Project …..................................
Owner …..................................
Consultant …..................................
Contractor …..................................
Grand Summary
1 Concrete work Eth birr -
Substrate work for steel structure errection and
2 installation '' '' -
3 Steel I beams and connections '' '' -
4 Composite slab '' '' -
Sub total -
15% VAT -
Grand Total -
It/No Item of work description Unit Quantity Unit rate Amount
1 Concrete work
Demolish and surface preparation of concrete columns
and shear wall. The concrete demolishing should be
1.1 m2 0 -
done with no damage or acceptable damage to the
bondage between rebar and concrete.
Supply and errecting Grade of S-400 and above column
Steel reinforcement as marked on the rebar and based
on a test result. Reinforcement shall be free from dirt,
oil, grease, paint, etc and any other substances which
may affect the reinforcement and concrete bond (price
include cutting bend placing in position according to
1.2 structural drawing and tying with wire -
Dia.16 deformed bar Kg - -
Dia.8 deformed bar Kg - -
1.3 Column concrete m3 - -
1.4 Column formwork m2 0 -
2 Installation of substrate for Steel construction
Chisling of column surface for steel strip installation.
The surface chisling should be done so that the
bondage between the rebar and concrete not affected.
1 Initially, the existing concrete surface is cleaned. Any
dirt, dust, oil, efflorescence on the surface must be
removed completely to facilitate the proper working of
the bonding agent. Excessive dirt on concrete surfaces
can be cleaned by pressure washing or vacuum shot
blasting.2 prepare the admixture according to the
specification recomended by the manufacturer. 3 the
selected high performance epoxy bonding agent should
be clearly specified for high performance concrete to
steel bonding agent. 4 the bonding agent should make
the concrete and steel act as a single unit for the
applied force. m2 0 -
2.1 Installation of steel strip or palte on column faces -
70x2600x20mm steel strip/plate the strip should be
connected with the column using approved quality high
performance epoxy resing to connect with the chisled
concrete surface. pcs -
Fabricate transport delivery and installation of steel
work with approved quality accessories (bolts, plates,
nuts weldings…) Plates and J-bolts should be
according to the specified strength and applied steel
2.2 primer -
330X180X10mm plate Base plate pcs 9 -
D-1 and -2
600x350x13mm plate on shear wall pcs 8 -
700x400x13mm plate on steel strip pcs -
500x250x20014mm plate with two supporting bracket pcs 4 -
D-3 450x300x13mm plate pcs 2
2960x350x40mm plate to carry the suspended slab
beam system pcs 6 -
D-4 50x50x3.5x250mm stifening RHS pcs 54
3060x350x40mm plate to carry the slab pcs 3
D-4'' 50x50x3.5x250mm stifening RHS pcs 27
2.2 Bolts
650mm J-bolt grade 4.8 and dia 16 pcs 36 -
360mm grade 8.8 dia 24 Bolt pcs 24 -
400mm grade 8.8 dia 24 Bolt pcs 6 -
150mm Grade 4.8 dia 20mm bolt pcs 63 -
3 I sections and connections -
Supply fabricate transport delivery and installation of
steel work with approved quality accessories (bolts,
plates, nuts weldings…) Plates and J-bolts should be
according to the specified strength and applied steel
primer
3.1 Connecting plates -
330X180X10mm plate Base plate on I section pcs 9 -
400x250x13mm plate pcs 2 -
400x250x13mm plate pcs 10
2x170x130x11mm plate pcs 196 -
3.2 Bolts -
110mm Dia 20 grade 4.8 bolt pcs 588 -
140mm dia 24 grade 8.8 bolt pcs 60 -
3.3 Welding
6.2cm thick fillet welding m 14 -
4.7cm thick fillet welding m 48
3.4 Main Beam profiles
Main I-Profiles IPN 320 profile (6.35m) pcs 5 -
Main I-Profiles IPN 240 profile (6m) pcs 3
Main I-Profiles IPN 320 profile (6.65m) pcs 1
Joist I-profile IPN220 (4.9m) pcs 24 -
Joist I-profile IPN200(3m) pcs 32
4 Composite slab
Supply fabricate and install deck slab according to the
specification in the drawing. The deformation should
be done so that the mechnaical interlock between the
concrete and deck slab shear acieved based on the
recommendation of EBCS EN 1994
Deformed 0.87 to 1.25mm deck slab with applied steel
primer and corrugation according to the design.
The width of the deck will be 1.2m to C/C of the joist
and greater than 2m in length. Overlaping of the deck
should be avoided during construction m2 212.83 -
toping concrete m3 21.59 -
130mm length Dia 16 shear studs C/C20cm in both
sides pcs 2129 -
Dia 8 rebar Kg 1,020.48 -