0% found this document useful (0 votes)
47 views1 page

As-Built: Bill of Material

as built

Uploaded by

akashpounraj2000
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
47 views1 page

As-Built: Bill of Material

as built

Uploaded by

akashpounraj2000
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Printed on:

---- Printed by:

PLANT NORTH BILL OF MATERIAL


UP SHOP MATERIALS
N
PT NPD MESC No./
NO DESCRIPTION (INS) ITEM CODE QTY

PIPE
DOWN
1 PIPE, SCH.80, BE, ASTM A106-B, ASME B 36.10M, 2 7430030711 5.2 M
2 NACE MR0175/ISO 15156

FITTINGS

2 ELBOW, 90 DEGREE, SCH.80, LR, BW, ASTM A234-WPB, 2 7630426081 2


ASME B16.9, NACE MR0175/ISO 15156
3 FLANGE, WN, SCH.80, RF, 150#, ASTM A105N, ASME 2 7662783601 1
3
42"-PO-4395-011440-X 65 B16.5, NACE MR0175/ISO 15156
PS-82-207-01
FOR CONTD. DRG. NO
03-82-15-1604
FIELD MATERIALS
E 541330
N 373795
PT NPD MESC No./
EL +103961
NO DESCRIPTION (INS) ITEM CODE QTY

4 GASKET, RF, 150#, SUIT TO ASME B16.5, SPIRAL 2 8541363141 1


1
> WOUND, AISI 316 (L), GRAPHITE CS CENTRING SS
<B
S7 INNER RING
37
29 S3 (NOTE 5) 5 STUD BOLT WITH 2 NOS. NUTS, ASTM 5/8 8138170759 4
A193-B7M/A194-2HM, COATED WITH XYLAN 1070 OR
TAKECOAT 1000 (FOR 2"-150# FLANGE), 90.0MM
BOLT LENGTH
575

PIPE SUPPORTS

6 SHOE FOR SLOPING LINES 2 S3-2-250-100-CS 1

7 SHOE FOR SLOPING LINES 2 S3-2-250-100-CS 1

1
<C>

2055
1
i01

CUT PIPE LENGTH


S6
<A>
.

S3 (NOTE-5)
0 PIECE LENGTH NPD REMARKS END END
50
NO (MM) (INS) ONE TWO
\D-4490

0
10
1:
E PS-82-206-01
OP <A> 499 2 BEVEL BEVEL
SL
<B> 2785 2 BEVEL BEVEL
<C> 1915 2 BEVEL BEVEL
STPL-PC:E:\P03423\ISO\OUT\ADNOC\PEOLDA001P

F3 G4 B5

CONT. ON
SHT 2
E 544267
N 373795
EL +101304

OPERATING PRESS.:ATM barg DES. TEMP.:4 - 85 °C DES. PRESS.:18.1 barg


3

OPERATING TEMP.: 35 °C TEST. PRESS.:21.5 COAT & WRAP : NA


3 barg
\\

NOTES:
RT: 100% MT: 100% VISUAL : 100%
1.PIPE QUANTITY IS IN METERS AND OTHER QUANTITIES IN NOs.

2.ALL DIMENSIONS, CO-ORDINATES AND ELEVATIONS ARE IN MILLIMETERS. PWHT: NA HEAT TRACING : NA
DPT: NA
3.THE HYDROTEST AND PWHT (IF ANY) HAS BEEN CARRIED OUT IN

ACCORDANCE WITH ASME B 31.3 AND PIPING MATERIAL SPECIFICATION. PAINT : LC1-N INSULATION : N STRESS SYSTEM : NA
4.ALL DIMENSIONS, CENTER LINE ELEVATIONS AND TIE-IN LOCATIONS HAS BEEN FIELD

PROJECT No.: P03423 AREA : INDUSTRIAL AREA CLASS : 011440-X

AS-BUILT
VERIFIED BY CONSTRUCTION CONTRACTOR PRIOR TO FABRICATION AND INSTALLATION

5.FOR SUPPORT TYPE S3, THE HEIGHT FOR THE SHOE HAS BEEN

ADJUSTED AT SITE AS REQUIRED. P & ID : 03-82-08-1620 PIPING GA : 03-82-21-1605 LINE No.:4"-D-4490-011440-X

CONSULTANT / CONTRACTOR / VENDOR PROJECT: EPC FOR


3 13/05/24 AK KEN TG ISSUED FOR AS-BUILT
EXTRACTION DATE:

CRUDE RECIEVING FACILITIES AT JEBEL DHANNA


2 23/07/23 SB NV SS ISSUED FOR RLMU
PENSPEN DRG. TITLE:
09/03/22 P.O. Box. 46562
1 ST NA ZBI ISSUED FOR CONSTRUCTION
Abu Dhabi, U.A.E

REV. DATE DR'N CH'D AP'D DESCRIPTION


PIPING ISOMETRIC FOR 4"-D-4490-011440-X

SCALE: NTS LOCATION: JEBEL DHANNA PROJECT No. P03423 DRAWING No. 03-82-15-1654
DRG.No.
03 82 15 1654 3 1 / 2
AREA P/AREA DOC.CODE SERIAL No. REV. SHT OF SHT

ADNOC_ONSHORE_A3 - ISO.DGN 2020 ADNOC Onshore . All rights reserved. Abu Dhabi Company for Onshore Petroleum Operations Ltd. Restricted Circulation P03423-03-82-15-1654-1.DGN