0% found this document useful (0 votes)
109 views23 pages

Sample Rating Sheets 2 in Conducting Competency Assessment

The document provides sample rating sheets for conducting competency assessment. It includes questions to test the candidate's knowledge in installing and configuring computer systems, setting up networks and servers, and maintaining computer systems and networks. The candidate's performance is evaluated as satisfactory or not.

Uploaded by

Jovemer Agudo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
109 views23 pages

Sample Rating Sheets 2 in Conducting Competency Assessment

The document provides sample rating sheets for conducting competency assessment. It includes questions to test the candidate's knowledge in installing and configuring computer systems, setting up networks and servers, and maintaining computer systems and networks. The candidate's performance is evaluated as satisfactory or not.

Uploaded by

Jovemer Agudo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 23

Sample Rating Sheets 2 in Conducting Competency

Assessment
Trainers Methodology (Technical Education and Skills Development Authority)

Scan to open on Studocu

Studocu is not sponsored or endorsed by any college or university


Downloaded by John Jaime Lovena ([email protected])
TESDA-OP-QSO-02-F07
Rev.No.00-03/01/17

Reference No.
1 1 1 0 5 1 7 1 2 7 0 0 0 0 0 4

RATING SHEETS

QUESTIONS AND ANSWERS FOR DEMONSTRATION WITH ORAL QUESTIONING

Name of Candidate

Name of Assessor JOHN JAIME A. LOVENA


 INSTALL AND CONFIGURE COMPUTER SYSTEMS
 SET-UP COMPUTER NETWORKS
Unit of Competency  SET-UP COMPUTER SERVERS
 MAINTAIN AND REPAIR COMPUTER SYSTEMS AND
NETWORKS

Date of Assessment JUNE 18, 2024


Did the candidate can? Satisfactory


response
Yes No

COC 1

 Assemble computer hardware

Plan and prepare unit assembly

Identify and obtain the materials, tools and equipment in accordance with job requirements

Follow the OH & S policies and procedures to ensure operation safety requirements

Assemble computer hardware in accordance with job and system requirements

Configure Basic-Input-Output System (BIOS)

 Prepare Installer

Create portable bootable devices


Customize installers

Install portable applications

 Install operating systems and drivers/peripherals


installation work
Install Operating System

Install and configure peripherals/devices

Access and install OS and drivers update/patches

Undertake on-going checks to ensure quality of work

 Install application software based on software

Install application software based on installation guide and software license agreement

Carry out variation to application software installation

Access and install software updates

 Conduct testing and documentation

Test devices’ systems and/or installation

Follow 5S and 3Rs according to environmental policies

Prepare and forward documentation to appropriate

COC 2

 Install network cables

Determine and plan the cable route

Identify and obtain network materials necessary to complete the work

Obtain the needed tools, equipment and testing devices


Perform cable splicing based on standards
Install network cables and cable raceway

Perform and check installation work

 Set Network Configuration

Check network connectivity of terminals

Diagnose and remedy fault or problem in the Network system

Configure Network Interface Card Settings

Carry out communication checking between terminals

Respond to unplanned events or conditions

 Set Router/Wi-Fi/wireless access point/repeater configuration

Configure client device system settings

Configure Local Area Network port

Configure Wide Area Network port

Configure wireless settings

Configure security/firewall/advance settings

Inspect and test configured computer networks

COC 3

 Set up user access

Create user folder

Configure user access level

Perform security check


 Configure network services

Check normal functions of server

Install/Update required modules/add-ons

Check operation of network services

Confirm network services to be configured

Respond to unplanned events or conditions

 Perform testing, documentation and pre-deployment


procedures
Undertake pre-deployment procedures

Undertake and configure peripherals/devices

Prepare complete reports

COC 4

 Plan and prepare for maintenance and repair

Plan and prepare for maintenance and/or diagnosis of faults

Obtain and check tools, equipment and testing devices

Obtain materials necessary to complete the work

Follow OHS policies and procedures

Check computer systems and networks against job/service order

 Maintain computer systems and networks

Use appropriate personal protective equipment

Check normal functions of computer systems and networks


Perform scheduled periodic maintenance

Perform needed repairs and replacements

Respond to unplanned events or conditions

 Diagnose faults of computer systems and networks

Manage and implement contingency measures

 Rectify/correct defects in computer systems and networks

Replace defective components or parts without damaging the surrounding environment


services
Make adjustments, if necessary

 Inspect and test the computer systems and networks

Check and test computer systems and networks

Follow 5S and 4Rs according to environmental policies

The candidate’s overall performance was:

 Satisfactory
 Not Satisfactory

Candidate signature: Date: June 18, 2024

Assessor signature: Date: June 18, 2024


TESDA-OP-QSO-02-F07
Rev.No.00-03/01/17

Reference No.
1 1 1 0 5 1 7 1 2 7 0 0 0 0 0 4

RATING SHEETS

QUESTIONS AND ANSWERS FOR DEMONSTRATION WITH ORAL QUESTIONING


PROBABLE ANSWERS

Name of Candidate

Name of Assessor JOHN JAIME A. LOVENA


 INSTALL AND CONFIGURE COMPUTER SYSTEMS
 SET-UP COMPUTER NETWORKS
 SET-UP COMPUTER SERVERS
Unit of Competency  MAINTAIN AND REPAIR COMPUTER SYSTEMS AND
NETWORKS

Date of Assessment JUNE 18, 2024



Questions to probe the candidate’s underpinning
knowledge Satisfactory response

The candidate should answer the following questions: Yes No

COC 1
1. If you want to set up a dual-boot scenario between Windows 7
and Windows Server 2008. How would you do this?

Answer:
Step 1: Partition hard drive Step
2: Install Windows 7 first
Step 3: Then, install Windows Server 2008 in the second partition

2. What do you call the computer software which you configure


before installing the OS?

Answer: BIOS
3. After testing the assembled product, you have noticed that
the product is not working, what are the possible causes?

Answer:
 Cold solder
 Wrong component placement,
 Wrong polarity

4. How many RID (Relative Identification) master in one domain?

Answer: Single

5. What type of screw driver will you use for small screws usually
found in Compaq and Apple computers?

Answer: Torx Screwdriver


COC 2
1. What do you call a bootable disk one or more IP subnets that are
connected by the fast links?

Answer: Site
2. What if the computer you have to network is more than 100, and
you have noticed that the network is slowing down, what are you
going to do? Give at least one recommendation.

Answer: Divide the network into groups or subnet the network


3. What would you do if you suspect that the cause of the trouble in
the network is the cable?

Answer: Get a LAN tester and check the cable. Swap a good or working
cable in place with the suspected cable.
4. After replacing a good cable, still the computers cannot
connect to each other, what are the possible causes if the
network is using static IP Addresses?

Answer:
 Wrong IP address
 Maybe some computers don’t belong to the group
 Wrong subnet mask
5. Based on rules, what type of network would you suggest to your
client who wants to network more than 100 computers?

Answer:
Client/Server type of Network
6. After configuring the network interface card, how will you
going to test the connectivity of your network?

Answer:
 Ping each other
 Using net view
7. What type of Cable will you use to connect two computers?

Answer: Crossover cable


8. What is the common type of cabling standards used for straight thru
cable?

Answer: 568B standard


9. In order for computers to networks, what are the things you are
going to set or configure?

Answer: Workgroup name should be the same, IP addresses should have


the same network address and host address should be different; for
subnet mask, computers in the same network or subnet should be the
same.
10. What type of network would you recommend if your client has
only few computer units?

Answer: Peer to peer network


COC 3
1. What should you do if you want to transfer file/s into another
computer? How do you share a folder named TESDA in
DRIVE C?

Answer: Create a folder using windows explorer


2. Name the two kinds of Linux boot loader.

Answer: GRUB and LILO


3. What is the term used for software which is not part of the OS?

Answer: Third party software/installer


4. Can you configure a server to permit users only to connect via
RemoteApp and block users from connecting to the desktop?

Answer: No. This option is not supported

5. What windows Server 2008 feature is a special installation


option that creates a minimal environment for running only
specific service or roles?

Answer: Server Core


COC 4
1. What may be the causes why the computer displays a black
screen and produces no beeps when power is turned on? What
should you do to correct the situation?

Answer: The probable cause must be the RAM. Turn off the
computer, unplug it, remove the cover, and remove the card. Then
take a plain old pencil eraser and rub it over the contacts
on the part of the card that fits into the slot.
2. What are the possible causes if the printer is not
responding?

Answer:
 The printer cable is defective or not connected
 Printer driver is not installed correctly or corrupted.
 No power supply
3. The computer power supply fan is creating noise. If after
inspection you found out that it is rotating slowly, what would
you do?

Answer:
Replace the power supply
4. How would you avoid overheating of devices such as CPU, or
any other devices that produces more heat?

Answer: Provide the computer proper ventilation or just cleaning or


removing the dust from the fans. Dust can slow down the moving
rotation of fans.
5. After transferring the computer unit, the monitor has no more
display but the power indicator is on. What are the steps that
you must do? Name two causes of the problem.

Answer: Cable, ATX Power Supply on the mother board,


Graphic Card Steps: Check the cable, check the on board power supply,
check graphic card and then test the unit.

The candidate’s overall performance was:

 Satisfactory
 Not Satisfactory

Candidate signature: Date: June 18, 2024

Assessor signature:
Date: June 18, 2024
TESDA-OP-QSO-02-F07
Rev.No.00-03/01/17

Reference No.
2 2 2 0 5 1 7 1 2 7 0 0 0 0 0 4

RATING SHEETS

QUESTIONS FOR DEMONSTRATION WITH ORAL QUESTIONING

Name of Candidate

Name of Assessor JOHN JAIME A. LOVENA


 INSTALL AND CONFIGURE COMPUTER SYSTEMS
 SET-UP COMPUTER NETWORKS
Unit of Competency  SET-UP COMPUTER SERVERS
 MAINTAIN AND REPAIR COMPUTER SYSTEMS AND
NETWORKS

Date of Assessment JUNE 18, 2024


Did the candidate can? Satisfactory


response
Yes No

COC 1

 Assemble computer hardware

Plan and prepare unit assembly

Identify and obtain the materials, tools and equipment in accordance with job requirements

Follow the OH & S policies and procedures to ensure operation safety requirements

Assemble computer hardware in accordance with job and system requirements

Configure Basic-Input-Output System (BIOS)

 Prepare Installer

Create portable bootable devices


Customize installers

Install portable applications

 Install operating systems and drivers/peripherals


installation work
Install Operating System

Install and configure peripherals/devices

Access and install OS and drivers update/patches

Undertake on-going checks to ensure quality of work

 Install application software based on software

Install application software based on installation guide and software license agreement

Carry out variation to application software installation

Access and install software updates

 Conduct testing and documentation

Test devices’ systems and/or installation

Follow 5S and 3Rs according to environmental policies

Prepare and forward documentation to appropriate

COC 2

 Install network cables

Determine and plan the cable route

Identify and obtain network materials necessary to complete the work

Obtain the needed tools, equipment and testing devices


Perform cable splicing based on standards

Install network cables and cable raceway

Perform and check installation work

 Set Network Configuration

Check network connectivity of terminals

Diagnose and remedy fault or problem in the Network system

Configure Network Interface Card Settings

Carry out communication checking between terminals

Respond to unplanned events or conditions

 Set Router/Wi-Fi/wireless access point/repeater configuration

Configure client device system settings

Configure Local Area Network port

Configure Wide Area Network port

Configure wireless settings

Configure security/firewall/advance settings

Inspect and test configured computer networks

COC 3

 Set up user access

Create user folder

Configure user access level


Perform security check

 Configure network services

Check normal functions of server

Install/Update required modules/add-ons

Check operation of network services

Confirm network services to be configured

Respond to unplanned events or conditions

 Perform testing, documentation and pre-deployment


procedures
Undertake pre-deployment procedures

Undertake and configure peripherals/devices

Prepare complete reports

COC 4

 Plan and prepare for maintenance and repair

Plan and prepare for maintenance and/or diagnosis of faults

Obtain and check tools, equipment and testing devices

Obtain materials necessary to complete the work

Follow OHS policies and procedures

Check computer systems and networks against job/service order

 Maintain computer systems and networks

Use appropriate personal protective equipment


Check normal functions of computer systems and networks

Perform scheduled periodic maintenance

Perform needed repairs and replacements

Respond to unplanned events or conditions

 Diagnose faults of computer systems and networks

Manage and implement contingency measures

 Rectify/correct defects in computer systems and networks

Replace defective components or parts without damaging the surrounding environment


services
Make adjustments, if necessary

 Inspect and test the computer systems and networks

Check and test computer systems and networks

Follow 5S and 4Rs according to environmental policies

The candidate’s overall performance was:

 Satisfactory
 Not Satisfactory

Candidate signature: Date: June 18, 2024

Assessor signature: Date: June 18, 2024


TESDA-OP-QSO-02-F07
Rev.No.00-03/01/17

Reference No.
2 2 2 0 5 1 7 1 2 7 0 0 0 0 0 4

RATING SHEETS

QUESTIONS AND PROBABLE ANSWERS FOR


DEMONSTRATION WITH ORAL QUESTIONING

Name of Candidate

Name of Assessor JOHN JAIME A. LOVENA


 INSTALL AND CONFIGURE COMPUTER SYSTEMS
 SET-UP COMPUTER NETWORKS
 SET-UP COMPUTER SERVERS
Unit of Competency  MAINTAIN AND REPAIR COMPUTER SYSTEMS AND
NETWORKS

Date of Assessment JUNE 18, 2024



Questions to probe the candidate’s underpinning
knowledge Satisfactory response

The candidate should answer the following questions: Yes No

COC 1
1. If you want to set up a dual-boot scenario between Windows 7
and Windows Server 2008. How would you do this?

Answer:
Step 1: Partition hard drive Step
2: Install Windows 7 first
Step 3: Then, install Windows Server 2008 in the second partition

2. What do you call the computer software which you configure


before installing the OS?

Answer: BIOS
4. After testing the assembled product, you have noticed that
the product is not working, what are the possible causes?

Answer:
 Cold solder
 Wrong component placement,
 Wrong polarity

4. How many RID (Relative Identification) master in one domain?

Answer: Single

5. What type of screw driver will you use for small screws usually
found in Compaq and Apple computers?

Answer: Torx Screwdriver


COC 2
1. What do you call a bootable disk one or more IP subnets that are
connected by the fast links?

Answer: Site
2. What if the computer you have to network is more than 100, and
you have noticed that the network is slowing down, what are you
going to do? Give at least one recommendation.

Answer: Divide the network into groups or subnet the network


3. What would you do if you suspect that the cause of the trouble in
the network is the cable?

Answer: Get a LAN tester and check the cable. Swap a good or working
cable in place with the suspected cable.
5. After replacing a good cable, still the computers cannot
connect to each other, what are the possible causes if the
network is using static IP Addresses?

Answer:
 Wrong IP address
 Maybe some computers don’t belong to the group
 Wrong subnet mask
5. Based on rules, what type of network would you suggest to your
client who wants to network more than 100 computers?

Answer:
Client/Server type of Network
7. After configuring the network interface card, how will you
going to test the connectivity of your network?

Answer:
 Ping each other
 Using net view
7. What type of Cable will you use to connect two computers?

Answer: Crossover cable


8. What is the common type of cabling standards used for straight thru
cable?

Answer: 568B standard


9. In order for computers to networks, what are the things you are
going to set or configure?

Answer: Workgroup name should be the same, IP addresses should have


the same network address and host address should be different; for
subnet mask, computers in the same network or subnet should be the
same.
10. What type of network would you recommend if your client has
only few computer units?

Answer: Peer to peer network


COC 3
1. What should you do if you want to transfer file/s into another
computer? How do you share a folder named TESDA in
DRIVE C?

Answer: Create a folder using windows explorer


2. Name the two kinds of Linux boot loader.

Answer: GRUB and LILO


3. What is the term used for software which is not part of the OS?

Answer: Third party software/installer


4. Can you configure a server to permit users only to connect via
RemoteApp and block users from connecting to the desktop?

Answer: No. This option is not supported

5. What windows Server 2008 feature is a special installation


option that creates a minimal environment for running only
specific service or roles?

Answer: Server Core


COC 4
1. What may be the causes why the computer displays a black
screen and produces no beeps when power is turned on? What
should you do to correct the situation?

Answer: The probable cause must be the RAM. Turn off the
computer, unplug it, remove the cover, and remove the card. Then
take a plain old pencil eraser and rub it over the contacts
on the part of the card that fits into the slot.
3. What are the possible causes if the printer is not
responding?

Answer:
 The printer cable is defective or not connected
 Printer driver is not installed correctly or corrupted.
 No power supply
3. The computer power supply fan is creating noise. If after
inspection you found out that it is rotating slowly, what would
you do?

Answer:
Replace the power supply
4. How would you avoid overheating of devices such as CPU, or
any other devices that produces more heat?

Answer: Provide the computer proper ventilation or just cleaning or


removing the dust from the fans. Dust can slow down the moving
rotation of fans.
5. After transferring the computer unit, the monitor has no more
display but the power indicator is on. What are the steps that
you must do? Name two causes of the problem.

Answer: Cable, ATX Power Supply on the mother board,


Graphic Card Steps: Check the cable, check the on board power supply,
check graphic card and then test the unit.

The candidate’s overall performance was:

 Satisfactory
 Not Satisfactory

Candidate signature: Date: June 18, 2024

Assessor signature:
Date: June 18, 2024

You might also like