Yapı Merkezi: Global Construction Leader
Yapı Merkezi: Global Construction Leader
,
To build happiness is our happiness
- Ersin Arıoğlu
,,
Yapı Merkezi, founded in 1965, aims "to create and to realize construction projects that will serve humanity by creating happy environments".
As the first and largest company of the Yapı Merkezi Group, Yapı Merkezi Construction, in its more than half a century history, has
realized the design and construction of a wide variety of buildings, heavy construction and railway projects both in Türkiye and abroad,
especially in United Arab Emirates, Saudi Arabia, Sudan, Algeria, Morocco, Tanzania and Ethiopia.
Group History
1965 1969 1978 1987 1994 1995 1996 1998 1998 2012
Research & General Real Estate Pipe Railway E/M
Prefabrication Prestressing Education Holding
Design Contracting Development Production Systems Systems
• Railway Systems
• Heavy Construction
• Advanced Buildings
• Prefabrication
• Rail and Mass Transit Signalling, Control, Telecom and LV Power Systems Design,
Development, Integration and Installation
Group •
•
Bridge Construction Methods
Post-tensioned Buildings
• Circular Structures
Companies •
•
Seismic Retrofit
Design
Service Product
Yapı Merkezi Construction & Industry Inc.
ON-GOING PROJECTS
58 in 500
YEARS 10 COUNTRIES COMPLETED
PROJECTS
$1,72
BILLION
ANNUAL
$4,98
TURNOVER
85% International
BILLION
90% Transportation BACKLOG
Bosnia and Herzegovina
Romania Ilidza - Hrasnica Tram Extension
Major Projects Modernization of
Romania Railway’s
Extension of Tram Line between Ilidza and
Hrasnica
Hungary 11 LOT Türkiye
BMW Automobile Numerous major projects including:
Morocco
Casablanca Tramway Line 2 S. Arabia
Turn-Key (Civil & Track Works) HHR Jeddah Station
Design & Build (Civil Works, MEP)
Senegal
Dakar – AIBD Railway CTW 130 Railway
Turn-Key (Design, Civil & Track Works)
Turn-Key (Design, Civil & Track Works)
Tanzania Track Maintenance of EWR &
Dar es Salaam – Morogoro Railway Jubail Link Lines
Sudan Turn-Key (D&B) – ERTMS / ETCS Level 2
Al Halfaia Bridge Ethiopia
Morogoro - Makutupora Railway Awash – Weldia Railway
El Mek Nimir Bridge
Turn-Key (D&B) – ERTMS / ETCS Level 2 Turn-Key (D/B, Civil Works, Track Works, System Works)
Makutupora - Tabora Railway
Zambia
Turn-Key (D&B) – ERTMS / ETCS Level 2
Modernization of
Livingstone-Chingola Railway Tabora - Isaka Railway
Turn-Key (D&B) – ERTMS / ETCS Level 2
About
Top 10
in the “Mass Transit & Rail List” published annually by ENR -
Engineering News Record.
About
Heavy Construction
Advanced Buildings
Prefabrication
Challenges
The Highest
Largest Contract Longest Tunnel Railway
with partners 5.5 Billion
USD (Eurasia Tunnel, 2016) 5.400 m Commercial Speed
(Yerköy-Sivas HSR,
300 km/h
(Dubai Metro, 2005)
ongoing)
Lowest
The World’s Longest TunnelElevation
Span Suspension
2.023 m -106,4m Max. Temperature
Bridge
(1915 Çanakkale
(below sea level)
(Eurasia Tunnel, 2016)
(CTW 130, S. Arabia,
ongoing)
+55°C
Bridge,2022 )
Largest
Longest Railway Station Built 700.000 m² Min. Temperature
Bridge
(Dubai Metro, 2011)
62 km (Jeddah Station, S. Arabia,
ongoing)
(Yerköy-Sivas HSR,
-32°C
ongoing)
• Yapı Merkezi’s aim for the use of BIM during tender stage is to achieve a fast and
accurate methodology for the preparation of preliminary quantity take-offs. For
application stages, Yapı Merkezi encourages the selection of design
subcontractors who make extensive use of the technology.
BIM Implemented Projects
BIM •
•
•
Al-Nariyah Workshop Project, S. Arabia
HHR Madinah Station, S. Arabia
HHR Jeddah Station, S. Arabia
Applications • Awash-Kombolcha-H.Gebaya Railway, Ethiopia
• Doha Metro, Gold Line, Qatar
• Dar Es Salaam - Morogoro Railway, Tanzania
• Morogoro – Makutupora Railway, Tanzania
• The Istanbul Museum of Modern Art, Türkiye
• TOGG Gemlik Facility, Türkiye Clash Detection (Madinah High Speed Railway Station Project)
Projects in Türkiye
Akbank Barwa Bank AFD EKF Eurasia Tunnel : $1.2 Billion
Garantibank Citibank EBRD EKN 1915 Çanakkale Bridge : € 3.1 Billion
Halkbank Credit Suisse EIB SEK
İşbank Deutsche Bank IDB-ICIEC NEXI Projects in Africa
Tanzania SGR Projects : $2.4 Billion
QNB Finansbank Emirates NBD IFC KEXIM Ethiopia SGR Project : $1.7 Billion
Vakıfbank ING AFREXIM KSURE
Yapı Kredi Bank KfW DBSA KUKE
Ziraat Bank Mashreq Bank TDB OEKB
Mizuho SACE
IN PROGRESS
SMBC CESCE
Standard Chartered SERV USD 3.2 billion
Qatar Central Bank TURKISH EXIM
UKEF
Projects in Africa
*Tanzania SGR Projects : $2.2 Billion
Zambia Railway Rehabilitation : $1 Billion
*to be closed by the end of the year
Intercity Railway Systems
• High Speed Railways
• Conventional Railways
Stations
• Intercity Rail Stations
• Urban Rail Stations
3 CONTINENTS 168 KM
TUNNEL
63 PROJECTS 108KM
BRIDGES & VIADUCTS
MORE THAN
MILLION
3,5 PASSENGERS 23WORKSHOP & DEPOTS
th
8 in Mass Transit & Rail
2022 List
Modernization of
Romania Railway’s 11 LOT
Divaca-Koper Railway
RAILWAY
SYSTEMS • Alayunt–Afyon–Konya Railway
Rehabilitation & Signalization
•
INTERCITY Bir Touta – Zeralda Railway
•
Electrification of Malatya-Elazığ Railway
System
Yerköy – Sivas HSR
•
RAILWAY SYSTEMS • CTW 130 & 140 Railway •
Maintenance and Repair Works of
Electrification Systems of Sivas Line
Polatlı – Konya HSR
• Global Track Maintenance of • Signalization, Electrification and System
Dakar – AIBD Railway EWR & Jubail Link Lines Maintenance of Polatlı – Konya HSR
(Part 2,3,4)
Land of Tomorrow
TOTAL
LENGTH 390 km
65 9,5 km
VIADUCTS & BRIDGES TUNNEL
10 STATIONS
25.000 m² 151.000 m²
WORKSHOP AREA DEPOT AREA
Turn-Key
(D/B, Civil Works, Track Works, System Works)
ERTMS / ETCS Level 1
RAILWAY
SYSTEMS Tanzania
TOTAL
LENGTH 205 km
SIDING &
PASSING 95 km
160 km/h
DESIGN SPEED 6 STATIONS
Turn-Key (D/B)
ERTMS / ETCS Level 2
RAILWAY
SYSTEMS Tanzania
TOTAL
LENGTH 336 km
SIDING &
PASSING 86 km
160 km/h
DESIGN SPEED 8 STATIONS
Turn-Key (D/B)
ERTMS / ETCS Level 2
RAILWAY
SYSTEMS Tanzania
TOTAL
LENGTH 294 km
SIDING &
PASSING 74 km
160 km/h
DESIGN SPEED 7 STATIONS
Turn-Key (D/B)
ERTMS / ETCS Level 2
RAILWAY
SYSTEMS Tanzania
TOTAL
LENGTH 130 km
SIDING &
PASSING 35 km
160 km/h
DESIGN SPEED 3 STATIONS
Turn-Key (D/B)
ERTMS / ETCS Level 2
RAILWAY
SYSTEMS Slovenia
15.000 m
TUNNEL (NATM)
239 m
CROSS-PASSAGE (NATM)
7.755 m
TUNNEL (NATM)
371 m
ESCAPE TUNNEL (NATM)
54 m
CROSS-PASSAGE (NATM)
452 m
Gabrovica Viaduct (ILM)
TOTAL
LENGTH 367 km
6 TRANSFOMER
STATIONS
RAILWAY
SYSTEMS Türkiye
TOTAL
LENGTH 139 km
4 TRANSFOMER
CENTER
RAILWAY
SYSTEMS S. Arabia
TOTAL
LENGTH 2077 km
TOTAL
BRIDGES
98 Units
RAILWAY
SYSTEMS S. Arabia
SINGLE TRACK
TOTAL LENGTH 69,3 km
318 m
CABLE SUPPORTED
BRIDGE
30
BRIDGES
Turn-Key
(Design, Civil & Track Works)
RAILWAY
SYSTEMS Senegal
DOUBLE
TRACK LINE 57 km
125.000 m²
DEPOT AREA
23.000 m²
WORKSHOP AREA
Turn-Key
(Design, Civil & Track Works)
RAILWAY
SYSTEMS Türkiye
DOUBLE TRACK
TOTAL LENGTH 245 km
300 km/h
DESIGN SPEED
Turn-Key
(Civil, Track and System Works)
ERTMS / ETCS Level 1 & 2
RAILWAY
SYSTEMS Algeria
DOUBLE TRACK
TOTAL LENGTH 21 km
17
VIADUCTS & BRIDGES
5 STATIONS
340 m
CUT&COVER TUNNEL
SINGLE TRACK
TOTAL LENGTH 475 km
4,5 km
TUNNEL
33 STATIONS
DOUBLE TRACK
TOTAL LENGTH 212 km
250 km/h
DESIGN SPEED
COMPLETED IN
23 MONTHS
WORKSHOPS
Caroubier
Workshop & Depot Area
in Consortium with Infrarail
2011
28.300 m²
WORKSHOP AREA
105.000 m²
DEPOT AREA