0% found this document useful (0 votes)
43 views11 pages

Carga Termica Modulo de Conectividad Colegio 19 de Abrilrev13032024

This document analyzes the HVAC load for a building called IE 19 DE ABRIL in Junin, Peru. It provides input data on weather conditions, building details like dimensions and materials, internal load profiles, and HVAC system specifications. The analysis is intended to help size the HVAC system for the building.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
43 views11 pages

Carga Termica Modulo de Conectividad Colegio 19 de Abrilrev13032024

This document analyzes the HVAC load for a building called IE 19 DE ABRIL in Junin, Peru. It provides input data on weather conditions, building details like dimensions and materials, internal load profiles, and HVAC system specifications. The analysis is intended to help size the HVAC system for the building.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 11

IE 19 DE ABRIL

HVAC Load Analysis


for

Prepared By:

Ing. Carlos Uceda

miércoles, 13 de marzo de 2024


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
ServiParamo Ltda. IE 19 DE ABRIL
Barranquilla, Page 2

General Project Data Input


General Project Information
Project file name: C:\Users\Usuario\Desktop\ATLANTA SISTEMAS\PPTO COLEGIOS\elite
modulo de conectividad\CALCULO TERMICOS MOD CONECTIVIDAD IE 19
DE ABRIL REV13032024.CHV
Project title: IE 19 DE ABRIL
Designed by: Your Name
Project date: Sunday, Octuber 01, 2023
Project comment: To create a template from an existing project, open the project and select 'File
Weather reference city: JUNIN, PERU
Company representative: Ing. Carlos Uceda
Barometric pressure: 18,204 in.Hg.
Altitude: 13123 feet
Latitude: -11 Degrees
Mean daily temperature range: 11,5 Degrees
Starting & ending time for HVAC load calculations: 6pm - 12am
Number of unique zones in this project: 1

Building Default Values


Calculations performed: Cooling loads only
Lighting requirements: 2,80 Watts per square foot
Equipment requirements: 0,00 Watts per square foot
People sensible load multiplier: 250 Btuh per person
People latent load multiplier: 225 Btuh per person
Zone sensible safety factor: 10 %
Zone latent safety factor: 10 %
Zone heating safety factor: 0 %
People diversity factor: 80 %
Lighting profile number: 1
Equipment profile number: 1
People profile number: 1
Building default ceiling height: 8,50 feet
Building default wall height: 10,60 feet

Internal Operating Load Profiles (C = 100)


hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
1 C C C C C C C C C C C C C C C C C C C C C C C C
2 C C C C C C C C C C C C C C C C C 0 0 0 0 0 0 0
3 C C C C C C C C C C C C C C C C C C C C C C C C
4 C C C C C C C C C C C C C C C C C C C C C C C C
5 C C C C C C C C C C C C C C C C C C C C C C C C
6 C C C C C C C C C C C C C C C C C C C C C C C C
7 C C C C C C C C C C C C C C C C C C C C C C C C
8 C C C C C C C C C C C C C C C C C C C C C C C C
9 C C C C C C C C C C C C C C C C C C C C C C C C
10 C C C C C C C C C C C C C C C C C C C C C C C C

C:\ ...\CALCULO TERM ... 13032024.CHV miércoles, 13 de marzo de 2024, 05:00


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
ServiParamo Ltda. IE 19 DE ABRIL
Barranquilla, Page 3

General Project Data Input (cont'd)


Building-Level Design Conditions
Design Outdoor Outdoor Indoor Indoor Grains In/Outdoor
Month Dry Bulb Wet Bulb Rel.Hum Dry Bulb Diff Correction
January 72 69 50% 70 82,68 -11
February 72 69 50% 70 82,68 -11
March 72 69 50% 70 82,68 -11
Winter 58 58

Master Roofs
Roof ASHRAE Roof Dark Susp.
No. Roof# U-Fac Color Ceil
1 4 0,685 No Sí
2 4 0,685 No Sí
3 4 1,100 No Sí

Master Walls
Wall ASHRAE Wall Wall
No. Group U-Fac Color
1 A 0,390 D

Master Partitions
Partition Partition Cool Heat
No. U-Factor T-D T-D
1 0,350 10 0
2 0,350 10 0
3 1,100 10 0

Master Glass
Glass Summer Winter Glass Interior Interior
No. U-Factor U-Factor Shd.Coef. Shading Shd.Coef
1 1,018 1,100 0,700 2 0,700
2 1,000 1,000 0,400 1 0,400
3 1,000 1,000 0,600 1 0,600

C:\ ...\CALCULO TERM ... 13032024.CHV miércoles, 13 de marzo de 2024, 05:00


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
ServiParamo Ltda. IE 19 DE ABRIL
Barranquilla, Page 4

Air Handler Input


Air Handler Number 1 Input Data
Name:
Terminal type: Constant Volume
Method for CV Sum of Peaks
Supply fan type: Package fan
Calculations performed: Cooling loads only
Excess supply air: Reserve
Occurrences: 1
People profile number: 1
Lighting profile number: 0
Equipment profile number: 0
Exhaust may not exceed supply air: No
Leaving heating coil temp (deg.F): 95,0
Leaving cooling coil temp (deg.F): 55,0
Cooling coil CFM 0
Misc. Btuh gain - supply side: 0
Misc. Btuh gain - return side: 0
Combined fan & motor efficiency: 80
Static pressure across fan (in.wg.): 2,20
Summer supply duct temp rise (deg.F): 0,000
Summer return duct temp rise (deg.F): 0,000
Winter supply duct temp drop (deg.F): 0,000
Winter return duct temp drop (deg.F): 0,000
Chilled water temp difference (deg.F): 10,000
Hot water temp difference (deg.F): 20,000
Cooling ventilation: 10 AC/Hr
Cooling infiltration: 0 AC/Hr
Heating ventilation: 0 Direct
Heating infiltration: 0 AC/Hr
Pretreated outside air: none
Pretreated air Summer DB (deg.F): 0
Pretreated air Summer WB (deg.F): 0
Pretreated air Winter DB (deg.F): 0

Design Outdoor Outdoor Indoor Indoor Grains In/Outdoor


Month Dry Bulb Wet Bulb Rel.Hum Dry Bulb Diff Correction
January 72 69 50% 70 82,68 -11
February 72 69 50% 70 82,68 -11
March 72 69 50% 70 82,68 -11
Winter 58 58

C:\ ...\CALCULO TERM ... 13032024.CHV miércoles, 13 de marzo de 2024, 05:00


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
ServiParamo Ltda. IE 19 DE ABRIL
Barranquilla, Page 5

Zone Input
Zone 1: MODULO DE CONECTIVIDAD 1 (345,6 sq.ft) (Group 0)
Air Handler number: 1 Zone occurrences: 1
Zone length: (feet) 32,00 Zone width (feet): 10,80
Lighting Watts: 968 Equipment Watts: 10.000
Number of people in zone: 4 People profile number: 1
Lighting profile number: 1 Equipment profile number: 1
Ceiling height (feet): 8,50 Heating safety factor (%): 0
Sensible safety factor (%): 10 Latent safety factor (%): 10
Sensible heat per person (Btuh): 250 Latent heat per person (Btuh): 225
Cooling ventilation method: CFM/Pr Cooling ventilation value: 35,000
Cooling infiltration method: Direct Cooling infiltration value: 0,000
Heating ventilation method: Direct Heating ventilation value: 0,000
Heating infiltration method: AC/Hr Heating infiltration value: 0,000
Winter exhaust air CFM: 0 Summer exhaust air CFM: 0
Minimum supply CFM: 0 Latent Btuh equipment load: 0
Ceil. exposed to plenum (sq.ft): 346 Exposed floor slab perimeter (ft): 0
Cooling loads only are calculated for this zone.

Part Type U-Factor Cool TD Heat TD Height Width Area


2 1 0,35 10,000 0,000 32,00 10,80 345,6

C:\ ...\CALCULO TERM ... 13032024.CHV miércoles, 13 de marzo de 2024, 05:00


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
ServiParamo Ltda. IE 19 DE ABRIL
Barranquilla, Page 6

Building Summary Loads


Building peaks in March at 6pm.
Bldg Load Area Sen %Tot Lat Sen Net %Net
Descriptions Quan Loss Loss Gain Gain Gain Gain
Roof 0 0 0,00 0 0 0 0,00
Wall 0 0 0,00 0 0 0 0,00
Glass 0 0 0,00 0 0 0 0,00
Floor Slab 0 0 0,00 0 0 0 0,00
Skin Loads 0 0,00 0 0 0 0,00
Lighting 968 0 0,00 0 3.632 3.632 7,44
Equipment 10.000 0 0,00 0 37.534 37.534 76,90
People 3 0 0,00 792 880 1.672 3,43
Partition 346 0 0,00 0 1.331 1.331 2,73
Cool. Pret. 0 0 0,00 0 0 0 0,00
Heat. Pret. 0 0 0,00 0 0 0 0,00
Cool. Vent. 140 0 0,00 4.524 -94 4.430 9,08
Heat. Vent. 0 0 0,00 0 0 0 0,00
Cool. Infil. 0 0 0,00 0 0 0 0,00
Heat. Infil. 0 0 0,00 0 0 0 0,00
Draw-Thru Fan 0 0 0,00 0 0 0 0,00
Blow-Thru Fan 0 0 0,00 0 0 0 0,00
Reserve Cap. 0 0 0,00 0 212 212 0,43
Reheat Cap. 0 0 0,00 0 0 0 0,00
Supply Duct 0 0 0,00 0 0 0 0,00
Return Duct 0 0 0,00 0 0 0 0,00
Misc. Supply 0 0 0,00 0 0 0 0,00
Misc. Return 0 0 0,00 0 0 0 0,00
Building Totals 0 0,00 5.316 43.494 48.811 100,00

Building Sen %Tot Lat Sen Net %Net


Summary Loss Loss Gain Gain Gain Gain
Ventilation 0 0,00 4.524 -94 4.430 9,08
Infiltration 0 0,00 0 0 0 0,00
Pretreated Air 0 0,00 0 0 0 0,00
Zone Loads 0 0,00 792 43.588 44.380 90,92
Plenum Loads 0 0,00 0 0 0 0,00
Fan & Duct Loads 0 0,00 0 0 0 0,00
Building Totals 0 0,00 5.316 43.494 48.811 100,00

Check Figures
Total Building Supply Air (based on a 15° TD): 4.342 CFM
Total Building Vent. Air (3,22% of Supply): 140 CFM
Total Conditioned Air Space: 346 Sq.ft
Supply Air Per Unit Area: 12,5640 CFM/Sq.ft
Area Per Cooling Capacity: 85,0 Sq.ft/Ton
Cooling Capacity Per Area: 0,0118 Tons/Sq.ft
Heating Capacity Per Area: 0,00 Btuh/Sq.ft
Total Heating Required With Outside Air: 0 Btuh
Total Cooling Required With Outside Air: 4,07 Tons

C:\ ...\CALCULO TERM ... 13032024.CHV miércoles, 13 de marzo de 2024, 05:00


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
ServiParamo Ltda. IE 19 DE ABRIL
Barranquilla, Page 7

Air Handler #1 Summary Loads


Zn Description Area Htg.Loss Sen.Gain Lat.Gain Htg.O.A. Clg.O.A.
No Zone Peak Time People Htg.CFM Clg.CFM S.Exh Req.CFM Req.CFM
Volume CFM/Sqft CFM/Sqft W.Exh Act.CFM Act.CFM
MODULO DE
346 0 43.596 990 None 35/P
1 CONECTIVIDAD 1
4 0 4.343 0 0 140
12am March
2.938 0,00 12,57 0 0 140

Zone Peak Totals: 346 0 43.596 990


Total Zones: 1 4 0 4.343 0 0 140
Unique Zones: 1 2.938 0,00 12,57 0 0 140

C:\ ...\CALCULO TERM ... 13032024.CHV miércoles, 13 de marzo de 2024, 05:00


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
ServiParamo Ltda. IE 19 DE ABRIL
Barranquilla, Page 8

Air Handler #1 Total Load Summary


Air Handler Description: Constant Volume - Sum of Peaks
Sensible Heat Ratio: 0,98 --- This system occurs 1 time(s) in the building. ---
Air System Peak Time: 6pm in March.
Outdoor Conditions: Clg: 70° DB, 68° WB, 172,40 grains
Indoor Conditions: Clg: 70° DB, 50% RH
Summer: Ventilation controls outside air, ----- Winter: Exhaust controls outside air.
Zone Space sensible loss: 0 Btuh
Infiltration sensible loss: 0 Btuh 0 CFM
Outside Air sensible loss: 0 Btuh 0 CFM
Supply Duct sensible loss: 0 Btuh
Return Duct sensible loss: 0 Btuh
Return Plenum sensible loss: 0 Btuh
Total System sensible loss: 0 Btuh
Heating Supply Air: 0 / (,608 X 1,08 X 0) = 0 CFM
Winter Vent Outside Air (0,0% of supply) = 0 CFM
Zone space sensible gain: 43.376 Btuh
Infiltration sensible gain: 0 Btuh
Draw-thru fan sensible gain: 0 Btuh
Supply duct sensible gain: 0 Btuh
Reserve sensible gain: 212 Btuh
Total sensible gain on supply side of coil: 43.588 Btuh
Cooling Supply Air: 43.588 / (,608 X 1,1 X 15) = 4.342 CFM
Summer Vent Outside Air (3,2% of supply) = 140 CFM
Return duct sensible gain: 0 Btuh
Return plenum sensible gain: 0 Btuh
Outside air sensible gain: -94 Btuh 140 CFM
Blow-thru fan sensible gain: 0 Btuh
Total sensible gain on return side of coil: -94 Btuh
Total sensible gain on air handling system: 43.494 Btuh
Zone space latent gain: 792 Btuh
Infiltration latent gain: 0 Btuh
Outside air latent gain: 4.524 Btuh
Total latent gain on air handling system: 5.316 Btuh
Total system sensible and latent gain: 48.811 Btuh

Check Figures
Total Air Handler Supply Air (based on a 15° TD): 4.342 CFM
Total Air Handler Vent. Air (3,22% of Supply): 140 CFM
Total Conditioned Air Space: 346 Sq.ft
Supply Air Per Unit Area: 12,5640 CFM/Sq.ft
Area Per Cooling Capacity: 85,0 Sq.ft/Ton
Cooling Capacity Per Area: 0,0118 Tons/Sq.ft
Heating Capacity Per Area: 0,00 Btuh/Sq.ft
Total Heating Required With Outside Air: 0 Btuh
Total Cooling Required With Outside Air: 4,07 Tons

C:\ ...\CALCULO TERM ... 13032024.CHV miércoles, 13 de marzo de 2024, 05:00


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
ServiParamo Ltda. IE 19 DE ABRIL
Barranquilla, Page 9

Zone Detailed Loads (At Zone Peak Times)


Load Unit -SC- CLTD U.Fac Sen. Lat. Htg. Htg.
Description Quan CFAC SHGF -CLF- Gain Gain Mult. Loss
Zone 1-MODULO DE CONECTIVIDAD 1 peaks (sensible) in March at 12am, Air Handler 1, Group 0, 32,0
x 10,8, Construction Type: 19 (Light)
Partition-2-1 345,6 10/0 0,350 1.210 0,000 0
Lights-Prof=1 968 1,000 3.302
Equipment-Prof=1 10.000 1,000 34.121 0
People-Prof=1 4,0 1,000 1.000 900
Sub-total 39.633 900 0
Safety factors: +10% +10% +0%
--------- --------- ---------
Total w/ safety factors: 43.596 990 0

C:\ ...\CALCULO TERM ... 13032024.CHV miércoles, 13 de marzo de 2024, 05:00


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
ServiParamo Ltda. IE 19 DE ABRIL
Barranquilla, Page 10

Air System #1 () Psychrometric Analysis


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 89,827 55,000
Draw-Thru Fan 0 0,000 0
Misc Load on Supply Side 0 0,000 0
Supply Air Duct 0 0,000 0
Zone Loads 792 0,441 43.376 14,927 4.321
Sensible Reserve 212 0,073 21
Zone Condition 792 90,268 43.588 70,000 4.342
Return Air Duct 0 0,000
Return Air Plenum 0 0,000
Misc Load on Return Side 0 0,000
Vent Air 140 CFM 4.524 2,572 -94 -0,032
Blow-Thru Fan 0 0,000
Entering Coil Condition 5.316 92,840 43.494 69,968 4.342

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29,921)
TSH = PR x 1,10 x CFM x (DB entering - DB leaving)
TLH = PR x 0,68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4,50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0,608 x 1,10 x 4.342 x( 69,968 - 55,000 )= 43.494 Btuh


TLH = 0,608 x 0,68 x 4.342 x( 92,840 - 89,827 )= 5.412 Btuh
----------
SUM = 48.906 Btuh
GTH = 0,608 x 4,50 x 4.342 x( 31,279 - 27,131 )= 49.306 Btuh
Total System Load = 48.811 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 49.306 / ( 10,00 x 500 ) = 9,9 GPM
Heating GPM = 0 /( 20,00 x 500 ) = 0,0 GPM
Steam Req. = 0 / 970 = 0,0 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 69,97 Dry bulb temperature: 58,00
Wet bulb temperature: 56,79
Relative humidity: 51,46
Enthalpy: 31,28 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 55,00 Dry bulb temperature: 58,00
Wet bulb temperature: 51,85
Relative humidity: 84,44
Enthalpy: 27,13 Btu/lbm

C:\ ...\CALCULO TERM ... 13032024.CHV miércoles, 13 de marzo de 2024, 05:00


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
ServiParamo Ltda. IE 19 DE ABRIL
Barranquilla, Page 11

Building Pie Charts


Building peaks in March at 6pm.

Reserve Cap. - 0,43%


Lighting - 7,44% Cool. Vent. - 9,08%
Partition - 2,73%
People - 3,43%

Building
Net Gain
48.811
Btuh

Equipment - 76,90%

C:\ ...\CALCULO TERM ... 13032024.CHV miércoles, 13 de marzo de 2024, 05:00

You might also like