressed gas
cylinders are equally dangerous if they are not properly handled or stored.
- Regular housekeeping shall be performed to remove combustible materials from the
- Combustible materials shall be segregated and stored neatly at the designated site waste
collection area.
- Where combustibles may be exposed to hot work, adequate precautionary measures shall be
taken to contain the hot work or shield the combustible materials as per the risk assessment.
- Flammable liquids / materials shall be handled and stored in accordance with the
manufacturer’s recommendations stated in the Material Safety Data Sheet (MSDS) as far
as practicable.
- Flammable liquid / material storage area shall be constructed far away from sources of
ignition, heat, naked flames and direct sunlight. Warning notices shall be posted
conspicuously around the storage area.
- Flammable liquids shall be stored in approved type containers as per the MSDS and
clearly labeled of its contents.
- Poor electrical connection, illegal tapping and modification of electrical installation and
distribution, undersized and poorly constructed electrical cables and equipment are the
common causes of electrical fires in construction sites.
- Electrical cables used shall be of adequate size, double insulated and protected from
damages.
- Electrical cables shall not be coiled or rolled up when energized, but rather, laid out neatly
or hung up (2 meters) away from access ways and in a manner that does not cause tripping
hazards
- Electrical extension cords shall not be constructed with multiple outlets plugs.
- Hot works such as arc welding, heating, or burning, gas cutting and grinding are
activities that are dangerous that can easily spark off a fire when effective precautionary
measures are not implemented.
- Employees performing the work shall ensure that all equipment and area is safe for the
work to be carried out.
- Combustible and flammable materials shall be kept clear from the hot work area
Page 55 of
Doc. No. : 26071-100-VSC-ME3.3-40001
20. LIFTING
- Cranes & Lifting Equipment
PT FEY will ensure that all cranes used for this project shall have valid certificate from
MIGAS. All cranes can only be used after get an approval from JO
- Slings and Lifting Gear
All lifting gears will be inspected by qualified inspector from Contractor and have valid
MIGAS certification. Lifting gears will follow the color code inspection system. All slings
and lifting gear will be maintained to accepted local standards. They shall also be inspected
on a regular 3 months basis. Valid Test Certificates will be obtained from the
manufacturer/supplier and these will be kept on file by the HSE Supervisor. The Safe
Working Load (SWL) will be clearly marked on the gear. Wire ropes will be inspected by the
crane operator before the start of each shift and by the rigger before each lift. Badly corroded
or kinked wire rope slings will be removed from site and immediately destroyed. All slings
and lifting gear will be kept in a store area when not in use.
Lifting plan will be applicable for critical lifting; non-critical lifting will be required only
the lifting calculation. Rigging engineer will develop and prepare lifting plan and method
statement then submit to RDMP BALIKPAPAN JO Sr. Rigging Engineer for review.
Lifting plan and method statement will be attached in PTW. This lifting plan would be
submitted at least two days prior to work execution.
All crane operator and rigger shall meet the requirements of RDMP BALIKPAPAN JO’s
standard and mandatory to have valid SIO/ Operator License (Surat Ijin
Page 56 of
Doc. No. : 26071-100-VSC-ME3.3-40001
Page 57 of
Doc. No. : 26071-100-VSC-ME3.3-40001
To ensure the cleanliness of all working areas and hygienic with carrying out
periodic
cleanliness using disinfectant such as: door hand hold, stair handhold,
meeting room and other places
- Optimize air circulation and sunlight enter the work area
- To provide mask and tissues
- To inform and educate all personnel in practicing of behavior in clean and
healthy life such as:
To clean the work area and tools with disinfectant
Washing hand with water and soap or alcohol hand wash
To avoid direct physical contact such as: shack hands, embrace
Keep distance/contact 1 meter from others who are having cough, fever
To avoid unnecessary touching part of face
With continues using masker
Increase endurance by consuming balance nutrition, vegetables and fruit with
enough rest
After work, clean body first before touching family member
- To socialize self isolated.
- To display health slogans/posters in strategic places such: door, rest area, access
way and other place accessed easily.
- HSE Personnel and medic will conduct proactive monitoring to all personnel to detect
personnel who having fever symptoms, cough, runny nose and sore throat in work area to
check to company clinic or to closed health facility treatment.
- When personnel get sick because of fever symptoms, cough, runny nose and sore
throat have to report to administration and HSE personnel to monitor for finding out
the connection with Covid-19
- If HSE personnel or medic found employee suspected Covid-19, immediately report and
coordinate with local health department. For employee confirm Covid- 19 ust be
referred to appointed hospital immediately.
- If HSE personnel or medic get information of availability of suspected or confirmed
Covid-19 on worker/s, so they have to conduct contact identification mean that the
suspected must be interact with 1 meter distance.
Page 58 of
Doc. No. : 26071-100-VSC-ME3.3-40001
- Company will be strong suggestion in using PPE (Masker) and practicing healthy and
cleanly life.
NOTE: This Protocol shall fix and follow with update local and government regulation.
22.1.1. Policies, Goals and Objectives HSE top management team CONTRACTORS project
will establish policies, objectives and targets HSE and ensure the commitment of all
personnel for HSE Management System Requirements and ensure continuous
improvement.
22.1.2. Planning
Plans for the HSE policy, goals and objectives will include the following.
- The location and conditions of the project (Plant projects, hills, etc.).
- Identification of work.
- To identify / recognize all the hazards in accordance with Hazard Zone Category
in plant operation, the character of the operation on the working tools, vehicles
and all types of equipment.
- Condition of worker / health worker.
- The background of the people involved in its construction, with respect to
Safety Awareness.
- Refer to the SOP (Standard Operating Procedure) and HSE Management System
Procedures.
- Provision of job execution procedures.
- Compliance with HSE Regulations (National Regulations and requirements
FIRM).
- Top down HSE policy commitment by top management of the project.
Page 59 of
Doc. No. : 26071-100-VSC-ME3.3-40001
22.1.3. Implementation
To ensure the plan was effective, an organization developed with the capabilities and
support systems necessary to achieve the policies, objectives and targets HSE. This
will include:
- The organization and duties adequately.
- Culturization safety (safety minded) to have:
safety messages for each type of Meetings Construction,
Induction HSE (conducted by representatives COMPANY),
Meeting Toolbox Daily,
Safety Talk Weekly,
Management Meeting,
Management Policy (indicated by the brochure, banners, notice boards,
newsletters, memos safety, etc.),
Firefighters and emergency evacuation drills,
Training,
Promotion and Safety Award.
- Provision of resources: people, materials, equipment / instruments, facilities and
funds.
- Inspection and maintenance.
Page 60 of
Doc. No. : 26071-100-VSC-ME3.3-40001
Page 61 of
Doc. No. : 26071-100-VSC-ME3.3-40001
Committee to attain the purpose planned herein. He has authority over members for the
improvement of HSE control. The Secretary will organize the HSE Committee and
prepare the minutes of meeting. Present to the Committee the status of inspection
reports, incident investigations and the Industrial HSE Report. Members will assist the
Chairman in the implementation of the HSE Management Program and provide
constant surveillance in the field on all matters pertaining to HSE and fire concerns on
the construction work site.
Page 62 of
Doc. No. : 26071-100-VSC-ME3.3-40001
Subcontractors will establish the programs necessary to ensure that the project employees work
safely in conditions of heat stress. Decrease the adverse health effects
Page 63 of
Doc. No. : 26071-100-VSC-ME3.3-40001
All toxic waste, paint cans, oily rags, the motor oil, solvents, engine coolant, etc., will be
disposed of in accordance with the requirements of Contractor.
Page 64 of
Doc. No. : 26071-100-VSC-ME3.3-40001
This plan will be updated regularly as conditions change. The plan will be in accordance with
statutory requirements and the requirements of Contractor. Sub-contractors must handle, sort and
dispose of waste in accordance with this plan. This plan should include procedures chain of
custody to ensure control of the waste disposal project to be approved waste disposal facility.
HSE department of Subcontractor will regularly inspect Camp and project work to ensure that
the environmental requirements of the project is to be desired. Regular inspection of the
facilities to the work site will also be made to ensure that construction work does not cause
harm to the surrounding environment.
Complaints from local residents, particularly complaints from local community leaders, will
be investigated by a special examination, should act as a violation of law, regulations,
guidelines, or environmental procedures. Any discrepancy noted by the inspector it will be
reported to the responsible party and would soon be corrected or repaired by the responsible
party.
A complete audit report will be made to the HSE JO after completion of Audit. Location
audits are non-conformance will be checked by the Supervisor and Coordinator
Subcontractor to assist in the improvement of the performance is below standard, and the
locations of nonconformance with the HSE Plan This project.
Audit reports will provide detailed actions that must be addressed, responsibilities, and
dates of completion and follow-up needs to be done.
Page 65 of
Doc. No. : 26071-100-VSC-ME3.3-40001
24.2. INSPECTION
The purpose of the inspection is to ensure HSE rules and legislation complied with in
accordance with the HSE Plan and procedures HSE. Internal inspections are
carried out periodically by Subcontractor. The purpose of the internal inspection is to
confirm that they are still safe to operate. Sticker consent should be installed after approval.
The following are some things to consider when carrying out internal inspections:
- Construction Equipment (moving and static) and electric power equipment should
be inspected and given tagging before being used in the work area.
- Inspections must be carried out using a checklist
- List must contain a detailed inspection equipment that has been inspected
- The user or the operator must perform a daily inspection of the equipment they are
using Pre Trip Inspection Checklist
- Vehicles (heavy and light vehicles) must have valid documents to comply with
national and / or local laws and regulations.
- Operator must have the vehicle's license to operate mobile equipment at the project
site.
- Vehicle operators must be healthy medically and accompanied by a certificate.
- Subcontractor must meet the safety procedures of motor vehicles belonging
Contractor.
The following is an example of Vehicles, equipment and tools that need to be
inspected (but not limited to this list)
- Construction heavy equipment (dozer, excavator, grader, etc.).
- Lifting equipment such as cranes, Lifting & Hauling etc.
- Heavy vehicles such as trailers, Truck, Forklift etc.
- Light vehicles such as Jeep, pick-ups, etc.
- Powered equipment and conveyances / ancillary equipment such as slings,
shackles, chain / liver / pulley blocks etc.
- Small fire extinguisher and other apparatus protection etc.
- Scaffolding
- Engines such as generator sets, Welding Machine, etc.
- Special tools such as grinding, digging machines, etc.
Page 66 of
Doc. No. : 26071-100-VSC-ME3.3-40001
Page 67 of
Doc. No. : 26071-100-VSC-ME3.3-40001
25.2. PUNISHMENT
Punishment will be given to workers who violate the regulations that have been
implemented in the project location. Punishment provisions are divided into:
25.2.1. Verbal warning
25.2.2. ID card perforation
25.2.3. Warning Letter
25.2.4. Work termination
26. ATTACHEMENTS
ATTACHMENT 1 : EMERGENCY RESPONSE FLOWCHART
ATTACHMENT 2 : EMERGENCY CONTACT NUMBER
ATTACHMENT 3 : EVACUATION ROUTE
ATTACHMENT 4 : HSE TRAINING MATRIX
ATTACHMENT 5 : HSE PROGRAM
Page 68 of
Doc. No. : 26071-100-VSC-ME3.3-40001
Page 69 of
Doc. No. : 26071-100-VSC-ME3.3-40001
Page 70 of
Doc. No. : 26071-100-VSC-ME3.3-40001
: MUSTER POINT
Page 71 of
Doc. No. : 26071-100-VSC-ME3.3-40001
Page 72 of
Doc. No. : 26071-100-VSC-ME3.3-40001
Page 73 of