SMT Mamatha MSB

This document is an estimate for arranging power supply to a multistoried residential building in Bangalore. [1] It provides details about the building such as its location, number of floors, total plinth area, and the requested load of 18 KWS + 2 HP to be distributed across 7 connections. [2] A feasibility report is included which evaluates the capacity of the local Vijayanagar MUSS station and F-3 VNR feeder to support a proposed 1 x 63 KVA distribution transformer located near the building. [3] The summary concludes that the requested load can be supported pending installation of the new distribution transformer.

Uploaded by

Shiv Kamble
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
48 views2 pages

SMT Mamatha MSB

This document is an estimate for arranging power supply to a multistoried residential building in Bangalore. [1] It provides details about the building such as its location, number of floors, total plinth area, and the requested load of 18 KWS + 2 HP to be distributed across 7 connections. [2] A feasibility report is included which evaluates the capacity of the local Vijayanagar MUSS station and F-3 VNR feeder to support a proposed 1 x 63 KVA distribution transformer located near the building. [3] The summary concludes that the requested load can be supported pending installation of the new distribution transformer.

Uploaded by

Shiv Kamble
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

BANGALORE ELECTRICITY SUPPLY COMPANY LIMITED

Submitted: To The Deputy General Manager (Elec)


( Commercial, Operation and Maintenance)
Rajajinagar, BESCOM, Rajajinagar,
Bangalore - 560 010.

Sub: Arranging Power Supply To Multistoried Building.

Estimate Ior Arranging Power Supply to Multistoried Building oI Smt Mamatha, # 173, 2
nd
Stage,
9
th
Block, 10
th
Main Road, Nagarabhavi, Bangalore, in 6B` C,O&M Unit, Nagarabhavi, N-2
Sub-Division to an Extent oI 18 KWS + 2 HP.
The Details are as Follows:

1. Application Reg. Fee Rs:
2. New Construction: - YES -
3. Existing Building with Additional to Plinth Area -
4. Existing Building without Additional to Plinth
Area
-
5. Number oI Floors existing: 4 Floors |St.F, G.F, F.F, S.F|
6. Plan Sanctioned Ior Domestic / Commercial: Domestic
7. Date oI Sanction oI Plan: 22.12.2010
8. Total Plinth Area: 642.36 Sqmts
9. Site Dimension: 40 x 60 Feet
10. Requisitioned Load: 5KW x 1 + 3KW x 4 + 1KW x 1 + 2HP x
1.
11. Assessed Load: - -
12. Number oI Connections Required: 7 Nos.
13. Service Charges to be paid As applicable
14. Space Ior Locating TransIormer: Space provided.
15. Consent Letter given by the Consumer -
16. Remarks: 1.There is No EHT Line Passing above the
Building.
2. There Seems to be No long Disconnected
Installation Exists in this Premises




PLINTH AREA CALCULATION:

1.
Sl
No
Floor Existing/
New
Measurement in
Feet
Sq ft. Sq Mts Purpose of
Use
01 Stilt Floor New 32 x 54 1728 160.59 Parking LT3

02 Ground Floor New 32 x 54 1728 160.59 LT2
03 First Floor New 32 x 54 1728 160.59 LT2
04 Second Floor New 32 x 54 1728 160.59 LT2
Total 6912 642.36

(a) Total Height of the Building: 38 Feet.

(b) Area Pertains to : It is an Electrified Layout.

FEASIBILITY REPORT:

1. MUSS / STATION
a) Name oI the Station Vijayanagar MUSS
b) Installed Capacity
c) Peak Load
d) Bank Number
e) Peak Load on Bank
2. FEEDER
a) Name oI the Feeder / Feeder Number F- 3 VNR MUSS
b) Peak Load 1 A
c) C.T. Ratio 400/200/1 A
d) Cable Size 3 x 400 Sqmm
e) Conductor Used / Existing Rabbit
I) H.T.V.R at the Tail End SatisIactory
3. TRANSFORMER
a) D.T.C Number / Capacity Proposed 1 x 63 KVA DTC
b) Location 2
nd
Stage 9
th
Block Nagarabhavi.
c) Connected Load -
d) Tong Tester Reading -
e) Number oI Circuits Existing -
4. EXISTING INSTALLATIONS
a) R.R Numbers -
b) Sanctioned Load -
c) Existing Plinth Area -
d) Additional Load required -


REMARKS: Proposed DTC 1 x 63 KVA under Self Execution work.