This summary details an 8 joint welding report for the fabrication and installation of a 1.4m long Agbada 1 W13S spool header. 8 welds were made joining flanges, elbows, pipes and tees using GTAW welding by welder E-001 and all welds passed visual inspection.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
46 views1 page
Weld Summary Report
This summary details an 8 joint welding report for the fabrication and installation of a 1.4m long Agbada 1 W13S spool header. 8 welds were made joining flanges, elbows, pipes and tees using GTAW welding by welder E-001 and all welds passed visual inspection.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1
xxxxxxxxxxxxxxxxxxxxx
REV: 01 SUMMARY DAILY WELDING REPORT
REPORT NO: 001 PROJECT TITTLE: Fabrication and installation of Agbada 1 W13S spool header. DOC NO: SINL/002 DATE: 03/01/2024 CONTRACTOR: Step II International Nigeria Limited CLIENT: Heirs Energies Limited TOTAL PIPE LENGTH: 1.4m AREA/LOCATION: Agbada I flow station EVALUATED MATERIAL GRADE: ASTM A106 Gr. B TOTAL WELD NO: 8jts
S/N WELD WELDING WALL PIPE WELDER’s VISUAL
NO RUNS/PASSES PROCESS THICKNESS SIZE NO INSPECTION REMARK (mm) (Inch) RP HP FP CP Acc Rej 1 FW001 Single Multiple Multiple Multiple GTAW 5.54 2” E-001 √ Flange-to-Elbow 2 FW002 Single Multiple Multiple Multiple GTAW 5.54 2” E-001 √ Elbow-to-Pipe 3 FW003 Single Multiple Multiple Multiple GTAW 5.54 2” E-001 √ Pipe-to-Equal tee 4 FW004 Single Multiple Multiple Multiple GTAW 5.54 2” E-001 √ Equal tee-to-Flange 5 FW005 Single Multiple Multiple Multiple GTAW 5.54 2” E-001 √ Equal tee-to-Pipe 6 FW006 Single Multiple Multiple Multiple GTAW 5.54 2” E-001 √ Pipe-to-Equal tee 7 FW007 Single Multiple Multiple Multiple GTAW 5.54 2” E-001 √ Equal tee-to-Flange 8 FW008 Single Multiple Multiple Multiple GTAW 5.54 2” E-001 √ Equal tee-to-Pipe PREVIOUS WELD: CUMMULATIVES WELD: 8jts CONTRACTOR’S QC. ENGINEER HEL QA/QC REP NAMES: NAMES: