0% found this document useful (0 votes)
39 views47 pages

PH1100286

This document contains detailed design drawings for a telecommunications site including architectural, structural, and electrical drawings and specifications. It provides site information, tower details, equipment layouts, and construction safety requirements for the project.

Uploaded by

Glen Espinosa
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
39 views47 pages

PH1100286

This document contains detailed design drawings for a telecommunications site including architectural, structural, and electrical drawings and specifications. It provides site information, tower details, equipment layouts, and construction safety requirements for the project.

Uploaded by

Glen Espinosa
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 47

DETAILED DESIGN DRAWING

(GREENFIELD)

SITE ID: PH1100286


SITE CODE:
SITE NAME:
LON(E): 125.51601
LAT(N): 7.07074
TOWER TYPE: JGT-36-340C-2NPT

700M&2.1G-3Sectors
TABLE OF CONTENTS
NO. DRAWING NO. DESCRIPTION
CONSTRUCTION SAFETY REQUIREMENTS
BILL OF QUANTITY
ARCHITECTURAL
1 AR-01 SITE INFORMATION
2 AR-02 PERSPECTIVE VIEW/ SITE LAYOUT/ ANTENNA VIEW
3 AR-03 SITE DEVELOPMENT PLAN/ ELEVATION VIEW
4 AR-04 ELEVATION VIEW
5 AR-05 EQUIPMENT LAYOUT
STRUCTURAL
1 ST-01 FENCE ELEVATIONS
2 ST-02 FENCE FOUNDATION DETAILS
3 ST-03 METAL GATE DETAILS
4 ST-04 RAMP DETAILS
5 ST-05 POWER SERVICE ENTRANCE POST DETAILS
6 ST-06 MCB/MTS LAYOUT
7 ST-07 TEST PIT DETAIL
8 ST-08 ACPDB STAND DETAILS
9 ST-09 HANDHOLE DETAILS 1 & 2
10 ST-10 SURGE PROTECTOR DEVICE LOCATION
11 ST-11 JGT-30-340C-2NPT TOWER LINE DIAGRAM
12 ST-12 JGT-30-340C-2NPT TOWER FOUNDATION SPECIFICATION
13 ST-13 JGT-30-340C-2NPT FOUNDATION DETAILS (WITHOUT WATER)
ELECTRICAL
1 EL-01 EQUIPMENT LAYOUT IN CABINET
2 EL-02 EQUIPMENT CONNECTION DIAGRAM
3 EL-03 EQUIPMENT CONNECTION DIAGRAM
4 EL-04 SINGLE LINE DIAGRAM
5 EL-05 EARTHING & LIGHTING LAYOUT
6 EL-06 GROUNDING RISER DIAGRAM

John Neil G. Mitra


CONSTRUCTION SAFETY REQUIREMENTS

1.The constructors shall follow the safety regulations and the mandatory provisions 15.It is strictly forbidden to cut off the power of a running equipment without
while constructing telecommunication project. authorization.
2.While constructing in special areas such as highways, railways, bridges, navigational 16. No connector is allowed in the middle of a power cord.
channels, and in urban areas with crowded traffic, it is necessary to set warning signs, 17.It is forbidden to install switches or fuses in the ground lead or AC neutral wire.
or send special guards if needed. 18. It is strictly forbidden to hang signal lines and power lines on the lightning
3. In high-altitude operations, constructors should ware safety belts, helmets, and soft receptor, down conductor and its support.
rubber insulated shoes. 19. It is strictly forbidden to hang the AC power cord on the communication device.
4. Temporary facilities such as living place, offices must be safe, secure, and 20. Verify the power supply capacity when using the original power outlet.
comply with fire safety regulations. Combustible material is strictly forbidden in building 21. Electric operations should use well-insulated tools and be operated by qualified
temporary facilities. Temporary facilities should be far away from electrical facilities operator. When operating in running equipment, head cabinets, and branch
and high-voltage electric wires. cabinets, do not wear metal ornaments and take effective measures to prevent
5.Living room should be built in places far away from landslides, floods and metal materials such as screws, gaskets, and metal chips from falling.
mudslides. 22. No tools or equipment shall be placed on iron frames, channels, racks, ladders.
6. When working on rivers, lakes and reservoirs, it's necessary to wear life vest and 23. When working in machine room with running equipment, the working area shall
listen to the unified command. be demarcated. The operator shall not touch the running equipment, or the fire
7. Fire and smoking are strictly prohibited while operating in optical (electric) cable protection facilities, unless it is necessary.
entry rooms, waterline houses, machine rooms, unattended stations, woodworking 24. Non-construction personnel are strictly prohibited from entering the construction
sites, warehouses, forest areas, grasslands, etc. Fire protection device for exhaust area without the consent of the on-site commander. When lifting and working on the
pipe must be installed in vehicles before entering the fire ban area. tower, it is prohibited work or stand under the tower.
8.When the cables and other materials passing through the walls or floors, the holes 25. It is strictly forbidden to operate on the tower if sick or drunk.
must be sealed with fireproof materials. 26. When working on the tower, the safety belt of the operator must be fixed to the
9. When the electrical equipment is on fire, the power must be cut off first. main structure of the tower.
10. Safety belts must comply with the national standards. It is strictly forbidden to 27. When installing the antenna feeder at high altitude, the constructor should pay
replace the seat belt with ordinary ropes, wires, etc. attention to the safety and prevent the damage of the falling objects to the people on
11.When working near power supply line, constructors must wear safety helmets, the ground.
insulated gloves, insulated shoes and use insulated tools. 28. When laying cables, do not pull hard. Do not stand on the windowsill when
12.When working near high-voltage line, the minimum distance from the laying cables on the roof. Use safety belts when you must stand on the windowsill.
high-voltage line to constructors must be guaranteed: 2.5m while the line voltage is 29. Set obvious safety warning signs at the entrance of the construction site, cranes,
below 35kV, and 4m while the line voltage is above 35kV. temporary power facilities, access passages, holes, manholes, tower bottoms,
13.When working in flammable and explosive places, explosion-proof tools must be hazardous gas and liquid storage. Safety warning signs must comply with national
used. regulations.
14.It is strictly forbidden to store flammable, explosive and other dangerous
materials in the machine room.

John Neil G. Mitra


BILL OF QUANTITY
Equipment Service
Contents Description Model Quantity Unit Remark Contents Description Model Quantity Unit Remark
Wireless Master Device 700M-3Sectors-3RRH Site Wireless Wireless Installation-Macrosite-LTE Single band-3 Sectors-3 Antenna Site
Wireless Master Device 2.1G-3Sectors-2RRU Site Wireless Wireless Installation-Macrosite-LTE Dual-band-3 Sectors-3 Antenna 1 Site
Wireless Master Device 2.1G-3sectors-3RRU Site
Wireless Wireless Installation-Macrosite-LTE Dual-band-3 Sectors-6 Antenna Site
Wireless Master Device 700M&2.1G-3Sectors-2RRU 1 Site
Wireless Master Device 700M&2.1G-3Sectors-3RRU Site Wireless Wireless Installation-Macrosite-LTE Tri-band-3 Sectors-3 Antenna Site
Wireless Master Device 2.1G&2.6G-3Sectors-2RRU Site Wireless Wireless Installation-Macrosite-LTE Tri-band-3 Sectors-6 Antenna Site
Wireless Master Device 2.1G&2.6G-3Sectors-3RRU Site Wireless Wireless Installation-Macrosite-LTE Tri-band-3 Sectors-9 Antenna Site
Wireless Master Device 700M&2.1G&2.6G-3sectors-2RRU Site Installation-Macrosite-NR Synchronization construction-3 Sectors-3 Antenna
Wireless Wireless Site
Wireless Master Device 700M&2.1G&2.6G-3sectors-3RRU Site
Wireless Master Device NR-3Sectors Site Wireless Wireless Installation-Macrosite-NR Asynchronous construction-3 Sectors-3 Antenna Site
Wireless Antenna L700 4ports 13.8dBi Pcs Auxiliary Power Device Installation for outdoor cabinet 1 Cabinet
Wireless Antenna L700 4ports 15.3dBi Pcs Auxiliary Civil work Equipment pad details on ground m3
Wireless Antenna L2.1 4ports 17dBI Pcs Auxiliary Civil work Tower Foundation Concrete Volume 76.7 m3
Wireless Antenna L700&L2.1 8ports 15dBi 3 Pcs Auxiliary Civil work Grounding system for GF site 41 Meter
Wireless Antenna L2.1&L2.6 12ports Pcs Auxiliary Civil work Grounding Busbar 2 Pcs 24 HOLES

Wireless Antenna L700&L2.1&L2.6 16ports 13.2dBI Pcs Auxiliary Civil work Equipment room-outdoor cable tray 1 Meter
Auxiliary Power 2.2m Power Cabinet_LiFeO4 1 Cabinet Auxiliary Civil work Soil test 1 Site
Auxiliary Power 2.2m Equipment Cabinet_LiFeO4 Cabinet Auxiliary Civil work Site layout and clean 1 Site
Auxiliary Power 2.2m Battery Cabinet_LiFeO4 Cabinet Auxiliary Civil work Door/Gate details 1 Site
Auxiliary Power 2.2m Eltek 2Bay Rectifier Cabinet Cabinet Auxiliary Civil work Power supply (service entrance) 1 Site
Auxiliary Power Rectifier Module(50A) 4 Pcs Auxiliary Civil work Perimeter Light 4 Pcs
Auxiliary Power 150Ah Lithium Iron Battery 2 Pcs Auxiliary Civil work Fence 1 Site
Auxiliary Power 100Ah Lithium Iron Battery Banks Auxiliary Power supply Power supply layouting-5KW Site Refer to Note 1.

Auxiliary Monitoring Monitoring in cabinet 1 Site Auxiliary Power supply Power supply layouting-20KW Site Refer to Note 1.

Tower Monopole DGT-30-340C-2NPT Site Auxiliary Power supply Power supply layouting-25KW Site Refer to Note 1.

Tower 3-Leg Tublar Tower 3GT-30-280C-2NPT Site Auxiliary Power supply Power supply layouting-35KW+ 1 Site Refer to Note 1.

Tower 3-Leg Tublar Tower 3GT-36-280C-2NPT Site Auxiliary Power supply Transformer-25KVA Site Refer to Note 1.

Tower 4-Leg Angle Tower JGT-30-340C-2NPT Site Auxiliary Power supply Transformer-37.5KVA Site Refer to Note 1.

Tower 4-Leg Angle Tower JGT-36-340C-2NPT 1 Site Auxiliary Power supply Transformer-50KVA Site Refer to Note 1.

Tower 4-Leg Angle Tower JGT-42-340C-2NPT Site Auxiliary Power supply Temporary power for the site installation 1 Site
Tower 4-Leg Tublar Tower 4GT-42-340C-2NPT Site Auxiliary Power Device Power system upgrade(Breaker, Rectifier, Rectifier model) Site

Note 1.
It will be adjusted based on the actual AC commercial power capacity application in the future.

John Neil G. Mitra


N

SITE
SITE ID (PH1100286)
TRANSFORMER (25KVA) Purok 2, KM 12,
Catalunan Pequeño, Davao City

APPROX. 70M AWAY


FROM THE SITE)

LESSOR'S
HOUSE

S
IT
E
A
C
C
E
S
S
B VICINITY MAP
SCALE NTS

HH
Site Information

MCB
MTS
ACPDB

Site
Site ID PH1100286
Site Code
Site Name
Area Type Suburban
A SITE DEVELOPMENT PLAN
SCALE NTS Location Detail
Longtitude(E): 125.51601
Latitude(N): 7.07074
Altitude(m): 67
Region Davao Region (Region XI)
Province DAVAO DEL SUR
Site Address Purok 2, KM 12, Catalunan Pequeño, Davao City

Site Detail
Site Type MacroSite
Civil Work Input:
Frequency band 700M&2.1G
Exposure category: C D ; Quantity of sectors 3
Soil Bearing Capacity: 278.04 kpa; Site Sub-type Greenfield
Site category New
Under Ground Water Level: NO WATER m;
Type of property Private Land
Soft Subsoil: Yes No (VERY HARD) .

John Neil G. Mitra


LIGHTNING
ARRESTER
OB LIGHT

PROPOSED
L700&L2.1 ANTENNA FOUNDATION LINE
(RRU/RRH AT THE
BACK OF ANTENNA)
N
PROPOSED
JGT-36-340C-2NPT TOWER

PROPOSED
24 HOLES BUSBAR PROPOSED
TEST PIT

PROPOSED
JGT-36-340C-2NPT TOWER
4 - Ø26/32mm HDPE PIPE PROPOSED
5 m 1*Ø110 PVC PIPE
5 m FOC
PROPOSED
PROPOSED MTS CLIMBING LADDER

PROPOSED MCB DISTANCE SHALL NOT


LESS THAN 700mm
PROPOSED PULL BOX
PROPOSED HANDHOLE
600*600*850
PROPOSED RESERVED 3 Ø110 STEEL
50mmØ IMC CEF ROUTE PIPE, w/ 3mm THICKNESS

PROPOSED
50mmØ FLEXIBLE
METAL/PVC CONDUIT

PROPOSED POWER SUPPLY


CABINET AT THE PLATFORM

PROPOSED ACPDB LOCATION


SURGE PROTECTOR DEVICE
AT THE BACK

PROPOSED
24 HOLES BUSBAR

PROPOSED
TEST PIT PROPOSED
PROPOSED 5 m 1*Ø26 / 32 HDPE PIPE
SERVICE ENTRANCE 5 m FOC
THE LENGTH OF THE MATERIAL CAN BE
PROPOSED ADJUSTED ACCORDING TO THE ACTUAL SCENE
PROPOSED FENCE
5 m 1*Ø110 PVC PIPE
5 m FOC PROPOSED
KWHR METER
B SITE LAYOUT
PROPOSED THE LENGTH OF THE MATERIAL CAN BE SCALE NTS
ADJUSTED ACCORDING TO THE ACTUAL SCENE
5 m 4*Ø26 / 32 HDPE PIPE
5 m FOC PROPOSED
PROPOSED HANDHOLE GATE WAY
R

THE LENGTH OF THE MATERIAL CAN BE


AM

600*600*850 ADJUSTED ACCORDING TO THE ACTUAL SCENE


P

A PERSPECTIVE VIEW
SCALE NTS

John Neil G. Mitra


2*3.5mm² AC cable(BLACK/RED) TO AVIATION LIGHT

PERIMETER LIGHT

CLIMBING LADDER

PROPOSED
GPS LOCATION

PROPOSED
TEST PIT POWER SUPPLY CABINET
AT THE PLATFORM

PROPOSED GPS ON THE


GPS POLE ON TOWER
PERIMETER @2M FROM THE PLATFORM
6.6 m
AVIATION LIGHT LIGHT
WITH PHOTOCELL FEEDER CABLE PROPOSED ACPDB LOCATION
& SURGE PROTECTOR DEVICE
3*1.5mm2 DC CABLE AT THE BACK
(BROWN/BLACK/GREY) PROPOSED M
PERIMETER LIGHT
POWER SUPPLY PROPOSED
CABINET 24 HOLES BUSBAR COMMERCIAL POWER 4.6 m

PROPOSED ACPDB
LOCATION
& SURGE
PROTECTOR
DEVICE AT THE
BACK

2*60mm² AC cable(BLACK/RED)

IP66 20Amp WATERPROOF MTS


MCB
1-GANG SWITH FOR MTS
4-PERIMETER LIGHTS MCB
@1.5m HIGH from FGL
0m

PERIMETER LIGHT
REFER TO
SINGLE LINE DIAGRAM
M
HH
2 SECTION "Y"
SCALE: NTS
COMMERCIAL POWER

1 ELECTRICAL LAYOUT Proposed Equipment list


SCALE: NTS
NO. Item Dimension(mm)(W*D*H) QTY Comments
1 Self Supporting Tower 36000(H) 1 NOTES :
2 PERIMETER LIGHT 4 1. ALL EMBEDDED PIPES @450mm DEPTH.
2. FOR WIRING & CONDUIT DETAILS REFER TO "SINGLE LINE DIAGRAM"
3 MCB 1
4 MTS 1
LEGEND: 5 ACPDB 1
6 Power Supply Cabinet 900*900*2285 1
DC CABLE
AC CABLE

John Neil G. Mitra


LIGHTNING
ARRESTER
OB LIGHT

A02
A03
PROPOSED
L700&L2.1 ANTENNA S02:180°
35.1 m S03:300°
(RRU/RRH AT THE
BACK OF ANTENNA)

PROPOSED U2100 PROPOSED


RRU & L700 RRH L700 RRH

N
PROPOSED
24 HOLES BUSBAR S01:20°
PROPOSED U2100
RRU & L700 RRH

A01
OB Light power supply Cable:
ZRVV22 3x1.5mm2, (Blue/Black/Yellow & Green)
Note:
The metal outer sheath of the cable installed Platform 1 Layout
horizontally should be connected to the lightning
protection flat bar or the ground wire every 5m ~ 10m;
The metal outer sheath of the cable (vertical) running
up and down should be grounded at least once near
both the upper and lower ends.

AHPC:
2*6mm² RRU DC POWER CABLE(BLUE/BLACK)
ARGA:
2*10mm² RRU DC POWER CABLE(BLUE/BLACK)

Proposed Antenna Information


ANT
Sector ID NO. Antenna Group Azimuth(°) Dimension(H*W*D) M-tilt(°) E-tilt(°) Ant mounted on Type
Height(m)

S01 A01 L700&L2.1 8ports 15dBi 20 35.1 2680×469×198 3.0 2.0 Platform 1 T2020L6R012
FIBER CABLE, CABLE TIE OR CLAMP, 0.8M/PCS
S02 A02 L700&L2.1 8ports 15dBi 180 35.1 2680×469×198 2.0 2.0 Platform 1 T2020L6R012

S03 A03 L700&L2.1 8ports 15dBi 300 35.1 2680×469×198 3.0 2.0 Platform 1 T2020L6R012

A04 GPS ANT 4.5

Proposed RRU Information


SOUTH TOWER LEG Dimension(H*W*D) Type
NO. RRU QTY

POWER SUPPLY CABINET 1 700M RRH 336.5x295x125 3 AHPC

PROPOSED GPS ON THE 2 2100M RRU 115x420x400 2 ARGA


GPS POLE ON TOWER
@2M FROM PLATFORM 6.6 m

GPS FEEDER PROPOSED ACPDB LOCATION


& SURGE PROTECTOR DEVICE
Proposed Cable Information
AT THE BACK 4.6 m
PROPOSED NO. Cable Type Length (m) Quantity
24 HOLES BUSBAR

1 CPRI 50 5

2 Jumper 3 / 10 16 / 8

0m 3 Power (+/-) 50 5
TEST
TEST PIT
Grounding (RRU)
PIT

4 12 5
5 AISG 3 3

A PERSPECTIVE VIEW
SCALE NTS

John Neil G. Mitra


PROPOSED
POWER SUPPLY CABINET N

PROPOSED ACPDB LOCATION


& SURGE PROTECTOR DEVICE
AT THE BACK

A PERSPECTIVE
SCALE NTS

SURGE
B TOP VIEW
PROTECTOR SCALE NTS

DEVICE

John Neil G. Mitra


10000
NOTES :

2200 2200 2175 3425 1. PROVIDE DRAIN HOLES ON THE FRAMES.


325 2. TOP OF PIPES COVERED WITH STEEL PLATE.

3. CHB / MASONRY :

FOR NON-LOAD BEARING TYPE CONCRETE BLOCK, A MINIMUM


NOTE: COMPRESSIVE STRENGTH OF 2.41MPA (350psi) SHALL BE DEVELOPED.

VARIES AS PER POWER PROVIDER


ALL PERIMETER
LIGHTS SHOULD 4. WALL REINFORCEMENTS SHALL BE AS FOLLOWS:
BE ON TOP OF
750

1.8m from FGL. WALL THICKNESS VERT. REINFORCEMENT HOR. REINFORCEMENT

(150 mm) 6 IN. 10mmØ @ 400mm 10mmØ @ 600mm

5. REINFORCING BARS: DIA.≥16,fy=414MPa


DIA.≤12,fy=275MPa

6. ALL CELLS CONTAINING REINFORCING BARS OR INSERTS SHALL


2000

BE SOLIDLY FILLED WITH CONCRETE.

7.ALL DIMENSIONS ARE MILIMETERS AND LEVES IN METERS UNLESS


OTHERWISE NOTED.

8.THE STRENGTH GRADE OF THE WALL CHB BLOCK MASONRY


FGL +0.30 FGL +0.30
MORTAR IS NOT LESS THAN 7.5Mpa.
300

NGL ±0.00 NGL ±0.00


550

1800
825 650 1500 650 1475 650 600 450 3200

1 FRONT FENCE ELEVATION


- SCALE : 1:20M

10000

2500 2500 2500 2500

NOTE:
ALL PERIMETER
LIGHTS SHOULD
BE ON TOP OF
750

1.8m from FGL.


2000

FGL +0.30
300

NGL ±0.00
2 TYPICAL ELEVATION
550

- SCALE : 1:20M

925 750 1725 750 1700 750 1725 750 925

John Neil G. Mitra


WELDED BARBED WIRE WELDED BARBED WIRE
(SEE NOTE #2) STAY 5-Ø10 ROUND BAR STAY 5-Ø10 ROUND BAR
(SEE NOTE #2)

Ø50 SCH. 40 G.I. PIPE Ø50 SCH. 40 G.I. PIPE 500

94

94
BARBED WIRE HOLDER BARBED WIRE HOLDER PROPOSED COLUMN
75 350 75

142

142
142

142
31 31
10 10

75
750
26

26
750

100
142

142
30

30
100 88 142

100 88 142
30

30

200

350

500
25 THK CEMENT MORTAR
COPING 12mmØ BARS

200

200
BOTHWAYS
100

100

200
2000

WELDED 8-Ø10x40mm WELDED 8-Ø10x40mm

OUTSIDE

75
INSIDE 100 100
LONG REBAR
75 75
LONG REBAR

DIA. 25MM GRAVEL SURFACE 200 200 100


LAYOUT 100MM THK.
3 6" CHB WALL

5 CORNER POST FOOTING DETAIL


SCALE NTS
FGL +0.300 (MIN.)
COMPACTIONNESS NOT LESS
100

4-12mmØ WITH 10mmØ LATERAL


THAN 93% TIES @ 200mm O.C.
CHB
300
200

NGL ±0.000
2 BARBED WIRE HOLDER +0.300 10mmØ HORIZONTAL
SCALE NTS
BARS@ 600mm O.C.
CONTINUOUS WALL
300

FOOTING
38mmØ PVC 10mmØ VERTICAL
12mmØ BARS WEEP HOLES BARS @ 400mm O.C.
550

BOTHWAYS SCREE (50mm>DIAMETER > 38mm)


250

50mm THK.
LEAN CONCRETE
12mmØ 150mm THK CHB WITH
TIE BARS @ 200 O.C. MORTAR (150mm CHB)
50 500 50 -0.150
50

3-12mmØ CONT.
BARS

150
FENCE POST DETAIL

75
1 -0.300
SCALE NTS

500
75 250 75
75 350 75
400
PROPOSED COLUMN
200
CONTINUOUS WALL FOOTING DETAIL
75

50 100 50 5

100
4-12mmØ WITH 10mmØ LATERAL SCALE NTS
TIES @ 200mm O.C.
50

200
100
200

350

500
BILL OF MATERIAL(GRAVEL )
50

12mmØ BARS
BOTHWAYS

3 COLUMN SECTION A

200
NOTES :
SCALE NTS
1. PROVIDE DRAIN HOLES ON THE FRAMES.
75

2. TOP OF PIPE POST COVERED WITH STEEL PLATE.


3.CONCRETE STRENCGTH:CLASS "A",21MPa(3000psi) @28 DAYS;
LEAN CONCRETE STRENGTH: 7MPa;

4 FENCE POST FOOTING DETAIL REINFORCING BARS: DIA.≥16 ,fy=414MPa


DIA.≤12 ,fy=275MPa
SCALE NTS
4. CONCRETE PROTECTION REINFORCED AS PER NSCP, CHAPTER 4, 407.8

John Neil G. Mitra


412
3000

20
31 83 70 197 63
25 1465 1465 25

10 25 25 25
80

30 26
93
142

30

R20
142

40
750

40
900

142
142

109

205
ELEV. +2.300
88

250
250
R60

60

96
5 6
--

15
15
--
975

700
2700

63 20

412

83 70 197 63
800

4
2 --
975

3 --
--

400
300

FGL +0.300
2 BARREL BOLT DETAIL 25 25 25

-- SCALE: 1:10 197 215


50

35

1 METAL GATE DETAILS 12


-- SCALE: 1:30
10 15

0
R1
70
10

10 15

10
15
12.5
25

15

35

25

60

35

40
6

25

70
25

12.6
7 DETAIL B

10
-- SCALE: 1:5
12.5 22.5 10 10
25

35 40
20

5 GATE STOPPER DETAIL 6 DETAIL A


-- SCALE: 1:5 -- SCALE: 1:5

7
252

252

--
135

135
160

160
75

75
175

175
50

50

FGL ±0.30
50

50

150
45
25
4 HINGE DETAIL
3 FOOT BOLT DETAIL 100
25
-- SCALE: 1:5
-- SCALE: 1:10

John Neil G. Mitra


300
00
30
15
00

4 RAMP DETAILS
SCALE 1:50

BILL OF MATERIAL(RAMP )

NOTES :
1.CONCRETE STRENCGTH:CLASS "A",21MPa(3000psi) @28 DAYS.
REINFORCING BARS: DIA.≥16,fy=414MPa
DIA.≤12,fy=275MPa
2.THE CONCRETE RAMP IS LAID ON THE COMPACTED SOIL WHICH
MUST BE NO LESS THAN 93% OF MAX DENSITY.

John Neil G. Mitra


20mmØ TIMBLE EYEBOLT
MESSENGER WIRE TO
300 ELECTRICAL POLE

SPOOL INSULATOR
(IF REQUIRED PROVIDE 10mmØ BARS

400
DRIP LOOP) 6-16mmØ BARS WITH 450

650
10mmØ TIES @ 150mm O.C.
100 100 100 100

B SERVICE ENTRANCE CAP


450
50 350 50

100
10mmØ BARS(SEE
SECTION 'B' DETAIL)

50

100
300
VARIES (AS PER POWER PROVIDER REQUIREMENT)

50mmØ IMC FOR UTILITY


METERING (EXPOSED)

100
300
200
MALLEABLE CLAMP
1.0m SPACING

50
A CONDULET WITH 4 SECTION 'B'
REMOVABLE COVER SCALE NTS

3 COLUMN PEDESTAL DETAIL


4550

SCALE NTS

KWHR METER
WITH CAGE & PADLOCK

1200
75 1050 75 450

450 CONDULET WITH


1300

REMOVABLE COVER

75

100
FGL +0.300 (MIN.)

300
NGL ±0.000

300
IMC CONDUIT
1200
1050

COMPACTED SOIL, COMPACTED SOIL,


COMPACTIONNESS NOT LESS THAN 93% COMPACTIONNESS NOT LESS THAN 93%
1800

GROUNDING CONNECTION 50mmØ BUSHING


BETWEEN MCB & KHW LOCKNUT
6-16mmØ BARS METER ENCLOSURE
800 300 100 BOTHWAYS 50mmØ IMC
6-16mmØ BARS TOP & BOTTOM CONDUIT
BOTHWAYS
300

75

50mm THK. 5 SECTION 'A'


50

LEAN CONCRETE SCALE NTS


50 1200 50

2 PEDESTAL FOOTING DETAIL


SCALE NTS

1 ELEVATION NOTES :

SCALE NTS
1.CONCRETE STRENCGTH:CLASS "A",21MPa(3000psi) @28 DAYS.
LEAN CONCRETE STRENGTH: 7MPa;
REINFORCING BARS: DIA.≥16 ,fy=414MPa
DIA.≤12 ,fy=275MPa

John Neil G. Mitra


650
850
30 10mmØ BARS RING

50mmØ HDPE

A
ONE CLAMP PER METER

HEIGHT FROM EQIUPMENT PLATFORM TO FGL.


MTS

200 200

MCB MTS

CONDULET WITH
REMOVABLE COVER CLAMP

IMC CLAMP

50mmØ FLEXIBLE 50mmØ IMC&

1200
METAL/PVC CONDUIT 50mmØ HDPE

1200
CABLE LADDER IMC CLAMP
50mmØ IMC

FGL +0.300
50mmØ IMC
450

IMC
COUPLING
FGL +0.300

50mmØ HDPE 50mmØ PVC 20mmØ PVC

450
TO EQUIPMENT

50mmØ PVC&
50mmØ HDPE

50mmØ PVC LONG SWEEP 50mmØ PVC LONG SWEEP


ELBOW & 50mmØ HDPE ELBOW & 50mmØ HDPE

1 ELEVATION 2 SECTION 'A'


SCALE NTS SCALE NTS

John Neil G. Mitra


SEE HANDLE
DETAIL
500

50 50 300 50 50 2-12mmØ HOLE


EARTHUING PIT COVER WELD-ON
CHECKERED PLATE HINGE
500mm x 500mm x 10mm THK

50 50
SEE HINGES
50mmØ PVC DETAIL 50 L 50mm x 6mm THK
PIPE SLEEVE

10
300
500
4-10mmØ NUTS 10mmØ DOWEL
38mm² BCW WITH WASHERS

50 50
10mmØ HANDLE
500mm x 200mm x 6mm THK
FLAT BAR (STOPPER PLATE)

1 TEST PIT / PULL-BOX COVER PLAN 1:8M


100
SCALE

5 HINGE DETAIL
3 TEST PIT / PULL-BOX COVER DETAIL NTS
SCALE NTS

SCALE

10mmØ HANDLE CONSTRUCTION JOINT WITH


16mm BITUMINOUS 10mmØ HANDLE
EARTHING PIT COVER CONCRETE FILLER EARTHING PIT COVER
CHECKERED PLATE
CHECKERED PLATE
500mm x 500mm x 10mm THK 75mm THK CONCRETE SLAB 500mm x 500mm x 10mm THK
100
100mm THK. CHB BROOM FINISHED 10mmØ THK. CHB

100
100

10mmØ ROUND BAR WITH


NUTS (GALVANIZED)

800
800

50mmØ PVC
50mm x 200mm x 6mm THK

950
950

PIPE SLEEVE

800
800

FLAT BAR (STOPPER PLATE)


CONCRETE CASING PVC

10 50
38mm² BCW END-BELL

150

200
50

50
38mm² BCW

COMPACTED COMPACTED
GRAVEL BEDDING GRAVEL BEDDING HANDLE DETAIL
SCALE NTS
5
8"Ø
x 3m
GROUNDING ROD
350 350

2 SECTION "A" 1:8M


4 PULL-BOX DETAIL
SCALE SCALE 1:8M

John Neil G. Mitra


3

1 ACPDB FRAMING LAYOUT


SCALE 1:8M

L60x60x6

L60x60x6

L60x60x6
2 SIDE VIEW 3 FRONT VIEW
SCALE 1:20M SCALE 1:8M

John Neil G. Mitra


PROPOSED POWER
SUPPLY CABINET

EQUIPMENT PLATFORM TO HANDHOLE


PROPOSED ACPDB

800
PROPOSED BUSBAR
500
150 500 150
Ø10mm TIES
75 SPACED AT 250mm O.C

75
PROPOSED
EQUIPMENT PLATFORM

500
4 - 16Ømm
CLOSED TIES

900
4 - Ø10mm TIES
TEMPERATURE BARS

75
1 SECTION 1
SCALE: NTS:

LEAN CONCRETE(75mm THK.)


5 - Ø16mm
O.C.BW

PROPOSED
CABLE LADDER
SECTION HANDHOLE DETAIL
310

Ø10mm TIES
SPACED AT 250mm O.C

Ø110 STEEL PIPE

4 - Ø10mm TIES
TEMPERATURE BARS
1 SECTION 2
SCALE: NTS:
1700

INSIDE OUTSIDE

NOTE:
500
THE PVC PIPE NEEDS TO BE ENCAPSULATED WITH
150

100mm THICK 3000PSI CONCRETE. FGL +0.300 (MIN.)

200 100
1 700mm (min)

300
550
400

NGL ±0.000
TOP OF ROADWAY

300
0 0
BOX CONCRETE R6

700
110
ENCASEMENT

R60

900
Ø110 PVC PIPE

50
R6
00

200
100mm THICK CONCRETE
4 - Ø 26/32mm 300 200 300
ENCASEMENT
HPDE PIPE 100mm THICK CONCRETE
ENCASEMENT 75mm THICK
LEAN CONCRETE
2

John Neil G. Mitra


800

100 600 100

OPENING

4MMTHHK
100 600 100
25

800

600

550
RISING SLOT

100
800

HANDHOLE COVER DETAIL


HOLE STIFFENER PLATE

Ø110mm PVC PIPE


3mm THICKNESS

HANDHOLE DETAIL PLAN

800

100 600 100 800


550
TOP OF ROADWAY 25
100

4-SCREW LOCK 4-RISING SLOT

40
50mm*50mm SQUARE
300

@12mm SPACING 4mm


4-HPDE CONDUIT PROJECTION
Ø26/32mm
195 195

DITO

800
550
110

FONT ARIAL BOLD


SIZE: 125
900

2019 4mm PROJECTION


FONT ARIAL BOLD
50
490

Ø110mm PVC PIPE SIZE: 50


4mm PROJECTION
158 234 158
75

IRON SUMP FRAME


50 300 200 300 50 HANDHOLE COVER
75mm THICK LEAN
CONCRETE
HANDHOLE DETAIL PLAN

John Neil G. Mitra


John Neil G. Mitra
LLVD MCB
2x16A/1P
8x32A/1P
2x125A/1P
BLVD MCB
Battery MCB 6x16A/1P
4x125A/1P 3x25A/1P
5x32A/1P
Monitor 2x16A/1P

RECTIFIER
MODULE
DCDU-1U 50A (4)
FMS GSFU-1U
A1-1U

RESERVED-2U

SPARE-1U

RESERVED IDU-2U

SPARE-1U

BBU-3U

DCDU ON ON ON ON ON ON ON ON

4x40A
I I I I I I I I
ODF-3U 0 0 0 0 0 0 0 0
OFF OFF OFF OFF OFF OFF OFF OFF

4x30A 40A 40A 40A 40A 30A 30A 30A 30A

150A Lithium BATTERY

150A Lithium BATTERY

Proposed Equipment Schedule in Equipment Cabinet

NO. Equipment QTY Comments


1 DC 1
2 BBU 1
3 BATTERY 2 150AH(LI)
4 RECTIFIER MODULE 4 50A
5 GSFU 1
6 DCDU 1
7 DCPDB 0
8 IPRAN 1 A1
9 MW IDU 0
10 ODF 1
Power Supply Cabinet 11 GPS ARRESTER 1
``
GENERAL NOTES:
1. ALL ELECTRICAL INSTALLATION WORKS HEREIN SHALL BE DONE IN ACCORDANCE WITH DITO
SPECIFICATIONS, THE LATEST EDITION OF THE PHILIPPINE ELECTRICAL CODE, THE RULES AND
REGULATION OF THE LOCAL MUNICIPALITY AND POWER UTILITY COMPANY.

160 AMP /Single Phase 2. WIRING METHOD:


A. INTERMEDIATE METAL CONDUIT (IMC) FOR SERVICE ENTRANCE AND ALL EXPOSED PORTIONS.
SERVICE ENTRANCE PEDESTAL 2 - 60mm² THW (BLACK/RED) +
1-30mm² THW GROUND (GREEN OR B. UNDERGROUND CONDUITS SHALL BE PVC, ENCASED IN CONCRETE .
YELLOW-GREEN) C. GROUNDING WIRES SHALL BE INSULATED.
IN 50mmØ IMC OR 50mmØ PVC PIPE 3. ALL NON-CURRENT CARRYING ELECTRICAL EQUIPMENT PARTS SHALL BE PROPERLY GROUNDED.
4. MINIMUM WIRE SIZE INSTALLED SHALL BE 3.5 mm² TYPE THHN/THW, UNLESS OTHERWISE INDICATED.
MECB
TO ELECTRIC UTILITY CO. IN NEMA 3R ENCLOSURE 5. ALL WIRES SHALL BE A BRAND
SERVICE DROP 160 AT, 2P, 25 kAIC MCCB
6. WIRING DEVICES SHALL BE A BRAND.
230VAC, 1 PHASE SYSTEM, 60Hz 230V, 60 Hz (ACPDB)
SPD AC DISTRIBUTION PANEL 7. ALL CIRCUIT BREAKERS SHALL BE BOLT ON TYPE IN IP 55 ENCLOSURE
100 kA IP 55 Enclosure
FOR OUTDOOR LOCATIONS, USING DITO TYPE APPROVED ENCLOSURE.

160 AT, 2P 8. MAIN CIRCUIT BREAKERS SHALL BE INDUSTRIAL TYPE, 25kAIC WHILE BRANCH CIRCUIT BREAKERS
SHALL BE COMMERCIAL TYPE 10kAIC.
2 - 60mm² THW (BLACK/RED) +
125AT, 2P 9. INSULATION TEST SHALL BE DONE BEFORE THE SITE IS ENERGIZED AND WITNESSED .
1-30mm² THW GROUND (GREEN OR
RECTIFIER 1 1 2 SPACE
YELLOW-GREEN) RESISTANCE SHALL BE GREATER THAN FIFTY(50) MEGA OHMS.
20AT, 2P 20AT, 2P
IN 50mmØ IMC OR 50mmØ PVC PIPE 10. ALL EQUIPMENT AND MATERIALS SHALL BE BRAND NEW AND SUITED TO THE REQUIRED USE.
M Perimeter Light 3 4 C.OUTLETS
GENSET PROVISION
20AT, 2P 20AT, 2P 11. PULL BOXES OR JUNCTION BOXES SHALL BE PROVIDED, EVEN IF NOT
SPARE 5 6 SPARE INDICATED IN THE PLANS.
2 - 60mm² THW (BLACK/RED) + TO GROUNDING LOOP 20AT, 2P
12. ALL ELECTRICAL WORKS SHALL BE DONE UNDER THE DIRECT SUPERVISION OF A DULY
1-30mm² THW GROUND (GREEN OR MTS SPARE 7 8 SPACE
YELLOW-GREEN) IN NEMA 3R OR 4X ENCLOSURE LICENSED AND REGISTERED ELECTRICAL ENGINEER.
2- 160 AT, 2P, 25 kAIC MCCB SPACE SPACE
IN 50mmØ IMC OR 50mmØ PVC PIPE 230V, 60 Hz
9 10

NOTE:
CONNECTED TO GROUNDING BUSBAR 1. THE POWER CORD OF THE SITE AVIATION OBSTRUCTION LIGHT SHOULD BE INSTALLED WITH
@ MTS (MANUAL TRANSFER SWITCH)
A POWER CABLE WITH A METAL SHEATH OR LAID THROUGH A STEEL TUBE.
SINGLE LINE DIAGRAM PANEL BOARD
THE METAL OUTER SHEATH OF THE CABLE (OR STEEL PIPE) SHOULD BE GROUNDED AT
SCALE NTS
BOTH ENDS AND INTO THE EQUIPMENT ROOM.
BOTH ENDS OF THE OUTDOOR CABLE LADDER SHOULD BE GROUNDED, AND THE GROUND
CONNECTION
WIRE SHOULD BE A MULTI-STRAND COPPER WIRE WITH A CROSS-SECTIONAL AREA OF NOT
LESS THAN 10MM2.
SCHEDULE OF LOADS (160 AMP MAIN) 2. IF THE AVIATION OBSTRUCTION LIGHT IS DUAL TYPE TAPPING POINT WILL BE AT THE ACPDB CIRCUIT NO.5.
PANEL : ACPDB
ENCLOSURE : IP 55 W/ GROUNDING BAR; BOTTOM FEED 3. IF THE AVIATION OBSTRUCTION LIGHT IS SINGLE TYPE TAPPING POINT WILL BE AT THE RECTIFIER CABINET.
POWER SOURCE : 230V, 1-PHASE, 60Hz

CIRCUIT BREAKERS
COMPUTATION: kVA LOAD SINGLE PHASE :
CKT. LOAD DESCRIPTION VOLTS_V LOAD_VA LOAD_AMP LOAD_AMP = LOAD_VA / LOAD_V
NO. AT POLE WIRE SIZE GROUND SIZE CONDUIT kVA = 80.44 x 230 / 1000
DEMAND FACTOR (%) = 100
RECTIFIER 1 230 12000 52.17 125 2P 2 - 35mm², THW 1-14mm², THW 50.8mm Ø IMC Pipe(2"), or 50mm Ø PVC TOTAL AMP = 64.35 A = 18.5kVA
1
PROTECTION AMP = TOTAL AMP * 1.25 = 80.44 = 37.5kVA, which is still minimum allowable transformer
2 SPACE - - - - - - - capacity of COOP.
3 Perimeter Light 230 400 1.74 20 2P 2 - 3.5mm², THHN 1 - 3.5mm², THHN 15.4mm Ø IMC Pipe(1/2"), or 20mm Ø PVC FEEDER:
4 C. OUTLETS 230 600 2.61 20 2P 2 - 3.5mm², THHN 1 - 3.5mm², THHN 15.4mm Ø IMC Pipe(1/2"), or 20mm Ø PVC 2-60mm² THW (Black/Red) + 1-30mm² THW GROUND LEGEND
5 SPARE 230 600 2.61 20 2P 2 - 3.5mm², THHN 1 - 3.5mm², THHN 15.4mm Ø IMC Pipe(1/2"), or 20mm Ø PVC (GREEN OR YELLOW-GREEN) IN 50mmØ IMC or 50mmØ PVC

6 SPARE 230 600 2.61 20 2P 2 - 3.5mm², THHN 1 - 3.5mm², THHN 15.4mm Ø IMC Pipe(1/2"), or 20mm Ø PVC
M KILOWATT HOUR METER
7 SPARE 230 600 2.61 20 2P 2 - 3.5mm², THHN 1 - 3.5mm², THHN 15.4mm Ø IMC Pipe(1/2"), or 20mm Ø PVC
PROTECTION: MECB MAIN ENCLOSED CIRCUIT BREAKER
8 SPACE - - - - - - - 160 AT, 1-Phase MECB 2P, 230 V, 25 kAIC (EZD), MTS MANUAL TRANSFER SWITCH
SPACE - - - - - - -
in NEMA 3R or 4x Enclosure. AC PANEL DISTRIBUTION BOARD
9 ACPDB

10 SPACE - - - - - - -

TOTAL LOAD 14800 64.35 SPD

GROUND

SERVICE ENTRANCE
NOTE:

1. INSULATED COPPER CABLE


(GREEN) FOR GROUNDING
SERVICE EQUIPMENT WILL BE
DEPEND ON THE kVA RATING OF
THE TRANSFORMER. Please refer
to the SINGLE LINE DIAGRAM
FOR EXACT kVA RATING OF
TRANSFORMER.

25kVA = 30mm² INSULATED


COPPER CABLE (GREEN)
37.5kVA = 30mm² INSULATED
4 WAY 4 WAY
EXOTHERMIC 3 WAY EXOTHERMIC COPPER CABLE (GREEN)
CONN EXOTHERMIC CONN 50kVA = 35mm² INSULATED
CONN
COPPER CABLE (GREEN)

SEE TEST
PIT DETAILS
ST-07

3 WAY
EXOTHERMIC
CONN

1-24 HOLES GROUNDING


CONVERSION BAR BUSBAR FOR ELECTRICAL
COPPER TO HDG EQUIPMENT PLATFORM

4 WAY 4 WAY
EXOTHERMIC
CONN
EXOTHERMIC
CONN
LEGEND:
38mm² BARE COPPER WIRE
2-40mmx4mm FLATBAR
FOR AIR TERMINAL CONNECTED
TO GROUNDING LOOP USING
EXOTHERMIC CONNECTION
40mmx4mm HDG FLAT BAR
3 WAY
EXOTHERMIC
CONN 30mm² INSULATED COPPER CABLE (GREEN)
REFER TO NOTE 1 FOR GROUNDING ELECTRODE CONDUCTOR
3 WAY
COMPACTED
EXOTHERMIC
CONN
CONVERSION BAR COPPER TO HDG FILL
MTS
MCB
CRIMP TYPE TERMINAL LUG
3 WAY
EXOTHERMIC
(FOR BARE AND INSULATED
CONN
COPPER CABLE, CU/AL)
16mmØ or 58"Ø x 2.5m or 3m Using Exothermic Weld or Cad Weld
To Bond the grounding cable and
COPPER CLAD STEEL Grounding Rod

3-WAY EXOTHERMIC CONNECTION with BCW


& Grounding Rod
3-WAY EXOTHERMIC CONNECTION with BCW
1 EARTHING & LIGHTING LAYOUT & FLATBAR 38mm² BARE COPPER WIRE
SCALE : NTS
3-WAY EXOTHERMIC CONNECTION with BCW
4-WAY EXOTHERMIC CONNECTION
with 40mmx4mm Flatbar , BCW
&Grounding Rod
SEE TEST PIT DETAILS
ST-07

16mmØ or 58"Ø x2.5m or 3m


COPPER CLAD STEEL

WHEN GROUNDING RESISTANCE


IS GREATER THAN 10Ω, ADD THIS 2 GROUNDING ROD IN LOOP DETAIL
PART OF GROUNDING BODY SCALE : NTS:
AIR TERMINAL ROD

ANTENNA
RRU

MW DISH
ODU

LEGEND:
38mm² BARE COPPER WIRE
AIR TERMINAL ROD CONNECTED WITH 2 - 40mmx4mm FLATBAR DOWN
LEAD TO THE LADDER RACK CONNECTED DIRECTLY TO THE GROUNDING REFER TO GENERAL NOTE 9. EL-05 40mmx4mm HDG FLAT BAR
LOOP RING USING EXOTHERMIC WELDING. 30mm² INSULATED COPPER CABLE (GREEN)
FOR GROUNDING ELECTRODE CONDUCTOR
1-24 HOLES GROUNDING CONVERSION BAR COPPER TO HDG
BUSBAR @ ELECTRICAL
EQUIPMENT PLATFORM AREA 40mmx4mm HDG FLATBAR 16mmØ or 58"Ø x 2.5m or 3m
Connected using conversion bar COPPER CLAD STEEL
COPPER to HDG bolted to the 24
HOLES GROUNDING BUSBAR, 3-WAY EXOTHERMIC CONNECTION with BCW
ENCASED WITH 50mmØ PVC & Grounding Rod
3-WAY EXOTHERMIC CONNECTION with BCW
35mm² INSULATED & FLATBAR
COPPER CABLE(GREEN) For
GROUNDING ELECTRODE 3-WAY EXOTHERMIC CONNECTION with BCW
REFER TO NOTE 1
CONDUCTOR

CONNECTED TO GROUND LOOP RING


NOTE:

POWER CABINET

MANUAL TRANSFER
1. INUSLATED COPPER CABLE (GREEN)

POWER CABINET

CIRCUIT BREAKER
FOR GROUNDING SERVICE EQUIPMENT

MAIN ENCLOSED
ACPDB
WILL BE DEPEND ON THE kVA RATING OF
THE TRANSFORMER. Please refer to the
SINGLE LINE DIAGRAM FOR EXACT kVA

SWITCH
RATING OF TRANSFORMER.
25kVA = 30mm² INSULATED COPPER
CABLE (GREEN)
37.5kVA = 30mm² INSULATED COPPER
ALL TOWER FOOT FLANGE MUST BE CABLE (GREEN)
WELDED WITH 40mmx4mm HDG FLAT BAR CONNECTING 50kVA = 35mm² INSULATED COPPER
TO THE GROUND LOOP USING WELDING AND MUST BE CABLE (GREEN)
COAT WITH ASPHALT
±0.000
GROUND LEVEL GROUND LEVEL

GROUND LOOP RING 38mm² BARE COPPER WIRE


USING EXOTHERMIC WELD
TO BOND THE GROUNDING CABLE AND
3000 3000
GROUNDING ROD

USE #150 POWDER TO CADWELD USE #150 POWDER TO CADWELD


SEE TEST PIT DETAILS (ST-07)
THE 40mmx4mm HDG FLATBAR TO THE GROUND LOOP THE 40mmx4mm HDG FLATBAR TO THE GROUND LOOP
WHEN THE GROUNDING
USE EARTH ROD CLAMPS RESISTANCE IS GREATER
TO CLAMP THE BCW
USE CADWELD METHOD TO CONNECT
THE 38mm² BARE COPPER WIRE FROM SERVICE
AND TEST PIT ROD THAN 10 OHMS, ADD THIS
EQUIPMENT ROD CONNECT TO THE GROUND LOOP PART OF GROUNDING BODY

GROUNDING RISER DIAGRAM