Orientation
17.1
5°
P
WIN REVA
D D ILIN
IRE G
CT
ION
STACK
PLANT ORIENTATION:
+Z +Y
E
LIN K
RE AC
NT
CE TO ST
TR U
ER
NK
BU BU
N
KE
R
E NO
+Z
+Y
RTH
+X
+X
Key Plan
Provision for expansion
outer layer rock wool 100-200mm Corrugated Sheet screwed to GI channel
with aluminium foil 780 or plane sheet depending on surface
43x17x1mm GI Channel (TYP)
Welded according TII insulation
Profile filler
fixed points max.1500mm
1st layer rock wool
Distance between
with wiremesh Aluminium foil
Insulation according TII insulation
Additional pin double layer
welded according TII insulation
Trapezoidal sheet
Aluminium foil Heat separation at 1
trapezoidal sheet
Membran wall Self tapping screw acc. TII insulation
Distance TBD by supplier.
fixed point max. 1500 mm
Additional pin
Distance sliding point to
welded according TII insulation Min. Depending on the process temperature
17mm
Convection barrier. Distance depending on process
temperature. TBD by supplier (approx. 4m)
movement for expansion
Overlapping with sliding
Sliding beam
Flat bar 40x4
50 to 100mm
overlapping TBD by supplier.
Depending on the process temperature
Insulation overlapping
min. insulation thickness
sliding point 300-500 mm
Distance sliding point to
Distance between
Distance TBD by supplier.
Sliding points
300-500mm
GI Channel 45x17x1 Depending on the process temperature
Kickplate
Platform
DETAIL-A
50mm in hot
condition
1
Plain sheet with One side self tapping 43x17x1mm GI Channel
screw for expansion joint 40x4mm flat bar cleat
screwed to cleat
3120 mm b/w expansion joints 1
NOTE:
REFERENCE DRAWING NO-98000021
43x17x1mm GI Channel
40x4mm flat bar cleat
3mm
1.0 SECOND ISSUE AS 27.01.22 AF 27.01.22 AF 27.01.22
0.0 FIRST ISSUE AS 20.01.22 AF 20.01.22 AF 20.01.22
Rev. Modification Drawn Checked Approved
Customer
DUBAI
WASTE
MANAGEMENT
CENTER
1 Sponsors
Contractor Consultant
Sub-Consultant / Supplier
Building Section
The reproduction, distribution and utilization of this document as
well as the communication of its contents to others without express
authorization is prohibited. Offenders will be held liable for the
payment of damages. All rights reserved in the event of the grant SITE OVERALL
of a patent, utility model or design.
Hitachi Zosen Inova AG / SIX Construct Drawing Title
Project INI415 Standard Insulation Typicals
10AAD1 RELEASED Drawing Subtitle
1:200 A0 Membrane wall
DocType Supplier Drawing-No. Sheet Revision
DAA INCO 41514F0001 1/1 1.0