Pending Deficiencies of Joint Inspection of P&C and Track Circuits-10

The document lists pending deficiencies from a joint inspection of point machines and track circuits at a station. It includes 66 items describing deficiencies like missing flat tie bars, housing issues, crushed rubber pads, and ballast that needs clearing.

Uploaded by

skpy43
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
11 views2 pages

Pending Deficiencies of Joint Inspection of P&C and Track Circuits-10

The document lists pending deficiencies from a joint inspection of point machines and track circuits at a station. It includes 66 items describing deficiencies like missing flat tie bars, housing issues, crushed rubber pads, and ballast that needs clearing.

Uploaded by

skpy43
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Dt: 02.06.

24
Pending Deficiencies of Joint Inspection of P&C and Track Circuits
SI Item
Station Pending Deficiencies
No Category
1 Point No. 101A M.S flat tie bar to be provided. B
2 Point No. 101B M.S flat tie bar to be provided. B
3 Point No. 102A MS flat tie bar to be provided. B
4 Point No. 102B MS flat tie bar to be provided. B
5 Point No. 103A MS flat tie bar to be provided. B
SDV 13.04.24
6 Point No. 105A MS flat tie bar to be provided. B
7 Point No. 105B MS flat tie bar to be provided. B
8 Point No. 106A MS flat tie bar to be provided. B
9 Point No. 106B MS flat tie bar to be provided. B
10 Point No. 104B RH tongue rail chipped off to a length of 100mm to be attended. B
11 Point No. 101A MS flat tie bar to be provided. B
12 Point No. 101B MS flat tie bar to be provided. B
GID 15.04.24
13 Point No. 105A MS flat tie bar to be provided. B
14 Point No. 105B MS flat tie bar to be provided. B
REM
15 Point No. 8B chair plate rubber pads to be replaced. B
06.05.24
16 Point No. 109 LH side opening to be attended. B
17 Point No. 108A chair plate bolts loose to be attended. B
CBM
18 105AT, 108AT, 02AT, 02BT pendrol clips & GFN liners to be provided.
18.05.24 Glued joints No. 27, 29, 45, 52, 63, 72, 81 missing / damaged GFN liners/ pendrol clips to be
19
provided.
20 Point No. 8A packing required. B
21 Point No. 14A 1st stretcher bar to be replaced. B
22 Point No. 14A packing required. B
23 CTYL Point No. 27B both sides housing to be improved. B
24 18.05.2024 Point No. 12A both sides opening to be adjusted. B
25 Point No. 13B point Toe out of square, same to be attended. B
26 Point No. 13B RH tongue rail floating to be attended. B
27 Point No. 14B point Toe, out of square, same to be attended. Gauge+8mm to be attended. A
28 Point No. 12A tongue rail rubbing on 1st (G.T plate) sleeper to be attended. B
TLU 21.05.24
29 Point No. 19B both sides opening to be attended. B
30 Point No. 22A, RH side housing & rubbing of chair plate to be attended. B
31 Point No. 22B crushed rubber pads to be replaced. B
32 Point No. 25B crushed rubber pads to be replaced. B
33 Point No. 16A crushed rubber pads to be replaced. B
34 Point No. 16B crushed rubber pads to be replaced. B
35 Point No. 17A crushed rubber pads to be replaced. B
GJJ 23.05.24
36 Point No. 17B crushed rubber pads to be replaced. B
37 Point No. 18B opening RH & LH side and crushed rubber pads to be replaced. B
38 Point No. 21B crushed rubber pads and LH side split to be attended. B
39 Point No. 27 cross level to be attended. A
40 7T, 3/6T, 16BT, 19BT tracks GFN liners missing to be provided.
41 Glued joints 27, 33, 57, 62, 94 & 123 missing/ damaged GFN liners to be provided.
42 Point No. 18B leading stretcher bar insulation to be replaced. B
43 Point No. 13B LH side stock rail burr to be removed. B
PPM
44 Point No. 11A LH side housing to be improved. B
27.05.24
45 Point No. 20B gap between stock rail and stretcher bar to be attended. B
46 Point No. 19B both side opening to be attended. B
47 Point No. 14B M.S flat tie bar to be provided. B
48 CMZ Point No. 14B LH opening to be adjusted. B
49 27.05.24 Point No. 7B M.S flat tie bar to be provided. B
50 Point No. 8B M.S flat tie bar to be provided. B
51 Point No. 14A LH housing to be attended. B
52 Point No. 14A RH side floating to be attended. B
53 Point No. 14B RH side tongue rail floating to be attended. B
KADM
54 Point No. 13B 2nd & 3rd stretcher bar insulations to be replaced. B
31.05.24 th
55 Point No. 13B LH side 11 sleeper welding given to be attended. B
56 Point No. 8A LH Side floating to be attended. B
57 Point No. 7B LH/RH housing to be attended. B
58 Point no. 18A packing to be attended. B
59 Point No. 14B RH side bur to be cleared. B
60 Point No. 13A LH side housing to be improved. B
61 Point No. 13B RH side housing to be improved. B
62 NLPI Point No. 13A opening to be attended. B
63 01.06.24 14AT ballast to be cleared.
64 18AT ballast to be cleared.
65 1LAT & 1LBT ballast to be cleared.
66 2LAT & 2LBT ballast to be cleared.
67 1T 30 Nos missing liners to be provided.