0% found this document useful (0 votes)
289 views22 pages

Jafurah Project Transmittal Notice

Uploaded by

Pangky Abasolo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
289 views22 pages

Jafurah Project Transmittal Notice

Uploaded by

Pangky Abasolo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 22

SAUDI ARABIAN OIL COMPANY

JAFURAH GAS PROJECTS DEPARTMENT


JAFURAH INDUSTRIAL SUPPORT FACILITIES
Jafurah Industrial Support Facilities & Infrastructure PKG-6
SA-PMT Office Building A

Transmittal No. Date


DOCUMENT TRANSMITTAL
JGPD-JISF-TR-0716/23 November 19,2023
TO: Mr. Yang Meng, Cotractor Representative FROM: Mr. Saleh S. Alamri, Company Representative
SINOHYDRO Corporation Ltd. Saudi Arabian Oil Company
P.O.Box 53337, Riyadh 12363

Contract Name: SINOHYDRO Corporation Ltd. Project Title: Jafurah Industrial Support Facility Division
Contract No. : 6600050451 / BI: 10-14329-0007
SinoHydro Reference No.: JGPD-ISF-T-SH-SA-1195
Document No Rev Subject Remarks Qty Nature
JSA for Earth Work including (Excavation,
JGPD-ISF-T- 00 Backfilling, Grading, Leveling & Compaction) Approved 1
SH-SA-1195
Company has reviewed the referenced transmittal and has no further comments.

Should you require any further clarification, please contact Handoo, Banarjee at
[email protected]

CONTRACTOR shall proceed with the scope in full compliance to the contract. Any COMPANY reviews /
response shall not relieve CONTRACTOR from his contractual obligations. CONTRACTOR shall state clearly
any deviations in his submittal and shall be listed as “Deviations”. If no explicit acceptance from COMPANY to
the listed deviations, CONTRACTOR shall not assume that COMPANY accepted the mentioned Deviations.
The content of this document does not supersede the Contract nor represent a Change Order request. Should
this document contain any requirement that is not a Contractual Obligation, then the Contract should be
followed, and the Contractor shall inform Company immediately and request a Change Order.

‫ــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــ‬
SALEH S. AL-AMRI, Company Representative
Attachment(s): N
Transmitted by: Received By: Received Date:

__________________________ ______________________________
Handoo, Banarjee Name and Signature

Saudi Aramco: Company General Use