SUN2000 - (175KTL-H0, 185KTL-INH0, 185KTL-H1) User Manual
SUN2000 - (175KTL-H0, 185KTL-INH0, 185KTL-H1) User Manual
User Manual
Issue 20
Date 2024-01-30
and other Huawei trademarks are trademarks of Huawei Technologies Co., Ltd.
All other trademarks and trade names mentioned in this document are the property of their respective
holders.
Notice
The purchased products, services and features are stipulated by the contract made between Huawei and
the customer. All or part of the products, services and features described in this document may not be
within the purchase scope or the usage scope. Unless otherwise specified in the contract, all statements,
information, and recommendations in this document are provided "AS IS" without warranties, guarantees
or representations of any kind, either express or implied.
The information in this document is subject to change without notice. Every effort has been made in the
preparation of this document to ensure accuracy of the contents, but all statements, information, and
recommendations in this document do not constitute a warranty of any kind, express or implied.
Website: https://e.huawei.com
Purpose
This document describes the installation, electrical connections, commissioning,
maintenance, and troubleshooting of the SUN2000-175KTL-H0, SUN2000-185KTL-
INH0, and SUN2000-185KTL-H1 (also referred to as SUN2000). Before installing
and operating the inverter, ensure that you are familiar with the features,
functions, and safety precautions provided in this document.
Intended Audience
This document is intended for photovoltaic (PV) plant operators and qualified
electricians.
Symbol Conventions
The symbols that may be found in this document are defined as follows.
Symbol Description
Change History
Changes between document issues are cumulative. The latest document issue
contains all the changes made in earlier issues.
Issue 20 (2024-01-30)
Updated 2.1 Product Overview.
Issue 19 (2023-12-20)
Updated 4.3.1 Environment Requirements.
Issue 18 (2023-08-31)
Added 2.5 Smart I-V Curve Diagnosis.
Updated 5.7 Installing the DC Input Power Cable. Changed "During DC input
power cabling, leave at least 50 mm of slack." to "During DC input power cabling,
leave at least 150 mm of slack."
Issue 17 (2023-05-25)
Updated 2.1 Product Overview.
Issue 16 (2023-03-30)
Updated 2.1 Product Overview.
Issue 15 (2023-02-28)
Updated 1 Safety Information.
Updated 2.1 Product Overview.
Updated 4.2 Preparing Tools.
Updated 4.5 Installing the Inverter.
Updated 5.6 Connecting the AC Output Power Cable.
Updated 7.1.2 Downloading and Installing the App.
Deleted the content about operations related to a USB flash drive.
Updated 8.5 Alarm Reference.
Added E Resetting Password.
Added F Contact Information.
Issue 14 (2022-02-20)
Updated 2.2 Appearance.
Updated 2.3.1 Enclosure Labels.
Updated 4.3.1 Environment Requirements.
Updated 6.2 System Power-On.
Updated 8.3 Routine Maintenance.
Updated 8.6 Resetting and Turning On the DC Switch.
Issue 13 (2021-09-30)
Updated 2.2 Appearance.
Updated 2.3.1 Enclosure Labels.
Updated 5.3 Opening the Maintenance Compartment Door.
Updated 5.4 (Optional) Replacing the Crimping Module.
Updated 5.5 (Optional) Installing the Power Cable of the Tracking System.
Updated 5.6 Connecting the AC Output Power Cable.
Updated 5.9 Closing the Maintenance Compartment Door.
Updated 6.2 System Power-On.
Updated 8.2 Power-Off for Troubleshooting.
Added 8.6 Resetting and Turning On the DC Switch.
Issue 12 (2021-07-08)
Updated 6.2 System Power-On.
Issue 11 (2021-05-21)
Updated 5.7 Installing the DC Input Power Cable.
Issue 10 (2021-04-26)
Updated 5.7 Installing the DC Input Power Cable.
Updated A Securing Y-Branch Connectors.
Issue 09 (2021-03-15)
Updated 4.2 Preparing Tools.
Updated 5.7 Installing the DC Input Power Cable.
Updated 8.5 Alarm Reference.
Issue 08 (2021-01-22)
Updated 4.3.1 Environment Requirements.
Updated D Grid Code.
Issue 07 (2020-12-21)
Updated 5.6 Connecting the AC Output Power Cable.
Issue 06 (2020-11-30)
Updated 4.5 Installing the Inverter.
Updated 6.2 System Power-On.
Issue 05 (2020-08-30)
Updated 2.1 Product Overview.
Updated 4.3.1 Environment Requirements.
Updated 4.5 Installing the Inverter.
Updated 6.2 System Power-On.
Updated 7.1 Operations with the App.
Updated 8.3 Routine Maintenance.
Issue 04 (2020-03-03)
Updated 1 Safety Information.
Updated 2.3.1 Enclosure Labels.
Issue 03 (2019-09-10)
Updated 5.7 Installing the DC Input Power Cable.
Updated 8.5 Alarm Reference.
Added B String Access Detection.
Issue 02 (2019-06-05)
Updated 2.1 Product Overview.
Issue 01 (2019-05-15)
This issue is used for first office application (FOA).
Contents
2 Overview................................................................................................................................. 13
2.1 Product Overview..................................................................................................................................................................13
2.2 Appearance............................................................................................................................................................................. 15
2.3 Label Description.................................................................................................................................................................. 20
2.3.1 Enclosure Labels.................................................................................................................................................................20
2.3.2 Product Nameplate........................................................................................................................................................... 21
2.4 Working Principles................................................................................................................................................................ 22
2.4.1 Circuit Diagram.................................................................................................................................................................. 22
2.4.2 Working Modes.................................................................................................................................................................. 23
2.5 Smart I-V Curve Diagnosis................................................................................................................................................. 25
3 Storage Requirements..........................................................................................................26
4 Installation..............................................................................................................................28
4.1 Checking Before Installation............................................................................................................................................. 28
4.2 Preparing Tools...................................................................................................................................................................... 28
4.3 Determining the Installation Position............................................................................................................................ 30
4.3.1 Environment Requirements............................................................................................................................................30
4.3.2 Clearance Requirements................................................................................................................................................. 32
4.4 Installing the Mounting Bracket...................................................................................................................................... 35
4.4.1 Support-mounted Installation.......................................................................................................................................35
4.4.2 Wall-mounted Installation............................................................................................................................................. 36
4.5 Installing the Inverter.......................................................................................................................................................... 37
5 Electrical Connections.......................................................................................................... 41
5.1 Precautions.............................................................................................................................................................................. 41
5.2 Crimping an OT or DT Terminal...................................................................................................................................... 42
5.3 Opening the Maintenance Compartment Door......................................................................................................... 45
6 System Commissioning........................................................................................................ 65
6.1 Checking Before Power-On................................................................................................................................................65
6.2 System Power-On................................................................................................................................................................. 66
7 Man-Machine Interactions.................................................................................................. 68
7.1 Operations with the App.................................................................................................................................................... 68
7.1.1 App Introduction................................................................................................................................................................ 68
7.1.2 Downloading and Installing the App..........................................................................................................................69
7.1.3 Logging In to the App...................................................................................................................................................... 70
7.1.4 Operations Related to the Advanced User............................................................................................................... 74
7.1.4.1 Setting Grid Parameters...............................................................................................................................................74
7.1.4.2 Setting Protection Parameters................................................................................................................................... 75
7.1.4.3 Setting Feature Parameters........................................................................................................................................ 75
7.1.5 Operations Related to the Special User.....................................................................................................................79
7.1.5.1 Setting Grid Parameters...............................................................................................................................................80
7.1.5.2 Setting Protection Parameters................................................................................................................................... 82
7.1.5.3 Setting Feature Parameters........................................................................................................................................ 83
7.1.5.4 Setting Power Adjustment Parameters...................................................................................................................88
7.2 Upgrading the Inverter....................................................................................................................................................... 91
8 Maintenance........................................................................................................................... 93
8.1 System Power-Off................................................................................................................................................................. 93
8.2 Power-Off for Troubleshooting........................................................................................................................................ 94
8.3 Routine Maintenance.......................................................................................................................................................... 95
8.4 Replacing a Fan..................................................................................................................................................................... 97
8.5 Alarm Reference..................................................................................................................................................................101
8.6 Resetting and Turning On the DC Switch.................................................................................................................. 101
1 Safety Information
Statement
Before transporting, storing, installing, operating, using, and/or maintaining
the equipment, read this document, strictly follow the instructions provided
herein, and follow all the safety instructions on the equipment and in this
document. In this document, "equipment" refers to the products, software,
components, spare parts, and/or services related to this document; "the Company"
refers to the manufacturer (producer), seller, and/or service provider of the
equipment; "you" refers to the entity that transports, stores, installs, operates,
uses, and/or maintains the equipment.
The Company shall not be liable for any of the following circumstances or
their consequences:
DANGER
Ensure that power is off during installation. Do not install or remove a cable with
power on. Transient contact between the core of the cable and the conductor will
generate electric arcs or sparks, which may cause a fire or personal injury.
DANGER
DANGER
DANGER
During operations, use dedicated insulated tools to prevent electric shocks or short
circuits. The dielectric withstanding voltage level must comply with local laws,
regulations, standards, and specifications.
WARNING
General Requirements
● Do not stop protective devices. Pay attention to the warnings, cautions, and
related precautionary measures in this document and on the equipment.
● If there is a likelihood of personal injury or equipment damage during
operations, immediately stop, report the case to the supervisor, and take
feasible protective measures.
● Do not power on the equipment before it is installed or confirmed by
professionals.
● Do not touch the power supply equipment directly or with conductors such as
damp objects. Before touching any conductor surface or terminal, measure
the voltage at the contact point to ensure that there is no risk of electric
shock.
● Do not touch operating equipment because the enclosure is hot.
● Do not touch a running fan with your hands, components, screws, tools, or
boards. Otherwise, personal injury or equipment damage may occur.
● In the case of a fire, immediately leave the building or the equipment area
and activate the fire alarm or call emergency services. Do not enter the
affected building or equipment area under any circumstances.
Personnel Requirements
● Only professionals and trained personnel are allowed to operate the
equipment.
– Professionals: personnel who are familiar with the working principles and
structure of the equipment, trained or experienced in equipment
operations and are clear of the sources and degree of various potential
hazards in equipment installation, operation, maintenance
DANGER
Before connecting cables, ensure that the equipment is intact. Otherwise, electric
shocks or fire may occur.
DANGER
DANGER
Prevent foreign matter from entering the equipment during operations. Otherwise,
equipment damage, load power derating, power failure, or personal injury may
occur.
WARNING
For the equipment that needs to be grounded, install the ground cable first when
installing the equipment and remove the ground cable last when removing the
equipment.
WARNING
During the installation of PV strings and the SUN2000, the positive or negative
terminals of PV strings may be short-circuited to ground if the power cables are
not properly installed or routed. In this case, an AC or DC short circuit may occur
and damage the SUN2000. The resulting device damage is not covered under any
warranty.
CAUTION
Do not route cables near the air intake or exhaust vents of the equipment.
General Requirements
● Follow the procedures described in the document for installation, operation,
and maintenance. Do not reconstruct or alter the equipment, add
components, or change the installation sequence without permission.
● Obtain approval from the national or local electric utility company before
connecting the equipment to the grid.
● Observe the power plant safety regulations, such as the operation and work
ticket mechanisms.
● Install temporary fences or warning ropes and hang "No Entry" signs around
the operation area to keep unauthorized personnel away from the area.
● Before installing or removing power cables, turn off the switches of the
equipment and its upstream and downstream switches.
● Before performing operations on the equipment, check that all tools meet the
requirements and record the tools. After the operations are complete, collect
all of the tools to prevent them from being left inside the equipment.
● Before installing power cables, check that cable labels are correct and cable
terminals are insulated.
● When installing the equipment, use a torque tool of a proper measurement
range to tighten the screws. When using a wrench to tighten the screws,
ensure that the wrench does not tilt and the torque error does not exceed
10% of the specified value.
● Ensure that bolts are tightened with a torque tool and marked in red and blue
after double-check. Installation personnel mark tightened bolts in blue.
Quality inspection personnel confirm that the bolts are tightened and then
mark them in red. (The marks must cross the edges of the bolts.)
● If the equipment has multiple inputs, disconnect all the inputs before
operating the equipment.
● Before maintaining a downstream electrical or power distribution device, turn
off the output switch on the power supply equipment.
● During equipment maintenance, attach "Do not switch on" labels near the
upstream and downstream switches or circuit breakers as well as warning
signs to prevent accidental connection. The equipment can be powered on
only after troubleshooting is complete.
● Do not open equipment panels.
● Check equipment connections periodically, ensuring that all screws are
securely tightened.
● Only qualified professionals can replace a damaged cable.
● Do not scrawl, damage, or block any labels or nameplates on the equipment.
Promptly replace labels that have worn out.
● Do not use solvents such as water, alcohol, or oil to clean electrical
components inside or outside of the equipment.
Grounding
● Ensure that the grounding impedance of the equipment complies with local
electrical standards.
● Ensure that the equipment is connected permanently to the protective
ground. Before operating the equipment, check its electrical connection to
ensure that it is reliably grounded.
● Do not work on the equipment in the absence of a properly installed ground
conductor.
● Do not damage the ground conductor.
Cabling Requirements
● When selecting, installing, and routing cables, follow local safety regulations
and rules.
● When routing power cables, ensure that there is no coiling or twisting. Do not
join or weld power cables. If necessary, use a longer cable.
● Ensure that all cables are properly connected and insulated, and meet
specifications.
● Ensure that the slots and holes for routing cables are free from sharp edges,
and that the positions where cables are routed through pipes or cable holes
are equipped with cushion materials to prevent the cables from being
damaged by sharp edges or burrs.
● Ensure that cables of the same type are bound together neatly and straight
and that the cable sheath is intact. When routing cables of different types,
ensure that they are away from each other without entanglement and
overlapping.
● Secure buried cables using cable supports and cable clips. Ensure that the
cables in the backfill area are in close contact with the ground to prevent
cable deformation or damage during backfilling.
● If the external conditions (such as the cable layout or ambient temperature)
change, verify the cable usage in accordance with the IEC-60364-5-52 or local
laws and regulations. For example, check that the current-carrying capacity
meets requirements.
● When routing cables, reserve at least 30 mm clearance between the cables
and heat-generating components or areas. This prevents deterioration or
damage to the cable insulation layer.
DANGER
DANGER
DANGER
Do not place the equipment near heat sources or fire sources, such as smoke,
candles, heaters, or other heating devices. Overheat may damage the equipment
or cause a fire.
WARNING
Install the equipment in an area far away from liquids. Do not install it under
areas prone to condensation, such as under water pipes and air exhaust vents, or
areas prone to water leakage, such as air conditioner vents, ventilation vents, or
feeder windows of the equipment room. Ensure that no liquid enters the
equipment to prevent faults or short circuits.
WARNING
To prevent damage or fire due to high temperature, ensure that the ventilation
vents or heat dissipation systems are not obstructed or covered by other objects
while the equipment is running.
General Requirements
● Store the equipment according to the storage requirements. Equipment
damage caused by unqualified storage conditions is not covered under the
warranty.
● Keep the installation and operating environments of the equipment within the
allowed ranges. Otherwise, its performance and safety will be compromised.
● The operating temperature range provided in the equipment's technical
specifications refers to the ambient temperatures in equipment's installation
environment.
● Do not install, use, or operate outdoor equipment and cables (including but
not limited to moving equipment, operating equipment and cables, inserting
connectors to or removing connectors from signal ports connected to outdoor
facilities, working at heights, performing outdoor installation, and opening
doors) in harsh weather conditions such as lightning, rain, snow, and level 6
or stronger wind.
● Do not install the equipment in an environment with dust, smoke, volatile or
corrosive gases, infrared and other radiations, organic solvents, or salty air.
● Do not install the equipment in an environment with conductive metal or
magnetic dust.
● Do not install the equipment in an area conducive to the growth of
microorganisms such as fungus or mildew.
● Do not install the equipment in an area with strong vibration, noise, or
electromagnetic interference. The equipment shall be installed in an
environment with a magnetic field strength less than 4 Gauss. If the magnetic
field strength is greater than or equal to 4 Gauss, the equipment may fail to
work properly. If the magnetic field strength is high, for example, in a
smeltery, you are advised to use a gauss meter to measure the magnetic field
strength of the equipment installation position when the smelting equipment
is running normally.
● Ensure that the site complies with local laws, regulations, and related
standards.
● Ensure that the ground in the installation environment is solid, free from
spongy or soft soil, and not prone to subsidence. The site must not be located
in a low-lying land prone to water or snow accumulation, and the horizontal
level of the site must be above the highest water level of that area in history.
● Do not install the equipment in a position that may be submerged in water.
● Do not install the equipment outdoors in salt-affected areas because it may
be corroded. A salt-affected area refers to the region within 500 m of the
coast or prone to sea breeze. Regions prone to sea breeze vary with weather
conditions (such as typhoons and monsoons) or terrains (such as dams and
hills).
● Before opening doors during the installation, operation, and maintenance of
the equipment, clean up any water, ice, snow, or other foreign objects on the
top of the equipment to prevent foreign objects from falling into the
equipment.
● When installing the equipment, ensure that the installation surface is solid
enough to bear the weight of the equipment.
● After installing the equipment, remove the packing materials such as cartons,
foam, plastics, and cable ties from the equipment area.
WARNING
Ensure that all necessary tools are ready and inspected by a professional
organization. Do not use tools that have signs of scratches or fail to pass the
inspection or whose inspection validity period has expired. Ensure that the tools
are secure and not overloaded.
WARNING
Do not drill holes into the equipment. Doing so may affect the sealing
performance and electromagnetic containment of the equipment and damage
components or cables inside. Metal shavings from drilling may short-circuit boards
inside the equipment.
General Requirements
● Repaint any paint scratches caused during equipment transportation or
installation in a timely manner. Equipment with scratches must not be
exposed for an extended period of time.
● Do not perform operations such as arc welding and cutting on the equipment
without evaluation by the Company.
● Do not install other devices on the top of the equipment without evaluation
by the Company.
● When performing operations over the top of the equipment, take measures to
protect the equipment against damage.
● Use correct tools and operate them in the correct way.
● Wear personal protective gears such as protective gloves and shoes when
manually moving the equipment.
● To move an object by hand, approach to the object, squat down, and then lift
the object gently and stably by the force of the legs instead of your back. Do
not lift it suddenly or turn your body around.
● Do not quickly lift a heavy object above your waist. Place the object on a
workbench that is half-waist high or any other appropriate place, adjust the
positions of your palms, and then lift it.
● Move a heavy object stably with balanced force at an even and low speed. Put
down the object stably and slowly to prevent any collision or drop from
scratching the surface of the equipment or damaging the components and
cables.
● When moving a heavy object, be aware of the workbench, slope, staircase,
and slippery places. When moving a heavy object through a door, ensure that
the door is wide enough to move the object and avoid bumping or injury.
● When transferring a heavy object, move your feet instead of turning your
waist around. When lifting and transferring a heavy object, ensure that your
feet point to the target direction of movement.
● When transporting the equipment using a pallet truck or forklift, ensure that
the tynes are properly positioned so that the equipment does not topple.
Before moving the equipment, secure it to the pallet truck or forklift using
ropes. When moving the equipment, assign dedicated personnel to take care
of it.
● Choose sea, roads in good conditions, or airplanes for transportation. Do not
transport the equipment by railway. Avoid tilt or jolt during transportation.
Using Ladders
● Use wooden or insulated ladders when you need to perform live-line working
at heights.
● Platform ladders with protective rails are preferred. Single ladders are not
recommended.
● Before using a ladder, check that it is intact and confirm its load bearing
capacity. Do not overload it.
● Ensure that the ladder is securely positioned and held firm.
● When climbing up the ladder, keep your body stable and your center of
gravity between the side rails, and do not overreach to the sides.
● When a step ladder is used, ensure that the pull ropes are secured.
● If a single ladder is used, the recommended angle for the ladder against the
floor is 75 degrees, as shown in the following figure. A square can be used to
measure the angle.
● If a single ladder is used, ensure that the wider end of the ladder is at the
bottom, and take protective measures to prevent the ladder from sliding.
● If a single ladder is used, do not climb higher than the fourth rung of the
ladder from the top.
● If you use a single ladder to climb up to a platform, ensure that the ladder is
at least 1 m higher than the platform.
Hoisting
● Only trained and qualified personnel are allowed to perform hoisting
operations.
● Install temporary warning signs or fences to isolate the hoisting area.
● Ensure that the foundation where hoisting is performed on meets the load-
bearing requirements.
● Before hoisting objects, ensure that hoisting tools are firmly secured onto a
fixed object or wall that meets the load-bearing requirements.
● During hoisting, do not stand or walk under the crane or the hoisted objects.
● Do not drag steel ropes and hoisting tools or bump the hoisted objects
against hard objects during hoisting.
● Ensure that the angle between two hoisting ropes is no more than 90
degrees, as shown in the following figure.
Drilling Holes
● Obtain consent from the customer and contractor before drilling holes.
● Wear protective equipment such as safety goggles and protective gloves when
drilling holes.
● To avoid short circuits or other risks, do not drill holes into buried pipes or
cables.
● When drilling holes, protect the equipment from shavings. After drilling, clean
up any shavings.
2 Overview
Function
The SUN2000 is a three-phase grid-tied PV string inverter that converts the DC
power generated by PV strings into AC power and feeds the power into the power
grid.
Model
This document involves the following product models:
● SUN2000-175KTL-H0
● SUN2000-185KTL-INH0
● SUN2000-185KTL-H1
NOTE
Networking Application
The SUN2000 applies to grid-tied PV systems for commercial rooftop projects and
utility-scale plants. Typically, a grid-tied PV system consists of the PV string,
SUN2000, AC power distribution unit, and step-up transformer.
NOTE
NOTE
The SUN2000 supports the IT earthing system in PV-only scenarios. The use of the
SUN2000 in other types of earthing systems, such as TT, TN-C, and TN-C-S, is not
recommended. (If such an earthing system is encountered, contact the Company's
engineers.)
2.2 Appearance
Dimensions
Front View
Communicatio LED3 -
ns indication
Blinking green at short The inverter receives data over RS485 or MBUS
intervals communication.
Alarm/O&M LED4 -
indication
Steady red A major alarm is generated.
If the PV connection indicator and grid connection
indicator are both not blinking green fast, replace
components or the solar inverter as instructed by
the SUN2000 app.
NOTE
● Local maintenance refers to operations performed after a universal serial bus (USB)
flash drive, Bluetooth module, WLAN module, or USB data cable is inserted into the USB
port of the inverter. For example, local maintenance includes configuration import and
export using a USB flash drive, and connecting to the SUN2000 app over a Bluetooth
module, WLAN module, or USB data cable.
● If the alarming and the local maintenance happen concurrently, the alarm/maintenance
indicator shows the local maintenance state first. After the USB flash drive, Bluetooth
module, WLAN module, or USB data cable is removed, the indicator shows the alarm
state.
Bottom View
NOTE
DC Switch Description
DANGER
The DC switches automatically turn off when a fault occurs in the inverters (LED4
is steady red, and the three DC switches are OFF). In this case, contact your
technical support. Do not turn on the DC switches by yourself.
RESET ● When the DC switch automatically turns off for protection, the
RESET button will be released.
● When the RESET button is not pressed, the DC switch can only
be turned to the unloaded position , and cannot be set to
the ON position.
NOTE
3 Storage Requirements
NOTICE
Store the device according to the storage requirements. Device damage caused by
unqualified storage conditions is not covered under the warranty.
If inverters will not be put into use immediately, store them according to the
requirements specified in this section. Device damage caused by unqualified
storage conditions is not covered under the warranty.
● Do not store the device without outer packaging.
● Do not remove the outer packaging. Check the packaging regularly
(recommended: once every three months). Replace any packaging that is
damaged during storage. If the inverter is unpacked but will not be used
immediately, put it back to the original packaging with the desiccant, and seal
with tape.
● Inverters must be stored in a clean and dry environment with appropriate
temperature and humidity. The air must not contain corrosive or flammable
gases.
● Do not store inverters for more than two years. If inverters have been stored
for two years or longer, they must be checked and tested by professionals
before being put into use.
4 Installation
NOTE
You are advised to remove the packing materials within 24 hours before installing the
inverter.
Package Contents
NOTICE
● After placing the equipment in the installation position, unpack it with care to
prevent scratches. Keep the equipment stable during unpacking.
After unpacking the inverter, check that the contents are intact and complete. If
any damage is found or any component is missing, contact your supplier.
NOTE
For details about the number of contents, see the Packing List in the packing case.
Type Tool
Type Tool
Personal
protective Protective gloves Safety goggles Dust mask Safety boots
equipment
- - -
(PPE)
Insulated gloves
Basic Requirements
● Do not install the inverter in working or living areas to avoid personal injury
or property loss caused by accidental contact by non-professionals or other
reasons during device operation.
● Do not install the inverter in noise-sensitive areas (such as residential areas,
office areas, and schools) to avoid complaints. If the preceding areas are
unavoidable, the distance between the installation position and noise-
sensitive areas must be greater than 40 m. Alternatively, use other low-noise
models.
● If the inverter is installed in public places (such as parking lots, stations, and
factories) other than working and living areas, install a protective net outside
the device and set up a safety warning sign to isolate the device. This is to
avoid personal injury or property loss caused by accidental contact by non-
professionals or other reasons during device operation.
● If the inverter is installed in a place with abundant vegetation, in addition to
routine weeding, harden the ground underneath the inverter using cement or
gravel (the area shall be greater than or equal to 3 m x 2.5 m).
● Take waterproof and insulation measures for unused DC power cables. High
voltage may exist in unused DC power cables. Take measures to prevent
personal injury or property damage caused by accidental contact with high
voltage or other reasons.
● Power cables must be vertically routed into combiner boxes and wiring
terminals to avoid damage caused by horizontal stress on the terminals,
which is not covered under the warranty.
● If an inverter has not been running for six months or longer after being
mounted, it may have failed and must be checked and tested by professionals
before being put into operation.
● To prevent the inverter from being corroded by moisture, PV terminals that
will not be used for a long time must be sealed with dedicated PV terminal
plugs. Inverter failure due to not using dedicated PV terminal plugs is not
covered under the warranty.
NOTE
The clearance from the bottom must meet the requirements on the bending radius of
the AC output power cables.
NOTE
The inverter mounting bracket has four groups of tapped holes, each group containing four
tapped holes. Mark any hole in each group based on site requirements and mark four holes
in total. The two round holes are recommended.
Before installing the mounting bracket, remove the security torx wrench from the
mounting bracket and set it aside.
Support-mounted Installation
Step 1 Install the mounting bracket.
NOTE
The M12x40 bolt assemblies are delivered with the SUN2000 (bound to the mounting
bracket). If the bolt assembly length does not meet the installation requirements, prepare
M12 bolt assemblies by yourself and use them together with the delivered M12 nuts.
----End
Wall-mounted Installation
Step 1 Install the mounting bracket.
WARNING
Avoid drilling holes in the water pipes and power cables buried in the wall.
NOTICE
● To prevent dust inhalation or contact with eyes, wear safety goggles and an
anti-dust respirator when drilling holes.
● Clean up any dust in and around the holes using a vacuum cleaner and
measure the distance between holes. If the holes are inaccurately positioned,
drill a new set of holes.
● Level the head of the expansion sleeve with the concrete wall after removing
the bolt, spring washer, and flat washer. Otherwise, the mounting bracket will
not be securely installed on the wall.
----End
NOTE
● Handles are packed in a fitting bag and are not delivered with the inverter.
● Secure the lifting handles (with the steel washers of the lifting handles closely fitted to
the device).
● If the stud of a lifting handle is bent, replace the lifting handle in time.
NOTICE
● Move the inverter with the help of other three persons or using an appropriate
transportation tool.
● Do not place the inverter with its wiring terminals at the bottom contacting the
floor or any other objects because the terminals are not designed to bear the
weight of the inverter.
● When you need to temporally place the inverter on the ground, use foam,
paper, or other protection material to prevent damage to its cover.
● Do not lift or hoist the inverter using the bottom holes of the handles to
prevent the handles from cracking.
For the model used in Australia, perform this step to meet the local standards.
----End
Supplementary Notes
If the inverter is installed in a high position, you can hoist it.
5 Electrical Connections
5.1 Precautions
DANGER
When exposed to sunlight, the PV arrays supply DC voltage to the inverter. Before
connecting cables, ensure that all DC SWITCH on the inverter are OFF. Otherwise,
the high voltage of the inverter may result in electric shocks.
DANGER
● The site must be equipped with qualified fire fighting facilities, such as fire sand
and carbon dioxide fire extinguishers.
● Wear personal protective equipment and use dedicated insulated tools to avoid
electric shocks or short circuits.
WARNING
CAUTION
● Stay away from the equipment when preparing cables to prevent cable scraps
from entering the equipment. Cable scraps may cause sparks and result in
personal injury and equipment damage.
● When routing PV cables whose pipe is less than 1.5 m long, the positive and
negative PV string cables shall be routed in different pipes to prevent cable
damage and short circuits caused by improper operations during construction.
NOTE
The cable colors shown in the electrical connection diagrams provided in this section are for
reference only. Select cables in accordance with local cable specifications (green-and-yellow
cables are only used for protective earthing).
NOTICE
Crimping an OT or DT Terminal
NOTICE
● Pay attention not to scratch the core wire when stripping a cable.
● The cavity formed after the conductor crimp strip of the OT or DT terminal is
crimped must wrap the core wires completely. The core wires must contact the
OT or DT terminal closely.
● Wrap the wire crimping area with a heat shrink tubing or PVC insulation tape.
The heat shrink tubing is used as an example.
● When using a heat gun, protect devices from being scorched.
NOTICE
Procedure
Step 1 Partially loosen the two screws on the maintenance compartment door.
Step 2 Open the maintenance compartment door and install a support bar.
Step 3 Remove the accessories that are bound in the maintenance compartment for
future use.
NOTE
For some models, a three-hole rubber plug is bound in the maintenance compartment.
After removing the rubber plug, save it properly for future use.
----End
If the AC output power cable has a single core, replace the crimping module.
----End
NOTICE
Cable Specifications
Recommended: dual-layer three-core outdoor copper cable with a conductor
cross-sectional area of 10 mm2 and a cable outer diameter of 15–18 mm.
Procedure
Step 1 Connect the power cable of the tracking system to the terminal block.
----End
WARNING
CAUTION
Each inverter shall be equipped with an AC output switch. Multiple inverters shall
not connect to the same AC switch.
NOTICE
● The cable outer diameter can be measured using the ruler sticker in the
maintenance compartment.
● Ensure that the cable jacket is in the maintenance compartment.
● Ensure that the AC output power cable is secured. Failing to do so may cause
the solar inverter to malfunction or damage to its terminal block by issues such
as overheating.
● The ground point on the enclosure is preferred to connect to the PE cable for
the inverter.
● The PE point in the maintenance compartment is used for connecting to the
PE cable included in the multi-core AC power cable.
● There are two ground points on the chassis shell and you only need either of
them.
● It is recommended that the PE cable of the inverter be connected to a nearby
ground point. For a system with multiple inverters connected in parallel,
connect the ground points of all inverters to ensure equipotential connections
to ground cables.
Cable Specifications
● If you connect a ground cable to the ground point on the chassis shell, you
are advised to use a three-core (L1, L2, and L3) outdoor cable or three single-
core outdoor cables.
● If you connect a ground cable to the ground point in the maintenance
compartment, you are advised to use a four-core (L1, L2, L3, and PE) outdoor
cable.
● You need to prepare the OT or DT terminal that matches the cable.
Note [1]: For some models, the outer diameter of a single-core cable ranges
from 14 mm to 36 mm based on the label in the maintenance compartment.
Note [2]: For some models, when the OT/DT terminal is crimped as shown in
the following figure and the rubber baffle plate of the AC wiring terminal is 112
mm, the maximum conductor cross-sectional area of the single-core cable can
be 400 mm2.
NOTE
● The cable diameter must comply with local cable standards. The factors that affect
cable selection include the rated current, cable type, routing mode, ambient
temperature, and maximum expected line loss.
● When the MBUS is used for communication, it is recommended that the multi-wire
cable be used. The maximum communication distance is 1000 m. If other types of AC
power cables are used, contact Huawei technical support.
The specifications are valid only if the conductors of the PE cable and AC power
cable use the same material. If the materials are different, ensure that the
conductor cross-sectional area of the PE cable produces a conductance
equivalent to that of the cable specified in this table. The specifications of the
PE cable are subject to this table or calculated according to IEC 60364-5-54.
----End
NOTICE
Sufficient slack should be provided in the PE cable to ensure that the last cable
bearing the force is the PE cable when the AC output power cable bears pulling
force due to force majeure.
----End
----End
NOTE
The 32–36 mm cable is supported only by some models. Refer to the corresponding label to
get the supported size.
Bending Radius
R indicates the bending radius, and D indicates the outer diameter of the cable.
NOTE
The AC power cable must be routed vertically into the maintenance compartment.
DANGER
● Before connecting the DC input power cable, ensure that the DC voltage is
within the safe range (lower than 60 V DC) and that the three DC switches on
the inverter are set to OFF. Failure to do so may result in electric shocks.
● When the inverter operates in grid-tied mode, do not perform maintenance or
operations on the DC circuit, such as connecting or disconnecting a PV string or
a PV module in the PV string. Failure to do so may cause electric shocks or
arcing, which may also cause fire.
WARNING
Ensure that the following conditions are met. Otherwise, the inverter may be
damaged, or even a fire could happen.
● The open-circuit voltage of each PV string must always be 1500 V DC or lower.
● The polarities of electric connections are correct on the DC input side. The
positive and negative terminals of a PV module connect to corresponding
positive and negative DC input terminals of the inverter.
WARNING
During the installation of PV strings and the SUN2000, the positive or negative
terminals of PV strings may be short-circuited to ground if the power cables are
not properly installed or routed. In this case, an AC or DC short circuit may occur
and damage the SUN2000. The resulting device damage is not covered under any
warranty.
NOTICE
Terminal Description
The inverter provides 18 DC input terminals, which are controlled by its three DC
switches. DC SWITCH 1 controls DC input terminals 1–6, DC SWITCH 2 controls DC
input terminals 7–12, and DC SWITCH 3 controls DC input terminals 13–18.
NOTICE
Wiring rules:
1. The PV+ on the string side must be connected to the PV+ on the SUN2000
side, and the PV– on the string side must be connected to the PV– on the
SUN2000 side.
2. Preferentially and evenly connect the Y-branch connectors to the MPPTs
controlled by DC SWITCH 1 or DC SWITCH 2.
Number of Y- Recommended Number of Y- Recommended
branch MPPT to Be branch MPPT to Be
Connector Connected Connector Connected
Sets Sets
Cable Specifications
Cable Type Conductor Cross- Cable Outer Diameter
sectional Area (Unit: (Unit: mm)
mm2)
NOTICE
● Cables with high rigidity, such as armored cables, are not recommended,
because poor contact may be caused by the bending of cables.
● Do not connect aluminum or aluminum alloy DC power cables directly to the
DC terminals of the inverter.
● The 1500 V PV cables must comply with IEC 62930 or EN 50618.
Procedure
NOTICE
● Use the MC4 EVO2 PV connectors delivered with the inverter. If the PV
connectors are lost or damaged, purchase the connectors of the same model.
The device damage caused by incompatible PV connectors is beyond the
warranty scope.
● For models of the crimping tool and removal wrench, use the recommended
model or contact your Staubli dealer.
NOTICE
NOTICE
During DC input power cabling, leave at least 150 mm of slack. The axial tension
on PV connectors must not exceed 80 N. Radial stress or torque must not be
generated on PV connectors.
----End
RS485-1 1 RS485A IN, RS485 2 RS485A OUT, RS485 Used for cascading
differential signal+ differential signal+ inverters or
connecting to
3 RS485B IN, RS485 4 RS485B OUT, RS485 devices such as the
differential signal– differential signal– SmartLogger.
Procedure
Step 1 Install the communications cable.
NOTICE
Block unused cable holes using plugs and tighten cable glands.
NOTICE
----End
----End
6 System Commissioning
10. Check that idle USB ports are plugged with waterproof plugs.
DANGER
● Wear personal protective equipment and use dedicated insulated tools to avoid
electric shocks or short circuits.
WARNING
When LED2 is steady green (meaning that the inverter is grid-tied), do not turn on
any DC switch. Otherwise, the inverter may be damaged because the insulation
resistance is not detected.
NOTICE
● Before the equipment is put into operation for the first time, ensure that the
parameters are set correctly by professional personnel. Incorrect parameter
settings may result in noncompliance with local grid connection requirements
and affect the normal operations of the equipment.
● Before turning on the AC switch between the inverter and the power grid,
check that the AC voltage is within the specified range using a multimeter.
● If the solar inverter has not been running for more than half a year after being
mounted, it must be checked and tested by professionals before being put into
operation.
● Do not turn the DC switch to the unloaded position .
● When the system is powered on or running, do not place obstacles (such as
cables) to block the rotation of the handle or manually hold the handle.
Otherwise, the DC switch cannot be automatically disconnected.
Procedure
Step 1 Turn on the AC switch between the inverter and the grid.
NOTICE
If you perform Step 2 before Step 1, the inverter reports a fault about abnormal
shutdown. The inverter can start normally after the fault is automatically cleared.
Step 2 Set DC SWITCH 1 (MAIN SWITCH) at the bottom of the SUN2000 chassis to ON.
When you hear a click sound, the switch is ON.
Step 3 Check the status of LED 1. If it is steady green, set DC SWITCH 2 and DC SWITCH
3 to ON.
----End
7 Man-Machine Interactions
Functions
● The FusionSolar app is recommended when the SUN2000 is connected to the
FusionSolar Smart PV Management System (SmartPVMS). The SUN2000 app
is recommended when the SUN2000 is connected to other management
systems.
● The SUN2000 or FusionSolar app (app for short) is a mobile phone app that
communicates with the SUN2000 over a WLAN/Bluetooth module or a USB
data cable to allow for querying alarms, setting parameters, and performing
routine maintenance as an easy-to-use maintenance platform.
Connection Mode
After the DC or AC side of the SUN2000 is powered on, you can connect the app
to it through a WLAN module, a Bluetooth module or a USB data cable.
NOTICE
Disclaimer
NOTICE
● The configurable parameters of the SUN2000 vary with the device model and
grid code.
● If you change the grid code, some parameters may be restored to factory
defaults. After the grid code is changed, check whether the previously set
parameters are affected.
● Delivering a reset, factory reset, shutdown, or upgrade command to the solar
inverters may cause power grid connection failure, which affects the energy
yield.
● Before the equipment is put into operation for the first time, ensure that the
parameters are set correctly by professional personnel. Incorrect parameter
settings may result in noncompliance with local grid connection requirements
and affect the normal operations of the equipment.
● The parameter names, value ranges, and default values are subject to change.
QR code:
Procedure
1. Run the app and select a connection mode.
NOTE
2. Select a login user and enter the login password to access the quick settings
screen or the main menu screen.
NOTICE
● The login password is the same as that for the SUN2000 connected to the
app and is used only when the SUN2000 connects to the app.
● The initial passwords for Common User, Advanced User, and Special User
are all 00000a.
● Use the initial password upon first power-on and change it immediately
after login. To ensure account security, change the password periodically
and keep the new password in mind. Not changing the initial password
may cause password disclosure. A password left unchanged for a long
period of time may be stolen or cracked. If a password is lost, devices
cannot be accessed. In these cases, the user is liable for any loss caused to
the PV plant.
● During the login, if five consecutive invalid password entries are made (the
interval between two consecutive entries is less than 2 minutes), the
account will be locked for 10 minutes. The password should consist of six
characters.
● If you log in to the app after the device connects to the app for the first
time or factory defaults are restored, the quick settings screen will be
displayed. Set basic parameters as prompted. If you do not set basic
parameters for the inverter on the quick settings screen, the screen is still
displayed when you log in to the app next time.
● To set SUN2000 basic parameters on the quick settings screen, switch to
Advanced User. If you log in as Common User or Special User, enter the
password of the advanced user to access the Quick Settings screen.
Procedure
Step 1 Choose Function Menu > Settings > Grid Parameters to access the parameters
setting screen.
----End
Parameters
No. Parameter Description
1 Grid Code Set this parameter based on the grid code of the country or
region where the inverter is used and the inverter application
scenario.
2 Isolation settings Set the working mode of the inverter based on the grounding
status at DC side and the connection to the power grid.
Procedure
Step 1 Choose Function Menu > Settings > Protect Parameters to go to the parameter
setting screen.
----End
Parameter
No. Parameter Description
1 Insulation resistance To ensure device safety, the inverter detects the insulation
protection threshold (MΩ) resistance of the input side with respect to ground when it
starts a self-check. If the detected value is less than the
preset value, the inverter does not connect to the grid.
Procedure
Step 1 Choose Function Menu > Settings > Feature Parameters to access the settings
screen.
----End
Parameters
No. Parameter Description Remarks
17 Delay upgrade This parameter is mainly used in After the inverter starts to
the upgrade scenarios where the upgrade, if Delay upgrade is
PV power supply is disconnected set to Enable, the upgrade
at night due to no sunlight or package is loaded first. After
unstable at dawn or dusk due to the PV power supply recovers
poor sunlight. and the activation conditions
are met, the inverter
automatically activates the
upgrade.
Procedure
Step 1 Choose Function Menu > Settings > Grid Parameters to access the parameters
setting screen.
----End
Parameters
No. Parameter Description
1 Grid Code Set this parameter based on the grid code of the country
or region where the inverter is used and the inverter
application scenario.
2 Isolation settings Set the working mode of the inverter based on the
grounding status at DC side and the connection to the
power grid.
3 Output mode Specifies whether the inverter output has a neutral wire
based on the application scenario.
5 Grid connected recovery Specifies the time after which the inverter begins
time from grid faults (s) restarting after the power grid recovers.
9 Grid reconnection voltage The standards of certain countries and regions require
upper limit (V) that after the inverter shuts down for protection due to a
fault, if the power grid voltage is higher than Grid
reconnection voltage upper limit, the inverter is not
allowed to reconnect to the grid.
10 Grid reconnection voltage The standards of certain countries and regions require
lower limit (V) that after the inverter shuts down for protection due to a
fault, if the power grid voltage is lower than Grid
reconnection voltage lower limit, the inverter is not
allowed to reconnect to the grid.
11 Grid reconnection frequency The standards of certain countries and regions require
upper limit (Hz) that after the inverter shuts down for protection due to a
fault, if the power grid frequency is higher than Grid
reconnection frequency upper limit, the inverter is not
allowed to reconnect to the grid.
12 Grid reconnection frequency The standards of certain countries and regions require
lower limit (Hz) that after the inverter shuts down for protection due to a
fault, if the power grid frequency is lower than Grid
reconnection frequency lower limit, the inverter is not
allowed to reconnect to the grid.
14 Reactive power Specifies the voltage threshold for exiting reactive power
compensation (cosφ-P) exit compensation based on the cosφ-P curve.
voltage (%)
Procedure
Step 1 Choose Function Menu > Settings > Protect Parameters to go to the parameter
setting screen.
----End
Parameters
No. Parameter Description
1 Voltage unbalance protection Specifies the inverter protection threshold when the
threshold (%) power grid voltage is unbalanced.
2 Phase angle offset protection The standards of certain countries and regions require
that the inverter needs to be protected when the
phase angle offset of the power grid three phases
exceeds a certain value.
Procedure
Step 1 Choose Function Menu > Settings > Feature Parameters to access the settings
screen.
----End
Parameters
No. Parameter Description Remarks
2 Threshold for Specifies the threshold for triggering LVRT. The This parameter is
triggering threshold settings should meet the local grid displayed when LVRT
LVRT (V) standard. is set to Enable.
10 Threshold for Specifies the threshold for triggering HVRT. The This parameter is
triggering threshold settings should meet the local grid displayed when HVRT
HVRT (V) standard. is set to Enable.
Procedure
Step 1 Choose Function Menu > Settings > Power Adjustment to go to the parameter
setting screen.
----End
Parameters
No. Parameter Description Remarks
2 Schedule instruction Specifies the time for maintaining When this parameter is set
valid duration (s) the scheduling instruction. to 0, the scheduling
instruction takes effect
permanently.
7 Derated by active Adjusts the active power output of If this parameter is set to
power % (%) the inverter by percentage. 100, the inverter outputs
based on the maximum
output power.
NOTE
● Delete the script file immediately after use to reduce information disclosure risks.
● The file system of the USB flash drive must be FAT32.
Procedure
Step 1 Download the required software upgrade package from the technical support
website.
Step 2 Decompress the upgrade package and copy all files to the root directory of the
USB flash drive.
NOTICE
Do not modify the content in the upgrade package because the files involve RSA
signature verification. If you modify the content, the upgrade will fail.
Step 3 Connect the USB flash drive to the USB port. The system automatically identifies
the USB flash drive and executes all commands specified in the boot script file.
View the LED indicator to determine the operating status.
Step 4 The system automatically restarts when the upgrade is completed. All LED
indicators are off during the restart. After the restart, the indicator is blinking
green slowly for 1 minute and then it becomes steady green, which indicates that
the upgrade is successful.
----End
8 Maintenance
DANGER
● Wear personal protective equipment and use dedicated insulated tools to avoid
electric shocks or short circuits.
WARNING
WARNING
● If two inverters share the same AC switch on the AC side, power off the two
inverters.
● After the inverter powers off, the remaining electricity and heat may still cause
electric shocks and body burns. Therefore, put on personal protective
equipment (PPE) and begin servicing the inverter fifteen minutes after power-
off.
Procedure
Step 1 Run a shutdown command on the SUN2000 app, SmartLogger, or network
management system (NMS).
Step 2 Turn off the AC switch between the inverter and the power grid.
----End
CAUTION
● When a solar inverter is faulty, try to avoid standing in front of the solar
inverter.
● If the LED1 indicator of the inverter is off, the switches are in the OFF position,
do not operate the DC switches of the inverter. In this case, go to Step 4.
● Do not operate the DC switch on the solar inverter before you finish Step 3 to
Step 5.
● The DC switch can be automatically disconnected when an internal fault is
detected in an inverter. Do not turn on the switch before the fault is cleared.
● If the AC switch between the solar inverter and the power grid has
automatically disconnected, do not turn on the switch before the fault is
rectified.
● Before power-off for troubleshooting, do not touch the energized components
of the solar inverter. Otherwise, electric shocks or arcing may occur.
Procedure
Step 1 Wear proper personal protective equipment (PPE).
Step 2 If the solar inverter is not shut down due to a fault, send a shutdown command
on the SUN2000 app, SmartLogger, or management system. If the solar inverter
has shut down due to a fault, go to the next step.
Step 3 Turn off the AC switch between the solar inverter and the power grid.
Step 4 Measure the DC current of each PV input string using a clamp meter that is set to
the DC position.
● If the current is less than or equal to 0.5 A, go to the next step.
● If the current is higher than 0.5 A, wait until the solar irradiance decreases
and the PV string current decreases below 0.5 A at night, and then go to the
next step.
Step 5 Open the maintenance compartment door, install a support bar, and use a
multimeter to measure the voltage between the AC terminal block and the
ground. Ensure that the AC side of the solar inverter is disconnected.
Step 6 Turn off all DC switches of the inverter and ensure that all switches are set to OFF.
If the DC switches of the inverter have been automatically turned off, go to the
next step.
WARNING
● Do not open the host panel for maintenance if the solar inverter is emitting
odor or smoke, or has obvious exceptions.
● If the solar inverter does not emit odor or smoke and is intact, repair or restart
it based on the alarm handling suggestions. Do not stand in front of the solar
inverter during the restart.
----End
Maintenance Item
To ensure that the inverter can operate properly for a long term, you are advised
to perform routine maintenance on it as described in this chapter.
CAUTION
● Before cleaning the system, connecting cables, and maintaining the grounding
reliability, power off the system and ensure that the three DC switches on the
inverter are OFF.
● If you need to open the maintenance compartment door in rainy or snowy
days, take protective measures to prevent rain or snow entering the
maintenance compartment. If unavoidable, do not open the maintenance
compartment door.
Maintenance list
CAUTION
NOTE
If the fan tray gets stuck when being pulled or pushed, slightly lift it.
Step 1 Remove the screw on the fan tray and save it. Pull out the fan tray until the fan
baffle plate aligns with the inverter chassis.
Step 2 Remove the cable ties shared by the cables, unscrew the connectors, and
disconnect the cables.
● FAN 2 Faulty
● FAN 3 Faulty
Step 8 Push the fan tray into the slot until the fan baffle plate aligns with the inverter
chassis.
Step 9 Connect the cables correctly according to the cable labels and bind the cables.
Step 10 Push the fan tray into the slot and tighten the screw.
----End
Procedure
Step 1 Loosen the caps of the RESET buttons for the three DC switches, and press the
RESET buttons inwards until you cannot go any further.
Step 2 Set the DC switches to ON.
Step 3 Tighten the caps of the RESET buttons.
Figure 8-17 Resetting and Turning On the DC Switch (DC SWITCH 1 is used as an
example)
----End
NOTICE
10 Technical Data
Efficiency
Technical SUN2000-175KTL SUN2000-185KTL SUN2000-185KTL
Specifications -H0 -INH0 -H1
Input
Technical SUN2000-175KTL SUN2000-185KTL SUN2000-185KTL
Specifications -H0 -INH0 -H1
Maximum input 26 A
current (per
MPPT)
Maximum short- 40 A
circuit current
(per MPPT)
Maximum 0A
backfeed current
to the PV array
Operating 500–1500 V
voltage range
Number of inputs 18
Number of MPP 9
trackers
Output
Technical SUN2000-175KTL SUN2000-185KTL SUN2000-185KTL
Specifications -H0 -INH0 -H1
Protection
Technical SUN2000-175KTL SUN2000-185KTL SUN2000-185KTL
Specifications -H0 -INH0 -H1
Anti-islanding Supported
protection
Output Supported
overcurrent
protection
DC surge Type II
protection
AC surge Type II
protection
Insulation Supported
resistance
detection
RS485 Supported
MBUS Supported
USB Supported
Common Parameters
Technical SUN2000-175KTL SUN2000-185KTL SUN2000-185KTL
Specifications -H0 -INH0 -H1
Humidity 0%–100% RH
IP rating IP66
Topology Transformerless
The DC input terminals of the solar inverter are prone to damage under stress.
When Y-branch connectors are connected to the solar inverter, bind and secure the
connectors to prevent the DC input terminals from bearing stress. You are advised
to install a tray or beam to secure the Y-branch connectors.
----End
----End
Function Description
● Applies to large-scale commercial ground PV plants with PV strings facing the
same direction.
● In AC or DC power limiting scenarios:
– If the PV string access type is not identified, the value of PV Status will
keep being displayed as Not connected. The PV string access type can be
identified only when the inverters restore to the non-power limiting state
and the current of all connected PV strings reaches the startup current.
– If the PV string access type has been identified, when some PV strings
connected to the 2-in-1 terminals are lost, no alarm will be generated. If
some PV strings connected to the 2-in-1 terminals are restored, the
access type cannot be identified. It can be determined whether all the 2-
in-1 PV strings are restored only when the string current reaches Startup
current for 2 in 1 detection.
Procedure
Step 1 Log in to the SUN2000 app as Advanced User. The initial password is 00000a.
NOTE
Use the initial password upon first power-on and change it immediately after login. To
ensure account security, change the password periodically and keep the new password in
mind. Not changing the initial password may cause password disclosure. A password left
unchanged for a long period of time may be stolen or cracked. If a password is lost, devices
cannot be accessed. In these cases, the user is liable for any loss caused to the PV plant.
Step 2 Choose Function Menu > Maintenance > String Access Detection to go to the
parameter setting screen.
----End
Parameters
N Parameter Description Remark
o. s
NOTE
D Grid Code
NOTE
The grid codes are subject to change. The listed codes are for your reference only.
E Resetting Password
Step 1 Check that the AC and DC sides of the inverter are both powered on, and
indicators and are steady green or blinking slowly for more than 3 minutes.
Step 2 Turn off the AC switch, set the DC SWITCH at the bottom of the inverter to OFF,
and wait until all LED indicators on the inverter panel turn off.
Step 3 Complete the following operations within 4 minutes:
1. Turn on the AC switch and wait for about 90s or until the inverter indicator
blinks.
2. Turn off the AC switch and wait about 30s or until all LED indicators on the
inverter panel turn off.
3. Turn on the AC switch and wait for about 90s or until the inverter indicator
blinks.
Step 4 Log in to the app and reset the password within 10 minutes. (If no operation is
performed within 10 minutes, all parameters of the inverter remain unchanged.)
----End
NOTICE
F Contact Information
If you have any questions about this product, please contact us.
https://digitalpower.huawei.com
Path: About Us > Contact Us > Service Hotlines
To ensure faster and better services, we kindly request your assistance in providing
the following information:
● Model
● Serial number (SN)
● Software version
● Alarm ID or name
● Brief description of the fault symptom
NOTE
https://digitalpower.huawei.com/robotchat/
CPV Concentrated
Photovoltaics technology
PV photovoltaic