Presentation RR Busduct
Presentation RR Busduct
Unique design of earth side plates (with cooling fins) ensure better heat dissipation.
Heavy Joint side plates (5mm thick extruded aluminium) help in joint cooling.
Aluminum
Properties G. I. Housing Remarks
Housing
Eddy current/
Less More Aluminum is better
hysteresis losses
• Copper Conductor
• Al Conductor
Store
• Bending For
Feeder Length
CNC Busbar • Bending for Panel
Bending M/c Flange & Elbows
BUSBAR BENDING MACHINE
Automated Busbar Insulation Wrapping
• Polyester Sheet
• Nomex Paper
Store
• Bending For
Feeder Length
Insulation • Bending for Panel
Wrapping Flange & Elbows
Busbar Assembly CNC Riveting Machine
• Housing
Busbar • Conductors
Assembly
• CNC Automatic
Riveting of Busbar
CNC Busbar Assembly
Riveting M/c
Busbar CNC Di Electric & Insulation Testing Machine
• CNC Di Electric
Di Electric Test Machine
Test
• CNC Insulation
Insulation Test Machine
Test
Temperature Rise Test facility up to 6300A
(Approved by ASTA- Intertek)
The temperature rise test ensure the safety and reliability of the bus trunking components
like insulation, busbar supports………
The bus trunking system is loaded to its rated current till the temperature of BBT is
stabilized , normally it takes 4~ 6 hrs. for stabilization of temperature.
Verification of Resistance to Flame Propagation
Application of flame for 40 minute on assembled BBT has met the following condition:
• BBT didn’t ignite.
• The maximum extent of the charred portion (external or internal)of the BBT was under 2.5 m
from the bottom edge of the burner.
Verification of Fire Resistance in Building Penetration
The test ensures that NO FIRE spread through bus trunking in case of fire in building.
The duration for fire resistance is 240 minute.
Support & Services
Site measure (last elements) pieces delivery within four working days.
Site testing.