INSTRUCTION MANUAL
Dear scale model enthusiast,
Congratulations – You´ve got your own
scale model of the impressive Liebherr
LTM 1750-9.1 mobile crane now. We wish
you a lot of fun and joy with it.
Please read these general recommenda-
tions and instructions before you build up
your model.
General recommendations for rigging up this model
• Please study the manual before you
start building up the model and take
your time.
• Make it step by step, carefully and
slowly.
• Please try to guide the wire with your
fingers while winding it up to a winch.
It will help to avoid that it gets jammed
aside of a winch.
• Please don’t put too much force on
the small and filigree parts. This might
cause damages.
2
Parts list for the Liebherr LTM 1750-9.1
1. 7. 17. 18.
8. 19.
2. 3. 16.
4.
9. 10. 11.
12. 13.
5. 6. 28. 29. 14. 15.
24.
22. 23. 26. 27. 30. 31.
25.
32.
38.
37.
20.
21.
33. 34. 35. 36.
Parts:
1. Swingable rear outrigger (2x) 19. Rod TY guying system (2x)
2. Outrigger support plate (3x) 20. Rod nut (8x)
3. Locking pin (3x) 21. Rod bolt (8x)
4. Swingable front outrigger (2x) 22. Working light
5. Swingable outrigger locking pin (4x) 23. Operating cab retainers (3x)
6. Swingable outrigger cylinder screws 24. Side platforms (2x)
(4x) 25. Ladders (4x)
7. Powerpack 26. Access platform (right)
8. Receptacle plate (counterweight base 27. Access platform (left)
plate) 28. Powerpack cover (right side)
9. Nut (2x) 29. Powerpack cover (left side)
10. Bolt (2x) 30. Small hook (3 pulleys)
11. Locking pin (2x) 31. Big hook (9 pulleys)
12. Counterweight plate centrings (6x) 32. Base plate (4x)
13. Counterweight retaining plates (4x) 33. Allen key
14. Counterweight plate 10t (16x) 34. Bolt key #1
15. Counterweight plate 5t (2x) 35. Bolt key #2
16. TY guying system (left & right) 36. Winch key
17. Screw long TY guying system (2x) 37. Connecting loop for spreader bar
18. Screw short TY guying system (2x) 38. Spreader bar
3
Assembling the swingable rear outrigger (left & right side)
Hold the swingable rear outriggers upsi- Put the outrigger support plate on top of
de down. the cylinders.
Fix it with the connection pin #3.
4
Attaching the front and rear swingable outriggers
Extend the swingable outrigger by pulling Connect the swingable outriggers to the
it out. chassis and fix it with the connection pin
#5.
Attach the cylinder to the chassis accor-
ding to the picture. Use screw #6 to fix it.
Attach the outrigger support plate to the Push in the lock pin #3.
rear support cylinder (underside of chas-
sis).
5
Attaching the powerpack
Place the powerpack on top of the re- Connect the square connection blocks
ceptacle plate (make sure the connection with the receptacle plate by using the
blocks are placed well). nuts (part #9) and bolts (part #10).
6
Turn the cylinders counterclockwise to
bring the powerpack down till it touches
the ballast base plate.
Attach the powerpack to the superstruc-
ture by hanging it onto the connection
joints.
Fix the powerpack to the superstructure
by pushing in the lock pins #11 at both
sides.
7
According to single or double counter-
weight setup, fold the counterweight
swing arms, place the counterweight
centerings (part #12) and place the coun-
terweight plates on top of the counter-
weight centerings.
Single setup for counterweight plates
Double setup for counterweight plates
Did you know that it is also possi-
ble for our scale model to simulate
the buildup of the ballast and po-
werpack like in real life? You want
to know how this works? Have
a look at our video on the WSI
Collectors Manuals page (Go to
wsi-collectors.com/en/manuals or
scan the QR code on the right).
8
Attaching the TY guying system
Place the TY guying system on top of the
telescopic boom so it sits parallel to the
boom.
Connect the TY guying system to the Connect the cylinders to the boom with
boom with the two long screws #17. the two short screws #18.
9
Connect the linking rods to the connec-
tion joints at the bottom of the boom by
“clicking” them in.
Pull the TY guying system up until it is at
a 45 degree angle to the boom and remo-
ve the connector bar, so the arms of the
TY guying system can swing to the side.
10
Pull the arms of the TY guying system up-
wards, so these are in a rough 90 degrees
position to the main boom.
Spread the arms of the TY guying system
to the left and right.
11
Rod Fork
Carefully pull the rod with the small pins Erect the boom and fix it with the allen
into the fork with the slotted holes on the key on the luffing cylinders.
left and right side.
Turn the winch from the left arm of the TY Connect the bar, which is attached to the
guying system counterclockwise and the pulley of the TY guying system, to the
winch from the right arm of the TY guying left and right side of the boom head. Use
system clockwise to release the rope. bolts (part #21) and nuts (#20) to fix it.
12
Reeving plan for the big hook with 9 pulleys
RED line is front side of the pulleys
GREEN line is rear side of the pulleys
3 pulleys at the boom head
11 pulleys at
the boom head
End point to
fix the rope
Start at winch #1
9 pulleys at the hook
13
Attaching separate parts
Attach the working light (part #22) to the Place the 3 different supporting retainers
front of the superstructure (right side). of the operator´s cab (part #23) at the rear
area of the crane chassis. Each of these
3 retainers have a different shape of the
fixing hole. Please place them carefully
and correct.
Attach the ladders to the side platforms. Stick the platforms with 2 ladders to the
crane chassis (left & right side). They sit
between the front and rear swingable
outriggers.
14
Place the access platforms on top of the Use part #26 for the right side and part
chassis and the outrigger cylinders like #27 for the left side of the crane.
shown in the right picture.
Place the covers (part #28 and #29) on
the top of the powerpack cylinders.
15
Folding in the boom
Please note, that the boom must be fully
extended before you can retract it again.
This is a technical reason, as you need
to release the lock parts to retract each
single boom section. Therefore the boom
must be extended completely. At the first
position the lock parts are covered by the
boom sections and you won´t be able to
push them inside to release the section.
2. 2.
1.
1.
Push the upper lock part inside at the Simultaneously push the fourth boom
third boom end. section downwards into the third section
until it is completely retracted.
16
Repeat these steps at all the telescopic
boom sections till the boom is fully re-
tracted.
17