0% found this document useful (0 votes)
45 views1 page

R12-T06c05-Tie-00-Xx-Sdw-El-60008 (C1)

The document contains general notes for an electrical project. It includes 6 notes on topics like motor protection, ELCB/ELR installation, electrical meters, transformer impedance, SPDs, and CT burden.

Uploaded by

Vishnu Pradeep
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
45 views1 page

R12-T06c05-Tie-00-Xx-Sdw-El-60008 (C1)

The document contains general notes for an electrical project. It includes 6 notes on topics like motor protection, ELCB/ELR installation, electrical meters, transformer impedance, SPDs, and CT burden.

Uploaded by

Vishnu Pradeep
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

General Notes

1. MOTOR PROTECTION SHALL BE IN THE VFD AND WILL


BE INDICATED BY VFD VENDOR DRAWING.

2. ELCB SHALL BE ALLOWED FOR ALL LOAD FEEDERS


UP TO 63A AND ELR FOR LOAD FEEDERS ABOVE 63A.

3. FOR RSG ELECTRICAL METER, REFER


DOCUMENT-"ANNEXURE A GENERAL SPECIFICATION
INFRASTRUCTURE WORK".

4. TRANSFORMER IMPENDANCE IS CONSIDERED AS PER SEC


STANDARD.
5. CLASS I+II SPDS SHALL BE INSTALLED AT INCOMER OF LV
SWITCHGEAR .SPD SHALL BE AS PER IEC 61643-11

6. CT BURDEN SHALL BE 15VA.

100% DD R12-T06C05-TIE-00-XX-DWG-EL-60008 RV.02

FROM
IRR1 NETWORK - PMCC
05BJA01

4C, 16 mm² CU/XLPE CABLE) C1 10/11/23 ISSUED FOR CONSTRUCTION NKS


1C, 16 mm² G/Y PVC ECC CABLE C0 17/08/23 ISSUED FOR CONSTRUCTION NKS
(L=20MTR.) MANUAL/ PHOTOCELL &
Date Reason For Issue Chk

AUTOMATIC SWITCH CLOCK CONTACTOR SHOP DRAWING


TAG NO. :05BLA01 Form 1
P Key Plan.
LIGHTING DISTRIBUTION BOARD IP : 41
LOC: PUMPING-STATION ELEC. ROOM M A R
CL: 6.4 kW M
MD: 4.4 kW

PB1 CF

240V AC
PB2 R
40A
3P, MCCB

R CF C1

IRR1 NETWORK - LIGHTING DISTRIBUTION BOARD


(05BLA01) N
400 V, 3Ph+N+PE, 60 Hz, 40 A, 16 kA /1s,Cu
F1 F2 F3 F4 F5 F6 DETAIL-A
CONTROL MECHANISM ONLY FOR
OUTDOOR LIGHTING CIRCUIT

REFERENCE DRAWINGS
16A 16A 16A 16A 20A 16A
SP, SP, SP, 3P, SP, SP, · FOR IRR 1 LOAD INFORMATION:
R12-T06C05-TIE-REG-EL-0001_IRR1 NETWORK ELECTRICAL
RCBO RCBO RCBO RCBO RCBO RCBO
LOAD LIST
· FOR CABLE LIST INFORMATION:
R12-T06C05-TIE-CAL-EL-0005_IRR NETWORK LV CABLE
CALCULATION REPORT

70mm2 cu conductor

Contractor highly recommended to resubmit with Contractor Design/Consultant


SPARE SPARE downstream to upstream.calculation with protection
3x1Cx4MM2 CU/XLPE FLEX.WIRE 3x1Cx6MM2 5Cx6MM2CU/XLPE details along with previews comments compliance
CU/XLPE ARMOURED CABLE sheets.
FLEX.WIRE

Supervision Consultant

LIGHTING SYSTEM LIGHTING SYSTEM SOCKET OUTLET 16A LIGHTING CIRCUIT 3-


CIRCUIT 1 CIRCUIT 2 1PH+N+PE OUTDOOR
(05BLA01-A0) (05BLA01-B0) (05BLA01-SOA) CL:1 kW
CL: 0.8kW CL: 0.6kW CL: 4.0kW MD:1 kW Contractor
MD: 0.8kW MD: 0.6kW MD: 2.0kW

IRR1 NETWORK - LIGHTING DB Client

Project

D&B IRRIGATION LINE - AIRPORT TO BRIDGE POINT

Drawing Title

IRR NETWORK SINGLE LINE DIAGRAM


IRR1 NETWORK - LIGHTING DB

Sheet (08 / 19)

Model File Reference


No model reference

Drawn By Checked By Approved By

SKY NKS DST


Project No Issue Date Scale at ISO A1
R12-T06C05 10/11/23 -
Drawing Number Revision:

R12-T06C05-TIE-00-XX-SDW-EL-60008 C1

You might also like