0% found this document useful (0 votes)
54 views22 pages

Rakich Machinery 6060 Main Pump Calibration

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
54 views22 pages

Rakich Machinery 6060 Main Pump Calibration

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 22

6060

MAIN PUMP
CALIBRATION
www.rakichmachinery.com
Part 2 of 3 part series

1. A20V Main Pump Control System

2. RH340-B // 6060 Main Pump Calibration

3. RH340-B // 6060 Travel Deviation


PUMP CALIBRATION
Calibrate: To validate the output of the
pump relative to the inputs.

Pump
PSt input MSt DW Valve
Output

PSt input MSt


Why calibrate the pumps?

Complaint of underperformance, where basic pressures and settings have


been confirmed to be ok.

Travel deviation – poor pump cal.

PSt pressure loss by internal leakage in PSt valve.

Replace/reseal PSt valve.


General Info

PSt Solenoid Valves


Located on the front of the hydraulic tank
MP 8 MP 6 MP 4 MP 2

0 0
BAR BAR

MP 7 MP 5 Combined pump MP 3 MP 1
output.
e.g. MP 5 & 6
Complaint 1: Underperformance

650 l/min 650 l/min 650 l/min 650 l/min

42 42
BAR BAR

650 l/min 650 l/min 450 l/min 650 l/min

2600 l/min 2400 l/min


Complaint 2: Travel Deviation

800
l/min
400 l/min 400 l/min
700
l/min
400 l/min 300 l/min
Complaint 3: PSt leakage PSt Pressure Pump output
(bar)

42 100%
36 83%

42 36
BAR BAR

2600 l/min 2150 l/min


PSt Signal Lines

8 8
BAR BAR
Pump Isolation

MP 8 MP 6 MP 4 MP 2

MP 7 MP 5 MP 3 MP 1
EXCAVATOR FLOW TEST Pump flow=100 l/min

1420mm
⌀300mm
Pump Isolation Vs. Using a Flowmeter

Testing can be done from the safety of the =100 Litres 60 SECONDS
operator's cab.

High pressure hoses do not easily


move to install a flow meter.

No requirement to open hydraulic


systems.

Flowmeters at main pump ranges are


expensive.

Permanent flowmeters? Will they work


when you need them?
HYDRAULIC OIL TEMPERATURE

WARM UP OIL TO
ABOVE 55°
COVER COOLER MODULE WITH
BLANKETS

Tooling list

• 2 x 100 bar pressure gauges.


• Spanners:
• 13mm
• 17mm
• 19mm
• 30mm
• 46mm
• 3mm Allan key
• 4mm Allan key
• Flat blade screwdriver
RECORD CYCLETIMES

BACKHOE ATTACHMENT POSITION FACE SHOVEL ATTACHMENT POSITION

PSt Setting Time (sec) Tolerance PSt Setting Time (sec) Tolerance
27 Bar 64 ±3 27 Bar 80 ±4
42 Bar 42 ±2 42 Bar 50 ±3

FS figures are only calculated.


Can be validated on a machine easily
PROCEDURE

1. Run single engine at high idle.

2. Verify there is 42 bar PSt pressure to the pump


when at 820mA.

3. Check/set the P port servo. (Single engine, high


idle).

PSt Pressure test port


PROCEDURE
PSt Manual Pressure
Adjustment

4. Disconnect PSt solenoid valve DIN plug.

5. Set PSt signal to 27 bar by adjusting the screw on PSt DIN Plug
top of the PSt solenoid valve.

6. Ensure that it’s 27 bar when 3 pumps are isolated.

PSt Pressure test port


PROCEDURE

7. Attach 100 bar gauge to MSt (t-piece test port at


PSt valve).
MSt Test Ports

8. MSt should be 30 bar difference to P Port Servo Servo= 80 / MSt= 50


when the PSt is at 27 Bar. Servo= 50 / MSt= 20

DW
Valves
9. Adjust this at the DW valve to achive the 30 bar
difference.
1. Stick vertical. 1. Bucket & stick cylinders fully extended.
2. Bucket base flat on ground. 2. Boom cylinders fully retracted.
PROCEDURE
BACKHOE FACESHOVEL

10. Set up machine:

11. Isolate the 3 main pumps not being tested at PSt


isolation manifold.

PSt Manual
Pressure
12. Carry out boom lift cycle times. Adjustment

• Start timing when boom begins to move.

• Not from when the joystick is moved.

• Carry out on all pumps individually and record times.


PROCEDURE

H Min
Adjustment
13. Make adjustments to H Min on the PSt valve –
CCW decrease cycletime, CC Increase
H Min
Locknut

14. Retest as per the previous steps.

PSt Manual
Pressure
Adjustment

15. Reset PSt pressure to 7.5 bar.

16. Reconnect PSt solenoid valve DIN plug


PROCEDURE

17. Carry out boom lift cycle times. H Max


Adjustment

H Max
18. Make adjustments to H Max. Locknut

19. Repeat on other engine.


6060 MAIN PUMP CALIBRATION
27 Bar Time
Step LH Record Backhoe 64 ± 3
Pre-
adjustment
Post-
adjustment
Engine Operation Faceshovel 80 ± 4

1 Hydraulic Oil Temperature MP 1


>55°C
Boom lift cycletime
2 PSt Pressure @ 820mA 8
spec: 42 bar ± 1 bar MP 2
Turn H Min adjustment to correct
Servo Pressure Clockwise: increase cycletime
3 SN up to 145: 80 bar MP 3
SN 146 and above: 50 bar
Counter-clockwise: Decrease cycletime
4 Disconnect the PSt Solenoid valve DIN plug
□ MP 4

5 Manually set PSt pressure to 27 bar with 3 pumps isolated



MP 1 □
9 Manually reset PSt pressure to 7.5 bar

6 Ensure that its 27 bar with each pump
MP 2 □ 10 Reconnect the PSt Solenoid valve DIN plug

MP 3 □ 42 Bar
Backhoe
Time
42 ± 2
Pre- Post-
adjustment adjustment
MP 4 □ Faceshovel 50 ± 3

MP 1
MP 1 □ Boom lift cycletime
Check MSt pressure on each pump 11 MP 2
7
50 bar on 80 bar servo machines
20 bar on 50 bar servo machines
MP 2 □ Turn H Max adjustment to correct
Clockwise: Decrease cycletime
Adjust DW if incorrect
MP 3 □ MP 3
Counter-clockwise: Increase cycletime
MP 4 □ MP 4
6060 MAIN PUMP CALIBRATION
27 Bar Time
Step RH Record Backhoe 64 ± 3
Pre-
adjustment
Post-
adjustment
Engine Operation Faceshovel 80 ± 4

1 Hydraulic Oil Temperature MP 5


>55°C
Boom lift cycletime
2 PSt Pressure @ 820mA 8
spec: 42 bar ± 1 bar MP 6
Turn H Min adjustment to correct
Servo Pressure Clockwise: increase cycletime
3 SN up to 145: 80 bar MP 7
SN 146 and above: 50 bar
Counter-clockwise: Decrease cycletime
4 Disconnect the PSt Solenoid valve DIN plug
□ MP 8

5 Manually set PSt pressure to 27 bar with 3 pumps isolated



MP 5 □
9 Manually reset PSt pressure to 7.5 bar

6 Ensure that its 27 bar with each pump
MP 6 □ 10 Reconnect the PSt Solenoid valve DIN plug

MP 7 □ 42 Bar
Backhoe
Time
42 ± 2
Pre- Post-
adjustment adjustment
MP 8 □ Faceshovel 50 ± 3

MP 5
MP 5 □ Boom lift cycletime
Check MSt pressure on each pump 11 MP 6
7
50 bar on 80 bar servo machines
20 bar on 50 bar servo machines
MP 6 □ Turn H Max adjustment to correct
Clockwise: Decrease cycletime
Adjust DW if incorrect
MP 7 □ MP 7
Counter-clockwise: Increase cycletime
MP 8 □ MP 8
PUMP CALIBRATION