67% found this document useful (3 votes)
700 views6 pages

Arbaminch University Institute of Technology Department of Computer Science and IT Final Project Proposal

This document provides a proposal for developing a Human Resource Management System for Arbaminch Textile Factory. The project team will analyze problems with the current manual system and design an automated new system to address issues like difficult data searching, delayed decision making, and high costs. The scope of the new system will include employee record management, payroll processing, and generating reports. Through interviews and observations, the team will study the existing workflows, identify requirements, and design and implement a working prototype system to solve problems with the manual process within the planned 8-month timeframe.

Uploaded by

abdiisabaa
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
67% found this document useful (3 votes)
700 views6 pages

Arbaminch University Institute of Technology Department of Computer Science and IT Final Project Proposal

This document provides a proposal for developing a Human Resource Management System for Arbaminch Textile Factory. The project team will analyze problems with the current manual system and design an automated new system to address issues like difficult data searching, delayed decision making, and high costs. The scope of the new system will include employee record management, payroll processing, and generating reports. Through interviews and observations, the team will study the existing workflows, identify requirements, and design and implement a working prototype system to solve problems with the manual process within the planned 8-month timeframe.

Uploaded by

abdiisabaa
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 6

Arbaminch University Institute of Technology Department of Computer Science and IT Final project proposal

Project Title: - Arbaminch Textile Factory Human Resource Management System

Project team composition:Name Kedir hawiya Gebeyehu Abera Mahlet Tariku Senait Taddese email [email protected] Id RET/1275/01 RENG/051/00 RET/ 610 / 01 RET/ 1120/01

Introduction Background of the Organization Arbaminch Textile factory (ATF) was established in 1979 EC. It is the governmental textile factory in Ethiopia that supplies different textiles to local and foreign market. The Factory is located around Arbaminch city. Currently the factory has 668 permanent and 30 contract employees. The Factory has its own leading principles. Based on its strategic plan the vision statement emphasizes on "Being a factory which has great contribution in National economy" its mission states that" Increase foreign currency by exporting different textiles through producing, manufacturing and supplying them in rows". The factory is headed by Board of Director and managed by the General Manager. The Production and Technique Department has the Production and Technique division. The Administration Department has the General Service and the Personnel Divisions and the like other department. This project is intended to deal with the Personnel division and the General Accounts divisions. Under the Personnel division different activities are performed, such as Employee record management, handling of incoming and outgoing letters, controlling employee attendance, leaves, promotion etc. Background of the project This project focused on developing on human resource management system for ATF and is initiated by the team members for the B.Sc Degree program in Computer science & IT. This project is conducted in two phases for eight months. The first phase of the project deals with analysis and the second phase deals with design and implementation of the new system.

Statement problem of the project According to the preliminary interview and observation we have conducted, the overall activity in human resource is undertaken manually. Due to this manual work ATF is facing many problems. Problems on manual employee record system. Employee records are put in flat file with cabinets. This way of handling has the following problems. Difficult to search employee information Decision making for management based on employees'

information is delayed Misplacement of files Loss of documents from file High stationary cost High labor cost Duplication of data Takes a lot of time to process data Cross referencing is difficult It requires more storage Problems on Manual payroll system Payroll preparation takes more than a week Highly labor intensive High stationary cost High computational load Due to these problems, we take this incident as an opportunity to develop an automated new system. If the system is not automated the aforementioned

problems may persist and affect the profitability of the factory. But if the existing system is automated then the new system will alleviate the problems observed in the manual system allowing saving time, cost, manpower, making report generation simple accurate. Scope of the Project The Scope of the project is to handle the human resource management system of ATF. The specific activities, that the system capable of doing in employee record aspect is the following. Develop an employee record data base which is capable of entering new employee Update employee record Record sick leave, annual leave attendance and other payroll related data. And the system is capable of doing activities that has to be performed during payroll preparation. Objective of the project General Objective The main objective of this project is to develop a prototype human resource management system for ATF, which could solve problems of the manual system and utilize opportunities of a computerized system. Specific Objective The following specific objectives are outlined to achieve the general objective; Study how the existing system works Identity and analyze problems of the existing system

Define requirements of the new system, analyze and prioritize these requirements. Design the new system based on requirements specifications. Build a working model of the new system Finally implement and test the system developed. Methodology Data Source and Data collection The main source of data for our project is the factory itself. So, we will use the following primary and secondary data collection technique in order to gather the required data and understand the system. Observation It is a fact finding technique that allowed a direct way of examining how the work currently is done by observing the role of the people in the current system and how do they go about their job. By doing this, it will help us to capture problems, functions and requirements that are not found through interview and inspection of the document of the existing system. Interview The most important element in information system is people and no other factfinding technique places as much emphasis on people as interviews. Since the workers of the section are cooperative and are willing to be interviewed, we also have chosen interview as one of our requirement gathering methodology. As a result, we interviewee responsible staffs and tried to learn more about the work flow the organization and gather facts and opinions. Schedule and Time Our project will be completed within the planned frame of time due to the fact that: 1. The project scope is limited and clearly defined

2. The project team size and composition is a strong asset that will enable it to accomplish the tasks in parallel and with sharing the responsibilities for handling different modules at a time. 3. Since there is a non-negotiable academic calendar for the project, the project team will exert the best effort to complete the project with in the stated deadline.

You might also like