PH1100286
PH1100286
(GREENFIELD)
700M&2.1G-3Sectors
TABLE OF CONTENTS
NO. DRAWING NO. DESCRIPTION
CONSTRUCTION SAFETY REQUIREMENTS
BILL OF QUANTITY
ARCHITECTURAL
1 AR-01 SITE INFORMATION
2 AR-02 PERSPECTIVE VIEW/ SITE LAYOUT/ ANTENNA VIEW
3 AR-03 SITE DEVELOPMENT PLAN/ ELEVATION VIEW
4 AR-04 ELEVATION VIEW
5 AR-05 EQUIPMENT LAYOUT
STRUCTURAL
1 ST-01 FENCE ELEVATIONS
2 ST-02 FENCE FOUNDATION DETAILS
3 ST-03 METAL GATE DETAILS
4 ST-04 RAMP DETAILS
5 ST-05 POWER SERVICE ENTRANCE POST DETAILS
6 ST-06 MCB/MTS LAYOUT
7 ST-07 TEST PIT DETAIL
8 ST-08 ACPDB STAND DETAILS
9 ST-09 HANDHOLE DETAILS 1 & 2
10 ST-10 SURGE PROTECTOR DEVICE LOCATION
11 ST-11 JGT-30-340C-2NPT TOWER LINE DIAGRAM
12 ST-12 JGT-30-340C-2NPT TOWER FOUNDATION SPECIFICATION
13 ST-13 JGT-30-340C-2NPT FOUNDATION DETAILS (WITHOUT WATER)
ELECTRICAL
1 EL-01 EQUIPMENT LAYOUT IN CABINET
2 EL-02 EQUIPMENT CONNECTION DIAGRAM
3 EL-03 EQUIPMENT CONNECTION DIAGRAM
4 EL-04 SINGLE LINE DIAGRAM
5 EL-05 EARTHING & LIGHTING LAYOUT
6 EL-06 GROUNDING RISER DIAGRAM
1.The constructors shall follow the safety regulations and the mandatory provisions 15.It is strictly forbidden to cut off the power of a running equipment without
while constructing telecommunication project. authorization.
2.While constructing in special areas such as highways, railways, bridges, navigational 16. No connector is allowed in the middle of a power cord.
channels, and in urban areas with crowded traffic, it is necessary to set warning signs, 17.It is forbidden to install switches or fuses in the ground lead or AC neutral wire.
or send special guards if needed. 18. It is strictly forbidden to hang signal lines and power lines on the lightning
3. In high-altitude operations, constructors should ware safety belts, helmets, and soft receptor, down conductor and its support.
rubber insulated shoes. 19. It is strictly forbidden to hang the AC power cord on the communication device.
4. Temporary facilities such as living place, offices must be safe, secure, and 20. Verify the power supply capacity when using the original power outlet.
comply with fire safety regulations. Combustible material is strictly forbidden in building 21. Electric operations should use well-insulated tools and be operated by qualified
temporary facilities. Temporary facilities should be far away from electrical facilities operator. When operating in running equipment, head cabinets, and branch
and high-voltage electric wires. cabinets, do not wear metal ornaments and take effective measures to prevent
5.Living room should be built in places far away from landslides, floods and metal materials such as screws, gaskets, and metal chips from falling.
mudslides. 22. No tools or equipment shall be placed on iron frames, channels, racks, ladders.
6. When working on rivers, lakes and reservoirs, it's necessary to wear life vest and 23. When working in machine room with running equipment, the working area shall
listen to the unified command. be demarcated. The operator shall not touch the running equipment, or the fire
7. Fire and smoking are strictly prohibited while operating in optical (electric) cable protection facilities, unless it is necessary.
entry rooms, waterline houses, machine rooms, unattended stations, woodworking 24. Non-construction personnel are strictly prohibited from entering the construction
sites, warehouses, forest areas, grasslands, etc. Fire protection device for exhaust area without the consent of the on-site commander. When lifting and working on the
pipe must be installed in vehicles before entering the fire ban area. tower, it is prohibited work or stand under the tower.
8.When the cables and other materials passing through the walls or floors, the holes 25. It is strictly forbidden to operate on the tower if sick or drunk.
must be sealed with fireproof materials. 26. When working on the tower, the safety belt of the operator must be fixed to the
9. When the electrical equipment is on fire, the power must be cut off first. main structure of the tower.
10. Safety belts must comply with the national standards. It is strictly forbidden to 27. When installing the antenna feeder at high altitude, the constructor should pay
replace the seat belt with ordinary ropes, wires, etc. attention to the safety and prevent the damage of the falling objects to the people on
11.When working near power supply line, constructors must wear safety helmets, the ground.
insulated gloves, insulated shoes and use insulated tools. 28. When laying cables, do not pull hard. Do not stand on the windowsill when
12.When working near high-voltage line, the minimum distance from the laying cables on the roof. Use safety belts when you must stand on the windowsill.
high-voltage line to constructors must be guaranteed: 2.5m while the line voltage is 29. Set obvious safety warning signs at the entrance of the construction site, cranes,
below 35kV, and 4m while the line voltage is above 35kV. temporary power facilities, access passages, holes, manholes, tower bottoms,
13.When working in flammable and explosive places, explosion-proof tools must be hazardous gas and liquid storage. Safety warning signs must comply with national
used. regulations.
14.It is strictly forbidden to store flammable, explosive and other dangerous
materials in the machine room.
Wireless Antenna L700&L2.1&L2.6 16ports 13.2dBI Pcs Auxiliary Civil work Equipment room-outdoor cable tray 1 Meter
Auxiliary Power 2.2m Power Cabinet_LiFeO4 1 Cabinet Auxiliary Civil work Soil test 1 Site
Auxiliary Power 2.2m Equipment Cabinet_LiFeO4 Cabinet Auxiliary Civil work Site layout and clean 1 Site
Auxiliary Power 2.2m Battery Cabinet_LiFeO4 Cabinet Auxiliary Civil work Door/Gate details 1 Site
Auxiliary Power 2.2m Eltek 2Bay Rectifier Cabinet Cabinet Auxiliary Civil work Power supply (service entrance) 1 Site
Auxiliary Power Rectifier Module(50A) 4 Pcs Auxiliary Civil work Perimeter Light 4 Pcs
Auxiliary Power 150Ah Lithium Iron Battery 2 Pcs Auxiliary Civil work Fence 1 Site
Auxiliary Power 100Ah Lithium Iron Battery Banks Auxiliary Power supply Power supply layouting-5KW Site Refer to Note 1.
Auxiliary Monitoring Monitoring in cabinet 1 Site Auxiliary Power supply Power supply layouting-20KW Site Refer to Note 1.
Tower Monopole DGT-30-340C-2NPT Site Auxiliary Power supply Power supply layouting-25KW Site Refer to Note 1.
Tower 3-Leg Tublar Tower 3GT-30-280C-2NPT Site Auxiliary Power supply Power supply layouting-35KW+ 1 Site Refer to Note 1.
Tower 3-Leg Tublar Tower 3GT-36-280C-2NPT Site Auxiliary Power supply Transformer-25KVA Site Refer to Note 1.
Tower 4-Leg Angle Tower JGT-30-340C-2NPT Site Auxiliary Power supply Transformer-37.5KVA Site Refer to Note 1.
Tower 4-Leg Angle Tower JGT-36-340C-2NPT 1 Site Auxiliary Power supply Transformer-50KVA Site Refer to Note 1.
Tower 4-Leg Angle Tower JGT-42-340C-2NPT Site Auxiliary Power supply Temporary power for the site installation 1 Site
Tower 4-Leg Tublar Tower 4GT-42-340C-2NPT Site Auxiliary Power Device Power system upgrade(Breaker, Rectifier, Rectifier model) Site
Note 1.
It will be adjusted based on the actual AC commercial power capacity application in the future.
SITE
SITE ID (PH1100286)
TRANSFORMER (25KVA) Purok 2, KM 12,
Catalunan Pequeño, Davao City
LESSOR'S
HOUSE
S
IT
E
A
C
C
E
S
S
B VICINITY MAP
SCALE NTS
HH
Site Information
MCB
MTS
ACPDB
Site
Site ID PH1100286
Site Code
Site Name
Area Type Suburban
A SITE DEVELOPMENT PLAN
SCALE NTS Location Detail
Longtitude(E): 125.51601
Latitude(N): 7.07074
Altitude(m): 67
Region Davao Region (Region XI)
Province DAVAO DEL SUR
Site Address Purok 2, KM 12, Catalunan Pequeño, Davao City
Site Detail
Site Type MacroSite
Civil Work Input:
Frequency band 700M&2.1G
Exposure category: C D ; Quantity of sectors 3
Soil Bearing Capacity: 278.04 kpa; Site Sub-type Greenfield
Site category New
Under Ground Water Level: NO WATER m;
Type of property Private Land
Soft Subsoil: Yes No (VERY HARD) .
PROPOSED
L700&L2.1 ANTENNA FOUNDATION LINE
(RRU/RRH AT THE
BACK OF ANTENNA)
N
PROPOSED
JGT-36-340C-2NPT TOWER
PROPOSED
24 HOLES BUSBAR PROPOSED
TEST PIT
PROPOSED
JGT-36-340C-2NPT TOWER
4 - Ø26/32mm HDPE PIPE PROPOSED
5 m 1*Ø110 PVC PIPE
5 m FOC
PROPOSED
PROPOSED MTS CLIMBING LADDER
PROPOSED
50mmØ FLEXIBLE
METAL/PVC CONDUIT
PROPOSED
24 HOLES BUSBAR
PROPOSED
TEST PIT PROPOSED
PROPOSED 5 m 1*Ø26 / 32 HDPE PIPE
SERVICE ENTRANCE 5 m FOC
THE LENGTH OF THE MATERIAL CAN BE
PROPOSED ADJUSTED ACCORDING TO THE ACTUAL SCENE
PROPOSED FENCE
5 m 1*Ø110 PVC PIPE
5 m FOC PROPOSED
KWHR METER
B SITE LAYOUT
PROPOSED THE LENGTH OF THE MATERIAL CAN BE SCALE NTS
ADJUSTED ACCORDING TO THE ACTUAL SCENE
5 m 4*Ø26 / 32 HDPE PIPE
5 m FOC PROPOSED
PROPOSED HANDHOLE GATE WAY
R
A PERSPECTIVE VIEW
SCALE NTS
PERIMETER LIGHT
CLIMBING LADDER
PROPOSED
GPS LOCATION
PROPOSED
TEST PIT POWER SUPPLY CABINET
AT THE PLATFORM
PROPOSED ACPDB
LOCATION
& SURGE
PROTECTOR
DEVICE AT THE
BACK
2*60mm² AC cable(BLACK/RED)
PERIMETER LIGHT
REFER TO
SINGLE LINE DIAGRAM
M
HH
2 SECTION "Y"
SCALE: NTS
COMMERCIAL POWER
A02
A03
PROPOSED
L700&L2.1 ANTENNA S02:180°
35.1 m S03:300°
(RRU/RRH AT THE
BACK OF ANTENNA)
N
PROPOSED
24 HOLES BUSBAR S01:20°
PROPOSED U2100
RRU & L700 RRH
A01
OB Light power supply Cable:
ZRVV22 3x1.5mm2, (Blue/Black/Yellow & Green)
Note:
The metal outer sheath of the cable installed Platform 1 Layout
horizontally should be connected to the lightning
protection flat bar or the ground wire every 5m ~ 10m;
The metal outer sheath of the cable (vertical) running
up and down should be grounded at least once near
both the upper and lower ends.
AHPC:
2*6mm² RRU DC POWER CABLE(BLUE/BLACK)
ARGA:
2*10mm² RRU DC POWER CABLE(BLUE/BLACK)
S01 A01 L700&L2.1 8ports 15dBi 20 35.1 2680×469×198 3.0 2.0 Platform 1 T2020L6R012
FIBER CABLE, CABLE TIE OR CLAMP, 0.8M/PCS
S02 A02 L700&L2.1 8ports 15dBi 180 35.1 2680×469×198 2.0 2.0 Platform 1 T2020L6R012
S03 A03 L700&L2.1 8ports 15dBi 300 35.1 2680×469×198 3.0 2.0 Platform 1 T2020L6R012
1 CPRI 50 5
2 Jumper 3 / 10 16 / 8
0m 3 Power (+/-) 50 5
TEST
TEST PIT
Grounding (RRU)
PIT
4 12 5
5 AISG 3 3
A PERSPECTIVE VIEW
SCALE NTS
A PERSPECTIVE
SCALE NTS
SURGE
B TOP VIEW
PROTECTOR SCALE NTS
DEVICE
3. CHB / MASONRY :
1800
825 650 1500 650 1475 650 600 450 3200
10000
NOTE:
ALL PERIMETER
LIGHTS SHOULD
BE ON TOP OF
750
FGL +0.30
300
NGL ±0.00
2 TYPICAL ELEVATION
550
- SCALE : 1:20M
94
94
BARBED WIRE HOLDER BARBED WIRE HOLDER PROPOSED COLUMN
75 350 75
142
142
142
142
31 31
10 10
75
750
26
26
750
100
142
142
30
30
100 88 142
100 88 142
30
30
200
350
500
25 THK CEMENT MORTAR
COPING 12mmØ BARS
200
200
BOTHWAYS
100
100
200
2000
OUTSIDE
75
INSIDE 100 100
LONG REBAR
75 75
LONG REBAR
NGL ±0.000
2 BARBED WIRE HOLDER +0.300 10mmØ HORIZONTAL
SCALE NTS
BARS@ 600mm O.C.
CONTINUOUS WALL
300
FOOTING
38mmØ PVC 10mmØ VERTICAL
12mmØ BARS WEEP HOLES BARS @ 400mm O.C.
550
50mm THK.
LEAN CONCRETE
12mmØ 150mm THK CHB WITH
TIE BARS @ 200 O.C. MORTAR (150mm CHB)
50 500 50 -0.150
50
3-12mmØ CONT.
BARS
150
FENCE POST DETAIL
75
1 -0.300
SCALE NTS
500
75 250 75
75 350 75
400
PROPOSED COLUMN
200
CONTINUOUS WALL FOOTING DETAIL
75
50 100 50 5
100
4-12mmØ WITH 10mmØ LATERAL SCALE NTS
TIES @ 200mm O.C.
50
200
100
200
350
500
BILL OF MATERIAL(GRAVEL )
50
12mmØ BARS
BOTHWAYS
3 COLUMN SECTION A
200
NOTES :
SCALE NTS
1. PROVIDE DRAIN HOLES ON THE FRAMES.
75
20
31 83 70 197 63
25 1465 1465 25
10 25 25 25
80
30 26
93
142
30
R20
142
40
750
40
900
142
142
109
205
ELEV. +2.300
88
250
250
R60
60
96
5 6
--
15
15
--
975
700
2700
63 20
412
83 70 197 63
800
4
2 --
975
3 --
--
400
300
FGL +0.300
2 BARREL BOLT DETAIL 25 25 25
35
0
R1
70
10
10 15
10
15
12.5
25
15
35
25
60
35
40
6
25
70
25
12.6
7 DETAIL B
10
-- SCALE: 1:5
12.5 22.5 10 10
25
35 40
20
7
252
252
--
135
135
160
160
75
75
175
175
50
50
FGL ±0.30
50
50
150
45
25
4 HINGE DETAIL
3 FOOT BOLT DETAIL 100
25
-- SCALE: 1:5
-- SCALE: 1:10
4 RAMP DETAILS
SCALE 1:50
BILL OF MATERIAL(RAMP )
NOTES :
1.CONCRETE STRENCGTH:CLASS "A",21MPa(3000psi) @28 DAYS.
REINFORCING BARS: DIA.≥16,fy=414MPa
DIA.≤12,fy=275MPa
2.THE CONCRETE RAMP IS LAID ON THE COMPACTED SOIL WHICH
MUST BE NO LESS THAN 93% OF MAX DENSITY.
SPOOL INSULATOR
(IF REQUIRED PROVIDE 10mmØ BARS
400
DRIP LOOP) 6-16mmØ BARS WITH 450
650
10mmØ TIES @ 150mm O.C.
100 100 100 100
100
10mmØ BARS(SEE
SECTION 'B' DETAIL)
50
100
300
VARIES (AS PER POWER PROVIDER REQUIREMENT)
100
300
200
MALLEABLE CLAMP
1.0m SPACING
50
A CONDULET WITH 4 SECTION 'B'
REMOVABLE COVER SCALE NTS
SCALE NTS
KWHR METER
WITH CAGE & PADLOCK
1200
75 1050 75 450
REMOVABLE COVER
75
100
FGL +0.300 (MIN.)
300
NGL ±0.000
300
IMC CONDUIT
1200
1050
75
1 ELEVATION NOTES :
SCALE NTS
1.CONCRETE STRENCGTH:CLASS "A",21MPa(3000psi) @28 DAYS.
LEAN CONCRETE STRENGTH: 7MPa;
REINFORCING BARS: DIA.≥16 ,fy=414MPa
DIA.≤12 ,fy=275MPa
50mmØ HDPE
A
ONE CLAMP PER METER
200 200
MCB MTS
CONDULET WITH
REMOVABLE COVER CLAMP
IMC CLAMP
1200
METAL/PVC CONDUIT 50mmØ HDPE
1200
CABLE LADDER IMC CLAMP
50mmØ IMC
FGL +0.300
50mmØ IMC
450
IMC
COUPLING
FGL +0.300
450
TO EQUIPMENT
50mmØ PVC&
50mmØ HDPE
50 50
SEE HINGES
50mmØ PVC DETAIL 50 L 50mm x 6mm THK
PIPE SLEEVE
10
300
500
4-10mmØ NUTS 10mmØ DOWEL
38mm² BCW WITH WASHERS
50 50
10mmØ HANDLE
500mm x 200mm x 6mm THK
FLAT BAR (STOPPER PLATE)
5 HINGE DETAIL
3 TEST PIT / PULL-BOX COVER DETAIL NTS
SCALE NTS
SCALE
100
100
800
800
50mmØ PVC
50mm x 200mm x 6mm THK
950
950
PIPE SLEEVE
800
800
10 50
38mm² BCW END-BELL
150
200
50
50
38mm² BCW
COMPACTED COMPACTED
GRAVEL BEDDING GRAVEL BEDDING HANDLE DETAIL
SCALE NTS
5
8"Ø
x 3m
GROUNDING ROD
350 350
L60x60x6
L60x60x6
L60x60x6
2 SIDE VIEW 3 FRONT VIEW
SCALE 1:20M SCALE 1:8M
800
PROPOSED BUSBAR
500
150 500 150
Ø10mm TIES
75 SPACED AT 250mm O.C
75
PROPOSED
EQUIPMENT PLATFORM
500
4 - 16Ømm
CLOSED TIES
900
4 - Ø10mm TIES
TEMPERATURE BARS
75
1 SECTION 1
SCALE: NTS:
PROPOSED
CABLE LADDER
SECTION HANDHOLE DETAIL
310
Ø10mm TIES
SPACED AT 250mm O.C
4 - Ø10mm TIES
TEMPERATURE BARS
1 SECTION 2
SCALE: NTS:
1700
INSIDE OUTSIDE
NOTE:
500
THE PVC PIPE NEEDS TO BE ENCAPSULATED WITH
150
200 100
1 700mm (min)
300
550
400
NGL ±0.000
TOP OF ROADWAY
300
0 0
BOX CONCRETE R6
700
110
ENCASEMENT
R60
900
Ø110 PVC PIPE
50
R6
00
200
100mm THICK CONCRETE
4 - Ø 26/32mm 300 200 300
ENCASEMENT
HPDE PIPE 100mm THICK CONCRETE
ENCASEMENT 75mm THICK
LEAN CONCRETE
2
OPENING
4MMTHHK
100 600 100
25
800
600
550
RISING SLOT
100
800
800
40
50mm*50mm SQUARE
300
DITO
800
550
110
RECTIFIER
MODULE
DCDU-1U 50A (4)
FMS GSFU-1U
A1-1U
RESERVED-2U
SPARE-1U
RESERVED IDU-2U
SPARE-1U
BBU-3U
DCDU ON ON ON ON ON ON ON ON
4x40A
I I I I I I I I
ODF-3U 0 0 0 0 0 0 0 0
OFF OFF OFF OFF OFF OFF OFF OFF
160 AT, 2P 8. MAIN CIRCUIT BREAKERS SHALL BE INDUSTRIAL TYPE, 25kAIC WHILE BRANCH CIRCUIT BREAKERS
SHALL BE COMMERCIAL TYPE 10kAIC.
2 - 60mm² THW (BLACK/RED) +
125AT, 2P 9. INSULATION TEST SHALL BE DONE BEFORE THE SITE IS ENERGIZED AND WITNESSED .
1-30mm² THW GROUND (GREEN OR
RECTIFIER 1 1 2 SPACE
YELLOW-GREEN) RESISTANCE SHALL BE GREATER THAN FIFTY(50) MEGA OHMS.
20AT, 2P 20AT, 2P
IN 50mmØ IMC OR 50mmØ PVC PIPE 10. ALL EQUIPMENT AND MATERIALS SHALL BE BRAND NEW AND SUITED TO THE REQUIRED USE.
M Perimeter Light 3 4 C.OUTLETS
GENSET PROVISION
20AT, 2P 20AT, 2P 11. PULL BOXES OR JUNCTION BOXES SHALL BE PROVIDED, EVEN IF NOT
SPARE 5 6 SPARE INDICATED IN THE PLANS.
2 - 60mm² THW (BLACK/RED) + TO GROUNDING LOOP 20AT, 2P
12. ALL ELECTRICAL WORKS SHALL BE DONE UNDER THE DIRECT SUPERVISION OF A DULY
1-30mm² THW GROUND (GREEN OR MTS SPARE 7 8 SPACE
YELLOW-GREEN) IN NEMA 3R OR 4X ENCLOSURE LICENSED AND REGISTERED ELECTRICAL ENGINEER.
2- 160 AT, 2P, 25 kAIC MCCB SPACE SPACE
IN 50mmØ IMC OR 50mmØ PVC PIPE 230V, 60 Hz
9 10
NOTE:
CONNECTED TO GROUNDING BUSBAR 1. THE POWER CORD OF THE SITE AVIATION OBSTRUCTION LIGHT SHOULD BE INSTALLED WITH
@ MTS (MANUAL TRANSFER SWITCH)
A POWER CABLE WITH A METAL SHEATH OR LAID THROUGH A STEEL TUBE.
SINGLE LINE DIAGRAM PANEL BOARD
THE METAL OUTER SHEATH OF THE CABLE (OR STEEL PIPE) SHOULD BE GROUNDED AT
SCALE NTS
BOTH ENDS AND INTO THE EQUIPMENT ROOM.
BOTH ENDS OF THE OUTDOOR CABLE LADDER SHOULD BE GROUNDED, AND THE GROUND
CONNECTION
WIRE SHOULD BE A MULTI-STRAND COPPER WIRE WITH A CROSS-SECTIONAL AREA OF NOT
LESS THAN 10MM2.
SCHEDULE OF LOADS (160 AMP MAIN) 2. IF THE AVIATION OBSTRUCTION LIGHT IS DUAL TYPE TAPPING POINT WILL BE AT THE ACPDB CIRCUIT NO.5.
PANEL : ACPDB
ENCLOSURE : IP 55 W/ GROUNDING BAR; BOTTOM FEED 3. IF THE AVIATION OBSTRUCTION LIGHT IS SINGLE TYPE TAPPING POINT WILL BE AT THE RECTIFIER CABINET.
POWER SOURCE : 230V, 1-PHASE, 60Hz
CIRCUIT BREAKERS
COMPUTATION: kVA LOAD SINGLE PHASE :
CKT. LOAD DESCRIPTION VOLTS_V LOAD_VA LOAD_AMP LOAD_AMP = LOAD_VA / LOAD_V
NO. AT POLE WIRE SIZE GROUND SIZE CONDUIT kVA = 80.44 x 230 / 1000
DEMAND FACTOR (%) = 100
RECTIFIER 1 230 12000 52.17 125 2P 2 - 35mm², THW 1-14mm², THW 50.8mm Ø IMC Pipe(2"), or 50mm Ø PVC TOTAL AMP = 64.35 A = 18.5kVA
1
PROTECTION AMP = TOTAL AMP * 1.25 = 80.44 = 37.5kVA, which is still minimum allowable transformer
2 SPACE - - - - - - - capacity of COOP.
3 Perimeter Light 230 400 1.74 20 2P 2 - 3.5mm², THHN 1 - 3.5mm², THHN 15.4mm Ø IMC Pipe(1/2"), or 20mm Ø PVC FEEDER:
4 C. OUTLETS 230 600 2.61 20 2P 2 - 3.5mm², THHN 1 - 3.5mm², THHN 15.4mm Ø IMC Pipe(1/2"), or 20mm Ø PVC 2-60mm² THW (Black/Red) + 1-30mm² THW GROUND LEGEND
5 SPARE 230 600 2.61 20 2P 2 - 3.5mm², THHN 1 - 3.5mm², THHN 15.4mm Ø IMC Pipe(1/2"), or 20mm Ø PVC (GREEN OR YELLOW-GREEN) IN 50mmØ IMC or 50mmØ PVC
6 SPARE 230 600 2.61 20 2P 2 - 3.5mm², THHN 1 - 3.5mm², THHN 15.4mm Ø IMC Pipe(1/2"), or 20mm Ø PVC
M KILOWATT HOUR METER
7 SPARE 230 600 2.61 20 2P 2 - 3.5mm², THHN 1 - 3.5mm², THHN 15.4mm Ø IMC Pipe(1/2"), or 20mm Ø PVC
PROTECTION: MECB MAIN ENCLOSED CIRCUIT BREAKER
8 SPACE - - - - - - - 160 AT, 1-Phase MECB 2P, 230 V, 25 kAIC (EZD), MTS MANUAL TRANSFER SWITCH
SPACE - - - - - - -
in NEMA 3R or 4x Enclosure. AC PANEL DISTRIBUTION BOARD
9 ACPDB
10 SPACE - - - - - - -
GROUND
SERVICE ENTRANCE
NOTE:
SEE TEST
PIT DETAILS
ST-07
3 WAY
EXOTHERMIC
CONN
4 WAY 4 WAY
EXOTHERMIC
CONN
EXOTHERMIC
CONN
LEGEND:
38mm² BARE COPPER WIRE
2-40mmx4mm FLATBAR
FOR AIR TERMINAL CONNECTED
TO GROUNDING LOOP USING
EXOTHERMIC CONNECTION
40mmx4mm HDG FLAT BAR
3 WAY
EXOTHERMIC
CONN 30mm² INSULATED COPPER CABLE (GREEN)
REFER TO NOTE 1 FOR GROUNDING ELECTRODE CONDUCTOR
3 WAY
COMPACTED
EXOTHERMIC
CONN
CONVERSION BAR COPPER TO HDG FILL
MTS
MCB
CRIMP TYPE TERMINAL LUG
3 WAY
EXOTHERMIC
(FOR BARE AND INSULATED
CONN
COPPER CABLE, CU/AL)
16mmØ or 58"Ø x 2.5m or 3m Using Exothermic Weld or Cad Weld
To Bond the grounding cable and
COPPER CLAD STEEL Grounding Rod
ANTENNA
RRU
MW DISH
ODU
LEGEND:
38mm² BARE COPPER WIRE
AIR TERMINAL ROD CONNECTED WITH 2 - 40mmx4mm FLATBAR DOWN
LEAD TO THE LADDER RACK CONNECTED DIRECTLY TO THE GROUNDING REFER TO GENERAL NOTE 9. EL-05 40mmx4mm HDG FLAT BAR
LOOP RING USING EXOTHERMIC WELDING. 30mm² INSULATED COPPER CABLE (GREEN)
FOR GROUNDING ELECTRODE CONDUCTOR
1-24 HOLES GROUNDING CONVERSION BAR COPPER TO HDG
BUSBAR @ ELECTRICAL
EQUIPMENT PLATFORM AREA 40mmx4mm HDG FLATBAR 16mmØ or 58"Ø x 2.5m or 3m
Connected using conversion bar COPPER CLAD STEEL
COPPER to HDG bolted to the 24
HOLES GROUNDING BUSBAR, 3-WAY EXOTHERMIC CONNECTION with BCW
ENCASED WITH 50mmØ PVC & Grounding Rod
3-WAY EXOTHERMIC CONNECTION with BCW
35mm² INSULATED & FLATBAR
COPPER CABLE(GREEN) For
GROUNDING ELECTRODE 3-WAY EXOTHERMIC CONNECTION with BCW
REFER TO NOTE 1
CONDUCTOR
POWER CABINET
MANUAL TRANSFER
1. INUSLATED COPPER CABLE (GREEN)
POWER CABINET
CIRCUIT BREAKER
FOR GROUNDING SERVICE EQUIPMENT
MAIN ENCLOSED
ACPDB
WILL BE DEPEND ON THE kVA RATING OF
THE TRANSFORMER. Please refer to the
SINGLE LINE DIAGRAM FOR EXACT kVA
SWITCH
RATING OF TRANSFORMER.
25kVA = 30mm² INSULATED COPPER
CABLE (GREEN)
37.5kVA = 30mm² INSULATED COPPER
ALL TOWER FOOT FLANGE MUST BE CABLE (GREEN)
WELDED WITH 40mmx4mm HDG FLAT BAR CONNECTING 50kVA = 35mm² INSULATED COPPER
TO THE GROUND LOOP USING WELDING AND MUST BE CABLE (GREEN)
COAT WITH ASPHALT
±0.000
GROUND LEVEL GROUND LEVEL