Report On Preliminary Survey of Proposed New Rundu WTW To Nkarapamwe Site Pipeline Route and Kayengona Scheme Pipeline Route

The document reports on a preliminary survey of proposed water pipeline routes from Rundu WTW to Nkarapamwe and from Nkarapamwe to Kayengona. The survey notes missing construction drawings, boundary wall encroachments onto the pipeline route, protected and other trees falling within the pipeline premises, and road crossings of the pipelines.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
48 views13 pages

Report On Preliminary Survey of Proposed New Rundu WTW To Nkarapamwe Site Pipeline Route and Kayengona Scheme Pipeline Route

The document reports on a preliminary survey of proposed water pipeline routes from Rundu WTW to Nkarapamwe and from Nkarapamwe to Kayengona. The survey notes missing construction drawings, boundary wall encroachments onto the pipeline route, protected and other trees falling within the pipeline premises, and road crossings of the pipelines.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 13

Report on Preliminary Survey of the Proposed New Rundu WTW to Nkarapamwe Site

Pipeline Route And Kayengona Scheme Pipeline Route

Surveyed and drafted by : Surveyor Jason


Date of Survey : 17 - 18 April 2024

1. Objectives
 To know the location and distribution of the pipe line on the ground.
 To take note of any obstruction that may delay or interfere with the construction of the
pipeline.
 To make a preliminary survey of the pipe line route.

2. Materials and Instruments Used


 Hi Target GPS (Base and Rover) : To locate the position of the pipeline
 Data controller : To store Surveyed data
 Tripod : To hold the Base firm to its position
 Auto cad 3D civil : Used for drafting purposes

3. Methodology
This was the preliminary survey of the proposed clear water Main Gravity pipe from New
Rundu WTW Site to Nkarapamwe site then to Kayengona Scheme Pipeline route. All
chainages along the pipeline were located in a sequence of one after the other and all features
of interest or features within the premises of the Pipeline were physically surveyed and noted.
All drawing were done in Auto cad 3D Civil.

4. Observations
a) There is a section of construction drawing missing between W3.33 to W3.54 of
Proposed New Rundu WTW to Nkarapamwe Pipeline Route.

1
Figure 1: Missing section

b) New Rundu WTP to Nkarapamwe Water Pipeline and Boundary Wall


Encroachment

At point name W3.78 there is an encroachment of boundary wall into the street. As shown on
the figure attached below, there is a distance of 17cm between the existing boundary wall and
the line of the proposed new water pipe.

Figure 2: Existing Boundary wall vs Proposed new Water Pipe line

2
Figure 3: Boundary wall encroachment

 At Bwall7 the Proposed new Water pipe line lies 34.10cm from the existing boundary
wall as shown on the figure above.
 At Bwall5 the existing boundary wall encroached into the street and exceeded the
Pipe line with a distance of 1.1404m.
 At Bwall3, the existing boundary encroached into the street and exceeded the pipe
line with 0.4289cm

Figure 4: Boundary wall and encroachment

3
c) Nkarapamwe to Kayengona Proposed Clear water Gravity Main

There is a protected tree called Mangeti tree falling within the premises of the proposed clear
water Gravity Main as shown on the figure below.

Figure 5: Surveyed Mangeti Tree along the pipeline

Figure 6: Picture taken on site

4
Figure 7: Screenshot taken from google map
 The marked with red dots are the Mangeti trees

5
d) Nkarapamwe to Kayengona Proposed Clear water Gravity Main continue…….

The pipe line passing through Evergreen and Marula tree at the University of Namibia,
Rundu Campus

Figure 8: As-built survey of Unam Gate area

6
Evergreen Tees for shades at University of Namibia Gate, Rundu Campus

Figure 9: Picture taken on site

7
Marura Tree at University of Namibia Gate

Figure 10: Picture taken on site

8
Figure 11: Screenshot taken from Google Map

9
e) Nkarapamwe to Kayengona Proposed Clear water Gravity Main continue…….

Figure 12: Intersection pipeline crossing


 As-built survey of the road intersection
 Demonstrate crossing of the road
 There is a culvert indicated with an arrow

Figure 13: Culvert and Surveyed features

10
Picture of Figure 13 above

Figure 14: Picture taken on site for surveyed feature on figure 13

Figure 15: pipe line crossing Usivi Main Road

11
Figure 16: Pipe line crossing to Kayengona Elevated Tanks
 Tree falling within the Pipeline premises

12
Figure 17: Screenshot taken from Google Map

5. Conclusion
For all the chainages provided with the design of the pipeline, preliminary demarcation was
done and all features interfering with the premises of the pipeline were surveyed and noted.
The challenges and obstructions within the pipeline alignment due to the permanent structures
and natural trees shall be reviewed and resolved with the Engineer.