The document is a Saudi Aramco inspection plan for irrigation piping. It lists inspection tasks and assigns responsibility for quality control between Saudi Aramco and contractors. It includes tasks like material receiving, installation of piping, valves and accessories, hydrostatic testing, and backfilling. General notes provide guidance on inspection participation and responsibilities.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
62 views2 pages

SATIP-S-070-02 Rev 7 Irrigation Piping

The document is a Saudi Aramco inspection plan for irrigation piping. It lists inspection tasks and assigns responsibility for quality control between Saudi Aramco and contractors. It includes tasks like material receiving, installation of piping, valves and accessories, hydrostatic testing, and backfilling. General notes provide guidance on inspection participation and responsibilities.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

SAUDI ARAMCO ID/PID FORM REV 1 - 010109 (Standards Cutoff - March 2013) Rev 7 31-Mar-13

SAUDI ARAMCO TYPICAL INSPECTION PLAN SATIP No. APPROVED DATE DISCIPLINE:

Irrigation Piping SATIP-S-070-02 30-Apr-13 PLUMBING


PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. & ACTIVITY CODE PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO

1.0 DOCUMENT REVIEW

See See
1.1 Hydrostatic Package See SATIP-A-004-02 Pressure Testing
Remarks Remarks

2.0 MATERIAL RECEIVING

See See
2.1 Thermoplastic and RTR piping See SATIP-S-070-03 Thermoplastic and RTR piping
Remarks Remarks

3.0 INSTALLATION

See See See SATIP-S-070-01 Excavation and Backfilling for


3.1 Trench Inspection
Remarks Remarks Underground Utilities

Motor Operated Valves, Control Valves See See See SATIP-J-700-01 Motor Operated Valves and Control
3.2
and Valves Remarks Remarks Valves and SATIP-L-108-01 Valves as applicable

Piping lay-out SAIC SAIC Saudi Aramco to be notified on start of this activity for
3.3
Inspection S-4052 S-4052 W W each location

Irrigation Piping Accessories SAIC SAIC


3.4
Inspection S-4053 S-4053 W S

See See
3.5 RTR & Thermoplastic Piping See SATIP-S-070-03 Thermoplastic and RTR Piping
Remarks Remarks

See See
3.6 Hydrostatic Testing See SATIP-A-004-02 Pressure Testing
Remarks Remarks

Control Wiring (Same Trench) SAIC SAIC Saudi Aramco to be notified on start of this activity for
3.7
Inspection S-4032 S-4032 W W each location / area

See See See SATIP-S-070-01 Excavation and Backfilling for


3.8 Backfill placement and compaction
Remarks Remarks Underground Utilities

Page 1 of 2
SAUDI ARAMCO ID/PID FORM REV 1 - 010109 (Standards Cutoff - March 2013) Rev 7 31-Mar-13

SAUDI ARAMCO TYPICAL INSPECTION PLAN SATIP No. APPROVED DATE DISCIPLINE:

Irrigation Piping SATIP-S-070-02 30-Apr-13 PLUMBING


PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. & ACTIVITY CODE PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO

4.0 PRE-COMMISSIONING

4.1 Not applicable

GENERAL NOTES
The first three incidents of each Inspection or testing activity listed require 100 % participation by Saudi Aramco Site Inspection Personnel. After this period, Saudi Aramco Inspection may adjust the
1 levels of Saudi Aramco participation based upon the Contractor’s performance.
2 Surveillance: QA/QC organization to monitor work in progress without notice from Construction Organization
Witness: QA/QC organization shall be notified of the timing of Inspection or test in advance. However, the inspection or test shall be performed as scheduled if the QA/QC organization representative
3 is not present.
Hold: QA/QC organization shall be notified of the timing of inspection or test in advance. Inspection or test shall not be carried out without the QA/QC organization representative in attendance.
4
5 If the Main Contractor delegates the assigned responsibility to the Subcontractor, then the Main Contractor will have the same degree of responsibility as assigned to Saudi Aramco.

LEGEND
H Hold Point for QC Inspection/ Test R Review of Documents
W Witness Inspection/Test RH Review and Approval of Documents
S Surveillance I 100% Contractor Inspection

Page 2 of 2

You might also like