Maisonette Drawing Floor Plan
Maisonette Drawing Floor Plan
200
underlay and nailed to timber
200 200 200 200 16,333 truss structure to SE's detail.
1,700 9,800 4,729 3,071 200 200 200 Drawings are not to scaled. only figured dimensions to be used
1,800
1,800
GARDEN A B C D E F
IC IC 3,750 5,850 3,450 1,279
All dimenssions are in mm unless otherwise specified.
1,984
200 200 200
2,308
3,750 5,850
200
200
The contractor must check and verify all dimensions before
10 10 commencement of any work.
200
200
1,000
900 850
Kitchen
CONSTRUCTION
2,721
1,745
1,800
1,600
1,600
1,800
Yard RC gutter to detail
Kitchen
Kitchenette BIODIGESTER Yard All slab at ground level to be poured over 1000 gauge polythene
600 50
+6,200 +6,200
148 448
IC
9 9
200
200
2,500
Kitchenette 2 Story 2 Story
700
sheet on 50mm thick murram blinding on hardcore.
6,413
580mm high steel All soil under slab around and under foundation to be treated
1,520
2,952
BDR 02
2,900
2,700
2,900
Dining GARDEN railing matte YARD KITCHENETTE DINING LOUNGE
with approved anti-termite
3,300
2,500
finished to RC column molded to detail
BDR 02 Dining
300 580
approval.
SOAK +3,100 +3,100
STAIRCASE LOBBY
CIVIL
2,200
PIT
1 Story 1 Story
700
8 8
200
All soil on cut embarkment to be stablized.The slope not to
2,400
200
Floor finish to schedule on sand/cem
exceed the natural angle of repose
Bath
1,800
WC
2,200
2,200
BEDROOM 03 LOUNGE screed on 100mm floor slab on 500 gauge
2,450
1,400
RC column
Bath
600 100
DPM on 50mm blinding on well
STRUCTURAL
WC
IC molded to detail compacted hardcore all to S.E.'s details.
±0 ±0
600
2,500
10
Lounge 7 7
200
Bath
All black cotton soil to be removed from all buildings and paved
E-04
600x200mm strip
10
Lounge
5,500
1,600
1,400
1,600
Bath
footing on 50mm
900
surfaces
WC
11
E-02
12
9
concrete blinding to
8
structural engineer's
6 6 1,204 3,950 3,950 2,100 4,177 For all R.C work,refer to stuctural Engineer's details.
13
200
11
18,600
850
7
5,753
9
14
6
12
8
detail
19G x 290
20R x 155
15 13
19,000
19,000
Depth of foundation to be detemined on site to S.E's aproval
5 7
SECTION 01 1:125
2,650
1,900
1,900
16 14
4 6
19G x 290
20R x 155
17 15
All walls less than 150mm thick to be reinforced with hoop iron at every
3 5
S-01 S-01
18 16
BDR 03
2 4
3,300
2,500
alternate course.
19 17
1 3
5 5
200
A B C D E F
20
UP
DOWN 18
BDR 03
2
19
All adjacent R.C. work and masonry walls to be tied with hoop iron at
1
1,600
1,600
20
UP
DOWN
2,500
3,000
850
4 4
200
approved 25mm EPS
All plumbing and drainage to comply with relevant local authority
WC
Bath
1,600
1,400
1,600
WC
900 700 900
Bath
Study Room A B C D E F SVP denotes soil vent pipe to be provided at the head of the drainage
1,520
2,308
3 3 system
200
900 700
200
Entry IC
Bath
WC
1,600
1,400
1,400
1,600
Entry
Bath
WC
2,811
RC gutter to detail
concrete surround.
6,434
Lobby
2,024
2 2 The storm water drain pipes to comply with BS 556 specification.
200
200
PARKING
MASTER +6,200 +6,200
148 448
148 448
2 Story 2 Story All underground soil and waste drain pipes shall be UPVC to comply
BDR
700
700
MASTER with BS 5255.
BDR 01
BDR 2500 x 1800mm steel
4,050
4,050
1,800
1,800
3,600
3,400
3,400
3,600
2,952
2,952
casement window to RC column molded
BDR 01 window schedule. to detail All inspection chambers covers and framing shall be cast iron.
+3,100 +3,100 Minimum slope in the drains pipes to be 1 in 100
600
600
150
1 Story 1 Story
200
200
700
700
200 200 200 No chases will be allowed for pipes. Sleeves will be allowed with
2,400
1 1
200
200
1,700 14,729 3,071 RC column molded to written approval of structural Eng's. No cutting of concrete without
1,800
1,800
2,950
detail 1700 x 2400mm
600 100
400 steel door to door
express approval of the Architect or structural Eng.
2,800
2,800
schedule
GARDEN ±0 ±0
600
600
825 2,500 1,350 2,500 925 1,700 All testing of pipes must be completed before plastering.
200 200 200 200 0 Ground Floor 0 Ground Floor
3,750 3,750 1,900 3,450 1,324 ELEVATION 01 1:150 All mechanical works must be co-ordinated with electrical and any
1,504 3,950 3,950 2,100 4,177 conflict must be clarified before work begins.
200
250
A B C D E F
approved 25mm EPS
underlay and nailed to timber
FINISHES
E-01 truss structure to SE's detail.
All doors and windows to have permanent ventilations (PV ) except
A C C E S S R O A D 10 9 8 7 6 5 4 3 2 1
1,293
w.c's and showers doors.
All floor finishes to be cement/sand screed unless otherwise
3,284
+6,200 +6,200 NOTES
2 Story 2 Story
700
700
700
A B C E-03 D E F 900 x 1500mm steel 900 x 1500mm steel
casement window to casement window to
1,500
1,500
15,100
2,100
window schedule window schedule
1,500 3,950 3,950 2,100 4,177
700 900
700 900
+3,100 +3,100
150 300
200 200 200
1,400 3,750 5,850 395 3,500 1 Story 1 Story
825 2,500 1,510 900 3,170 900 A B C D E F
REVISI0NS
E-03
1,500
1,800
2,950
900 x 2400mm steel
door to door schedule RC column molded to
10 10
200
200
240
detail
1,000
900
±0 ±0
600
900
1,800
1,800
ELEVATION 02 1:150
BDR
3,400
9 9 10 10
2,500
4,300
BDR 01
3,810
2,900
PROPOSED RESIDENTIAL
40 degree fall
underlay and nailed to timber
WC
1,400
7,150
Bath
750 900
8 8 F E D C B A
Bath
DEVELOPMENT ON PLT NO:
2,325
1,400
200
900
WC
8 8
LR 12715/13196 MACHAKOS
2,200
2,200
40 degree fall
565
200
1,935
2,500
7 7
Kitchen
4,000
Lounge
2,100
E-04
+6,200 +6,200
148 448
148 448
7 7
Yard
Dining
Client:
1,600
1,600
E-04
3,100
2 Story 2 Story
700
700
700
Kitchenette
E-02
40 degree fall
E-02
200
1,500
1,500
6 6 2500 x 1800mm steel
1,800
2,952
2,952
6 6
900
ID NO: 11636857
1,875
7,200
5,100
900
900
+3,100 +3,100
1,900
1,900
200
400
200
600
40 degree fall 40 degree fall
S-01 S-01
150
S-01 S-01 1 Story 1 Story
900
5 5
2,400
5 5 40 degree fall Approved stone
Client
3,100
3,100
3,100
250
2,950
Dining
Kitchenette detail
approval:...................................................................
600 100
1,600
1,600
Yard
2,100
4,000
4 4 ±0 ±0
Lounge 40 degree fall
0 Ground Floor 0 Ground Floor
2,500
4 4 40 degree fall
3 3
ELEVATION 03 1:150
1,600
1,600
200
900 660
1,400
WC
3 3
900 700
200
1,400
1,600
200
Bath
WC
WC
6,100
1 2 3 4 5 6 7 8 9 10
4,950
MASTER
4,300
4,050
BDR
1 1
3,600
3,400
3,600
4,332
BDR 01 RC gutter to detail
148 448
1 1
200
200
700
700
700
825 2,500 1,350 2,500 3,025 A B C D E F
PLANS, SECTIONS &
900 x 1500mm steel 2500 x 1800mm steel
1,500
E-01 casement window to
1,800
1,800
casement window to
2,952
200 200 200 window schedule window schedule
1,400 3,750 5,850 3,500
ELEVATIONS
700 900
+3,100 +3,100
600
600
ROOF PLAN 1:125
1,204 3,950 3,950 2,100 4,177 1 Story 1 Story
700
700
RC column molded to
15,100 detail 3,600 1,600 1,600 1,600 1,900 1,600 2,200 2,900 1,800
SCALES As Indicated
1,500
1,500
3,100
Approved stone
1,800
A B C D E F cladding
:
E-01
900
900
±0 ±0 FILE NO.
600
0 Ground Floor 0 Ground Floor