0% found this document useful (0 votes)
41 views2 pages

Insp ContractorTestCertificate

t

Uploaded by

samerk.alassiri
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
41 views2 pages

Insp ContractorTestCertificate

t

Uploaded by

samerk.alassiri
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 2
CONTRACTOR'S INSPECTION CERTIFICATE | I / We certify that the Electrical Installation at : Project : Villa / Building / Consumer catea site wah 0 Application No. : Account No./S. 0: .eeeeeeeeee eee aie as Drawing Approval Reference : HCS/NDS/DA/ /9 Connected Load : .. kW Max. Demand : ..........,KW » A/C No, has been completed, inspected and tested in accordance with the DEWA/IEE Wiring Regulations (latest edition) and that the results are as indicated below: ITEMS INSPECTED OR TESTED: 1 Type of L.V. distribution system : 1-Phase and/or 3-Phase 2.1 Over current protection is provided by: - Main circuits in MDB/s MCCB / Fuse / = Sub-circuits in SMDB/s MCCB / Fuse / MCB - Final circuits in DB/s MCB / Fuse 2.2 Earth leakage protection is provided by: = B0/eceeeee es mA ELCB for 13A socket-outlet & water heater/........ circuits : Yes / No - 30/100/.........mA ELCB for Lighting/ veeeeeeeeeeeeeeeeeenerees CLECULES : Yes / No - 100/300/......mA ELCB /.......for A/C Equipment /Pumps/Machines/...+.sseeeee : Yes / No 2.3 farth leakage detection is provided by: 30/100 mA ELS/ELR with Audio/Visual alarm for Essential service equipment/.... : Yes / No 3 Continuity of each earth continuity conductor is satisfactory. 2 Yes / No 4 Insulation resistance of the fixed wiring installation with 500V meggar in mega-chms. go { 5 Continuity of ring circuit conductors is satisfactory. 2 Yes / NO 6. Polarity throughout the installation is correct and ali single pole devices for protection and switching are in the phase conductor only. : Yes / No 7 Power Factor (P.F.) Correction Capacitors/Panel/s : Yes / No installed. = Min. Power factor of the wiring installation : 8.1 Earth fault loop impedance is satisfactory : Yes / No 8.2 Main earth electrode resistance in ohms CONTRACTOR’ $_ INSPECTION CERTIFICATE Page 2/2 9. Under Voltage relays with auto-reset timer for Air Conditioners / Units fitted : Yes / No - Auto-reset timer set at. (in minutes) 2 4 : 10. ‘The operation of current operated earth leakage circuit breaker(s) is checked and effective : Yes / No ti. Barriers and enclosures for protection against electric shock in normal service are satisfactory. : Yes / No 12, All flexible cords, switches, fuses, plugs and sockets outlets are in good serviceable condition except as noted below, (specify under para 17) + Yes /\No 13. There is no sign of overloading of conductors or accessories except as stated below, (specify under para 17). : Yes / No 14. Apparatus tested [] includes/ [] does not include portable appliances. 15. We also confirm that the Main Distribution Board (MDBs) as noted below are fit to be energised (LV MDBs connected directly to the Transformer) . (s/s. ) : Yes / No. MDB. (S/S. +) + Yes /\No (s/s. ) : Yes / No. MDB. .(8/s. .-) + Yes / No 16. In pursuance of this certification we undertake to carry out necessary tests in the wiring installations carried out by us, after the electric supply is released, and rectify any defects if found and/or when reported by the Owner/DEWA. We confirm that the electrical equipment, accessories and materials utilized in the project comply with standards specified in the DEWA’s Wiring Regulations for Electrical Installations. 18. Comments and deviations, if any, from the wiring regulations Electrical wiring installations supervised and tested by : Name: .. Company t oveessee P.O. Box . . Tel. DEWA Wireman’s Competency Licence No. : Authorised Signature Stamp

You might also like