D-104189-TC-E08-001 - 2 - Single Line Diagram (11KV, 415V)
D-104189-TC-E08-001 - 2 - Single Line Diagram (11KV, 415V)
H H
G G
FROM SIL PRY2 OR SIL GPRY1 FROM SIL PRY2 OR SIL GPRY1
11KV INCOMER#1 11KV INCOMER#2
F F
1R X 3C X 240 SQMM,11KV MV CABLE 1R X 3C X 240 SQMM,11KV MV CABLE
E
TRM- SUPPLY BY ADDC QRM - SUPPLY BY ADDC E
D D
B B
D104189-TC-E08-001
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
FROM SIL PRY2 OR SIL GPRY1 FROM SIL PRY2 OR SIL GPRY1
11KV INCOMER#1 11KV INCOMER#2
STATUS
CIRCUIT BREAKER
NORMAL NORMAL NORMAL NORMAL NORMAL NORMAL
OPERATION-1 OPERATION-2 OPERATION-3 OPERATION-4 OPERATION-5 OPERATION-6 EMERGENCY
LV SWITCHGEAR
TOTAL CONNECTED LOAD = 2198 kW
TOTAL ACTUAL LOAD = 1764 kW
NO NC
E E
NO NO
1 2
1C-240mm² E1
VFD-2 VFD-4
L L
M M
D D
DESCRIPTION
TAG NO
POWER IN kW
CABLE SIZE
CABLE LENGTH
3R(R,Y,B,N)X1CX630 SQMM
C C
3R(R,Y,B,N)X1CX630 SQMM
B B
1C-240mm² E1
VFD-1 VFD-3
A L L
M M
SINGLE LINE DIAGRAM (11KV, 415V)
DESCRIPTION
TAG NO
POWER IN kW
CABLE SIZE
CABLE LENGTH
D104189-TC-E08-001
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
B Y R B Y R B Y R B Y R
250/1A VSR V VSS 250/1A VSR V VSS 250/1A VSR V VSS VSR V VSS
250/1A
CLS-1.0 CLS-1.0 CLS-1.0 CLS-1.0
5VA A ASS 5VA A ASS 5VA A ASS 5VA A ASS
35kA 35kA 35kA
ATS AUTO 35kA
250A MCCB 250A MCCB 250A MCCB CHANGEOVER
250A MCCB
(M)
(KW) (SQ.MM) (M)
-
-
(KW) (SQ.MM)
(KW) (SQ.MM)
-
-
-
LOAD
0.8
0.8
1.5
9.2
9.2
8.2
17
11
30
45
20
0.8
0.8
1.5
5
17
11
-
1
RINATION BUILDING
DB FOR HYPOCHOL
SMALL POWER DB
WATER CHILLER
TRANSFORMER
TRANSFORMER
ELEC. BUILDING
ELEC. BUILDING
TANK BLOWER
TANK BLOWER
TANK BLOWER
TANK BLOWER
DOSING PUMP
DOSING PUMP
LIGHTING DB-1
LIGHTING DB-2
DESCRIPTION
DESCRIPTION
DESCRIPTION
DB FOR L&SP
VALVE ROOM
PUMP HOUSE
PUMP HOUSE
SUPPLY FOR
BRINE PUMP
BRINE PUMP
RECTIFIER
RECTIFIER
ANALYSER
SPARE-1
CABINET
SPARE
SPARE
SPARE
SPARE
HVAC
F F
B Y R B Y R B Y R B Y R
RYB1 RYB2 RYB3 RYB4 RYB5 RYB6 RYB7 RYB8 RYB9 RYB10 RYB11 RYB12 RYB13
RYB1 RYB2 RYB3 RYB4 RYB5 RYB6 RYB7 RYB8 RYB9 RYB10 RYB11 RYB12 RYB13 RYB14 RYB15 RYB16 RYB17 RYB18 RYB19 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A
325A,3P 325A,3P 63A,3P 63A,3P 32A,3P 16A,3P 32A,3P 32A,3P 16A,3P 16A,3P 16A,3P 16A,3P 16A,3P 16A,3P 63A,3P 63A,3P 16A,3P 16A,3P 32A,3P MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB
MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB
-
-
-
D D
-
-
-
163
163
5.5
2.2
2.2
2.2
1.1
1.1
2.2
2.2
1.5
1.5
1.5
1.5
-
30
30
15
15
15
30
1.5
2
3
-
-
-
VALVE 3 WAY MIXING
VALVE CHAMBER
BY PASS CONTROL
EX.TANK WITH PUMP
SECTION HEADER
NEW VALVE ROOM
VALVE CHAMBER
BY PASS CONTROL
PLC & MCC PANEL
EXHAUST FAN DB
MIXING STANDBY
DISCHARGE OF
DISCHARGE OF
DISCHARGE OF
DISCHARGE OF
UPSTREAM FM
CHILLED WATER
PUMP-WORKING
CHILLED WATER
PUMP-WORKING
CHILLED WATER
PUMP MP-001C
PUMP MP-001D
PUMP-STANDBY
PUMP MP-001A
PUMP MP-001B
DESCRIPTION
BY PASS LINE
AHU-WORKING
AHU-STANDBY
DESCRIPTION
NEW VALVE
VALVE 3 WAY
FIRST LV IN
PUMP HALL
PU CHILLER
CHEMICAL
ROOM C
WORKING
WORKING
STANDBY
SPARE
SPARE
SPARE
CHILLER
CHILLER
DOSING
SPARE
SPARE
SPARE
SPARE
F.AHU
TOTAL CONNECTED LOAD TOTAL CONNECTED LOAD TOTAL CONNECTED LOAD 40kW
FF PANEL-FORM2 126kW COMPRESSOR PANEL-FORM2 40kW STATION SERVICE PANEL-FORM2
I/C-1 I/C-2 INCLUDING FUTURE LOAD (TCL) I/C-1 I/C-2 INCLUDING FUTURE LOAD (TCL) I/C-1 I/C-2 INCLUDING FUTURE LOAD (TCL)
LOCATION OF PANEL- LV ROOM LOCATION OF PANEL- LV ROOM LOCATION OF PANEL- LV ROOM
TOTAL DEMAND LOAD (TDL) 12.5kW TOTAL DEMAND LOAD (TDL) 30kW TOTAL DEMAND LOAD (TDL) 30kW
B Y R B Y R B Y R B Y R B Y R B Y R
400/1A VSR V VSS VSR V VSS 125/1A VSR V VSS 125/1A VSR V VSS VSR V VSS 125/1A VSR V VSS
400/1A 125/1A
CLS-1.0 CLS-1.0 CLS-1.0 CLS-1.0 CLS-1.0 CLS-1.0 Abu Dhabi Distribution Company
5VA A ASS 5VA A ASS 5VA A ASS 5VA A ASS A ASS 5VA A ASS
5VA
35kA AUTO 35kA 35kA AUTO AUTO
400A MCCB 125A MCCB CHANGEOVER 35kA 35kA CHANGEOVER 35kA
CHANGEOVER 400A MCCB 125A MCCB 125A MCCB
125A MCCB
400A,35kA,TPN+E CU BUSBAR 400A,35kA,TPN+E CU BUSBAR 125A,35kA,TPN+E CU BUSBAR 125A,35kA,TPN+E CU BUSBAR 125A,35kA,TPN+E CU BUSBAR 125A,35kA,TPN+E CU BUSBAR
RYB4 RYB5 RYB6 RYB1 RYB2 RYB3 RYB4 RYB5 RYB6 RYB7 RYB9 RYB10
RYB1 RYB2 RYB3 RYB3 RYB8 RYB11 R12 Y12 B12
B 32A,3P 32A,3P 16A,3P RYB1 RYB2
16A,3P 16A,3P 16A,3P 16A,3P 16A,3P 16A,3P 16A,3P 16A,3P 16A,3P 16A,3P 16A,3P 16A,DP 16A,DP 16A,DP
B
250A,3P 10A,3P 32A,3P MCB 63A,3P 16A,3P 63A,3P MCCB MCCB
MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCB MCB MCB
MCCB MCB MCCB MCCB MCCB MCCB
DOL DOL DOL DOL DOL DOL
CONTRACT NO: D 104189.1
1C-70mm² E1 1C-70mm² E2 1C-35mm² E1 1C-35mm² E2 1C-35mm² E1 1C-35mm² E2
UPGRADING OF MINA PUMP STATION
LOAD SIZE LENGTH
AT SILA
(M)
(KW) (SQ.MM) (M)
(M)
(KW) (SQ.MM) (M)
-
-
(KW) (SQ.MM)
(KW) (SQ.MM)
-
-
CONSTRUCTION L.L.C
11.5
11.5
5.5
5.5
114
30
30
5
3
3
3
3
-
-
-
-
1
RESERVOIR VALVE
RESERVOIR VALVE
ELECTRICAL DIO
COMPRESSOR -1
COMPRESSOR -1
SERVICE WATER
SERVICE WATER
BOOSTER PUMP
BOOSTER PUMP
DIESEL ENGINE
JOCKY PUMP-1
SUMP PUMP FF
AUXILIARY DIO
JOCKY PUMP-2
DESCRIPTION
DESCRIPTION
DESCRIPTION
DESCRIPTION
DESCRIPTION
FIRE PUMP-1
SUMP PUMP
SUMP PUMP
SUMP PUMP
A
EOT CRANE
EOT CRANE
PUMP HALL
WORKING
WORKING
WORKING
WORKING
STANDBY
STANDBY
SPARE-1
SPAR-2
SPARE
SPARE
SPARE
SPARE
PANEL
PANEL
ROOM
PUMP
D104189-TC-E08-001
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
H H
G G
F F
E E
D D
C C
B B
D104189-TC-E08-001
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
H H
G G
F F
E E
D D
C C
B B
D104189-TC-E08-001
1 2 3 4 5 6 7 8 9 10 11 12